Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Utility Plan
CA T V XXXXXXXXXX3.1'8.2'TC: 884.41Inv. 12" N 882.01Inv. 15" S 882.01TC: 884.98Inv. 10" E 883.23TC: 884.92Inv. Unable to OpenTC: 884.90Inv. Unable to OpenTC: 884.41Inv. 15" W 882.66TC: 885.76Inv. Unable to OpenTC: 884.12COCOCOMMTTTTTEx. End SectionInv. 881.42Ex. End SectionInv. 881.28Ex. End SectionInv. 880.88Ex. End SectionInv. 881.12Ex. End SectionInv. 880.90Ex. End SectionInv. 882.38Ex. End SectionInv. 881.65Ex. End SectionInv. 882.43Ex. End SectionInv. 882.408"W 8"W 8"W PLPLPLPLPLPL PL PL PLPLPL 2"W2"W2"W10"STM12"STM15"STM15"STMSTME E E E SANSANSAN50' Ex. R/WWetlandoo12"STM12"STM12" STM12" STM12"STMDSDSDSCOCO8"RD8"RD8"RD8"RD8"RD 1246EX1EX2EX3EX4EX5EX6G6"F6"F 6"F6"FPR. PIPE CULVERTINV. 882.0012"STMPIVGG547'PreservationEasementConstruction LimitsConstruction LimitsConstruction Limits312PROPOSEDBUILDING ADDITIONEXISTING BUILDINGEXPOSEEXPOSEPR. HYDRANT1234567891011121314EXPOSEFDCCONNECTIONWater Service Coordinates1234567891011121314DESCRIPTION8"x6" TAP SADDLE6" TAPPING VALVE45° VERT. BEND6" TAPPING VALVE6" TAPPING VALVE45° VERT. BEND6"x6" TEE6" VALVE BOXFIRE HYDRANTPOST INDICATOR VALVE45° HORIZ. BEND45° HORIZ. BEND45° HORIZ. BEND45° HORIZ. BENDNORTHING1704660.931704660.871704659.081704659.051704657.941704657.901704656.461704678.371704682.281704656.131704654.381704649.311704550.701704545.85EASTING168147.47168143.47168026.48168024.48167951.49167948.49167854.28167853.94167853.88167832.35167717.72167712.80167714.31167719.35NORTHING AS-BUILTEASTING AS-BUILTâ„„ ELEVATIONX1.UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINERELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BETHE DEVELOPER TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOTOF PROPOSED RIGHT-OF-WAY LINE.2.DIMENSIONS AND COORDINATES ARE FROM FACE OF CURB OR EXTERIOR FACE OF BUILDING, UNLESS OTHERWISE NOTED.3.EXTEND UTILITIES TO WITHIN 5' OF FACE OF BUILDING, UNLESS OTHERWISE NOTED. COORDINATE EXACT LOCATION WITHPLUMBING CONTRACTOR. FINAL CONNECTION BY PLUMBING CONTRACTOR.4.REFER TO SHEETS C2.1-C2.2 FOR STORM SEWER INFORMATION.5.MAINTAIN MINIMUM 4'-0" COVER OVER ALL WATERLINES.6.MAINTAIN MINIMUM 18" VERTICAL CLEARANCE FROM THE OUTSIDE OF ANY WATERLINE PIPE TO THE OUTSIDE OF ANYSTORM OR SANITARY SEWER.7.PROVIDE THRUST BLOCKS OR RESTRAINED MECHANICAL JOINT PIPE AT EACH VALVE, TEE, FITTING, OR CHANGE INDIRECTION OF WATERLINE.8.REFER TO CITY OF CARMEL STANDARD DRAWINGS FOR TYPICAL FIRE HYDRANT INSTALLATION DETAILS.9.ROOF DRAINS, FOUNDATION DRAINS, AND OTHER CLEAN WATER CONNECTIONS TO THE SANITARY SEWER ARE PROHIBITED.10.CONNECTION TO EXISTING WATER MAINS SHALL NOT BE PERFORMED UNTIL THE NEW LINES HAVE BEEN SANITIZED AND ALLTESTS HAVE BEEN COMPLETED AS SPECIFIED BY THE CITY OF CARMEL AND THESE CONTRACT DOCUMENTS.11.ALL COORDINATES AND ELEVATIONS BASED ON SURVEY PERFORMED BY DLDS DATED 02/21/2022. REFER TO TOPOGRAPHICSURVEY SHEET.12.WHERE PLANS PROVIDE FOR A PROPOSED UTILITY TO BE CONNECTED TO, OR CROSS OVER, OR UNDER AN EXISTINGUNDERGROUND UTILITY, THE CONTRACTOR SHALL LOCATE THE EXISTING PIPES OR UTILITIES, BOTH AS TO LINE AND GRADEBEFORE STARTING TO LAY THE PROPOSED UTILITY. THESE LOCATIONS ARE NOTED THUS: EXPOSE. IF IT IS DETERMINEDTHAT THE ELEVATION OF THE EXPOSED UTILITY DIFFERS FROM THE PLAN ELEVATION, RESULTS IN A CHANGE IN THE PLANSEWER SLOPE, OR WILL INTERSECT AN EXISTING UTILITY AS SHOWN ON THE PLAN, THE ENGINEER SHALL BE NOTIFIEDBEFORE STARTING CONSTRUCTION OF ANY PORTION OF THE PROPOSED UTILITY WHICH WILL BE AFFECTED BY THEVARIANCE IN THE EXISTING ELEVATIONS.13.SUPPORT AND PROTECT ALL UTILITIES EXPOSED DURING EXCAVATION AND TRENCHING.14.ANY REQUIRED WATERLINE SHUT-DOWNS SHALL BE COORDINATED WITH THE OWNER AND/OR THE CITY.1.GAS LINE RELOCATION COORDINATED BY CENTER POINT ENERGY.2.PROVIDE CONNECTION INTO BUILDING PER DETAIL A/C3.2. COORDINATE FINAL LOCATION AND ELEVATION WITH PLUMBINGCONTRACTOR. FINAL CONNECTION BY PLUMBING CONTRACTOR.0GRAPHIC SCALESCALE IN FEET306090GENERAL NOTES:CODED NOTES:REVISION:PROJECT NUMBER:20297Sheet Name:© 2021 M+A Architects04 MARCH 2022DATE:SHEET NUMBER:RENOVATION AND ADDITION MEDVET CARMEL - ANIMAL HOSPITAL 9650 MAYFLOWER PARK DRIVE | CARMEL, IN 46032STATUS:PROJECT NUMBER:CHECKED BY:DESIGNED BY:1650 WATERMARK DRIVECOLUMBUS, OHIO 43215SUITE 200DRAWN BY:2021-0012UTILITY PLANC3.1AWMAWMJDBUTILITY LEGENDEXISTINGPROPOSEDPIVUNDERGROUND ELECTRIC LINEFIRE PROTECTION SERVICE LINEGAS LINESTORM SEWERFIRE HYDRANTGATE VALVE & CURB BOXPOST INDICATING VALVEFIRE DEPARTMENT CONNECTIONSTRUCTURE NUMBERREMOVE AND REPLACEPAVEMENT IN KIND PERSTD. DWG. 10-24EFGSTMWREFER TO TOPOGRAPHIC SURVEY12222022-04-18BULLETIN 0112022-03-17ADDENDUM 0162023-05-10BULLETIN 056