Project Name: CRC PZ-2023-00251 ADLS Republic Airways HQ Corporate Campus
Workflow Started: 10/17/2023 12:26:08 PM
Report Generated: 04/03/2024 09:34 AM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
1 1 Planning & Zoning
Mike Hollibaugh
10/27/23 3:55 PM
Changemark
Changemark note #01
Lighting and photometric plan will need to locate and account for street
lighting in this area
Republic HQ_Lighting Plan and
Photometrics.pdf
Responded by: Connor Strege - 12/7/23 11:34 AM
See updated Photometrics
Resolved
2 1 Planning & Zoning
Mike Hollibaugh
10/27/23 3:55 PM
Changemark
Changemark note #02
please provide cut sheets for lights specified
Republic HQ_Lighting Plan and
Photometrics.pdf
Responded by: Connor Strege - 3/13/24 9:08 AM
An excel file containing hyperlinks to all product cut
sheets has been uploaded to Files/Correspondence.
----------------------------------------------------------
Reviewer Response: Mike Hollibaugh - 12/28/23 11:54
AM
cut sheets not provided with revised plans
----------------------------------------------------------
Responded by: Connor Strege - 12/7/23 11:34 AM
See cut sheets uploaded with revisions.
Question
3 1 Planning & Zoning
Mike Hollibaugh
10/27/23 3:56 PM
Changemark
Changemark note #01
MH 20 street light in this location?
Republic HQ_Lighting Plan and
Photometrics.pdf
Responded by: Connor Strege - 12/7/23 11:34 AM
See updated Photometrics
Resolved
4 1 Planning & Zoning
Mike Hollibaugh
10/27/23 3:56 PM
Changemark
Changemark note #02
slide this MH 20 westward to better illuminate service area?
Republic HQ_Lighting Plan and
Photometrics.pdf
Responded by: Connor Strege - 12/7/23 11:34 AM
See updated Photometrics
Resolved
5 1 Planning & Zoning
Mike Hollibaugh
10/27/23 3:57 PM
Changemark
Changemark note #01
it appears from other plans in the set that a fire-hydrant is planned for this
location that needs to be identified?
C6.0 UTILITY PLAN.pdf Responded by: Connor Strege - 12/7/23 11:35 AM
The area in question will feature a relocated hydrant.
Sheet C6.0 has been updated to clearly indicate this
condition.
Resolved
6 1 Planning & Zoning
Mike Hollibaugh
10/27/23 3:57 PM
Changemark
Changemark note #02
please show sidewalk, ramp and crosswalk improvements so we are certain
the details will blend together and not conflict
C6.0 UTILITY PLAN.pdf Responded by: Connor Strege - 12/7/23 11:35 AM
Additional sidewalk has been provided extending to the
north of the service drive. Crosswalk improvements have
been added to Sheet C3.0.
Resolved
REVIEW COMMENTS
Plan Review - Review Comments Report
Project Name: CRC PZ-2023-00251 ADLS Republic Airways HQ Corporate Campus
Workflow Started: 10/17/2023 12:26:08 PM
Report Generated: 04/03/2024 09:34 AM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
7 1 Planning & Zoning
Mike Hollibaugh
10/27/23 3:57 PM
Changemark
Changemark note #01
looking for completed sidewalk and E-W crosswalk for this side of the service
drive. appears the hydrant placement will conflict with future sidewalk and
crosswalk
L-501 Planting Plan - Phase III.pdf Reviewer Response: Mike Hollibaugh - 12/28/23 11:38
AM
Landscape plan needs updated to reflect improvements
in Site Features Plan
----------------------------------------------------------
Responded by: Connor Strege - 12/7/23 11:35 AM
See updates to Site Features Plans showing completed
walk
Info Only
8 1 Planning & Zoning
Mike Hollibaugh
10/27/23 4:01 PM
Changemark
Changemark note #01
completed sidewalk, ramp and crosswalk design is needed for this area, as
discussed at CRC Arch Review Committee.
C3.0 SITE PLAN.pdf Reviewer Response: Mike Hollibaugh - 12/28/23 11:26
AM
what's going on with stop bar and relocated stop sign
isn't making sense to me - is it correct to assume that is
short term fix and not part of long term, overall plan for
'Brickyard Lane'?
----------------------------------------------------------
Responded by: Connor Strege - 12/7/23 11:35 AM
Additional sidewalk has been provided extending to the
north of the service drive. Crosswalk improvements have
been added to Sheet C3.0.
Info Only
9 1 Planning & Zoning
Mike Hollibaugh
10/27/23 4:01 PM
Changemark
Changemark note #02
do we have elevation of 'amenity wall'
C3.0 SITE PLAN.pdf Reviewer Response: Mike Hollibaugh - 12/28/23 11:30
AM
thanks. Is it planned that the wall include signage ?
----------------------------------------------------------
Responded by: Connor Strege - 12/7/23 11:35 AM
See Sheet L-708
Info Only
10 1 Planning & Zoning
Mike Hollibaugh
10/27/23 4:09 PM
Changemark
Changemark note #01
a little concerned about heavy reliance on hawthorn with potential for fire
blight
L-502 Planting Plan - Phase III.pdf Responded by: Connor Strege - 12/7/23 11:36 AM
If another tree species is preferred as an alternate,
please specify
Info Only
Plan Review - Review Comments Report
Project Name: CRC PZ-2023-00251 ADLS Republic Airways HQ Corporate Campus
Workflow Started: 10/17/2023 12:26:08 PM
Report Generated: 04/03/2024 09:34 AM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
11 1 Planning & Zoning
Mike Hollibaugh
10/27/23 4:19 PM
Changemark
Changemark note #01
planting bed interrupts pedestrian traffic flow (it's nice, but is it necessary ?
C5.0 GRADING AND DRAINAGE
PLAN.pdf
Responded by: Connor Strege - 12/7/23 11:36 AM
Planter is capturing stormwater via shimmed planter
curb detail and underdrains in planter and is protecting
pedestrians from parking garage exit. RATIO has
intentionally located it in the location it's in for these
reasons
Resolved
12 1 Carmel
Redevelopment
Commission
Larysa Glaspie
10/30/23 4:05 PM
Changemark
Better integrate this area
Submit a plan to better integrate this area, as discussed at CRC Architectural
Review meeting. Sidewalk to be connected to future development (north and
east), when completed.
C3.0 SITE PLAN.pdf Responded by: Connor Strege - 12/7/23 11:36 AM
Additional sidewalk has been provided extending to the
north of the service drive. Crosswalk improvements have
been added to Sheet C3.0.
Resolved
13 1 Carmel
Redevelopment
Commission
Larysa Glaspie
10/30/23 4:13 PM
Comment
Please provide solar plan details for review.
Responded by: Connor Strege - 3/13/24 8:56 AM
The petitioner will reengage the CRC/DOCS when this
information is ready to be shared.
----------------------------------------------------------
Reviewer Response: Justin Myers - 1/24/24 11:10 AM
Engage with CRC/DOCS re: this scope when information
is ready to be shared. CRC views this as 'unresolved'
until more information and plan is provided.
----------------------------------------------------------
Responded by: Connor Strege - 12/7/23 11:37 AM
Future solar scope is still being evaluated at this time.
UnResolved
14 1 Urban Forestry
Daren Mindham
10/31/23 8:50 AM
Changemark
calipers
Please put all the caliper notations in the same column on all sheets.
L-501 Planting Plan - Phase III.pdf Responded by: Connor Strege - 12/7/23 11:37 AM
See updated plant schedules on L-501, L-502, and L-659
Resolved
15 1 Urban Forestry
Daren Mindham
10/31/23 8:51 AM
Changemark
L-654
This page is L-654 not L-653. Please change.
L-654 Plan Enlargements - Planting
Plan.pdf
Responded by: Connor Strege - 12/7/23 11:37 AM
L-654 has been updated w/ the correct sheet number
Resolved
16 1 Urban Forestry
Daren Mindham
10/31/23 8:54 AM
Changemark
structural soil
Please note that structural soil is not to be placed in the open grated area, it
is only used as needed under hardscape. Normal top soil should be used as
much as possible around the rootball in the pit area.
L-511 Soils Placement Plan - Phase
III.pdf
Responded by: Connor Strege - 12/7/23 11:38 AM
See Sheet L-511 for the appropriate revision
Resolved
Plan Review - Review Comments Report
Project Name: CRC PZ-2023-00251 ADLS Republic Airways HQ Corporate Campus
Workflow Started: 10/17/2023 12:26:08 PM
Report Generated: 04/03/2024 09:34 AM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
17 1 Urban Forestry
Daren Mindham
10/31/23 9:02 AM
Changemark
structural soil install
Structural soil is not to be placed in the grated area. Soil is to be placed
around the rootball anywhere there is not hardscape above. Please note that
topsoil should be backfilled around the rootball underneath all grated areas.
