HomeMy WebLinkAboutChange Orde 7 FINAL/ENG/-$11,000/Calumet Civil/16-ENG-37-116TH DocuSign Envelope ID:399A3E29-3B85-4ACO-BOOD-9EF0F465E732 C i ty of Carmel Project 16-E N G-3 7 APPeROVEDkhn„aaePm,ren+e,zos. Roundabout Improvements : 116' Street and Medical Drive at Range Line Road CHANGE ORDER #7 Change Order#7 is a balancing change order for the final contract cost for Contract I6-ENG-37. Contract Price prior to this Change Order $5,329,312.55 Contract Price will be changed by this Change Order ($11,000.00) New Contract Price including this Change Order $5,318,312.55 Amount Adjusted Contract Cumulative%Change Price from Original Contract Original Contract $5,439,000.00 N/A N/A CO1 $0.00 $5,439,000.00 0.0% CO2 $174.00 $5,439,174.00 0.003% CO3 $29,196.00 $5,468,370.00 0.5% C04 $46,020.59 $5,514,390.59 1.4% C05 $40,867.29 $5,555,257.88 2.1% C06 ($225,945.33) $5,329,312.55 (2.0%) C07 ($11,000.00) $5,318,312.55 (2.22%) DocuSign Envelope ID:399A3E29-3B85-4ACO-BOOD-9EF0F465E732 CITY OF CARMEL TO: Jeremy Kashman CONTRACT CHANGE ORDER NO.: 7 City Engineer DATE: February 19,2024 City of Carmel Indiana PROJECT NAME: 116th and Range Line RAB One Civic Square CITY REQ. NO.: Carmel, IN 46032 CITY PO NO.: 16-ENG-37 CITY PO DATE: I. You are directed to make the following changes in this Contract: Change Order#7 will balance the final contract price for Carmel Project No. 16-ENG-37. The adjustment is to deduct$6,000 for pay item#0156 and deduct$5,000 for Liquidated Damages. Total deduction equals$11,000. Final contract amount is$5,318,312.55 and matches the final pay estimate (#19). SCHEDULED ADJUSTMENT ITEM AMOUNT (+)OR(-)DAYS II. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order: R.F.P.: N/A W.D.C.NO.: N/A The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order $ 5,329,312.55 Contract Price will be decreased by this Change Order $ (11,000.00) New Contract Price including this Change Order $ 5,318,312.55 Contract Time prior to this Change Order Days 10/16/2022 Substantial Completion Date Contract Time prior to this Change Order 12/8/2022 Final Completion Date Net change resulting from this Change Order 0 Calendar Days Current Contract Time including this Change Order Substantial Completion Date Current Contract Time including this Change Order Final Completion Date This Change Order is for full and final settlement of all direct,indirect,impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are The Above Changes Are Accepted Approved Recommended American Structurepoint,Inc. Calumet Civil Contractors,Inc. NOT PRESENT ENGINEER CONTRACTOR Sue Finkam,Mayor 9025 River Road,Suite 200 4898 Fieldstone Drive (aw.(A.,pbt.U, Address Address Laura Campbell, Member Indianapolis,IN 46240 Whitestown,IN 46075 F Q S City/State/Zip City/State/Zip Alan Potasnik,Member Jer K hman,PE,City Engineer By: Daozd-leac.loia- By:Sib ATTEST: Phone:317-281-9563 Phone: 317-362-1763 cJacti‘Mau,co euinn,City Clerk 3/6/2024 Date:02-19-2024 Date: 02/19/2024 Date: