Lillard. Sarah N
Page 1 of 1
From: Hoyt, Gary A
Sent: Friday, February 09, 2007 10:11 AM
To: 'jjaffe@panconinc.com'
Cc: Blanchard, Jim E; Lillard, Sarah N
Subject: Panattonis Business Park Bldg. 2
John,
I am in the process of reviewing the above mentioned project that you have
submitted. During my review I found a schematic of the fire alarm and in the
electrical plans there is a circuit designated for the fire alarm, but I could not find
a sheet showing locations of the devices or fire alarm control panel of annuciator
panel. Are these drawing being submitted separately? If so when they become
available, please forward copies to my office and the building commissioner
office for review.
Thank you,
Gary Hoyt
Fire Marshal
Carmel Fire Prevention Bureau
317-571-2600 - Office
317-571-2674 - Fax
ghoYl@carmel.in,gov
2/9/2007
~~
~\'\~1
;0; \ct /'
d- (J;' --
<(,L'Sy~
E~ l hc'-M ~i/e~
-/;{J '. (I~
re~ u-es+ed ! 1l{V
~0(\\
~t
Lillard. Sarah N
From:
Sent:
To:
Cc:
Subject:
Hill, Dick B
Thursday, February 01,20072:16 PM
'CForgey@amercons.com'; 'T Jensen@amercons.com'; 'Mjett@amercons.com'
Lillard, Sarah N
Panattoni Business Park
.---
~
L' h~received confirmation of Crider & Crider's bond and they are now on our bonded listing.
rtalked with Crider & Crider yesterday. I should receive confirmation today regarding their Plumbers/Excavators bond. As
soon as I receive confirmation I will place them on our bonded list and you may then pay your Water Fees and schedule
your pre-submittal with Building Code Services. However, we will withhold our recommendation of approval of a C/O until
the required right of way dedication has been finalized.
A pre-con should be scheduled (if not already scheduled). It should include:
Dan Greskamp, Engineering (714-3058)
Amanda Foley, Engineering (571-2441)
Brett Ransford, Carmel Utilities (716-4675)
Thanks.
Dick Hill, Engineering Administrator
Department of Engineering
City of Carmel, Indiana
Direct (317) 571-2459
Fax (317) 571-2439
dhill@carmel.in.gov
1
Page 1 of2
Lillard, Sarah N
From: Duncan, Gary R
Sent: Tuesday, January 23,2007 10:57 AM
To: 'Forgey, Craig'
Cc: Foley, Amanda J; Glaser, Fred J; Hill, Dick B; Lillard, Sarah N; McBride, Mike T; Redden, Nick
Subject: RE: City Center and Penn
Thanks so much Craig.
Is the heavy dashed line representative of the RAB construction limits or the required sight lines? If they were th~
sight Jjnes, J will ask that the R/W to be revised at the corner. If not, then the R/VV appears adequate provided that
the Owner would allow us a temporary construction easement at no cost for grading and incidental construction.'
That aside, it appears that all outstanding items have been satisfactorily addressed. Thank you for making the
revisions. You may submit the requisite number of plans for approval (per Dick's most recent email). We will not
approve the plans until the bonding is provided, and the availability fees are paid.
Please contact Fred Glaser to obtain a retroactive r/w permit for the construction of the construction entrances (if
this permit has not been issued) and to obtain a full r/w permit for all other work in the r/w. This permit is not
necessary for final plan approval but there is no reason not to obtain this now.
Thanks so much,
Gary
-----Original Message-----
From: Forgey, Craig [mailto:CForgey@amercons.com]
Sent: Friday, January 19, 2007 10:17
To: Duncan, Gary R
Subject: City Center and Penn
Gary,
Per our meeting on Wednesday, we have revised the plans for the Panattoni Project at City Center and Penn.
We will have the revised set of plans to by the end of the day. Below is a list of items that were addressed.
Please let me know if you have any comments. Thanks for you help.
1. The attached exhibit shows the proposed roundabout at City Center and Penn, and the improvements to ,
Penn for the Old Meridian Project.
2. Revise paving details to indicate Current INDOT Specs instead of 1999
3. Add ADA ramp on the south side of City Center Drive
4. Revise entrance to Penn so that it is configured for the new Penn layout but can be built to the existing
pavement.
5. Include a concrete gutter section at Penn driveway.
6. Add a Concrete Pavement Section Detail for the driveway aprons.
Craig W. Forgey, PE
American Structurepoint, Inc.
