HomeMy WebLinkAboutA140b - FINISH PLAN - PART IIFINISH PLAN SYMBOLS 1 = CEILING FINISH TYPE 2 = WALL FINISH TYPE 3 = BASE FINISH TYPE 4 = FLOOR FINISH TYPE NOTE: SEE PROJECT MANUAL OR SPECIFICATION SHEET FOR MORE INFORMATION. DENOTES EXTENT OF FLOOR MATERIAL DENOTES EXTENT OF WALL FINISH PT-12 BS-13 CPT-14 ACT-11 BS-1 CPT-2CPT-1 FINISH PLAN NOTES 1. ALL INTERIOR WALL AND CEILING FINISHES SHALL BE CLASSIFIED IN ACCORDANCE WITH ASTM E-84. FINISHES SHALL BE CLASS "A": FLAME SPREAD 0-25: SMOKE- DEVELOPED 0-45. 2. ALL EXISTING GYPSUM BOARD CEILINGS, SOFFITS AND DRYWALL PARTITIONS THAT ARE PATCHED SHALL BE PAINTED IN THEIR ENTIRETY. 3. GENERAL CONTRACTOR SHALL FLASH PATCH AND PREPARE ALL FLOORS AS REQUIRED TO RECEIVE SPECIFIED FLOORING MATERIAL. 4. FLOORS MUST BE FREE OF DUST, OIL AND ALL FOREIGN MATTER. BUILDING MUST BE PREHEATED TO A MINIMUM OF 65°, 24 HOURS PRIOR TO INSTALLATION OF FLOOR COVERING. CRACKS 1/16" OR MORE, HOLES, AND OTHER UNEVENNESS MUST BE FILLED WITH A LATEX BASE FLOOR FILLER, HIGH SPOTS MUST BE LEVELED. FLOOR MUST BE SWEPT CLEAN, WET MOPPED WITH WARM WATER AND SWEPT AGAIN. IF SWEEPING LEAVES A RESIDUE, FLOORS SHALL BE VACUUMED. 5. ALL VINYL OR RUBBER BASE TO BE CONTINUOUS ROLL TYPE WITH SEAMING TO OCCUR ONLY ON INSIDE CORNERS OR AT LEAST 12" FROM WRAPPED OUTSIDE CORNER. 6. GENERAL CONTRACTOR TO PROVIDE AND INSTALL ALL METAL ANGLES AND/OR MARBLE REDUCING SADDLES PER DETAILS, IN ADDITION TO ANY FLOOR LEVELING AS MAY BE REQUIRED FOR SMOOTH TRANSITION AT ALL STONE OR TILE FLOORING/MATERIAL TRANSITION POINTS. 7. WHERE STONE, MARBLE, LIMESTONE AND HARD SURFACE FLOORING IS SPECIFIED, G.C. SHALL BE RESPONSIBLE FOR PROVIDING/APPLYING SEALANT AS SPECIFIED OR AS RECOMMENDED BY SUPPLIER, FOR A CLEAN, LASTING SURFACE. 8. FLOOR COVERING IN CLOSETS SHALL BE THE SAME AS THAT OF THE SPACE ONTO WHICH THE CLOSET OPENS UNLESS OTHERWISE NOTED. 9. CROSS JOINTS NECESSARY DUE TO LENGTH OF ROLLS RECEIVED, SHALL BE PLACED TO AVOID OCCURRENCE AT CONSPICUOUS LOCATIONS NEAR DOOR OR AT DOORWAYS AND ENTRIES PERPENDICULAR TO DOORS OR ENTRIES. SEAMS OCCURRING PARALLEL TO DOORS SHALL BE CENTERED DIRECTLY UNDER THE DOOR. CONTRACTOR TO SUBMIT SEAMING DIAGRAM FOR ARCHITECT'S REVIEW. 10. SEAMS SHALL BE TRIMMED AND SEAMED IN ACCORDANCE WITH THE MANUFACTURER'S SPECIFICATIONS. 11. GENERAL CONTRACTOR TO PROVIDE FIRE-RETARDANT BLOCKING FOR BLINDS ON EXTERIOR WINDOWS THROUGHOUT. 12. IN AREAS WITH EXPOSED OPEN CEILINGS, GENERAL CONTRACTOR AND THEIR SUBCONTRACTORS ARE TO PAINT ANY AND ALL EXPOSED SPRINKLER PIPES, CEILING SLABS, BEAMS AND IF NEEDED PATCH CEILING SLAB SMOOTH TO RECEIVE NEW FINISHES. REFER TO FINISH PLAN FOR ADDITIONAL INFORMATION AND SPECIFICATIONS. 13. PAINTING OF ANY SURFACES NOT SPECIFICALLY MENTIONED TO BE PAINTED HEREIN OR ON DRAWINGS, BUT FOR WHICH PAINTING IS OBVIOUSLY NECESSARY TO COMPLETE THE PROJECT OR WORK WHICH COMES WITHIN THE INTENT OF THESE SPECIFICATIONS, SHALL BE INCLUDED AS THROUGH SPECIFIED AND INCLUDED IN SCOPE OF WORK OF CONTRACTOR WITHOUT EXCEPTIONS. 14. ALL WALLS (NEW AND EXISTING) SHALL BE PROPERLY PREPARED (SPACKLED, SANDED, ETC.) FOR PAINTING AND/OR WALL COVERING AS PER FINISH PLAN AND MANUFACTURER'S SPECIFICATIONS. 15. ALL PAINTS SHALL BE APPLIED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS FOR THE PARTICULAR SURFACE. 16. ALL SURFACES WHICH ARE TO BE PAINTED SHALL RECEIVE (1) COAT OF PRIMER AND (2) COATS OF FINISH PAINT. (3) COATS TOTAL. NOTE THAT BOTH CONTRACTOR AND ITS PAINTING SUBCONTRACTOR TO INCLUDE IN SCOPE OF WORK PAINT TOUCH UP DUE TO ANY DAMAGE DONE DURING CONSTRUCTION AS CAUSED BY NO FAULT OF THE PAINTING SUBCONTRACTOR BUT WHICH MIGHT OF BEEN CAUSED BY OTHER TRADES, INCLUDING BUT NOT LIMITED TO CONSTRUCTION TRADES, VOICE/DATA AND SECURITY CONTRACTOR AND INCLUDING FURNITURE INSTALLERS AND MOVERS. CONTRACTOR AND PAINTING SUBCONTRACTOR TO INCLUDE PAINT TOUCH UP WITHIN THEIR SCOPE OF WORK WITHOUT EXCEPTION OR EXCLUSION FROM BIDS. 17. UNLESS OTHERWISE NOTED: ALL WALLS TO BE PAINTED SHALL BE PAINTED WITH A LATEX BASE EGGSHELL FINISH PAINT - ALL GYPSUM BOARD CEILINGS AND SOFFITS TO BE PAINTED SHALL BE PAINTED WITH A LATEX BASE MATTE FINISH PAINT -ALL DOORS, DOOR FRAMES, WINDOW FRAMES, AND CONVECTOR ENCLOSURES SHALL BE PAINTED WITH AN ALKYD BASE SEMIGLOSS FINISH PAINT. 18. ALL CONVECTOR ENCLOSURES TO BE PAINTED SHALL HAVE THE GRILLES AND ACCESS PANELS REMOVED AND PAINTED SEPARATELY AND REINSTALLED WHEN THOROUGHLY DRY. 19. ALL DOORS AND FRAMES TO BE PAINTED THE SAME COLOR AND TYPE OF PAINT ON BOTH SIDES, UNLESS OTHERWISE NOTED. 20. ALL WALLS, CEILINGS, SOFFITS AND SURFACES WHICH HAVE BEEN PAINTED WITH AN EGGSHELL FINISH AND MUST BE TOUCHED UP AS A PUNCH LIST ITEM SHALL BE REPAINTED ENTIRELY BETWEEN THE (2) CLOSEST BREAK POINTS. 21. SAMPLES OF ALL FINISHES SPECIFIED SHALL BE SUBMITTED TO THE ARCHITECT FOR APPROVAL, IN TRIPLICATE, PRIOR TO COMMENCEMENT OF THE WORK. CARPET, WALL COVERING, AND WOOD FINISH SAMPLES TO BE A MIN. 12" X 12". PAINT SAMPLES FOR GYPSUM BOARD. SURFACES TO BE PROVIDED ON 12"X12" PIECES OF GYPSUM BOARD. 22. GENERAL CONTRACTOR IS RESPONSIBLE TO THOROUGHLY VACUUM CLEAN ALL CARPETED AREAS, CLEAN ALL FLOORING, MILLWORK, ETC, AND UNCOVER AND VACUUM OUT ALL CONVECTOR UNITS AFTER THE INSTALLATION IS COMPLETED, AND MAINTAIN CONDITION THROUGH THE TENANT'S MOVE IN THE ENTIRE POST- CONSTRUCTION SITE IS TO BE DUST FREE AND ALL STAINS REMOVED FROM ANY FLOORING, WALLS AND/OR CEILINGS. 23. ALL DRAPERY IS REQUIRED TO HAVE A FABRIC BACKER. COORDINATE WITH DESIGNER. 