Loading...
HomeMy WebLinkAboutCorrespondencePlan Review - Review Comments Report Project Name: PZ-2024-00001 ADLS Amend - IMI Concrete Plant Rebuild Workflow Started: 1/11/2024 12:04:03 PM Report Generated: 03/29/2024 08:35 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 1 1 TriCo Regional Sewer Utility Ryan Hartman 1/23/24 11:23 AM Comment This facility in on septic vs sanitary sewer. Info Only 2 1 Planning & Zoning Christina Jesse 2/1/24 3:48 PM Comment Please confirm if a trash receptacle will be utilized on site. Responsed by: Michael Kalberg - 3/20/24 3:57 PM Dumpster enclosure details have been uploaded to the Architectural Drawings folder. ---------------------------------------------------------- Reviewer Response: Christina Jesse - 2/21/24 2:55 PM Please upload design with material and colors of the enclosure showing architectural compatibility with the primary building. Thank you. ---------------------------------------------------------- Responsed by: Michael Kalberg - 2/20/24 2:46 PM Yes, an 8 CYD dumpster will be utilized and located on the N/NE side of the concrete plant. The anticipated dumpster location is shown on the updated site plan that has been uploaded to the "Site Drawings" folder. Resolved 3 1 Planning & Zoning Christina Jesse 2/1/24 3:49 PM Comment Please show how parking on site will be accommodated on the site plan. Responsed by: Michael Kalberg - 2/20/24 2:50 PM The parking will be located on the north side of the existing building located south of the concrete plant. The parking area has been identified on the site plan that has been uploaded to the "Site Drawings" folder. Resolved 4 1 Planning & Zoning Christina Jesse 2/1/24 3:49 PM Comment Please upload the Letter of Grant from the BZA Hearing Officer meeting to allow the height of the silos. Responsed by: Michael Kalberg - 3/20/24 3:58 PM The Letter of Grant has been uploaded to the Correspondence folder. ---------------------------------------------------------- Responsed by: Michael Kalberg - 2/20/24 2:50 PM Noted. Resolved REVIEW COMMENTS Plan Review - Review Comments Report Project Name: PZ-2024-00001 ADLS Amend - IMI Concrete Plant Rebuild Workflow Started: 1/11/2024 12:04:03 PM Report Generated: 03/29/2024 08:35 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 5 1 Planning & Zoning Christina Jesse 2/1/24 3:50 PM Changemark Update Architectural Labels with Directional Labels Please rename the right elevation the "north elevation" A300 Exterior Elevations.pdf Responsed by: Michael Kalberg - 2/20/24 2:52 PM The elevation titles have been revised as requested. See revised architectural drawings uploaded to the "Architectural Drawings" folder. Resolved 6 1 Planning & Zoning Christina Jesse 2/1/24 3:50 PM Changemark Update Architectural Labels with Directional Labels Please rename the rear elevation the "west elevation" A300 Exterior Elevations.pdf Responsed by: Michael Kalberg - 2/20/24 2:52 PM The elevation titles have been revised as requested. See revised architectural drawings uploaded to the "Architectural Drawings" folder. Resolved 7 1 Planning & Zoning Christina Jesse 2/1/24 3:52 PM Changemark Update Architectural Labels with Directional Labels Please rename the left elevation the "south elevation" A200 Exterior Elevations.pdf Responsed by: Michael Kalberg - 2/20/24 2:52 PM The elevation titles have been revised as requested. See revised architectural drawings uploaded to the "Architectural Drawings" folder. Resolved 8 1 Planning & Zoning Christina Jesse 2/1/24 3:52 PM Changemark Update Architectural Labels with Directional Labels Please rename the front elevation the "east elevation" A200 Exterior Elevations.pdf Responsed by: Michael Kalberg - 2/20/24 2:52 PM The elevation titles have been revised as requested. See revised architectural drawings uploaded to the "Architectural Drawings" folder. Resolved 9 1 Planning & Zoning Christina Jesse 2/1/24 3:52 PM Changemark Sign Location Please relocate the sign to the southern elevation as this is the acting front facade. A200 Exterior Elevations.pdf Responsed by: Michael Kalberg - 2/20/24 2:53 PM The sign has been relocated to the southern elevation. See revised architectural drawings and sign drawing uploaded to the "Architectural Drawings" folder. Resolved 10 1 Vectren Energy Chad Miller 2/5/24 8:53 AM Changemark CenterPoint Energy The existing gas service and meter will need to be temporarily retired before demolition of the existing plant. Also, will need a utility plan showing the new location of the gas meter. CenterPoint Energy will also need an AutoCAD file. Please call the new service center at 1-800-990-1930 for the temporary retirement. IMI W 96TH STREET SITE PLAN.pdf Info Only Plan Review - Review Comments Report Project Name: PZ-2024-00001 ADLS Amend - IMI Concrete Plant Rebuild Workflow Started: 1/11/2024 12:04:03 PM Report Generated: 03/29/2024 08:35 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 11 1 Planning & Zoning Christina Jesse 2/6/24 2:18 PM Changemark Construction access Please verify if this is the proposed construction drive to the site. There is currently no access from the parking lot off of Mayflower Park Drive. Access should be through the drive to the south of the site from 96th Street. T100 Title Sheet.pdf Responsed by: Michael Kalberg - 2/20/24 3:02 PM No construction access off of Mayflower Park Drive is anticipated. The anticipated construction