Loading...
HomeMy WebLinkAboutA200 - UNIT A - BUILDING ELEVATIONSBUILDING ELEVATION NOTES VERIFICATION NOTE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CLEARANCES AND ALL EXISTING FIELD CONDITIONS BEFORE STARTING CONSTRUCTION. COMMENCEMENT OF WORK CONSTITUTES ACCEPTANCE OF CONDITIONS. SHOULD DIFFERENT CONDITIONS BE ENCOUNTERED, CONTACT THE ARCHITECT BEFORE PROCEEDING WITH WORK. (ALL NOTES MAY NOT BE INDICATED ON THIS SHEET) ELEVATION GENERAL NOTES X 1. REFER TO THE ELECTRICAL AND TECHNOLOGY DRAWINGS FOR CAMERA, LOCATIONS, SECURITY DEVICES, RECEPTACLES, LIGHT FIXTURES, ETC. COORDINATE LOCATIONS WITH VENEER COURSING TO PROVIDE CONSISTENT MOUNTING HEIGHTS. 2. REFER TO PLUMBING DRAWINGS FOR EXTERIOR WALL HYDRANTS, SECONDARY ROOF DRAIN OUTLETS, ETC. COORDINATE PENETRATIONS THROUGH EXTERIOR ENVELOPE WITH OTHER TRADES. PROVIDE TRANSITION MEMBRANE TO MAINTAIN AIR BARRIER SYSTEM. 3. REFER TO MECHANICAL DRAWINGS FOR EXTERIOR LOUVER LOCATIONS LOCATED IN EXTERIOR WALL AND EXTERIOR SOFFITS. COORDINATE PENETRATIONS THROUGH EXTERIOR ENVELOPE WITH OTHER TRADES. PROVIDE TRANSITION MEMBRANE TO MAINTAIN AIR BARRIER SYSTEM. FIRST FLOOR EL 100'-0" T/STEEL EL 126'-0" 1 A4.01 ___________1 A5.01 ___________4 A4.01 ___________ 11 1 A5.02 ___________ 1 3 1 5 3 1 6 8 5 2 6 EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ 7 5 7 3 5 6 8 5 911 2 10 4 8 6 12 7 17 1 A5.03 ___________ 2 A5.02 ___________ 13 BEYOND 1 17 TYP. 16 EJ EJEJ EJ EJ EJEJ EJ 9 A2.02 ___________ 21 21 FIRST FLOOR EL 100'-0" FIRST FLOOR EL 100'-0" T/STEEL EL 126'-0" T/STEEL EL 126'-0" 2 A4.01 ___________3 A4.01 ___________2 A5.01 ___________ 3 A5.02 ___________ 1 A5.01 ___________ SIM. 3 1 5 6 8 5 11 2 10 4 8 6 1 1 3 13 BEYOND 8 6 EJ EJ EJ EJ EJ EJ 18 EJ 17 21 FIRST FLOOR EL 100'-0" FIRST FLOOR EL 100'-0" T/STEEL EL 126'-0" T/STEEL EL 126'-0" 2 A4.01 ___________3 A4.01 ___________1 A5.04 ___________ 1 6 8 5 2 4 7 7 2 6 8 1 13 BEYOND 14 EJ EJ EJ EJ EJ EJ EJ EJ EJ 6 EJ 15 17 18 19 20 TYP. 3 A5.01 ___________ 17 EJ EJ T/STEEL EL 126'-0" T/STEEL EL 126'-0" 4 A4.01 ___________4 A5.01 ___________ 8 6 13 8 6 3'-0"9'-0 3/8"8'-0" TYP.8'-1 9/16"8'-0" TYP. 1414 148 8 4'-7" TYP. ALIGN W/ ADJ. SIDES4'-5"2'-4"1 COPYRIGHT 2023 BY FANNING/HOWEY ASSOCIATES, INC. KEY PLAN UNIT A WWW.FHAI.COM ARCHITECT NEW ADDITION 11/3/2023 10:10:19 AMJ:\221165.01\Production\BIM\2021_ARCH_221165.01_detached_Color