Loading...
HomeMy WebLinkAboutC4.0 INITIAL EROSION CONTROL PLANEXISTING HOTEL ±13,812 SF FFE: 862.39 PROPOSED HOTEL EXPANSION ±15,150 SF FFE: 862.39 PROPOSED BUILDING 1 ± 51,827 SF FFE = 862.40 FUTURE BUILDING FUTURE BUILDING FUTUREBUILDINGGARAGE BUILDING ±35,050 SF FFE: 862.00 PENNSYLVANIA AVENORTH ©CORPORATECAMPUS HQNOT APPR OVED F OR CONSTRUCTION C4.0INITIAL EROSIONCONTROL PLANEXISTING LEGEND C4.0INITIAL EROSIONCONTROL PLANINITIAL EROSION CONTROL LEGEND GENERAL PLAN NOTES MATCHLINE - SEE THIS SHEET MATCHLINE - SEE THIS SHEET 3/28/2024