drive is the existing drive from 96th Street that is directly located south of the concrete plant. Resolved 12 1 Sign Permits Aliza Shalit 2/8/24 10:23 AM Changemark Elevations labels Please label elevations with appropriate cardinal points. A200 Exterior Elevations.pdf Responsed by: Michael Kalberg - 2/20/24 2:52 PM The elevation titles have been revised as requested. See revised architectural drawings uploaded to the "Architectural Drawings" folder. Resolved 13 1 Sign Permits Aliza Shalit 2/8/24 10:23 AM Changemark Sign location Your assigned street frontage is to the South, therefore the sign as proposed would require a sign Variance for Sign not facing a frontage street. You may choose to move your sign to the South elevation which would then negate the need for a sign standards Variance. A200 Exterior Elevations.pdf Responsed by: Michael Kalberg - 3/20/24 4:00 PM The elevations have been updated to include the sign on the south elevation. Updated elevations uploaded to the Architectural drawings folder. ---------------------------------------------------------- Reviewer Response: Aliza Shalit - 2/28/24 9:04 AM Please show sign on the south elevation. ---------------------------------------------------------- Responsed by: Michael Kalberg - 2/20/24 2:54 PM The sign has been relocated to the southern elevation. See revised architectural drawings and sign drawing uploaded to the "Architectural Drawings" folder. Resolved 14 1 Sign Permits Aliza Shalit 2/8/24 10:23 AM Changemark Sign specs Please confirm this sign will be installed directly on metal siding without any kind of backer panel that extends beyond the shape of the individual poly raided letters. No full backer panels please. A200 Exterior Elevations.pdf Responsed by: Michael Kalberg - 2/20/24 2:55 PM The sign will be installed directly to the metal siding. The sign information has been uploaded to the "Architectural Drawings" folder. Resolved 15 1 Sign Permits Aliza Shalit 2/8/24 10:24 AM Comment All Signs require a sign permit application and review process. Please apply through the City's online application portal. Info Only Plan Review - Review Comments Report Project Name: PZ-2024-00001 ADLS Amend - IMI Concrete Plant Rebuild Workflow Started: 1/11/2024 12:04:03 PM Report Generated: 03/29/2024 08:35 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 16 1 Sign Permits Aliza Shalit 2/8/24 10:26 AM Comment Will there be any other types of signage proposed? Directional signs? All signs larger than 3sf require permits and must abide by UDO Sign Standards. If more signs are planned, please provide full signage plan. Responsed by: Michael Kalberg - 3/20/24 4:02 PM The only sign to be installed is the proposed building mounted sign. ---------------------------------------------------------- Responsed by: Michael Kalberg - 2/20/24 2:56 PM No, the only sign to be installed is the proposed building mounted sign. Question 17 2 Planning & Zoning Christina Jesse 2/21/24 3:02 PM Changemark Wall-pack lights Please show light fixture locations on the north and west elevations. A300 Exterior Elevations.pdf Responsed by: Michael Kalberg - 3/20/24 3:58 PM The elevations have been revised to show the light fixture locations. Updated elevations uploaded to the Architectural drawings folder. Resolved 18 2 Planning & Zoning Christina Jesse 2/21/24 3:02 PM Changemark Color Elevations Please upload a new version of all elevations in color. Thank you. A300 Exterior Elevations.pdf Responsed by: Michael Kalberg - 3/20/24 3:59 PM Updated elevations uploaded to the Architectural drawings folder. Resolved 19 2 Planning & Zoning Christina Jesse 2/21/24 3:03 PM Changemark Signage Relocation on Elevations Please show the new signage location on the south elevation. The notation still shows signage on the east elevation. Thank you. A200 Exterior Elevations.pdf Responsed by: Michael Kalberg - 3/20/24 3:59 PM The elevations have been updated to include the sign on the south elevation. Updated elevations uploaded to the Architectural drawings folder. Resolved 20 2 Planning & Zoning Christina Jesse 2/21/24 3:03 PM Changemark Painted silo labels Please label the existing silos on the south elevation will also be painted A200 Exterior Elevations.pdf Responsed by: Michael Kalberg - 3/20/24 4:00 PM The elevations have been updated to include a note indicating the existing silos are to be painted. Updated elevations uploaded to the Architectural drawings folder. Resolved 21 2 Sign Permits Aliza Shalit 2/28/24 9:01 AM Changemark Elevation Label Please label elevation with appropriate Cardinal Point (N, S, E, or W) IMI W 96th St Sign Details.pdf Responsed by: Michael Kalberg - 3/20/24 4:03 PM The sign details have been updated with the cardinal points. The sign details have been uploaded to the Architectural drawings. Resolved Plan Review - Review Comments Report Project Name: PZ-2024-00001 ADLS Amend - IMI Concrete Plant Rebuild Workflow Started: 1/11/2024 12:04:03 PM Report Generated: 03/29/2024 08:35 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 22 2 Sign Permits Aliza Shalit 2/28/24 9:02 AM Changemark Sign Please include signage on the elevation that will carry the signage. A200 Exterior Elevations.pdf Responsed by: Michael Kalberg - 3/20/24 4:03 PM The elevations have been updated to include the sign on the south elevation. Updated elevations uploaded to the Architectural drawings folder. Resolved