Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
C401 STORMWATER POLLUTION PREVETION PLAN
FIELDS MARKET GARDENPRELIMINARYCONSTRUCTIONNOT FOR DIRECTORY PATH: R:\Active\Uptown Partners\Field Market Garden\Design\CAD\PlansFILENAME: 401 SWPPP.dwgDATE/USER: 9/20/2023 2:03 PM / CmattoxDevelopment ConsultantsTransportation &P R OFESSIONAL ENGINEERCHARLES MATTOX401 401STAPLE PATTERN DETAIL EROSION CONTROL BLANKET SLOPE GRADIENTSLOPE LENGTHVICINITY MAP GENERAL EROSION CONTROL REQUIREMENTS FOR COMPLIANCE WITH IDEM GENERAL PERMIT RULES FOR STORM WATER RUNOFF FROM CONSTRUCTION SITES EROSION CONTROL PLAN INDEX PLAN ELEMENTS STORMWATER POLLUTION PREVENTION - DURING CONSTRUCTION MONITORING AND MAINTENANCE GUIDELINES CONSTRUCTION SEQUENCE & SCHEDULE OF EROSION CONTROL IMPLEMENTATION ADDITIONAL MATERIAL HANDLING AND SPILL PREVENTION PLAN A.PURPOSE B. PREVENTION AND READINESS C. SPILL RESPONSE · · · · · · · · · · · D.THE FOLLOWING PROCEDURES AND PRACTICES WILL HELP PREVENT UNNECESSARY SPILLS · · · ·“” · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · CSGP EROSION CONTROL PLAN INDEX ELEMENT SHEET ELEMENT SHEET ELEMENT SHEET ELEMENT SHEET A4 401 A19 300 B4 300 & 401 B11 300 & 401 A5 401 A21 300 B5 300 & 401 B12 300 & 401 A6 300 A22 300 B6 300 & 401 B13 401 A15 300 A23 300 B7 300 & 401 B14 401 A16 300 B2 401 B9 300 & 401 A18 401 B3 401 B10 300 & 401 LEGAL DESCRIPTION STORMWATER POLLUTION PREVENTION - POST CONSTRUCTION STORMWATER POLLUTIONPREVETION PLANNORTHPROJECT LOCATION SOIL MAP AND DESCRIPTION PROJECT LOCATION NORTHCROSBY SILT LOAM, FINE-LOAMY SUBSOIL-URBAN LAND COMPLEX (YclA) MIAMI SILT LOAM-URBAN LAND (YmsB2) MIAMI SILT LOAM-URBAN LAND (YmsC2) Hamilton County, Indiana (IN057)YshAH