HomeMy WebLinkAboutCorrespondencePlan Review - Review Comments Report Project Name: PZ-2023-00282 ADLS Amend - Capital Group Solar Canopies Workflow Started: 12/6/2023 11:00:11 AM Report Generated: 02/26/2024 09:12 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 1 1 Vectren Energy Chad Miller 12/19/23 11:49 AM Comment Please locate the existing gas service to 12811 N Meridian Street to avoid any conflicts with the proposed light poles. Info Only 2 1 Planning & Zoning Christina Jesse 12/19/23 11:57 AM Changemark ADA parking Please provide why the ADA parking is being removed from this area Capital Group Carmel Solar Site Plan v3 -1.pdf Responsed by: Aaron Wilson - 1/9/24 3:42 PM No change to ADA parking will be made; incorrect site plan was used. Resolved 3 1 Planning & Zoning Christina Jesse 12/19/23 11:57 AM Changemark New parking - missing parking island Please remove this proposed parking and put the existing parking island back Capital Group Carmel Solar Site Plan v3 -1.pdf Responsed by: Aaron Wilson - 1/9/24 3:42 PM No changes to parking; incorrect site plan was used. Resolved 4 1 Planning & Zoning Christina Jesse 12/19/23 11:57 AM Changemark New parking - missing bump out landscaping area Please remove this proposed parking and put the existing bump out landscaping area back with ADA parking spcaes Capital Group Carmel Solar Site Plan v3 -1.pdf Responsed by: Aaron Wilson - 1/9/24 3:43 PM No changes to parking; incorrect site plan was used. Plan has been revised to reflect the existing landscaping island. Resolved 5 1 Planning & Zoning Christina Jesse 12/19/23 11:57 AM Changemark New parking - missing bump out landscaping area and parking island extension Please remove this proposed parking and put the existing bump out landscaping area/parking island extension back. Capital Group Carmel Solar Site Plan v3 -1.pdf Responsed by: Aaron Wilson - 1/9/24 3:43 PM No changes are intended; incorrect site plan was used. Resolved 8 1 Planning & Zoning Christina Jesse 12/19/23 11:57 AM Changemark Carmel Drive setback Please label the setback distance from the nearest point of the canopy to the nearest point of the southern property line along Carmel Drive. Capital Group Carmel Solar Site Plan v3 -1.pdf Responsed by: Aaron Wilson - 1/9/24 3:44 PM Setbacks have been labeled on revised site plan - please enlarge plan when viewing so setbacks become legible. Resolved 9 1 Planning & Zoning Christina Jesse 12/19/23 11:57 AM Changemark US-31 setback Please label the setback distance from the nearest point of the canopy to the nearest point of the western property line along US-31. Capital Group Carmel Solar Site Plan v3 -1.pdf Responsed by: Aaron Wilson - 1/9/24 3:44 PM Approximately 300 feet. Resolved REVIEW COMMENTS Plan Review - Review Comments Report Project Name: PZ-2023-00282 ADLS Amend - Capital Group Solar Canopies Workflow Started: 12/6/2023 11:00:11 AM Report Generated: 02/26/2024 09:12 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 10 1 Planning & Zoning Christina Jesse 12/19/23 11:57 AM Changemark Property line label Please label the property line that splits these two parcels on the site plan Capital Group Carmel Solar Site Plan v3 -1.pdf Reviewer Response: Christina Jesse - 1/12/24 10:26 AM ---------------------------------------------------------- Responsed by: Aaron Wilson - 1/9/24 5:25 PM See revised site plan shows property line in orange color. Resolved 11 1 Planning & Zoning Christina Jesse 12/19/23 11:57 AM Changemark Canopies over shared property line Please provide context on why these canopies are spanning over the property line. Capital Group Carmel Solar Site Plan v3 -1.pdf Responsed by: Aaron Wilson - 1/9/24 3:46 PM The canopies will have a separation at the property line. Resolved 12 1 Planning & Zoning Christina Jesse 12/19/23 12:02 PM Changemark Setback to principal building Please label the setback distance from the nearest point of the canopy to the nearest point of the principal building. Capital Group Carmel Solar