7260 Shadeland Station
Indianapolis, IN 46256
1/26/2007
Panatonni Business Park
Page 1 of2
Lillard, Sarah N
From: Duncan, Gary R
Sent: Tuesday, January 23, 2007 7:55 AM
To: 'Forgey, Craig'; Hill, Dick B
Cc: Glaser, Fred J; Lillard, Sarah N
Subject: RE: Panatonni Business Park
Craig,
Please contact Terry Krueskamp @ 571-2565
Gary
-----Original Message-----
From: Forgey, Craig [mailto:CForgey@amercons.com]
Sent: Monday, January 22, 2007 17:18
To: Hill, Dick B
Cc: Duncan, Gary R; Glaser, Fred J; Lillard, Sarah N
Subject: RE: Panatonni Business Park
Dick,
I have been unable to located the City of Carmel Digital Submittal Requirements. Can you please let me know ;
where I might find a copy of these.
Thanks
Craig W. Forgey, PE
American Structurepoint, Inc.
7260 Shadel and Station
Indianapolis, IN 46256
(317) 547-5580
Fax: (317) 543-0270
cforgey@amercons.com
From: Hiil, Dick B [mailto:DHiII@carmel.in.gov]
Sent: Monday, January 22, 2007 4:52 PM
To: Forgey, Craig
Cc: Duncan, Gary R; Glaser, Fred J; Lillard, Sarah N
Subject: Panatonni Business Park
Craig - Fred Glaser, our Right of Way Inspector, has indicated the contractor is working on site. According to my
records, there are several issues to be resolved before construction can commence including:
. Two Detailed Certified Engineers Estimates and Two Performance Guarantees for
I
- Right of Way Improvements for Pennsylvania Street and City Center Drive including demo, asphalt, curbs,
I
I
1/26/2007
Panatonni Business Park
Page 2 of2
I
medians,
sidewalks/asphalt paths, etc.
- Water Mains, specifically the 6" fire line to building #2 including hydrants, mains, valves, service lines, etc'.
The Erosion Control Bond has been posted.
. R.OW. Permit. The R.OW. Improvement Performance Guarantee will used to satisfy the bonding
requirement of the Permit. If you or the contractor needs a copy of this Permit, it can be sent
electronically. Let us know.
. Engineering Drawing approval from Gary Duncan/Nick Redden.
. Minimum 4-se!s (1-se! back to Developer) or maximum 6-sets (3-sets back to Developer) of certified
construction drawings after receiving Engineering drawing approval. Also need a cd of the certified
construction drawings per City of Carmel digital standards.
. Payment of Water Fees. Think the last time we talked, you indicated the check had been written and
included Water Availability for 18.238 acres by mistake (18.238A@$1010.00/A= $18,420.00 Water .
Availability) rather than the revised legal for Phase I of 13.322 acres (13.322A @$1010.00/A = $13,455.00
Water Availability) and you asked if that was acceptable. I indicated that if your client did not want to write
another check, we would accept the Water Availability for 18.238 acres and would apply the difference
(4.916A1$4,965.00 Availability Fee) to the next phase of construction. The Water Connection Fee is
$90,718.00 in either case (69.25 EDU @ $131 O.OO/EDU).
Believe there is still right of way to be dedicated thru the BPW but we will not hold up pre-submittal since the
commitment has been made for the dedication.
Dick Hill, Engineering Administrator
Department of Engineering
City of Carmel, Indiana
Direct (317) 571.2459
Fax (317) 571-2439
dhill@carmel.in.gov
DISCLAIMER:
This message contains confidential information and is intended only for the individual named.
If you are not the named addressee, you should not disseminate, distribute, or copy this e-
mail. Please notify the sender immediately bye-mail if you have received this e-mail by
mistake, and delete this e-mail from your system. E-mail transmission cannot be guaranteed to
be secure or error-free as information could be intercepted, corrupted, lost, destroyed, I
arrive late or incomplete, or contain viruses. The sender therefore does not accept liabili~y
for any errors or omissions in the contents of this message which arise as a result of e-mail
transmission. If verification is required, please request a hard-copy version. American I
Consulting, Inc., 7260 Shadeland Station, Indianapolis, IN 46256, USA,
http;//www.amercons.com/
http;llwww.emaildisclaimers.com/
1/26/2007
Panatonni Business Park
Page 1 of3
Lillard, Sarah N
From: Duncan, Gary R
Sent: Tuesday, January 23, 2007 7:54 AM
To: 'Forgey, Craig'; Hill, Dick B
Cc: Glaser, Fred J; Lillard, Sarah N
Subject: RE: Panatonni Business Park
They have a permit to perform earthwork and to install certain on-site utilities. A R/W permit should have been
obtained to construct the construction entrance. Please obtain a R/W permit from Fred today. Please provide the
bonds and the estimates today as indicated. Please also deliver the check for the Water Fees today if the check is
already written. I agree with what Dick outlined below unless this causes problems for your client in that, most
times, the connection fees are paid by the individual builder (I am not sure of Pannantoni's arrangement with
subsequent builders).
