Loading...
HomeMy WebLinkAboutC0.0 TITLE SHEET© 2022 Microsoft Corporation © 2022 TomTom ©CORPORATECAMPUS HQNOT APPR OVED F OR CONSTRUCTION C0.0 CIVIL ENGINEERING PLANS HAMILTON CROSSING HQ 12201 N MERIDIAN ST CARMEL, IN 46032 TITLE SHEETLEGAL DESCRIPTION PROJECT TEAM ROLE COMPANY ADDRESS PHONE NUMBER EMAIL CONTACT DEVELOPER/OWN ER KITE REALTY GROUP 30 S. MERIDIAN ST., STE. 1100 INDIANAPOLIS, IN 46204 (317) 577-5600 DKIRBY@KITEREAL TY.COM DOUG KIRBY, P.E. CIVIL ENGINEER KIMLEY-HORN & ASSOCIATES, INC. 250 E. 96TH ST., STE 580, INDIANAPOLIS, IN 46240 (317) 218-9560 CONNOR.STREGE@ KIMLEY-HORN.COM CONNOR STREGE, P.E. LANDSCAPE ARCHITECT RATIO 101 S PENNSYLVANIA ST. INDIANAPOLIS, IN 46204 (317) 633-4040 TOMMY FREEBORN LAND SURVEYOR AMERICAN STRUCTUREPOINT, INC. 9025 RIVER ROAD, STE 200 INDIANAPOLIS, IN 46240 (317) 547-5580 TRACY MCGILL, P.S. UTILITY AND GOVERNING AGENCY CONTACTS SERVICE / JURISDICTION COMPANY / DEPT.ADDRESS PHONE NUMBER CONTACT ENGINEERING DEPARTMENT CITY OF CARMEL 1 CIVIC SQUARE, 1ST FLOOR CARMEL, IN 46032 (317) 571-2441 ALEX JORDAN ADA CITY OF CARMEL 1 CIVIC SQUARE, 3RD FLOOR CARMEL, IN 46032 (317) 571-2417 DAVID LITTLEJOHN FIRE DEPARTMENT CARMEL FIRE DEPARTMENT 1 CIVIC SQUARE CARMEL, IN 46032 (317) 571-2612 LUKE RAY PLANNING & ZONING CITY OF CARMEL 1 CIVIC SQUARE, 3RD FLOOR CARMEL, IN 46032 (317) 571-2417 ANGIR CONN BUILDING & CODE SERVICES CITY OF CARMEL 1 CIVIC SQUARE CARMEL, IN 46032 (317) 571-2444 WILLIAM (BILL) HOLT SANITARY SEWER CITY OF CARMEL UTILITIES 30 WEST MAIN STREET, STE 200 CARMEL, IN 46032 (317) 571-2443 JOHN DUFFY WATER CITY OF CARMEL UTILITIES 30 WEST MAIN STREET, STE 200 CARMEL, IN 46032 (317) 733-2855 STEVE COOK CARMEL NOTES (NOT TO SCALE) LOCATION MAP CONSTRUCTION OF A ±23,950 SF OFFICE EXPANSION WITH ASSOCIATED INFRASTRUCTURE. PROJECT IS IN SECTION 35 OF T18N, R3E IN THE CITY OF CARMEL, HAMILTON COUNTY, INDIANA HAMILTON COUNTY (NOT TO SCALE) HAMILTON COUNTY VICINITY MAP NORTH DOCKET NUMBER: PZ-2023-00251 ADLS Sheet List Table Sheet Number Sheet Title C0.0 TITLE SHEET C1.0 GENERAL SPECIFICATIONS C1.1 GENERAL NOTES C1.2 CITY OF CARMEL GENERAL NOTES C2.0 EXISTING CONDITIONS AND DEMO PLAN C3.0 SITE PLAN C4.0 INITIAL EROSION CONTROL PLAN C4.1 TEMPORARY EROSION CONTROL PLAN C4.2 PERMANENT EROSION CONTROL PLAN C4.3 EROSION CONTROL DETAILS C4.4 SWPPP C5.0 GRADING AND DRAINAGE PLAN C5.1 GRADING AND DRAINAGE PLAN C6.0 UTILITY PLAN C6.1 STORM PLAN & PROFILES C6.2 STORM PLAN & PROFILES C7.0 CONSTRUCTION DETAILS C7.1 CONSTRUCTION DETAILS C7.2 CONSTRUCTION DETAILS 3/28/2024