Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
C2.0 EXISTING CONDITIONS AND DEMO PLAN
5.00'10.00'5.00'5.00'10.00'5.00'EXISTING HOTEL ±13,812 SF FFE: 862.39 PROPOSED HOTEL EXPANSION ±15,150 SF FFE: 862.39 PROPOSED BUILDING 1 ± 51,827 SF FFE = 862.40 23.65'14.50'20.50'FUTURE BUILDING FUTURE BUILDING FUTUREBUILDINGGARAGE BUILDING ±35,050 SF FFE: 862.00 PENNSYLVANIA AVENORTH ©CORPORATECAMPUS HQNOT APPR OVED F OR CONSTRUCTION C2.0EXISTINGCONDITIONS ANDDEMO PLANEXISTING LEGEND C2.0EXISTINGCONDITIONS ANDDEMO PLANC2.0EXISTINGCONDITIONS ANDDEMO PLANC2.0 GENERAL PLAN NOTES DEMOLITION LEGEND EXISTINGCONDITIONS ANDDEMO PLANSWPPP NOTE BOARD OF PUBLIC WORKS NOTE FIRE DEPARTMENT NOTES 3/28/2024