I am hoping to do final review on the plans today.
Craig, is the R/W being dedicated by plat? If it is not; we need to have proper dedication documents for the first
Board meeting in February (by next Wednesday).
The Water Fees need to be paid immediately as these are normally paid prior to final plan approval.
Gary
-----Original Message---n
From: Forgey, Craig [mailto:CForgey@amercons.com]
Sent: Monday, January 22, 2007 16:59
To: Hill, Dick B
Cc: Duncan, Gary R; Glaser, Fred J; Lillard, Sarah N
Subject: RE: Panatonni Business Park
Dick,
We are working to resolve the outstanding issues. I have copies of the certified estimates and the bonds that I
will forward to you on Tuesday 2/23. I met with Gary Duncan last week to discuss some outstanding issues, and
forwarded a revised set to Gary today.
It's my understanding that we received special approval to move dirt from Gary Duncan prior to final approval of
the construction documents. If I mistaken, please let me know and I will discuss with my client.
In the mean time, I will make sure we address the rest of your outstanding items asap.
Thanks
Craig W. Forgey, PE
American Structurepoint, Inc.
7260 Shadeland Station
Indianapolis, IN 46256
(317) 547-5580
Fax: (317) 543-0270
cforgey@amercons.com
1/2612007
Panatonni Business Park
Page 2 of3
From: Hill, Dick B [mailto:DHill@carmel.in.gov]
Sent: Monday, January 22, 20074:52 PM
To: Forgey, Craig
Cc: Duncan, Gary R; Glaser, Fred J; Lillard, Sarah N
Subject: Panatonni Business Park
Craig - Fred Glaser, our Right of Way Inspector, has indicated the contractor is working on site. According to my
records, there are several issues to be resolved before construction can commence including:
. Two Detailed Certified Engineers Estimates and Two Performance Guarantees for
- Right of Way Improvements for Pennsylvania Street and City Center Drive including demo, asphalt, curbs,
medians, sidewalks/asphalt paths, etc.
- Water Mains, specifically the 6" fire line to building #2 including hydrants, mains, valves, service lines, etc'.
The Erosion Control Bond has been posted.
. R.O.W. Permit. The R.O.W. Improvement Performance Guarantee will used to satisfy the bonding
requirement of the Permit. If you or the contractor needs a copy of this Permit, it can be sent
electronically. Let us know.
. Engineering Drawing approval from Gary Duncan/Nick Redden.
. Minimum 4-sets (1-set back to Developer) or maximum 6-sets (3-sets back to Developer) of certified
construction drawings after receiving Engineering drawing approval. Also need a cd of the certified
construction drawings per City of Carmel digital standards.
. Payment of Water Fees. Think the last time we talked, you indicated the check had been written and
included Water Availability for 18.238 acres by mistake (18.238A@$1010.00/A=$18,420.00Water
Availability) rather than the revised legal for Phase I of 13.322 acres (13.322A@$1010.00/A=$13,455.00
Water Availability) and you asked if that was acceptable. I indicated that if your client did not want to write
another check, we would accept the Water Availability for 18.238 acres and would apply the difference
(4.916A1$4,965.00 Availability Fee) to the next phase of construction. The Water Connection Fee is
$90,718.00 in either case (69.25 EDU @ $1310.00/EDU).
Believe there is still right of way to be dedicated thru the BPW but we will not hold up pre-submittal since the
commitment has been made for the dedication.
Dick Hill, Engineering Administrator
Department of Engineering
City of Carmel, Indiana
Direct (317) 571-2459
Fax (317) 571-2439
dhill@carmel.in.gov
DISCLAIMER:
This message contains confidential information and is intended only for the individual name~.