Site Plan v3 -1.pdf Responsed by: Aaron Wilson - 1/9/24 6:04 PM See revised site plan - please enlarge plan when viewing so setbacks become legible Resolved 13 1 Planning & Zoning Christina Jesse 12/19/23 12:02 PM Changemark Setback to principal building Please label the setback distance from the nearest point of the canopy to the nearest point of the principal building. Capital Group Carmel Solar Site Plan v3 -1.pdf Responsed by: Aaron Wilson - 1/9/24 4:28 PM See revised site plan - please enlarge plan when viewing so setbacks become legible Resolved 14 1 Planning & Zoning Christina Jesse 12/19/23 2:04 PM Changemark Dimensions of canopies Please label the width and lengths of each canopy on the site plan Capital Group Carmel Solar Site Plan v3 -1.pdf Responsed by: Aaron Wilson - 1/9/24 4:28 PM Arrays have different width based on spacing between islands; depth is 48.6 feet on the dual arrays and 24.3 feet on the single array. Resolved 15 1 Planning & Zoning Christina Jesse 12/19/23 2:19 PM Changemark Canopy sizes Redesign the canopy structures to meet the minimum 9' distance between canopies and parking islands for future tree canopy growth. Capital Group Carmel Solar Site Plan v3 -1.pdf Responsed by: Aaron Wilson - 1/9/24 4:10 PM Distance measurements from edge of canopy to tree trunk have been reviewed and approved by Mr. Mindham via Email. Resolved 16 1 Planning & Zoning Christina Jesse 12/19/23 3:53 PM Changemark Tree preservation Why are we removing and relocating healthy trees? Please adjust the plans to preserve healthy trees and install replacements for the stumps per the Urban Forester. L010.4 Proposed Landscape Plans.pdf Responsed by: Aaron Wilson - 1/9/24 4:06 PM See Ref. 18, Mr. Mindham has provided his recommendations on which trees to preserve which we will adhere to. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00282 ADLS Amend - Capital Group Solar Canopies Workflow Started: 12/6/2023 11:00:11 AM Report Generated: 02/26/2024 09:12 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 17 1 Transportation Systems David Littlejohn 12/21/23 2:32 PM Comment Please ensure that both of the sidewalks connections in the parking lot comply with ADA standards to provide an ADA compliant accessible route from the path along Pennsylvania to the building entrances. Responsed by: Aaron Wilson - 1/31/24 3:49 PM The curbs for the sidewalk at 12911 N Meridian will be converted to ADA compliant ramps to provide an accessible route from our building to Pennsylvania Street. A proposal has been obtained from Howard Companies to install 10 ramps. ---------------------------------------------------------- Reviewer Response: David Littlejohn - 1/24/24 11:47 AM The northern (diagonal) sidewalk through the parking lot has curbs on the edges of each island that do not provide an accessible route from the path along Pennsylvania to the building. Converting the curbs to ADA ramps would provide an ADA compliant accessible route. Please revise the plans to convert this sidewalk so it is accessible. ---------------------------------------------------------- Responsed by: Aaron Wilson - 1/9/24 3:49 PM Existing sidewalks from Pennsylvania to the buildings will not be changed as part of this project. Please indicate what changes are needed in case the existing sidewalks currently do not meet ADA compliance. Resolved 18 1 Urban Forestry Daren Mindham 12/22/23 9:01 AM Changemark Per email sent 12.22.23 I have provided three options for landscaping changes via email - also see below. I have a pdf in the correspondence folder noting these options. Option 1: Remove noted islands and pave over for solar and parking. Parking lot island space will be added to other parking lot islands as noted, essentially doubling of some islands, and removing others for a net zero change. Option 2: Remove noted islands and pave over for solar and parking. Parking lot island spaces will need to be relocated along both sides of entrance where existing parking spaces will be removed. Option 3: Remove all island landscaping as proposed (except the existing trees on the 6 islands where there is a current walkway and replace with landscaping as proposed. *Solar panels must be placed at least a 9â (1 parking space) from each island in all options. L010.4 Proposed Landscape Plans.pdf Responsed by: Aaron Wilson - 1/9/24 4:25 PM Will be implementing option 3 in addition we will also keep few other trees as discussed during the site walk. Updated plans were provided and approved via E-mail. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00282 ADLS Amend - Capital Group Solar Canopies Workflow Started: 12/6/2023 11:00:11 AM Report Generated: 02/26/2024 09:12 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 19 1 Planning & Zoning Christina Jesse 12/22/23 10:17 AM Comment Please upload a photometric plan showing the illumination levels across both parcels beyond the property lines in foot-candles for both the new proposed canopy lights as well as the parking lot pole lights to remain on site. Responsed by: Aaron Wilson - 2/20/24 9:42 AM Updated plans have been submitted. ---------------------------------------------------------- Responsed by: Aaron Wilson - 1/31/24 3:56 PM Noted, will update plan. ---------------------------------------------------------- Reviewer Response: Christina Jesse - 1/12/24 10:22 AM Please provide foot-candle levels at property lines. ---------------------------------------------------------- Responsed by: Aaron Wilson - 1/9/24 3:48 PM Plan will be part of the permit submittal. Will this suffice? Resolved 20 1 Engineering Alex Jordan 12/22/23 11:45 AM Comment We will require a right-of-way permit application and $5,000 license and permit bond for this project. Please apply for this here: https://cw.carmel.in.gov/PublicAccess/login Responsed by: Aaron Wilson - 1/9/24 3:40 PM Noted. We will apply for right-of-way permit prior to start of construction. Info Only 21 1 Building & Code Services Mike Sheeks 12/22/23 2:57 PM Comment Please see parking spot comments. Thank you! Responsed by: Aaron Wilson - 1/9/24 3:37 PM See notes below. Resolved 22 1 Hamilton County Surveyor Samuel Clark 12/29/23 12:19 PM Comment PLEASE PROVIDE DRAINAGE CALCULATIONS THAT DETAIL THE IMPACT ON VOLUME OF WATER LEAVING THE SITE AS A RESULT OF SOLAR PANELS. WILL THERE BE AN INCREASED RELEASE RATE OR INCREASED AMOUNT OF IMPERVIOUS SURFACE? BE SURE TO VERIFY THAT THE OUTLET POINTS HAVE ADEQUATE CAPACITY. CONTACT OUR OFFICE IF YOU NEED ANY DRAINAGE CALCULATIONS FOR THE PARKWOODS CROSSING ARM OF THE CLARA KNOTTS REGULATED DRAIN Responsed by: Aaron Wilson - 1/9/24 4:02 PM We will not be adding impervious surfaces or modifying the existing drain paths; down spouts from the canopies will be implemented every 27 feet which will drain into the existing drainage path. Resolved 23 1 Fire Carmel Fire 1/3/24 10:41 AM Comment Indiana fire Code 503.2.1 Dimensions. Fire apparatus access roads shall have an unobstructed width of not less than 20 feet (6096 mm), exclusive of shoulders and an unobstructed vertical clearance of not less than 13 feet 6 in. Provide confirmation the drive lanes in the parking lot between solar structures will comply with this IFC rule. Responsed by: Aaron Wilson - 1/9/24 5:31 PM Smallest width is 21 feet. Vertical clearance is above 13'6". Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00282 ADLS Amend - Capital Group Solar Canopies Workflow Started: 12/6/2023 11:00:11 AM Report Generated: 02/26/2024 09:12 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 24 1 Fire Carmel Fire 1/3/24 10:43 AM Comment 507.5.4 Obstruction. Unobstructed access to fire hydrants shall be maintained at all times. The fire department shall not be deterred or hindered from gaining immediate access to fire protection equipment or fire hydrants. This project shall not cause any fire hydrant or fire department connection to become obstructed. Responsed by: Aaron Wilson - 1/9/24 4:01 PM Fire hydrant access will not be impacted. Resolved