HomeMy WebLinkAboutCorrespondencePlan Review - Review Comments Report
Project Name: PZ-2024-00001 ADLS Amend - IMI Concrete Plant Rebuild
Workflow Started: 1/11/2024 12:04:03 PM
Report Generated: 03/29/2024 08:35 AM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
1 1 TriCo Regional
Sewer Utility
Ryan Hartman
1/23/24 11:23 AM
Comment
This facility in on septic vs sanitary sewer.
Info Only
2 1 Planning & Zoning
Christina Jesse
2/1/24 3:48 PM
Comment
Please confirm if a trash receptacle will be utilized on site.
Responsed by: Michael Kalberg - 3/20/24 3:57 PM
Dumpster enclosure details have been uploaded to the
Architectural Drawings folder.
----------------------------------------------------------
Reviewer Response: Christina Jesse - 2/21/24 2:55 PM
Please upload design with material and colors of the
enclosure showing architectural compatibility with the
primary building. Thank you.
----------------------------------------------------------
Responsed by: Michael Kalberg - 2/20/24 2:46 PM
Yes, an 8 CYD dumpster will be utilized and located on
the N/NE side of the concrete plant. The anticipated
dumpster location is shown on the updated site plan
that has been uploaded to the "Site Drawings" folder.
Resolved
3 1 Planning & Zoning
Christina Jesse
2/1/24 3:49 PM
Comment
Please show how parking on site will be accommodated on the site plan.
Responsed by: Michael Kalberg - 2/20/24 2:50 PM
The parking will be located on the north side of the
existing building located south of the concrete plant.
The parking area has been identified on the site plan
that has been uploaded to the "Site Drawings" folder.
Resolved
4 1 Planning & Zoning
Christina Jesse
2/1/24 3:49 PM
Comment
Please upload the Letter of Grant from the BZA Hearing Officer meeting to
allow the height of the silos.
Responsed by: Michael Kalberg - 3/20/24 3:58 PM
The Letter of Grant has been uploaded to the
Correspondence folder.
----------------------------------------------------------
Responsed by: Michael Kalberg - 2/20/24 2:50 PM
Noted.
Resolved
REVIEW COMMENTS
Plan Review - Review Comments Report
Project Name: PZ-2024-00001 ADLS Amend - IMI Concrete Plant Rebuild
Workflow Started: 1/11/2024 12:04:03 PM
Report Generated: 03/29/2024 08:35 AM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
5 1 Planning & Zoning
Christina Jesse
2/1/24 3:50 PM
Changemark
Update Architectural Labels with Directional Labels
Please rename the right elevation the "north elevation"
A300 Exterior Elevations.pdf Responsed by: Michael Kalberg - 2/20/24 2:52 PM
The elevation titles have been revised as requested. See
revised architectural drawings uploaded to the
"Architectural Drawings" folder.
Resolved
6 1 Planning & Zoning
Christina Jesse
2/1/24 3:50 PM
Changemark
Update Architectural Labels with Directional Labels
Please rename the rear elevation the "west elevation"
A300 Exterior Elevations.pdf Responsed by: Michael Kalberg - 2/20/24 2:52 PM
The elevation titles have been revised as requested. See
revised architectural drawings uploaded to the
"Architectural Drawings" folder.
Resolved
7 1 Planning & Zoning
Christina Jesse
2/1/24 3:52 PM
Changemark
Update Architectural Labels with Directional Labels
Please rename the left elevation the "south elevation"
A200 Exterior Elevations.pdf Responsed by: Michael Kalberg - 2/20/24 2:52 PM
The elevation titles have been revised as requested. See
revised architectural drawings uploaded to the
"Architectural Drawings" folder.
Resolved
8 1 Planning & Zoning
Christina Jesse
2/1/24 3:52 PM
Changemark
Update Architectural Labels with Directional Labels
Please rename the front elevation the "east elevation"
A200 Exterior Elevations.pdf Responsed by: Michael Kalberg - 2/20/24 2:52 PM
The elevation titles have been revised as requested. See
revised architectural drawings uploaded to the
"Architectural Drawings" folder.
Resolved
9 1 Planning & Zoning
Christina Jesse
2/1/24 3:52 PM
Changemark
Sign Location
Please relocate the sign to the southern elevation as this is the acting front
facade.
A200 Exterior Elevations.pdf Responsed by: Michael Kalberg - 2/20/24 2:53 PM
The sign has been relocated to the southern elevation.
See revised architectural drawings and sign drawing
uploaded to the "Architectural Drawings" folder.
Resolved
10 1 Vectren Energy
Chad Miller
2/5/24 8:53 AM
Changemark
CenterPoint Energy
The existing gas service and meter will need to be temporarily retired before
demolition of the existing plant. Also, will need a utility plan showing the
new location of the gas meter. CenterPoint Energy will also need an
AutoCAD file. Please call the new service center at 1-800-990-1930 for the
temporary retirement.
IMI W 96TH STREET SITE PLAN.pdf Info Only
Plan Review - Review Comments Report
Project Name: PZ-2024-00001 ADLS Amend - IMI Concrete Plant Rebuild
Workflow Started: 1/11/2024 12:04:03 PM
Report Generated: 03/29/2024 08:35 AM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
11 1 Planning & Zoning
Christina Jesse
2/6/24 2:18 PM
Changemark
Construction access
Please verify if this is the proposed construction drive to the site. There is
currently no access from the parking lot off of Mayflower Park Drive. Access
should be through the drive to the south of the site from 96th Street.
