HomeMy WebLinkAbout07010209 Sewer
SF Residential
393/172007
Regional Waste District
. I
I
~~
SANITARY SEWER PERMIT
INDIVIDUAL LOT I EXISTING BUILDINGS.
Permit Type Final
Lift Station 19 Village of West Clay Station
Treatment Plant MIX
-<
Subdivision Village of West Clay 9007
Builder Pulte __, 3175752350
~- -....._~"'-...~"--.,.....---_."-. -,-" -.'......-,
Lot Number 109
Address Number 13474
Street Humbolt Ln
City Carmel
Co~,!~ ~mil!.o~___
,- I'- ~
Parcel Acreage
Employees
Square Footage
EDU Fee
Application Fee
Fees Due
Invoice Number
$1,650.00
$100.00
$1,750.00
PLEASE NOTE: Installation of building sewer shall be per the specifications of the Clay Township Regional Waste
District (see reverse) and any conditions noted below. All installations shall be inspected by District personnel during
"open trench" phase and before backfilling with stone to six inches above the pipe. NO footing or foundation drains, or
other sources of ground or stormwater, shall be permitted to enter the District's sanitary sewer system. The District will
assume no liability for drains which are below the grade level of the nearest downstream manhole nor for laterals
which are extended beneath driveways or sidewalks. The permit holder (property owner, developer or builder) will be
responsible for damages to the District's sewer system. This includes damages to manholes, castings, manhole lids
and the like; caused by construction activity on the building site which is the subject of this permit. I
Inspections by the District are MANDATORY and shall be arranged by contacting the District's office at 844-9200
24 hours in advance. All new construction will be placed on billing six months after connection has been made o'r when
water is connected, whichever comes first. Up VWC-418 VWC-41~ Down
L L.
Lid Elevation 904.37 ft 901,94 ft
I
First Floor Elevation 907.40 ft 907.40 ft
,
Basement Elevation 897.60 ft 897.60 ft
Slab Foundation No
Crawl Space No
Grease Trap No
Grit Interceptor No
The building has a: Basement Yes
Grinder Station No
Difference between the lowest gravity connection and the nearest manhole cover must be greater than 1 foot.
1---3.03r-s:~
If applicable, the basement plumbing status is: Plumbed without Grinder Pump Installed
JS
-
~
~ Manholes shall remain accessible at all times. Buried manholes will be corrected by the Developer/Owner,
The District reserves the right to inspect all sump pump connections to ensure no illegal connections have been made,
I have received a copy of Ordinance No,. 9-13-99 and agree to follow all District standards.
Conditional Permit Terms:
Plans Submitted No Two sets of plans showing at least one sanitary manhole and top of castin9 elevation
No Connection No NO CONNECTION to the sewer until furth~r notification.
Certificate of Insurance No Certificate of Insurance must be on file with CTRWD listed as certificate holder.
Inspection Notice No 48 hours notice before work starts on manhole core drilling or cuts of active lines
Fees Paid No All District fees will be paid in full.
Plan Review No Approval pending Districts review of plans.
Other Permits No Copies of approved permits from appropriate county or city agencies
No Occupancy
Fats, Oils & Greas~
No No occupancy until further notification
F 0". dG F "" "I b'd b D" m:.,,,,~'HAMlc>O
No ats, I s an rease aClltles WI a ley Istnct st ~ras ' ~/.n
(~ ~~
" '"
;:: ~
i:! 'AID .<.
. .';. eTHvl! t;
? ~.
~.... -t.?
. d t t "1""'t" f " !\:"".$-I d th' 't
tlons an agree 0 accep responSl II ys or a wo(~ "f"':ne un er IS perml .
~ .
Ov. Phone Number
6CAN N~-SH&Pt-te.D
Approved
Permit Date 1/30/2007
r, irector of Administration & Cu orner Service
Permit is valid for ONE-YEAR from the date issued. Permit valid only with CTRWD seal in red ink,