If you are not the named addressee, you should not disseminate, distribute, or copy this e- I
mail. Please notify the sender immediately bye-mail if you have received this e-mail by :
mistake, and delete this e-mail from your system. E-mail transmission cannot be guaranteed to
be secure or error-free as information could be intercepted, corrupted, lost, destroyed,
arrive late or incomplete, or contain viruses. The sender therefore does not accept liability
for any errors or omissions in the contents of this message which arise as a result of e-ma~l
I
1/26/2007
Panatonni Business Park
Page 1 of2
I
Lillard, Sarah N
From: Forgey, Craig [CForgey@amercons.com]
Sent: Monday, January 22,20074:59 PM
To: Hill, Dick B
Cc: Duncan, Gary R; Glaser, Fred J; Lillard, Sarah N
Subject: RE: Panatonni Business Park
Dick,
We are working to resolve the outstanding issues. I have copies of the certified estimates and the bonds that I
will forward to you on Tuesday 2/23. I met with Gary Duncan last week to discuss some outstanding issues, and
forwarded a revised set to Gary today.
It's my understanding that we received special approval to move dirt from Gary Duncan prior to final approval of
the construction documents. If I mistaken, please let me know and I will discuss with my client.
In the mean time, I will make sure we address the rest of your outstanding items asap.
Thanks
Craig W. Forgey, PE
American Structurepoint, Inc.
7260 Shadel and Station
Indianapolis, IN 46256
(317) 547-5580
Fax: (317) 543-0270
cforgey@amercons.com
From: Hill, Dick B [mailto:DHiII@carmel.in.gov]
Sent: Monday, January 22, 2007 4:52 PM
To: Forgey, Craig
Ce: Duncan, Gary R; Glaser, Fred J; Lillard, Sarah N
Subject: Panatonni Business Park
Craig - Fred Glaser, our Right of Way Inspector, has indicated the contractor is working on site.
records, there are several issues to be resolved before construction can commence including:
I
I
i
I
According to my
. Two Detailed Certified Engineers Estimates and Two Performance Guarantees for
- Right of Way Improvements for Pennsylvania Street and City Center Drive including demo, asphalt, curbs;
medians, sidewalks/asphalt paths, etc.
,
- Water Mains, specifically the 6" fire line to building #2 including hydrants, mains, valves, service lines, etc;
The Erosion Control Bond has been posted.
. RO.W. Permit. The RO.W. Improvement Performance Guarantee will used to satisfy the bonding
1/26/2007
Lillard. Sarah N
From:
Sent:
To:
Cc:
Subject:
Hill, Dick B
Monday, January 22, 20074:52 PM
'CForgey@amercons.com'
Duncan, Gary R; Glaser, Fred J; Lillard, Sarah N
Panatonni Business Park
Craig - Fred Glaser, our Right of Way Inspector, has indicated the contractor is working on site. According to my recbrds,
there are several issues to be resolved before construction can commence including:
. Two Detailed Certified Engineers Estimates and Two Performance Guarantees for
- Right of Way Improvements for Pennsylvania Street and City Center Drive including demo, asphalt, curbs,
medians, sidewalks/asphalt paths, etc.
- Water Mains, specifically the 6" fire line to building #2 including hydrants, mains, valves, service lines, etc.
The Erosion Control Bond has been posted.
. R.O.W. Permi!. The R.OW. Improvement Performance Guarantee will used to satisfy the bonding requirement of the
Permi!. If you or the contractor needs a copy of this Permit, it can be sent electronically. Let uS know.
. Engineering Drawing approval from Gary Duncan/Nick Redden.
. Minimum 4-sets (1-set back to Developer) or maximum 6-sets (3-sets back to Developer) of certified construction
drawings after receiving Engineering drawing approval. Also need a cd of the certified construction drawings per City
of Carmel digital standards. ,
. Payment of Water Fees. Think the last time we talked, you indicated the check had been written and included Water
Availability for 18.238 acres by mistake (18.238A @$1010.00/A = $18,420.00 Water Availability) rather than the:
revised legal for Phase I of 13.322 acres (13.322A@$1010.00/A=$13,455.00WaterAvailability)and you asked if
that was acceptable. I indicated that if your client did not want to write another check, we would accept the Water
Availability for 18.238 acres and would apply the difference (4.916A1$4,965.00 Availability Fee) to the next phas~ of
construction. The Water Connection Fee is $90,718.00 in either case (69.25 EDU @$1310.00IEDU). .
