Loading...
HomeMy WebLinkAboutC901 - STORMWATER POLLUTION PREVENTION DETAILSMARCH 30, 20238 AB3456712CDEFGH83456712ABCDEFGHDESCRIPTIONDATENO REVISION RECORD 1 05/19/2023 STATE SUBMITTAL DATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:STUDIO M ARCHITECTURE L'ETOILE 833 W. MAIN STREET CARMEL, INDIANAREFERENCE 530 E. Ohio Street · Suite G - Indianapolis, IN 46204 317-655-7777 · 877-746-0749 www.cecinc.comPERMITNOT FORCONSTRUCTIONPENDING22192-773PROFESSIONAL ENGI NE ERINDIANA A A RON C. HURTPE10300058STATE OF-oNR EGISTERED* HAND SIGNATURE ON FILE 2 06/15/2023 BZA Packet Update 3 12/18/2023 ADLS Cycle 2 Re-submittal BEB ACH DRAFT 1" = 20'C901STORMWATER POLLUTION PREVENTION DETAILS 22DETAIL 903 - TEMPORARY CONSTRUCTION ENTRANCEDETAIL 900 - SILT FENCEINSTALLATION DETAILDETAIL 907 - EROSION CONTROL INLET PROTECTIONFOR CURB INLET AND CATCH BASINSDETAIL 906 - NON-PAVED AREA CATCHBASIN INLET PROTECTION DETAILPLANSECTION B-BNOT TO SCALEDETAIL 901- CONCRETE WASHOUT BMPDETAIL 904 - BELOW GRATE INLET PROTECTIONDETAIL 905 - FILTER SOCKDETAIL 902 - STRAW BALE FOR CONCRETE WASHOUT- ONLYPERMANENT SEEDING DATESLAWNS AND HIGH MAINTENANCE AREASSTEEP BANKS AND CUTSLEVEL AND SLOPING, OPEN AREASTEMPORARY SEEDINGPERMANENT SEEDINGTEMPORARY SEEDING DATESDETAIL 908 - TEMPORARY WHEEL WASH STATION