Loading...
HomeMy WebLinkAboutAddition C-104 Landscape Plan pg. 2 Erosion & Sediment ControlEX. STORM MANHOLE T.C. 786.60 INV. 781.62 EX. CURB INLET T.C. 786.32 INV. 781.78' EX. STORM MANHOLE T.C. 786.64 INV. 782.11 EX. CURB INLET T.C. 786.42 INV. 782.1212" R.C.P.a; ,11 X11 11 11 Lx. STORM MANHOLE T. 787.38 INV. 782.64 EX. CURB INLET T.C. 787.14 INV. 782.66 CURB INLET 1 787.96 784.60 12" R.C.P. A2" R empracerieseramarionamereval 1 ^T7 im® n mu •41 7751 __vZ v BASE BID 'f EXISTING TREE LINE Tq REMAIN LIMIT OF DETURBANCEI ,5 x ,,1 1 1 1 1 1 11 1 1 1 1 1 1 1 1 01 X11 ,11 1,11 �II 11 11 II 11 0 0 0 E 1 BASE y BID: LIMIT OF DISTURBAIJCr BUILDING POINT OF ORIGIN (V.I.F.) N 4708.5329 E 5533.4939 General Erosion Control Notes: All erosion and sediment control ;practices shall be in accordance with the Indiana Handbook for Erosion Control in Developing Areas from the Division of Soil Conservation, Indiana Department of Natural Resources. 2. A copy of this Erosion and Sediment Control Plan and the Erosion and Sediment Control Report shall be available at the Project Site throughout the entire construction period. 3. The Contractor shall control waste, garbage, debris, wastewater, and other substances on the site so they will not be transported from the site by the action of wind, storm water runoff, or other forces. Proper disposal or management of all wastes and unused building material appropriate to the nature of the waste or material is required. 4. Public or private roadways shall be kept clear of accumulated sediment. All sediment that is cleared must be returned to the likely point of origin or other suitable location. Clearing of large amounts of sediment shall not include flushing the area with water. 5. Minimize the exposure of bare earth by limiting the work area to that necessary to perform the Work, and by proper scheduling of manpower and equipment. 6. All erosion and sediment control measures shall be inspected, cleaned, and maintained following each storm event. 7. Wherever possible, maintain existing vegetative cover. Use non vegetative material including mulch, erosion blankets, or stone to control erosion from disturbed areas. 8. It is the contractor's responsibility to maintain erosion control measures as shown on plans and comply with all new posting, ground stabilization. and notification requirements for the duration of the project. Stabilization practice Permanent seeding Dormant seeding Temporary seeding Sodding Mulching G Seasonal Soil Protection Chart: A Erosion and Sediment Control Plan 1" 40' Jan. Feb. Mar. Apr. May. June July Aug. Sept. Oct. Nov. Dec. E F *NNW *1 i B D 1 17* 1 OS TEMPORARY SEDIMENT TRAP /ROCK DAM, SEE DETAIL 2/C -503. REMOVE ROCK DAM AND ANY ACCUMULATED SEDIMENT UPON SUCESSFUL TURF ESTABLISHMENT IN UPSTREAM AREAS. RESTORE AND SEED PER SPECIFICATIONS. O6 ROCK CHUTE /APRON, TYP. SEE DETAIL 7/C -503 0 INLET CASTING PROTECTION. SILT FENCE, SEE DETAIL 5/C -503 SHOWN. STRAW BALES, PER DETAIL 6/C -503 MAY BE SUBSTITUTED. OS EROSION CONTROL BLANKET, TYP. PROVIDE ON SLOPES GREATER THAN 6H:1V AND IN EARTH SWALES AS SHOWN. SEE DETAIL 8/C -503. INSTALL PER MANUFACTURED RECOMMENDATIONS. 