Believe there is still right of way to be dedicated thru the BPW but we will not hold up pre-submittal since the commitment
has been made for the dedication.
Dick Hill, Engineering Administrator
Department of Engineering
City of Carmel, Indiana
Direct (317) 571-2459
Fax (317) 571-2439
dhill@carmel.in.gov
1
,.\
[
Page 1 of2
Lillard, Sarah N
Hill, Dick B
Friday, January 19, 2007 1:44 PM
Duncan, Gary R; Lillard, Sarah N; 'grh@co.hamilton.in.us'; 'Ryan.hartman@ctrwd.org'; Duffy, John
M
Subject: RE: Pre-Submittal for Panattoni Business Park Bldg 2
From:
Sent:
To:
We need certified engineers estimates and individual Performance Bonds for:
I
. Right of Way Improvements for Pennsylvania Street and City Center Drive including demo, asphalt, curbs,
medians, sidewalks/asphalt paths, etc.
. Water Mains, specifically the 6" fire line to Building #2
Payment of Water Fees. Believe they were planning to send me the check but haven't seen it yet. Waiting to !
give you calculations because they are paying Water Availability for a different acreage than I had calculated and
that they had originally submitted. I
Copying Fred Glaser as I don't know if he has received their R.OW. Permit. If he has, he cannot approve until
they post the Performance Bond.
Need minimum of 4-sets and maximum of 6-sets of construction drawings for approval plus a cd of the approved
construction drawings per City of Carmel digital standards.
They still have to dedicate Right of Way but have committed to do so and would not hold up pre-submittal or
building permit.
-----Original Message-----
From: Duncan, Gary R
Sent: Friday, January 19, 2007 1:12 PM
To: Lillard, Sarah N; 'grh@co.hamilton.in.us'; 'Ryan.hartman@ctrwd.org'; Duffy, John M
Cc: Hill, Dick B
Subject: RE: Pre-Submittal for Panattoni Business Park Bldg 2
.
Sarah,
We are ready to approve the plans. I think they still need to post bonds and pay any fees.
Gary
-----Original Message-----
From: Lillard, Sarah N
Sent: Friday, January 19, 2007 12:54
To: 'grh@co.hamilton.in.us'; 'Ryan.hartman@ctrwd.org'; Duncan, Gary R; Duffy, John M
Cc: Lillard, Sarah N
Subject: RE: Pre-Submittal for Panattoni Business Park Bidg 2
Gentlemen,
I am emailing to check the status of your approvals for the Panattoni Business Park Bldg.
#2 project. If you could let me know your status, I would greatly appreciate it. (Mr.
Duffy-I need to verify whether or not they are being required to obtain a permit from
Carmel Utilities for water service.)
1/22/2007
~
Page 2 of2
I
,
Thank you,
Sarah Lillard
:5M"h-LittM~
Building & Code Services
City of Carmel
Ph. (317) 571-2475
Fax (317) 571-2499
sli1lard@carmel.in.gov
1/22/2007
Page 1 of 1
Lillard, Sarah N
From: Lillard, Sarah N
Sent: Monday, January 22,2007 11:46 AM
To: jjaffe@panconinc.com'
Cc: Hill, Dick B; Glaser, Fred J
Subject: FW: Pre-Submittal for Panattoni Business Park Bldg 2
John,
Below are Dick Hill's comments regarding items that still need to be completed with Engineering before we can
schedule your submittal meeting.
Thank you,
Sarah
-----Original Message--m
From: Hill, Dick B
Sent: Friday, January 19, 2007 1:44 PM
To: Duncan, Gary R; Lillard, Sarah N; 'grh@co.hamilton,in.us'; 'Ryan.hartman@ctrwd.org'; Duffy, John M
Subject: RE: Pre-Submittal for Panattoni Business Park Bldg 2
We need certified engineers estimates and individual Performance Bonds for:
. Right of Way Improvements for Pennsylvania Street and City Center Drive including demo, asphalt, curbs,
medians, sidewalks/asphalt paths, etc. '
. Water Mains, specifically the 6" fire line to Building #2
Payment of Water Fees. Believe they were planning to send me the check but haven't seen it yet. Waiting to
give you calculations because they are paying Water Availability for a different acreage than I had calculated and
that they had originally submitted.
Copying Fred Glaser as I don't know if he has received their R.OW. Permit. If he has, he cannot approve until
they post the Performance Bond.
I
Need minimum of 4-sets and maximum of 6-sets of construction drawings for approval plus a cd of the approved
construction drawings per City of Carmel digital standards.
They still have to dedicate Right of Way but have committed to do so and would not hold up pre-submittal or
building permit.
1/22/2007
Page 1 of 1
Lillard, Sarah N
From: Fred Simmons [fsimmons@mail.simmonsarchitects.net]
Sent: Monday, November 27, 2006 3:53 PM
To: Brewer, Scott I; Griffin, Matt l
Cc: Lillard, Sarah N; jjaffee@panconinc.com; 'PANATTONI - Greg levell'
Subject: Panattoni Business Park - Building 2
Matt & Scott,
As per Sarah Lillard's requested, we will hand deliver 4 sets of the approved landscape Drawings and 3 copies of
the approved Architectural Elevations either late this afternoon or first thing in the morning. This project was
originally called 122nd & Penn Project Building 2.
Call or write should you have any questions or need additional information.
Thanks
Frederick A. Simmons, AlA
Simmons Architects, LLC
305 East New York Street
Indianapolis, IN 46204
317/656-3500 Voice
317/656-3501 Fax
317/691-2318 Mobile
11/28/2006
Page 1 of2
Lillard, Sarah N
From: Lillard, Sarah N
Sent: Wednesday, November 22, 20064:28 PM
To: Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Hoyt, Gary A; Blanchard, Jim E; Brewer, Scott I;
Dolan, Veronica A; Akers, William P; 'grh@co.hamilton.in.us'; 'rct@co.hamilton.in.us';
'Ryan.hartman@ctrwd.org'; 'jbt@co.hamilton.in.us'; Foley, Amanda J; Griffin, Matt L; Duncan, Gary
R; Redden, Nick; Duffy, John M
Cc: 'jjaffe@panconinc.com'
Subject: RE: Pre-Submittal for Panattoni Business Park Bldg. 2
John,
The following requests for copies of certain parts of the approved plan come from members of
our Planning and Zoning office. One copy of each stamped plan is required for submittal for the
building permit. I have also listed another item you may need to check into after the first items.
1. Please submit four (4) copies of the approved site plan to Scott Brewer, DOCS, One Civic Square, Carmel, IN,
46032. You will be notified when your copies are ready for pickup. Contact: Scott Brewer, City Forester/Environmental
Planner. One Civic Square; Carmel. IN 46032. Phone: (317) 571-2478. FAX (317) 571-2426
2. Please submit three (3) copies of the architectural elevation drawings for the structure to Matt Griffin, DOCS,
One Civic Square, Carmel, IN, 46032. You will be notified when your copies are ready for pickup. Contact: Matt
Griffin, Planning Administrator. One Civic Square; Carmel. IN 46032. Phone: (317) 571-2417. FAX (317) 571-2426.
You may also need to contact John Duffy of Carmel Utilities regarding the water
connection/availability. If a permit for the water needs to be issued, that will need to be
obtained prior to submittal for the building permit, or at the time of the submittal meeting.
Thank you,
Sarah
-----Original Message--m
From: Lillard, Sarah N
Sent: Thursday, November 16, 2006 1 :30 PM
To: Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Hoyt, Gary A; Blanchard, Jim E; Brewer, Scott I;
Dolan, Veronica A; Akers, William P; 'grh@co.hamilton.in.us'; 'rct@co.hamilton.in.us';
'Ryan.hartman@ctrwd.org'; 'jbt@co.hamilton.in.us'; Foley, Amanda J; Griffin, Matt L; Duncan, Gary R;
Redden, Nick; Duffy, John M
Cc: 'jjaffe@panconinc.com'
Subject: Pre-Submittal for Panattoni Business Park Bldg. 2
The Dept. of Community Service, Building & Code Services division, has
received a request to meet for the purpose of submitting to obtain a building
permit for the below-mentioned project. PLEASE '"REPLY TO ALL'" AS
SOON AS POSSIBLE, IF YOU HAVE OUTSTANDING ISSUES. After that
time, we may proceed with the meeting and submittal.
