Loading...
HomeMy WebLinkAbout07010209 Sewer SF Residential 393/172007 Regional Waste District . I I ~~ SANITARY SEWER PERMIT INDIVIDUAL LOT I EXISTING BUILDINGS. Permit Type Final Lift Station 19 Village of West Clay Station Treatment Plant MIX -< Subdivision Village of West Clay 9007 Builder Pulte __, 3175752350 ~- -....._~"'-...~"--.,.....---_."-. -,-" -.'......-, Lot Number 109 Address Number 13474 Street Humbolt Ln City Carmel Co~,!~ ~mil!.o~___ ,- I'- ~ Parcel Acreage Employees Square Footage EDU Fee Application Fee Fees Due Invoice Number $1,650.00 $100.00 $1,750.00 PLEASE NOTE: Installation of building sewer shall be per the specifications of the Clay Township Regional Waste District (see reverse) and any conditions noted below. All installations shall be inspected by District personnel during "open trench" phase and before backfilling with stone to six inches above the pipe. NO footing or foundation drains, or other sources of ground or stormwater, shall be permitted to enter the District's sanitary sewer system. The District will assume no liability for drains which are below the grade level of the nearest downstream manhole nor for laterals which are extended beneath driveways or sidewalks. The permit holder (property owner, developer or builder) will be responsible for damages to the District's sewer system. This includes damages to manholes, castings, manhole lids and the like; caused by construction activity on the building site which is the subject of this permit. I Inspections by the District are MANDATORY and shall be arranged by contacting the District's office at 844-9200 24 hours in advance. All new construction will be placed on billing six months after connection has been made o'r when water is connected, whichever comes first. Up VWC-418 VWC-41~ Down L L. Lid Elevation 904.37 ft 901,94 ft I First Floor Elevation 907.40 ft 907.40 ft , Basement Elevation 897.60 ft 897.60 ft Slab Foundation No Crawl Space No Grease Trap No Grit Interceptor No The building has a: Basement Yes Grinder Station No Difference between the lowest gravity connection and the nearest manhole cover must be greater than 1 foot. 1---3.03r-s:~ If applicable, the basement plumbing status is: Plumbed without Grinder Pump Installed JS - ~ ~ Manholes shall remain accessible at all times. Buried manholes will be corrected by the Developer/Owner, The District reserves the right to inspect all sump pump connections to ensure no illegal connections have been made, I have received a copy of Ordinance No,. 9-13-99 and agree to follow all District standards. Conditional Permit Terms: Plans Submitted No Two sets of plans showing at least one sanitary manhole and top of castin9 elevation No Connection No NO CONNECTION to the sewer until furth~r notification. Certificate of Insurance No Certificate of Insurance must be on file with CTRWD listed as certificate holder. Inspection Notice No 48 hours notice before work starts on manhole core drilling or cuts of active lines Fees Paid No All District fees will be paid in full. Plan Review No Approval pending Districts review of plans. Other Permits No Copies of approved permits from appropriate county or city agencies No Occupancy Fats, Oils & Greas~ No No occupancy until further notification F 0". dG F "" "I b'd b D" m:.,,,,~'HAMlc>O No ats, I s an rease aClltles WI a ley Istnct st ~ras ' ~/.n (~ ~~ " '" ;:: ~ i:! 'AID .<. . .';. eTHvl! t; ? ~. ~.... -t.? . d t t "1""'t" f " !\:"".$-I d th' 't tlons an agree 0 accep responSl II ys or a wo(~ "f"':ne un er IS perml . ~ . Ov. Phone Number 6CAN N~-SH&Pt-te.D Approved Permit Date 1/30/2007 r, irector of Administration & Cu orner Service Permit is valid for ONE-YEAR from the date issued. Permit valid only with CTRWD seal in red ink,