0 STRAW BALE FENCE, TYP. SEE DETAIL 10 /C -503 10 CONSTRUCTION STAGING AREA/EQUIPMENT FUELING 11 CONCRETE WASHOUT 12 CONTRACTOR JOB TRAILER 13 TEMPORARY CMP TO ALLOW CONSTRUCTION ACCESS ACROSS SWALE, APPROX. 25 LF L Y Temporary Diversion Berm Practice 3.21 Silt Fence Rock Filter Practice 3.74 (option) Straw Bale Fence Practice 3.75 Straw Bale Inlet Protection Practice 3.54 Erosion Control Legend Rock Dam Practice 3.76 Temporary Sediment Trap Silt Fence Practice 3.74 B Silt Fence Inlet Protection Practice 3.52 Stone Lined Swale (w/ or w/o underdrain) EROSION CONTROL NOTES INSTALL STABILIZED CONSTRUCTION ENTRY, SEE DETAIL 1/C -503 EXISTING GAS PIPE CROSSING. VERIFY DEPTH OF PIPE AND INSTALL APPROPRIATE MEASURES FOR SAFE CROSSING WITH CONSTUCTION EQUIPMENT. 0 TEMPORARY DIVERSION BERM, SEE DETAIL 4/C -503 O SILT FENCE, TYP., SEE DETAIL 3/C -503 Rock Chute Outlet Proctection Practice 3.41 North American Green S75 or approved equal Stabilized Construction Entrance Practice 3.01 A Kentucky bluegrass 40 Ibs /acre; Creeping red fescue 40 Ibs /acre; plus 2 tons straw mulch /acre, or add annual ryegrass 20 Ibs /acre. B Kentucky bluegrass 60 Ibs /acre; Creeping red fescue 60 Ibs /acre; plus 2 tons straw mulch /acre, or add annual ryegrass 30 lbs/acre. C Spring oats 3 bushel /acre D Wheat or rye 2 bushel /acre E Annual ryegrass 40 Ibs /acre F sod G Straw mulch 2 tons /acre *111* Irrigation needed during June, July, and /or September Irrigation needed for 2 to 3 weeks after applying sod 2/C -503 Gravel Donut Inlet Protection Practice 3.56 NOT USED 7/C -503 3/C -503 4/C -503 9/C -503 10 /C -503 6/C -503 5/C -503 NOT USED 8/C -503 1/C -503 SCHMIDT ASSOCIATES Wil -Fra -Mar Building 320 East Vermont Street Indianapolis, IN 46204 -2126 317 263 -6226 Fax: 317 -263 -6224 Project No Project Date Produced Revision Date 2002 -036 March 15, 2004 CEC April 8, 2004 44'° 11 E. d 1 �P No., 4 ri ti ti S t X These Drawings and Specifications, and all copies thereof are and shall remain the property and copyright of the Architect. They shall be used only with respect to this Project and are not to be used on any other Project or Work without prior written permission from the Architect. Layout Legend N INLET CASTING PROTETION. SILT FENCE, SEE DETAIL 5/C -503 SHOWN. STRAW BALES PER DETAIL 6/C -503 MAY BE SUBSTITUTED. EROSION CONTROL BLANKET, TYP. PROVIDE ON SLOPES GREATER THAN 6H:1V AND IN EARTH SWALES AS SHOWN. SEE DETAIL 8/C -503. INSTALL PER MANUFACTURED RECOMMENDATIONS. TEMPORARY SEDIMENT TRAP/ ROCK DAM SEE DETAIL 2/C -503 ROCK CHUTE/ APRON TYP. SEE DETAIL 7/C -503 INSTALL STABILIZED CONSTRUCTION ENTRY, SEE DETAIL 1/C -503 --f- SILT FENCE, TYP. SEE DETAIL 3/C -503 TEMPORARY DIVERSION BERM, SEE DETAIL 4/C -503 LAWN SEEDING PER SPECIFICATIONS Hazel Dell Christian Church Education Wing Addition EROSION AND SEDIMENT CONTROL PLAN C -104