HomeMy WebLinkAboutC900 - POST STORMWATER POLLUTION PREVENTION PLANABCDE54321W. M A I N S T R E E TPROPOSED BUILDINGF.F.E. = 847.20ZONED: UCRETAILTENANTLOBBYPROPOSED LEGEND:MARCH 30, 20238
AB3456712CDEFGH83456712ABCDEFGHDESCRIPTIONDATENO
REVISION RECORD
1 05/19/2023 STATE SUBMITTAL
DATE:
DWG SCALE:
DRAWN BY:
CHECKED BY:
APPROVED BY:
PROJECT NO:SHEETOFDRAWING NO.:STUDIO M ARCHITECTURE
L'ETOILE
833 W. MAIN STREET
CARMEL, INDIANAREFERENCE 530 E. Ohio Street · Suite G - Indianapolis, IN 46204
317-655-7777 · 877-746-0749
www.cecinc.comPERMITNOT FORCONSTRUCTIONPENDING22192-773PROFESSIONAL ENGI
NE
ERINDIANA A
A
RON C. HURTPE10300058STATE OF-oNR
EGI
STERED* HAND SIGNATURE ON FILE
2 06/15/2023 BZA Packet Update
3 12/18/2023 ADLS Cycle 2 Re-submittal
BEB
ACH
DRAFT
1" = 20'C900POST STORMWATER POLLUTION
PREVENTION PLAN
21NORTHSOIL MAPCONTACT INFORMATIONSOILS MAP LEGENDGENERAL NOTES ADDITIONAL CITY OF CARMEL NOTES: