Loading...
HomeMy WebLinkAboutC-900.0 SPECIFICATIONSHARVEST CHURCHPRELIMINARYCONSTRUCTIONNOT FOR DIRECTORY PATH: R:\Active\Bryan Lacey\Harvest Bible\Cad\PLANS 2023FILENAME: 900 SPECIFICATIONS.dwgDATE/USER: 10/17/2023 2:22 PM / DmyerDevelopment ConsultantsTransportation &900 900SPECIFICATIONSEARTHWORK 1. SCOPE OF WORK 2. BENCH MARKS 3. REMOVAL OF TREES 4. HANDLING OF TOPSOIL 5. DISPOSITION OF UTILITIES 6. SITE GRADING 7. EARTH WORK BALANCE CITY OF CARMEL RIGHT-OF-WAY PAVING POLICY 1. GENERAL 2. FOUNDATION CITY OF CARMEL CONCRETE CURB POLICY 1. General 2. Foundation 3. Aggregate Bases 4.Concrete Curb STORM SEWER SYSTEMS 1. SCOPE OF WORK 2. STORM SEWER CONSTRUCTION 3. APPLICATION 3. AGGREGATE BASES 4. ASPHALT PAVEMENT 5. Inspections 6. Acceptance 3. APPLICATION ” ADDITIONAL WATER ITEMS 1. HIGH DENSITY POLYETHYLENE (HDPE) PIPE ” “” 2. HORIZONTAL DIRECTIONAL DRILLING (HDD) WATER LINE SYSTEM 1. SCOPE OF WORK 2. MATERIALS 3. APPLICATION 5. INSPECTIONS ” SANITARY SEWER SYSTEMS 1. SCOPE OF WORK 2. MATERIALS