HomeMy WebLinkAboutL-511 Soils Placement Plan - Phase IIIXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X
XXX
XX
X
XX
X
XXX
XXX
XXX
XX
X
XX
X
XX
XXXXXXXXXXXXXXMAINTENANCE32 STUDENT112MAINTENANCELARGEEQUIPMENTTRAINING111100 PERSONAUDITORIUM10660 PERSONCLASSROOM118MAINTENANCE30 STUDENT113TRASH117DELIVERY116NORTHCORRIDOR110ACCESSCORRIDOR115WATERSERVICE117ATOPSOIL FOR LAWN4,960 sf6" DEPTHTOPSOIL FOR SHRUB, PERENNIAL, AND BEDDINGPLANT BEDS19,575 sf14" DEPTHSTRUCTURAL SOIL1,056 sf36" DEPTHTOPSOIL SCHEDULESCALE010'20'40'A1L-511SOILS PLACEMENT PLAN - PHASE IIIOwnerMechanical / Electrical / Plumbing EngineerCivil EngineerArchitect / Landscape Architect101 South Pennsylvania StreetIndianapolis, Indiana 46204317-633-4040RATIO30 S. Meridian Street, #1100Indianapolis, Indiana 46204Kite Realty GroupRepublic AirwaysHeadquarters12201 N. Meridian St.Carmel, Indiana 46032Structural Engineer1717 E 116th Street, Suite 200Carmel, Indiana 46032317-580-0402McComas/O'donnell Naccarato22014.0009229 Delegates Row, Suite 150Indianapolis, Indiana 46240317-781-6200Circle Design Group250 East 96th Street, Suite 580Indianapolis, Indiana 46240Kimley Horn8909 Purdue Road, Suite 300Indianapolis, Indiana 46268Republic Airways Holdings815 East 65th Street, #200Indianapolis, Indiana 46220Pure DevelopmentSOILS PLACEMENTPLAN - PHASE IIINOTE:REFER TO A1/L-502FOR CONTINUATION.PROPOSEDHEADQUARTERSF.F.E. = 862.40PROPOSEDGARAGEF.F.E. = 862.00EXISTINGTRAINING CENTERF.F.E. = 862.40FUTURE R.O.W.
FUTURE R.O.W.
FUTURE R.O.W.FUTURE R.O.W.FUTURE R.O.W.FUTURE R.O.W.PROPERTY LINEPHASE 1 LIMITSSCOPE LIMITS1.WORK SHOWN ON THE DRAWINGS SHALL BE BASE BID UNLESS SPECIFICALLY NOTED TO BE BY ALTERNATE BID.2.COORDINATE WORK WITH OTHER DESIGN DISCIPLINES.3.PARTICIPATE IN THE PRE-INSTALLATION CONFERENCE FOR THE PLANTING SCOPE OF WORK, ACCORDING TO THEPROJECT SPECIFICATIONS, PRIOR TO COMMENCEMENT.4.EXISTING AND PROPOSED UTILITIES THAT ARE SHOWN ARE FOR REFERENCE ONLY. REFER TO THE SITE SURVEYFOR EXISTING UTILITIES AND VERIFY ALL IN THE FIELD. REFER TO AND COORDINATE WITH DRAWINGS PREPAREDBY OTHER DESIGN DISCIPLINES FOR PROPOSED ALL PROPOSED UTILITIES.5.MATCH GRAPHIC REPRESENTATION SHOWN UNLESS NOTED OR DIMENSIONED OTHERWISE.6.COMMENCEMENT OF SOILS PLACEMENT SCOPE CONSTITUTES ACCEPTANCE OF SITE CONDITIONS. ENSURETHAT NECESSARY AND SPECIFIED SUBGRADE CONDITIONS HAVE BEEN ACHIEVED PRIOR TO PLACEMENT OFSOILS, INCLUDING POSITIVE DRAINAGE AND INFILTRATION OF PRECIPITATION.7.PROVIDE MINIMUM SOIL DEPTHS AS SHOWN IN LEGEND. PLACE SOIL IN 6" MAXIMUM LIFTS AND COMPACTLIGHTLY (SEE SPECIFICATION SECTION 329119 FOR COMPACTION RATES). PERFORM PERCOLATION TESTS ATEACH LIFT TO ENSURE ADEQUATE DRAINAGE.8.INSTALL SOIL TO AN ELEVATION THAT ASSUMES A MINIMUM OF 2" ORGANIC MULCH WILL BE PROVIDED IN ALLPLANTING BEDS (NON-LAWN AREAS).9.STRUCTURAL SOIL AREAS ARE FURTHER IDENTIFIED AND DEFINED ON THE SITE FEATURE PLANS AND DETAILS.10.REFER TO SPECIFICATION SECTION 329119 - LANDSCAPE GRADING FOR ADDITIONAL INFORMATION.GENERAL NOTES | SITE SOILS PLANS:R.O.W.R.O.W.COPYRIGHT NOTICE: THIS ARCHITECTURALAND ENGINEERING DRAWING IS GIVEN INCONFIDENCE AND SHALL BE USED ONLYPURSUANT TO THE AGREEMENT WITH RATIO.NO OTHER USE, DISSEMINATION ORDUPLICATION MAY BE MADE WITHOUT PRIORWRITTEN CONSENT OF RATIO. ALL COMMONLAW RIGHTS OF COPYRIGHT AND OTHERWISEARE HEREBY SPECIFICALLY RESERVED.SHEET TITLESHEET NUMBERSHEET ISSUENPROJECT NO.SEAL | DATEL-5111ADLS SUBMISSION10/17/232CITY COMMENTS12/08/232223/28/2024