24. CARPET CONTRACTOR SHALL INSPECT THE SUBFLOOR PRIOR TO COMMENCEMENT OF WORK. THEY SHALL NOTIFY THE ARCHITECT AND/OR THE TENANT'S REPRESENTATIVE IN WRITING OF ANY CONDITIONS WHICH WILL PREVENT THEM FROM PRODUCING SATISFACTORY FINISH WORK. 25. CARPET CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR ANY UNACCEPTABLE FINISH WORK CAUSED BY SUBFLOOR CONDITIONS. 26. GENERAL CONTRACTOR SHALL INSTALL NEW 4" FLAT VINYL WALL BASE ON ALL WALLS IN CARPETED AREAS, AND 4" VINYL COVE BASE IN ALL VINYL FLOOR TILE AREAS TYPICAL THROUGHOUT EXCEPT WHEN STONE OR CERAMIC TILE FLOORING IS SPECIFIED OR WHERE OTHERWISE NOTED. G.C. SHALL THOROUGHLY CLEAN ALL VINYL BASE AFTER INSTALLATION IS COMPLETED. 27. CARPET CONTRACTOR TO PROVIDE AND INSTALL ALL NECESSARY VINYL REDUCING STRIPS AND/OR METAL SADDLES AS REQUIRED AT ALL CARPET/MATERIAL TRANSITION POINTS. COLOR SPECIFICATION BY ARCHITECT. 28. WHEN A GLUE DOWN INSTALLATION IS SPECIFIED, CARPETS SHALL BE LAID WITH TIGHT BUTT SEAMS LAID TRUE WITH AN APPROVED BRAND OF WATERPROOF QUICK RELEASE CEMENT IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. 29. SPOTS AND/OR SMEARS OF CARPET CEMENT SHALL PROMPTLY BE REMOVED WITH APPROVED SOLVENT. 30. ALL EXCESS PIECES OF USABLE CARPET SHALL BE ROLLED, TAGGED, AND LEFT WITH THE OWNER FOR FUTURE USE. 31. CARPET CONTRACTOR SHALL COORDINATE WITH THE ELECTRICIANS REGARDING FLOOR OUTLETS FOR ELECTRICAL AND COMMUNICATION REQUIREMENTS. ALL CUTTING OF CARPET FOR FLOOR OUTLETS AND JUNCTION BOXES SHALL BE THE RESPONSIBILITY OF THE CARPET CONTRACTOR. WATERPROOF MEMBRANE SYSTEM: IN RESTROOMS, KITCHENS, & OTHER FOOD PREP AREAS -PROVIDE BOSTIC-USA HYDROMENT BLACK TOP MEMBRANE SYSTEM. ALTERATE APPROVED PRODUCT IS LATICRETE 9235 WATERPROOF SYSTEM. MEMBRANE SYSTEM TO PROJECT UP WALL 4” AND OUT FROM WALL 16”AT SLAB ON GRADE CONDITIONS AND TO FULLY COVER FLOOR SURFACE ABOVE OCCUPIED SPACES. REFER TO PARTITION TYPE SHEET FOR ADDITIONAL INFORMATION. EXTRA MATERIALS: 1. PROVIDE EXTRA MATERIALS AS NOTED IN SPECIFICATIONS. 2. PROVIDE 1 GALLON OF EACH FLOOR CLEANER. PROTECTION MATERIALS: 1. DO NOT PERMIT TRAFFIC OVER FINISHED FLOOR SURFACE FOR 4 DAYS AFTER INSTALLATION. 2. PROVIDE TWO LAYERS OF CRAFT PAPER OVER ALL TILE AND GROUT ON FLOORS. TAPE DOWN AND STAGGER SEAMS BY HALF THE WIDTH ON SECOND LAYER. 1 1.2 1.6 2 2.4 2.8 3 H J K L 110 BAR DINING 111 BAR 114 LOUNGE ALCOVE 115 FIREPLACE DINING 116 SUNROOM 117 MECH ROOM 126 PATIO DINING 1 1 1 1 1 1 1 5 20 20 2 4 6 7 8 WDF-14 10 WDF-14 GRAINWDF-1TL-10TL-94TL-104TL-74 TL-74 TL-74 10 10 2" 4" 2" R 5 '-9 1 /2 "R 5'-9 1/2"R 5'-9 1/2" R 5'-9 1/2" WDF-14 WDF-14 WDF-14 WDF-14 CPT-24 CPT-34 10 10 1 10 WDF-14 WDF-14 3 FULL PLANKSTYPICAL2 PLANK WIDTHS3 PLANK WIDTHS WDF-14 CONC-14 GRAINGRAIN11 11 11 11 PART I PART II TR-5 TR-5 TR-5 TR-5 TR-5 TL-6 TR-11TL-94TL-94R 2 '-7 " RESF-24 13 13CPT-3WDF-1TL-7 RESF-2 ALIGNALIGNALIGN NOT IN SCOPE 15 TL-25 TL-26 TL-27 45.00°45.00°45.00° R 5 '-0 "R 5 '-6 "6"6"6"6"10'-0"14'-5"6'-0"113 SEMI PDR 112 BOURBON DINING _____14 A192 TYPICAL 3 FULL PLANKS ALIGN 12 CPT-3 WDF-1 45.00°TYPICAL 3 FULL PLANKS TYPICAL 3 FULL PLANKS WLC-132WLC-132WLC-132WLC-132WLC-132WLC-13216 16 16 16 1616 16 16 LAM-72 LAM-72LAM-72 LAM-72 LAM-72 LAM-72 LAM-72 LAM-72 TR-5 8"2"7'-2"2"4"2"4'-6"5'-2"3'-5" TYP.8"5'-10"8"7'-5 1/2"2"4"2"6'-9 1/2"4'-1" TYP. 3'-5" TYP.8" 5'-4"5'-4"3'-5"8"TL-1045'-9 1/2"2'-6"2"4"2"6'-5"7'-1"8"2"5'-3"8"8'-9 1/2"2"4"2" 8" TR-6 TR-6 TR-6 TR-5 TR-5 TL-94 1'-0"ALIGNALIGN1'-0" TL-94 DATE ISSUED REG. NO. THIS DOCUMENT IS CERTIFIED BY consultant project title seal project no. sheet title drawn client issue date checked 10 South Eighth Street Minneapolis, MN 55402 t 612_339-2257 sheadesign.com AR00910059 David A. Shea, Architect 2024-02-02 2/26/2024 5:55:58 PMC:\Revit Projects\A22_8764.00-1933 RESTAURANT - CARMEL, IN_AmeliaK-SHEA.rvt8764.00 AK KL/HS/SO FINISH PLAN -PART II A140b © 2022 shea, inc. (FOR CONSTRUCTION) ADDENDUM 1 2024-02-26 1ST. ELMO, INC. 101 W. WASHINGTON STREET, SUITE 1250 EAST INDIANAPOLIS, IN 46204 1933 LOUNGE 175 S RANGELINE RD, SUITE 100 CARMEL, INDIANA 46032 PROJECT NORTH (NOT ALL KEYNOTES MAY BE USED ON THIS SHEET) FINISH KEY NOTES NO.DESCRIPTION REV. 1 SEE SHEET A120 FOR CEILING FINISHES 2 STAINLESS STEEL BY KEC VENDOR 3 STAINLESS STEEL CORNER GUARD OR END CAP, CONFIRM HEIGHT WITH OWNER 4 STAINLESS STEEL PANEL TO 8'-0" IN HEIGHT THROUGHOUT, PAINT WALL ABOVE (PT-6) TO CEILING 5 CONTINUE FLOORING UNDER MILLWORK. 6 PROVIDE SLOPE IN FLOORING FINISH TO FLOOR DRAIN/SINK AS REQUIRED. SEE DRAIN DETAIL FOR MORE INFORMATION. 7 PROVIDE WATERPROOF MEMBRANE UP WALL, TYP. SEE GENERAL FINISH NOTES FOR MORE INFORMATION. 8 PROVIDE WATERPROOF MEMBRANE UNDER FLOORING 16" FROM DIEWALL THROUGHOUT AS SHOWN, SEE GENERAL FINISH NOTES FOR MORE INFORMATION. 9 CENTER CARPET RUNNER AND TILE BORDER BETWEEN WINE ROOMS 10 SEE ELEVATIONS FOR WALL FINISHES 11 RADIAL TL-9 AND TL-10 INSTALL AROUND CURVE 12 MITER WOOD AT EACH CORNER, TYPICAL 13 [SPF-5] WINDOW FILM APPLIED TO INTERIOR OF WINDOWS, SEE ELEVATIONS 14 SEE SHEET A541 FOR FINISH INFORMATION 15 TILES APPLIED TO FIREPLACE SURROUND, SEE DETAIL FOR INSTALL PATTERN 16 ALL OUTSIDE CORNERS OF WALLS TO GET 1"X1" BLACKENED STEEL CORNER TRIM, TYPICAL. EXTEND TRIM FROM WALL BASE TO BOTTOM OF COUNTERTOP. 17 COVE BASE, TYP. 18 EXPOSED CONCRETE SLAB FINISH. APPLY A CONCRETE FLOOR SEALER AS REQUIRED. 19 VERIFY WITH STAIN MANUFACTURER, APPLY A CONCRETE FLOOR SEALER AS REQUIRED. 20 NO WOOD FLOORING UNDER MILLWORK. EXPOSED SLAB FINISH, SEAL AS REQUIRED. SCALE: 1/4" = 1'-0"A140b 1 FINISH PLAN - LEVEL 1 - PART II no. date issued for