L-707 Site Details.pdf Responded by: Connor Strege - 12/7/23 11:38 AM
See updated details on L-707
Resolved
18 1 Urban Forestry
Daren Mindham
10/31/23 9:12 AM
Changemark
remove wording
It is never recommended to remove interior twigs and lateral branches on a
newly planted tree. Please remove this wording. The city requires that all
binding and wire baskets be removed. Please either use the city standard
details or add this wording. Maintenance-wise it will be a lot harder to
remove a wire basket out of a tree grated hole as saws will not be able to be
used to get the old rootball out. City details have been uploaded to the
correspondence folder.
L-751 Site Details - Planting.pdf Responded by: Connor Strege - 12/7/23 11:38 AM
See updated detail on L-751
Resolved
19 1 Vectren Energy
Chad Miller
10/31/23 2:46 PM
Changemark
CenterPoint Energy
Please have the developer call the new service center at 1-800-990-1930 to
have a work order created for the new gas service when they are ready.
CenterPoint will need an AutoCAD file and load information on the proposed
building to size the new gas meter.
C6.0 UTILITY PLAN.pdf Info Only
20 1 Fire
Carmel Fire
11/6/23 7:32 AM
Comment
All Previous CFD comments issued for project remain in place and
unchanged.
Info Only
21 1 Engineering
Alex Jordan
11/6/23 10:45 AM
Library Comment
Please provide the engineering firm's email address on the cover sheet
Responded by: Connor Strege - 12/7/23 12:03 PM
The requested email address has been added to the
Cover Sheet.
Resolved
22 1 Engineering
Alex Jordan
11/6/23 10:45 AM
Library Comment
Please provide the developer's email address on the cover sheet
Responded by: Connor Strege - 12/7/23 12:03 PM
The requested email address has been added to the
Cover Sheet.
Resolved
23 1 Engineering
Alex Jordan
11/6/23 10:45 AM
Library Comment
Please submit a storm water management permit application
Responded by: Connor Strege - 12/7/23 12:49 PM
This comment has been duly noted.
Resolved
24 1 Engineering
Alex Jordan
11/6/23 10:45 AM
Library Comment
Please provide the anticipated start construction date in a comment letter or
project summary
Responded by: Connor Strege - 12/7/23 12:49 PM
Anticipated construction start date is Winter 2023/2024.
Resolved
Plan Review - Review Comments Report
Project Name: CRC PZ-2023-00251 ADLS Republic Airways HQ Corporate Campus
Workflow Started: 10/17/2023 12:26:08 PM
Report Generated: 04/03/2024 09:34 AM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
25 1 Engineering
Alex Jordan
11/6/23 10:45 AM
Library Comment
Please verify that there are no direct discharge areas
Responded by: Connor Strege - 12/7/23 12:50 PM
Direct discharge area is included within the master
drainage design. The direct discharge area delineated is
not considered within the scope of this project.
Resolved
26 1 Engineering
Alex Jordan
11/6/23 10:45 AM
Library Comment
Please verify that all elevations are North American Vertical Datum of 1988
(NAVD)
Responded by: Connor Strege - 12/7/23 12:50 PM
Confirmation of the horizontal datum has been
provided on Sheet C1.1.
Resolved
27 1 Engineering
Alex Jordan
11/6/23 10:45 AM
Library Comment
Please verify that the horizontal datum of topgraphic map is Indiana State
Plane Coordinates, NAD83
Responded by: Connor Strege - 12/7/23 12:50 PM
Confirmation of the horizontal datum has been
provided on Sheet C1.1.
Resolved
28 1 Engineering
Alex Jordan
11/6/23 10:45 AM
Library Comment
Please verify that the locations of existing utilities with top of curb and invert
elevations, pipe sizes, and direction are shown
Responded by: Connor Strege - 12/7/23 1:33 PM
Locations of existing utilities have been provided as
requested.
Resolved
29 1 Engineering
Alex Jordan
11/6/23 10:45 AM
Library Comment
Please verify that all existing culverts, pipes, and bridges on existing drives or
under the roadway are shown indicating size, type, and invert elevations
Responded by: Connor Strege - 12/7/23 1:33 PM
Locations of existing utilities have been provided as
requested.
Resolved
30 1 Engineering
Alex Jordan
11/6/23 10:45 AM
Library Comment
Please verify that the locations of all existing electrical power vaults,
transformers, power lines, gas lines, television cable , and telephone lines are
shown
Responded by: Connor Strege - 12/7/23 1:33 PM
Locations of existing utilities have been provided as
requested.
Resolved
31 1 Engineering
Alex Jordan
11/6/23 12:26 PM
Library Comment
Please clearly show the construction limits on all sheets with plan view (not
required on profile sheets)
Responded by: Connor Strege - 12/7/23 1:34 PM
Limits of disturbance have been added to all plan view
sheets.
Resolved
32 1 Engineering
Alex Jordan
11/6/23 12:26 PM
Library Comment
Please provide all on-site and off-site flood routing through the site
Responded by: Connor Strege - 12/7/23 1:34 PM
Flood routing has been added to Sheet C5.0.
Resolved
Plan Review - Review Comments Report
Project Name: CRC PZ-2023-00251 ADLS Republic Airways HQ Corporate Campus
Workflow Started: 10/17/2023 12:26:08 PM
Report Generated: 04/03/2024 09:34 AM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
33 1 Engineering
Alex Jordan
11/6/23 12:26 PM
Library Comment
Please show the 100-year elevations of all inlets in the clogged condtions
Responded by: Connor Strege - 12/7/23 1:34 PM
Depth of ponding at clogged inlets has been added to
Sheet C6.0.
Resolved
34 1 Engineering
Alex Jordan
11/6/23 12:26 PM
Library Comment
Please provide the minimum flood protection grade (MFPG) and minimum
lowest adjacent grade (MLAG) elevations and definitions of each
Responded by: Connor Strege - 12/7/23 1:34 PM
MFPG and MLAG elevations, along with definitions,
have been provided on Sheet C5.0.
Resolved
35 1 Engineering
Alex Jordan
11/6/23 12:27 PM
Changemark
Please have this note added to the grading plan as well
We would like this note to be made on the grading plan.
C2.0 EXISTING CONDITIONS AND
DEMO PLAN.pdf
Responded by: Connor Strege - 12/7/23 1:38 PM
This note has been added to Sheet C5.0.
Resolved
36 1 Engineering
Alex Jordan
11/6/23 12:41 PM
Changemark
These items should be included in the limits of disturbance
C4.0 INITIAL EROSION CONTROL
PLAN.pdf
Responded by: Connor Strege - 12/7/23 1:38 PM
The LOD has been expanded as specified.
Resolved
37 1 Engineering
Alex Jordan
11/6/23 12:41 PM
Changemark
Perimeter protection will need to added around the pond to protect it during
demolition
C4.0 INITIAL EROSION CONTROL
PLAN.pdf
Responded by: Connor Strege - 12/7/23 1:38 PM
Additional silt fence has been added to Sheets C4.X.
Resolved
38 1 Engineering
Alex Jordan
11/6/23 12:41 PM
Changemark
If this area is paved, please replace the silt fence call out with a perimeter
protection that works on pavement
C4.0 INITIAL EROSION CONTROL
PLAN.pdf
Responded by: Connor Strege - 12/7/23 1:39 PM
Filter sock has been provided on Sheet C4.0.
Resolved
39 1 Engineering
Alex Jordan
11/6/23 2:01 PM
Changemark
The construction entrance will need to be 150' for this site
Please show the entrance at this length on the plans and in the detail.
C4.1 TEMPORARY EROSION CONTROL
PLAN.pdf
Responded by: Connor Strege - 12/7/23 1:39 PM
The construction entrance plan view and detail have
been updated accordingly.
Resolved
40 1 CrossRoad
Engineers
Willie Hall
11/6/23 4:15 PM
Changemark
102.02.v.f.
Existing Project Site Layout shall include the location of storm, sanitary,
combined sewer, and septic tank systems and outfalls with all top of casting
elevation, invert elevations, pipe sizes, and pipe material indicated. Existing
structure and pipe information shall be as-built information and not design
information.
C2.0 EXISTING CONDITIONS AND
DEMO PLAN.pdf
Responded by: Connor Strege - 12/7/23 1:41 PM
Existing storm and sanitary infrastructure data from
prior phases of Hamilton Crossing development are
shown as "as-built".
Resolved
Plan Review - Review Comments Report
Project Name: CRC PZ-2023-00251 ADLS Republic Airways HQ Corporate Campus
Workflow Started: 10/17/2023 12:26:08 PM
Report Generated: 04/03/2024 09:34 AM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
41 1 CrossRoad
Engineers
Willie Hall
11/6/23 4:15 PM
Changemark
Existing Contours
Please provide existing contours. It does not appear that this area is a
staging area now.
C2.0 EXISTING CONDITIONS AND
DEMO PLAN.pdf
Responded by: Connor Strege - 12/7/23 1:41 PM
The existing topography of the staging area is not
relevant to the scope of work for this project.
Resolved
42 1 CrossRoad
Engineers
Willie Hall
11/6/23 4:15 PM
Changemark
102.02.v.d
Existing Project Site Layout shall include one hundred (100) year floodplains,
floodway fringes, and floodways, established or identified in accordance with
the City of Carmel Flood Hazard Area Ordinance. Please note if none exists.
C2.0 EXISTING CONDITIONS AND
DEMO PLAN.pdf
Responded by: Connor Strege - 12/7/23 1:41 PM
A note has been added on Sheet C5.0 confirming that
no flood hazard areas are included within the project
scope limits.
Resolved
43 1 CrossRoad
Engineers
Willie Hall
11/6/23 4:15 PM
Changemark
102.02.v.b.
Please provide critical storm elevations for parking garage detention and wet
pond.
C2.0 EXISTING CONDITIONS AND
DEMO PLAN.pdf
Responded by: Connor Strege - 12/7/23 1:42 PM
This information has been added to plan sheets.
Resolved
44 1 CrossRoad
Engineers
Willie Hall
11/6/23 4:41 PM
Changemark
102.02.xi.n
Please provide more details for D304 that show the connection of both
upstream pipes and weir plate.
C6.0 UTILITY PLAN.pdf Responded by: Connor Strege - 12/7/23 1:42 PM
A detail has been added to Sheets C7.X for the existing
outlet control structure.
Resolved
45 1 CrossRoad
Engineers
Willie Hall
11/6/23 4:41 PM
Changemark
305.02
The minimum diameter of all storm sewers shall be 12 inches. Under no
circumstances shall the pipe be less than 12-inches diameter, measured as
the inside diameter. This shall apply to both public and private storm piping,
unless the piping is a roof drain, footing drain or sump pump.
C6.0 UTILITY PLAN.pdf Responded by: Connor Strege - 12/7/23 1:42 PM
The existing 10" stub has been replaced to provide a
12" storm sewer to serve this development.
Resolved
46 1 CrossRoad
Engineers
Willie Hall
11/6/23 4:41 PM
Changemark
102.02.vii
The construction plans shall include Plan and Profile Sheet(s).
C6.0 UTILITY PLAN.pdf Reviewer Response: Willie Hall - 1/23/24 5:29 PM
Resolved based on revised sheets C6.1 & C6.2 received
1/23/24 and uploaded by Willie Hall.
----------------------------------------------------------
Reviewer Response: Willie Hall - 12/22/23 10:04 AM
Storm P&P need to include HGL.
----------------------------------------------------------
Responded by: Connor Strege - 12/7/23 1:43 PM
Plan and profiles have been added.
Resolved
Plan Review - Review Comments Report
Project Name: CRC PZ-2023-00251 ADLS Republic Airways HQ Corporate Campus
Workflow Started: 10/17/2023 12:26:08 PM
Report Generated: 04/03/2024 09:34 AM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
47 1 CrossRoad
Engineers
Willie Hall
11/6/23 5:09 PM
Changemark
Drainage Summary
Please update drainage summary to be project specific. Please also include
information that verifies the proposed improvements meet the
masterplanned conditions of the Phase II drainage report.
C5.0 GRADING AND DRAINAGE
PLAN.pdf
Responded by: Connor Strege - 12/7/23 1:45 PM
The drainage summary has been updated to be project
specific.
Resolved
48 1 CrossRoad
Engineers
Willie Hall
11/6/23 5:09 PM
Changemark
102.02.xi.a
the grading and drainage plan shall include existing drainage facilities,
including size, material, invert elevations and top casting information.
Existing structure and pipe information shall be as-built information and not
design information.
C5.0 GRADING AND DRAINAGE
PLAN.pdf
Responded by: Connor Strege - 12/7/23 1:45 PM
Existing storm and sanitary infrastructure data from
prior phases of Hamilton Crossing development are
shown as "as-built".
Resolved
49 1 CrossRoad
Engineers
Willie Hall
11/6/23 5:09 PM
Changemark
102.02.xi.d
The grading and drainage plan shall include the delineation of all proposed
land disturbing activities, including off-site activities that will provide services
to the project site.
C5.0 GRADING AND DRAINAGE
PLAN.pdf
Responded by: Connor Strege - 12/7/23 1:45 PM
Limits of disturbance have been added to all plan view
sheets.
Resolved
50 1 CrossRoad
Engineers
Willie Hall
11/6/23 5:09 PM
Changemark
102.02.xi.
the grading and drainage plan shall include all proposed topographic
information at one-foot contour interval based on NAVD 1988.
C5.0 GRADING AND DRAINAGE
PLAN.pdf
Responded by: Connor Strege - 12/7/23 1:46 PM
Refer to L-40X plans for proposed grading contours
within hardscape areas. Refer to Sheet C 5.1 for
proposed contours for proposed grading beyond
hardscape areas.
Resolved
51 1 CrossRoad
Engineers
Willie Hall
11/6/23 5:09 PM
Changemark
102.02.xi.g
Include the critical storm elevations of the adjacent detention facilities as
well as the MFPGs for each building.
C5.0 GRADING AND DRAINAGE
PLAN.pdf
Responded by: Connor Strege - 12/7/23 1:46 PM
The requested information has been added to Sheets
C5.X.
Resolved
52 1 CrossRoad
Engineers
Willie Hall
11/6/23 5:09 PM
Changemark
102.02.xi.h
the grading and drainage plan shall indicate as to the system being public or
private.
C5.0 GRADING AND DRAINAGE
PLAN.pdf
Responded by: Connor Strege - 12/7/23 1:46 PM
A note has been added to Sheet C5.0 providing the
requested information.
Resolved
53 1 CrossRoad
Engineers
Willie Hall
11/6/23 5:09 PM
Changemark
102.02.xi.k & 303.07
the grading and drainage plan shall include the emergency flood routing
path(s) and their invert elevations from detention facilities to the receiving
system.
C5.0 GRADING AND DRAINAGE
PLAN.pdf
Responded by: Connor Strege - 12/7/23 1:47 PM
Ponding limits and depths have been added to Sheets
C5.0 & C6.0.
Resolved
Plan Review - Review Comments Report
Project Name: CRC PZ-2023-00251 ADLS Republic Airways HQ Corporate Campus
Workflow Started: 10/17/2023 12:26:08 PM
Report Generated: 04/03/2024 09:34 AM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
54 1 CrossRoad
Engineers
Willie Hall
11/6/23 5:50 PM
Changemark
Easements
Please include and label drainage easements on the plans.
C5.0 GRADING AND DRAINAGE
PLAN.pdf
Responded by: Connor Strege - 12/7/23 1:47 PM
Existing drainage easements have been labeled clearly
on plan sheets.
Resolved
55 1 CrossRoad
Engineers
Willie Hall
11/6/23 5:54 PM
Changemark
102.03.i
Please provide summary of how the proposed improvements meet the Phase
II masterplan. Please do the same for the stormwater quality calculations.
170051006_DrainageReport-HQ.pdf Responded by: Connor Strege - 12/8/23 4:34 PM
Additional language has been provided to the narrative
as requested.
Resolved
56 1 CrossRoad
Engineers
Willie Hall
11/6/23 5:54 PM
Changemark
305.05
Please provide inlet grate calculations.
170051006_DrainageReport-HQ.pdf Responded by: Connor Strege - 12/8/23 4:16 PM
Nyloplast inlet grate calculations have been added to
the Drainage Report.
Resolved
57 1 Engineering
Alex Jordan
11/7/23 8:45 AM
Changemark
Can one "master planned" O&M manual be created rather than an O&M for
each phase
It appears that we have O&M's for phase one and two but neither are
recorded. Can one O&M be generated for all the phases and submitted for
review with this project?
O&M Manual HQ.pdf Responded by: Connor Strege - 12/8/23 4:35 PM
A consolidated O&M has been provided with this
resubmittal.
Resolved
58 1 Engineering
Alex Jordan
11/7/23 9:31 AM
Changemark
What is the status of this temporary basin?
From our aerials, it appears that this area is being used for staging and not
as the temporary detention shown on this and previous plans. If it is not
installed, we will need it to be constructed with this project.
170051006_DrainageReport-HQ.pdf Responded by: Connor Strege - 12/8/23 4:35 PM
The temporary drainage basin has been added to the
HQ plans. The basin will be restored by the end of the
project.
Resolved
59 1 Engineering
Alex Jordan
11/7/23 9:54 AM
Changemark
Will this be a new structure or a doghouse structure over the existing line?
Please clarify what type of structure will be installed here and provide a
doghouse structure detail if that will be installed.
C5.0 GRADING AND DRAINAGE
PLAN.pdf
Responded by: Connor Strege - 12/7/23 2:10 PM
The structure in question is a proposed doghouse
manhole. A doghouse manhole detail has been added
to Sheet C7.0.
Resolved
60 1 Engineering
Alex Jordan
11/7/23 10:00 AM
Changemark
Is there enough detention capacity in this temporary pond for this
expansion?
It appears that the majority of this site is bypassing the detention provided
under the garage. Is they temporary detention sized for these improvements
and will adequate detention be provided if there are any future phases to the
north?
C5.0 GRADING AND DRAINAGE
PLAN.pdf
Responded by: Connor Strege - 12/7/23 2:11 PM
The majority of this site drains towards the Phase 1
outlet control structure Str. D304. The garage detention
volume includes the pipes downstream of the detention,
up to this Outlet Control Structure.
Resolved
Plan Review - Review Comments Report
Project Name: CRC PZ-2023-00251 ADLS Republic Airways HQ Corporate Campus
Workflow Started: 10/17/2023 12:26:08 PM
Report Generated: 04/03/2024 09:34 AM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
61 1 Sign Permits
Aliza Shalit
11/7/23 1:35 PM
Changemark
Sign Size
Per UDO Sign Standards maximum sign height is 70% of spandrel panel
height. Spandrel panel is as outlined. Please reduce.
A-201 - EXTERIOR ELEVATIONS.pdf Responded by: Connor Strege - 3/13/24 9:09 AM
This item will be addressed in a separate application
and submittal by Staley Signs.
----------------------------------------------------------
Reviewer Response: Aliza Shalit - 12/18/23 3:00 PM
This comment is related to signage, not run off. Please
update the sign size to conform to UDO sign standards
as specified. This applied to both proposed signs on this
building.
----------------------------------------------------------
Responded by: Connor Strege - 12/8/23 4:37 PM
The proposed expansion runoff enters existing storm
sewer downstream of the master planned vault, but
upstream of the outlet control structure. The runoff is
adequately detained.
Info Only
62 1 Sign Permits
Aliza Shalit
11/7/23 1:36 PM
Comment
All Signs require a separate sign permit and review process. Applications are
submitted through the City of Carmel Online Permitting site.
Info Only
63 1 Carmel Water
Operations
Brett Ransford
11/8/23 8:48 AM
Changemark
Changemark note #01
C6.0 UTILITY PLAN.pdf Responded by: Connor Strege - 12/7/23 2:09 PM
The utility plan has been revsied as indicated.
Resolved
64 1 Transportation
Systems
David Littlejohn
11/13/23 2:47 PM
Changemark
Crosswalks and ramps
This doesn't match what is shown on the other plans. Please revise the plan
to show the crosswalks and ramps to be consistent with the other plans for
this intersection.
C3.0 SITE PLAN.pdf Responded by: Connor Strege - 12/8/23 4:38 PM
Sheet C3.0 has been updated to provide consistency
with other plans.
Resolved
65 1 Transportation
Systems
David Littlejohn
11/13/23 2:47 PM
Changemark
ADA ramp leading direction
Where is this ramp leading people to? It looks like a curb and landscaping is
across from the ramp. Is there a pedestrian facility/route that this ramp is
providing access to/from?
C3.0 SITE PLAN.pdf Responded by: Connor Strege - 12/8/23 4:38 PM
Additional sidewalk has been provided extending to the
north of the service drive. Crosswalk improvements have
been added to Sheet C3.0.
Resolved
Plan Review - Review Comments Report
Project Name: CRC PZ-2023-00251 ADLS Republic Airways HQ Corporate Campus
Workflow Started: 10/17/2023 12:26:08 PM
Report Generated: 04/03/2024 09:34 AM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
66 1 Transportation
Systems
David Littlejohn
11/13/23 2:47 PM
Changemark
ADA compliance
Please ensure that all ramps and crosswalks will comply with ADA standards.
C3.0 SITE PLAN.pdf Reviewer Response: David Littlejohn - 1/9/24 1:40 PM
----------------------------------------------------------
Responded by: Connor Strege - 12/8/23 4:38 PM
Refer to Grading Notes on Sheet C1.1.
Resolved
67 1 Transportation
Systems
David Littlejohn
11/13/23 2:55 PM
Changemark
Bike Share station
Please consider including a bike share station with this project.
C3.0 SITE PLAN.pdf Reviewer Response: David Littlejohn - 1/9/24 1:55 PM
----------------------------------------------------------
Responded by: Connor Strege - 12/8/23 4:38 PM
This comment has been duly noted.
Info Only
68 1 Transportation
Systems
David Littlejohn
11/13/23 3:10 PM
Changemark
Long term bicycle parking
Section 5.29 of the City's UDO encourages long term bicycle parking for
offices at a rate of 2 spaces for each 10,000 sq ft. Will long term bicycle
parking be included as part of this project? If so, please provide details for
how the long term bicycle parking will be provided.
C3.0 SITE PLAN.pdf Reviewer Response: David Littlejohn - 12/21/23 3:06 PM
The bike racks located outside of the front door are
considered short term bicycle racks not long term
bicycle parking. Long term bicycle parking is covered
parking that can be provided using bike lockers or
locked enclosures or locked rooms. Please consider
including long term bicycle parking as part of this
project.
----------------------------------------------------------
Responded by: Connor Strege - 12/8/23 4:39 PM
There are 6 long term bike racks located outside of the
HQ front door called out on L-626
Resolved
69 1 Building & Code
Services
William Hohlt
11/13/23 4:46 PM
Comment
1. Show guardrail for accessible ramp. Page L-627
Info Only
70 2 Sign Permits
Aliza Shalit
12/18/23 3:14 PM
Changemark
Sign Location
Please identify on the site plan where this sign will be located.
A-911 - EXTERIOR SIGNAGE
DETAILS.pdf
Responded by: Connor Strege - 3/13/24 9:09 AM
See 10-14-BW on L-621.
Resolved
Plan Review - Review Comments Report
Project Name: CRC PZ-2023-00251 ADLS Republic Airways HQ Corporate Campus
Workflow Started: 10/17/2023 12:26:08 PM
Report Generated: 04/03/2024 09:34 AM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
71 2 Sign Permits
Aliza Shalit
12/18/23 3:14 PM
Changemark
Sign Height
Maximum height for a ground sign is 6' from grade to top of sign structure.
A-911 - EXTERIOR SIGNAGE
DETAILS.pdf
Responded by: Connor Strege - 3/13/24 9:10 AM
RATIO will issue a bulletin to revise the height of the
sign to 6' high.
Info Only
72 2 Sign Permits
Aliza Shalit
12/18/23 3:14 PM
Changemark
Delineated Cornice
If this is to be considered a ground sign, a delineated cornice is require per
sign standards. Depending where this is located, how it will be classified. As
it stands right now, it looks like a stand alone structure making it a ground
sign. It will require updates or a variance.
A-911 - EXTERIOR SIGNAGE
DETAILS.pdf
Responded by: Connor Strege - 3/13/24 9:10 AM
A variance will be submitted to allow for a ground sign
without a cornice.
Info Only
73 2 Engineering
Alex Jordan
12/22/23 12:40 PM
Comment
We have no further comments on the plans. Before we issue the stormwater
management permit, the following items will need to be provided: 1. A
signed and recorded O&M manual 2. An erosion control engineers estimate
3. A non-expiring erosion control performance bond for 100% of the
approved estimate 4. A right-of-way permit application and $5,000 license
and permit bond 5. Approval from Crossroad Engineers
Info Only
74 2 Transportation
Systems
David Littlejohn
1/9/24 2:24 PM
Changemark
Bicycle rack installation detail
Revise the plans to include a bicycle rack installation detail to ensure that
they are installed in compliance with the City's bicycle parking standards.
Racks are to be installed a minimum of 24" from any obstructions and with a
minimum of 30" between each rack. Please refer to section 5.29 of the City's
UDO for more details/information on the City's bicycle rack installation
standards.
L-703 Site Details.pdf Info Only
75 2 Transportation
Systems
David Littlejohn
1/23/24 3:30 PM
Comment
Approval condition - Please refer to section 5.29 of the City's UDO to view
the City's bicycle rack installation standards to ensure that the bicycle racks
for this project will be installed in compliance with the City's
standards/requirements. If you have any questions regarding this please feel
free to contact me at dlittlejohn@carmel.in.gov
Info Only