Loading...
HomeMy WebLinkAboutResolution BPW 03-20-24-02/Bond Release/Ambleside Sections 1A/1B/ Erosion Control-Common Area To: Board of Public Works Date: March 12, 2024 and Safety City of Carmel, Indiana Resolution No: BPW-03-20-24-02 From: CITY ENGINEER Principal: Platinum Properties Management Co, LLC Surety: Great American Insurance Board Members: I have conducted final inspection at Ambleside, Sections 1A/1B for the following improvements: ITEM SURETY NUMBER AMOUNT EROSION CONTROL-COMMON AREA 3739870 $87,700.00 The above improvements have been inspected and are acceptable to the City of Carmel. I recommend acceptance of said improvement, subject to the following conditions: 3-year maintenance guarantees to replace the surety listed above must be submitted to replace the performance guarantee. The required maintenance guarantee amounts are as follows: ITEM AMOUNT EROSION CONTROL-COMMON AREA $8,700.00 APPROVED: _____________________________ Jeremy Kashman, City Engineer Be it resolved by the board of Public Works and Safety, City of Carmel, Indiana on this 20th day of March, 2024, that the performance guarantee for Ambleside, Sections 1A/1B listed above is accepted and released by the City of Carmel, Indiana subject to any conditions listed above. Signed:_____________________________(Presiding Officer) _____________________________ (Member) _____________________________ (Member) Board of Public Works and Safety DocuSign Envelope ID: 30BD8676-E5FF-43CB-8074-C534F1849481