11/22/2006
Lillard. Sarah N
From:
Sent:
To:
VG'rewiJi6'Y'~[9th@co,hamilton.in .us]
. Thursday, November 16, 2006 2:12 PM i
Conn, Angelina V; Foley, Amanda J; Hill, Dick B; Duncan, Gary R; Hoyt, Gary A; Blanchard,
Jim E; Duffy, John M; Griffin, Matt L; Redden, Nick; Brewer, Scott I; Lillard, Sarah N; Dolan,
Veronica A; Akers, William P; Joel Thurman; Robert Thompson; Ryan.hartman@ctrwd.oig
jjaffe@panconinc.com
Re: Pre-Submittal for Panattoni Business Park Bldg. 2
Cc:
Subject:
""".t;o.Ja_~
Sarah
The Hamilton County Surveyors's Office still has not approved the outlet permit for this
project and I have not seen an approved drainage review from Carmel Engineering yet. 'r
believe they are still working out some site details at this time. If you have any
questions, please let me know.
~.
Greg Hoyes, AC, CFM
Plan Reviewer
Hamilton County Surveyorts Office
One Hamilton County Square, Suite 188
Noblesville, IN 46060
Phone, ( 317) 776 - 8495
Fax, (317) 776-9628
>>> "Lillard, Sarah Nil <SLillard@carrnel.in.gov> 1:29 PM Thursday,
November 16, 2006 >>>
The Dept. of Community Service, Building & Code Services division, has received a request
to meet for the purpose of submitting to obtain a building permit for the below-menti6ned
project. PLEASE "REPLY TO ALL" AS SOON AS POSSIBLE, IF YOU HAVE OUTSTANDING ISSUES.
After that time, we may proceed with the meeting and submittal.
Project:
PANATTONI BUSINESS PARK BLDG. 2
(Formerly the 122nd & Penn Project Bldg. 2)
1320 City Center Drive
Meeting Date:
PENDING
Time:
PENDING
Related Planning & Zoning docket numbers:
Representative:
John Jaffe
1
Page 1 of2
Lillard, Sarah N
From:' \;iB9]i;I}'~aU;[Ryan .Hartman@CTRWD.ORG]
Sent: Friday, November 17, 2006 7:58 AM
To: Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Hoyt, Gary A; Blanchard, Jim E; Brewer, Scott I;
Dolan, Veronica A; Akers, William P; grh@co.hamilton.in.us; rct@co.hamilton.in.us;
jbt@co.hamilton.in.us; Foley, Amanda J; Griffin, Matt L; Duncan, Gary R; Redden, Nick; Duffy, John
M
Cc: jjaffe@panconinc.com
Subject: RE: Pre-Submittal for Panattoni Business Park Bldg. 2
,,~
Sarah,
I am currently awaiting application prior to permitting. Thanks.
. ..~;""t'.',- .
. Ryan C:'Hartman, E.I.T
District Engineer
Clay Township Regional Waste District
10701 N. College Ave., Suite A
Indianapolis, IN 46280-1098
Direct: 317-844-9200
Fax: 317-844-9203
Cell: 317-714-7219
Kyan.hartman@ctrwd.org
From: Lillard, Sarah N [mailto:SLillard@carmel.in.gov]
Sent: Thursday, November 16,20061:30 PM
To: Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Hoyt, Gary A; Blanchard, Jim E; Brewer, Scott I; Dolan,
Veronica A; Akers, William P; grh@co.hamilton.in.us; rct@co,hamilton.in.us; Ryan Hartman;
jbt@co.hamilton.in.us; Foley, Amanda J; Griffin, Matt L; Duncan, Gary R; Redden, Nick; Duffy, John M
Cc: jjaffe@panconinc.com
Subject: Pre-Submittal for Panattoni Business Park Bldg, 2
The Dept. of Community Service, Building & Code Services division, has received a
request to meet for the purpose of submitting to obtain a building permit for the
below-mentioned project. PLEASE "REPLY TO ALL" AS SOON AS POSSIBLE. IF
YOU HAVE OUTSTANDING ISSUES. After that time, we may proceed with the
meeting and submittal.