Elevations.rvtPROJECT NUMBER: 221165.01 CARMEL HIGH SCHOOL POLYTECHNIC ADDITION AND RENOVATION CARMEL CLAY SCHOOLS 520 EAST MAIN STREET CARMEL, IN 46032 UNIT A -BUILDING ELEVATIONS A3.01 PROJECT ISSUE DATE: 08/31/2023 100% CONSTRUCTION DOCUMENTS DRAWN BY: DSR 317-848-0966 350 E. NEW YORK ST. SUITE 300, INDIANAPOLIS, IN 46204 SCALE: 1/8" = 1'-0" BUILDING ELEVATION - NORTH1 SCALE: 1/8" = 1'-0" BUILDING ELEVATION - EAST3 SCALE: 1/8" = 1'-0" BUILDING ELEVATION - WEST2 SCALE: 1/8" = 1'-0" BUILDING ELEVATION - SOUTH4 NO.DESCRIPTION 1 ANCHORED BRICK VENEER. 2 BRICK VENEER SOLDIER COURSE AT DOOR HEADS. SEE DOOR DETAILS FOR ADDITIONAL INFORMATION. 3 ALUMINUM FRAMED STOREFRONT SYSTEM. 4 4" TALL CAST STONE BAND / CAP WITH CUT DRIP EDGE. PROVIDE BACKER ROD AND CONTINUOUS SEALANT AT ALL JOINTS. 5 8" TALL CAST STONE BAND / CAP WITH CUT DRIP EDGE. PROVIDE BACKER ROD AND CONTINUOUS SEALANT AT ALL JOINTS. 6 METAL COMPOSITE MATERIAL (MCM) WALL PANEL SYSTEM. 7 GLAZED SECTIONAL DOOR SYSTEM. SEE DOOR SCHEDULE FOR ADDITIONAL INFORMATION. 8 PRE-FINISHED METAL COPING SYSTEM. 9 VERTICAL SLAT FENCE ENCLOSURE WITH SWING GATE. SEE CIVIL FOR ADDITIONAL INFORMATION. 10 VERTICAL SLAT ROLLING GATE. SEE CIVIL FOR ADDITIONAL INFORMATION. 11 PRE-ENGINEERED METAL WALKWAY COVERING SYSTEM WITH INTEGRAL DOWNSPOUTS. 12 EXISTING BRICK VENEER / CMU WALL TO REMAIN. MODIFY ONLY AS REQUIRED FOR INSTALLATION OF NEW EXTERIOR WALL AND NEW ALUMINUM STOREFRONT WINDOW. 13 24" WIDE FIXED ALUMINUM ACCESS LADDER WITH PLATFORM OVER PARAPET, SIMILAR TO O'KEEFES MODEL 503. 14 PRE-FINISHED METAL LOUVER. SEE MECHANICAL FOR ADDITIONAL INFORMATION. 15 EXISTING CONCRETE RETAINING WALL AND METAL GUARDRAIL TO REMAIN. PROTECT FROM DAMAGE DURING CONSTRUCTION. 16 MECHANICAL EQUIPMENT. SEE MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION. 17 LIGHT FIXTURE. SEE ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION. 18 PREFORMED JOINT SEAL. SEE PLAN DETAILS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION. 19 PRE-FINISHED METAL COPING SYSTEM TO MATCH ADJACENT PROFILE AND COLOR ON EXISTING BUILDING. 20 TURN METAL COPING VERTICALLY AT END WALL TO CAP WALL AND SHED OVER ADJACENT, LOWER COPING. 21 STANDING SEAM METAL ROOF ASSEMBLY. SEE ROOF PLANS FOR ADDITIONAL INFORMATION.PLANNORTHREV. NO.DESCRIPTION DATE 1 ADDENDUM #1 09/21/2023 1 2/15/2024