T100 Title Sheet.pdf Responsed by: Michael Kalberg - 2/20/24 3:02 PM
No construction access off of Mayflower Park Drive is
anticipated. The anticipated construction drive is the
existing drive from 96th Street that is directly located
south of the concrete plant.
Resolved
12 1 Sign Permits
Aliza Shalit
2/8/24 10:23 AM
Changemark
Elevations labels
Please label elevations with appropriate cardinal points.
A200 Exterior Elevations.pdf Responsed by: Michael Kalberg - 2/20/24 2:52 PM
The elevation titles have been revised as requested. See
revised architectural drawings uploaded to the
"Architectural Drawings" folder.
Resolved
13 1 Sign Permits
Aliza Shalit
2/8/24 10:23 AM
Changemark
Sign location
Your assigned street frontage is to the South, therefore the sign as proposed
would require a sign Variance for Sign not facing a frontage street. You may
choose to move your sign to the South elevation which would then negate
the need for a sign standards Variance.
A200 Exterior Elevations.pdf Responsed by: Michael Kalberg - 3/20/24 4:00 PM
The elevations have been updated to include the sign
on the south elevation. Updated elevations uploaded to
the Architectural drawings folder.
----------------------------------------------------------
Reviewer Response: Aliza Shalit - 2/28/24 9:04 AM
Please show sign on the south elevation.
----------------------------------------------------------
Responsed by: Michael Kalberg - 2/20/24 2:54 PM
The sign has been relocated to the southern elevation.
See revised architectural drawings and sign drawing
uploaded to the "Architectural Drawings" folder.
Resolved
14 1 Sign Permits
Aliza Shalit
2/8/24 10:23 AM
Changemark
Sign specs
Please confirm this sign will be installed directly on metal siding without any
kind of backer panel that extends beyond the shape of the individual poly
raided letters. No full backer panels please.
A200 Exterior Elevations.pdf Responsed by: Michael Kalberg - 2/20/24 2:55 PM
The sign will be installed directly to the metal siding.
The sign information has been uploaded to the
"Architectural Drawings" folder.
Resolved
15 1 Sign Permits
Aliza Shalit
2/8/24 10:24 AM
Comment
All Signs require a sign permit application and review process. Please apply
through the City's online application portal.
Info Only
Plan Review - Review Comments Report
Project Name: PZ-2024-00001 ADLS Amend - IMI Concrete Plant Rebuild
Workflow Started: 1/11/2024 12:04:03 PM
Report Generated: 03/29/2024 08:35 AM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
16 1 Sign Permits
Aliza Shalit
2/8/24 10:26 AM
Comment
Will there be any other types of signage proposed? Directional signs? All
signs larger than 3sf require permits and must abide by UDO Sign Standards.
If more signs are planned, please provide full signage plan.
Responsed by: Michael Kalberg - 3/20/24 4:02 PM
The only sign to be installed is the proposed building
mounted sign.
----------------------------------------------------------
Responsed by: Michael Kalberg - 2/20/24 2:56 PM
No, the only sign to be installed is the proposed
building mounted sign.
Question
17 2 Planning & Zoning
Christina Jesse
2/21/24 3:02 PM
Changemark
Wall-pack lights
Please show light fixture locations on the north and west elevations.
A300 Exterior Elevations.pdf Responsed by: Michael Kalberg - 3/20/24 3:58 PM
The elevations have been revised to show the light
fixture locations. Updated elevations uploaded to the
Architectural drawings folder.
Resolved
18 2 Planning & Zoning
Christina Jesse
2/21/24 3:02 PM
Changemark
Color Elevations
Please upload a new version of all elevations in color. Thank you.
A300 Exterior Elevations.pdf Responsed by: Michael Kalberg - 3/20/24 3:59 PM
Updated elevations uploaded to the Architectural
drawings folder.
Resolved
19 2 Planning & Zoning
Christina Jesse
2/21/24 3:03 PM
Changemark
Signage Relocation on Elevations
Please show the new signage location on the south elevation. The notation
still shows signage on the east elevation. Thank you.
A200 Exterior Elevations.pdf Responsed by: Michael Kalberg - 3/20/24 3:59 PM
The elevations have been updated to include the sign
on the south elevation. Updated elevations uploaded to
the Architectural drawings folder.
Resolved
20 2 Planning & Zoning
Christina Jesse
2/21/24 3:03 PM
Changemark
Painted silo labels
Please label the existing silos on the south elevation will also be painted
A200 Exterior Elevations.pdf Responsed by: Michael Kalberg - 3/20/24 4:00 PM
The elevations have been updated to include a note
indicating the existing silos are to be painted. Updated
elevations uploaded to the Architectural drawings
folder.
Resolved
21 2 Sign Permits
Aliza Shalit
2/28/24 9:01 AM
Changemark
Elevation Label
Please label elevation with appropriate Cardinal Point (N, S, E, or W)
IMI W 96th St Sign Details.pdf Responsed by: Michael Kalberg - 3/20/24 4:03 PM
The sign details have been updated with the cardinal
points. The sign details have been uploaded to the
Architectural drawings.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2024-00001 ADLS Amend - IMI Concrete Plant Rebuild
Workflow Started: 1/11/2024 12:04:03 PM
Report Generated: 03/29/2024 08:35 AM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
22 2 Sign Permits
Aliza Shalit
2/28/24 9:02 AM
Changemark
Sign
Please include signage on the elevation that will carry the signage.
A200 Exterior Elevations.pdf Responsed by: Michael Kalberg - 3/20/24 4:03 PM
The elevations have been updated to include the sign
on the south elevation. Updated elevations uploaded to
the Architectural drawings folder.
Resolved