Project:
PANATTONI BUSINESS PARK BLDG. 2
(Formerly the 122nd & Penn Project Bldg. 2)
1320 City Center Drive
Meeting Date:
PENDING
Time:
PENDING
11/20/2006
Page 1 of2
Lillard, Sarah N
From: Hoyt, Gary A
Sent: Thursday, November 16, 2006 1:40 PM
To: Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Blanchard, Jim E; Brewer, Scott I; Dolan, Veronica
A; Akers, William P; 'grh@co.hamilton.in.us'; 'rct@co.hamilton.in.us'; 'Ryan.hartman@ctrwd.org';
'jbt@co.hamilton.in.us'; Foley, Amanda J; Griffin, Matt L; Duncan, Gary R; Redden, Nick; Duffy,
John M
Cc: 'jjaffe@panconinc.com'
Subject: RE: Pre-Submittal for Panattoni Business Park Bldg. 2
All outstanding issues from the fire department have been resolved. Our office
requested a Knox box and Knox fire department connection caps for the building
siamese connection. Knox products may be ordered online at www.knoxbox.com
Gary Hoyt
CFD
From: Lillard, Sarah N
Sent: Thursday, November 16, 2006 1:30 PM
To: Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Hoyt, Gary A; Blanchard, Jim E; Brewer, Scott I; Dolan,
Veronica A; Akers, William P; 'grh@co.hamilton.in.us'; 'rct@co.hamilton.in.us'; 'Ryan.hartman@ctrwd.org';
'jbt@co.hamilton.in.us'; Foley, Amanda J; Griffin, Matt L; Duncan, Gary R; Redden, Nick; Duffy, John M
Cc: 'jjaffe@panconinc.com'
SUbject: Pre-Submittal for Panattoni Business Park Bldg. 2
The Dept. of Community Service, Building & Code Services division, has received a
request to meet for the purpose of submitting to obtain a building permit for the
below-mentioned project. PLEASE "REPLY TO ALL" AS SOON AS POSSIBLE, IF
YOU HAVE OUTSTANDING ISSUES. After that time, we may proceed with the
meeting and submittal.
Project:
PANATTONI BUSINESS PARK BLDG. 2
(Formerly the 122nd & Penn Project Bldg. 2)
1320 City Center Drive
Meeting Date:
PENDING
Time:
PENDING
Related Planning & Zoning docket numbers:
11/20/2006
Page 1 of 1
Lillard, Sarah N
From: Akers, William P
Sent: Thursday, November 09, 2006 11 :42 AM
To: Campbell, Scott; Crockett, Terry N; Daley, Penny J; Duffy, John M; Harding, Brent S; Hill, Dick B;
Hoyt, Gary A; Kempa, Lisa L; Krueskamp, Theresa A; Lillard, Sarah N; McCoy, David W; Spears,
Jack J
Cc: 'Brooke Gajownik'
Subject: 122nd(City Center Dr) and Penn Development
Addresses have been assigned to the 3 buildings that will be located in the Panattoni Business Park
(City Center Dr and Pennsylvania St).
The addresses assigned for each building are as follows:
. Building #1 - 12325 Pennsylvania St
. Building #2 - 1320 City Center Dr.
. Building #3 -1250 City Center Dr.
Bill Akers
Carmel Communications Center
911 Operations Manager
IDACS Coordinator
Office # 571-2577
Cell# 727-8507
Pager# 553-1919
Fax# 571-2585
11/22/2006
Page 1 ofl
Lillard, Sarah N
From: Lillard, Sarah N
Sent: Thursday, November 16, 2006 1 :30 PM
To: Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Hoyt, Gary A; Blanchard, Jim E; Brewer, Scott I;
Dolan, Veronica A; Akers, William P; 'grh@co.hamilton.in.us'; 'rct@co.hamilton.in.us';
'Ryan.hartman@ctrwd.org'; 'jbt@co.hamilton.in.us'; Foley, Amanda J; Griffin, Matt L; Duncan, Gary
R; Redden, Nick; Duffy, John M
Cc: 'jjaffe@panconinc.com'
Subject: Pre-Submittal for Panattoni Business Park Bldg. 2
The Dept. of Community Service, Building & Code Services division, has received a
request to meet for the purpose of submitting to obtain a building permit for the
below-mentioned project. PLEASE "REfJ_I.YI~A!"L" AS SOON AS POSSIBLE. IF
YOU HAVE OUTSTANDING ISSUES. After that time, we may proceed with the
meeting and submittal.
Project:
PANATTONI BUSINESS PARK BLDG. 2
(Formerly the 122nd & Penn Project Bldg. 2)
1320 City Center Drive
Meeting Date:
PENDING
Time:
PENDING
Related Planning & Zoning docket numbers:
Representative:
John Jaffe
jjaffe@panconinc.com
Ph. (317) 716-0190
Again, if there are concerns that might affect the issuance of this permit,
please REPLY TO ALL on this e-mail.
11/16/2006