Loading...
HomeMy WebLinkAboutCorrespondencePlan Review - Review Comments Report Project Name: CRC PZ-2023-00251 ADLS Republic Airways HQ Corporate Campus Workflow Started: 10/17/2023 12:26:08 PM Report Generated: 04/03/2024 09:34 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 1 1 Planning & Zoning Mike Hollibaugh 10/27/23 3:55 PM Changemark Changemark note #01 Lighting and photometric plan will need to locate and account for street lighting in this area Republic HQ_Lighting Plan and Photometrics.pdf Responded by: Connor Strege - 12/7/23 11:34 AM See updated Photometrics Resolved 2 1 Planning & Zoning Mike Hollibaugh 10/27/23 3:55 PM Changemark Changemark note #02 please provide cut sheets for lights specified Republic HQ_Lighting Plan and Photometrics.pdf Responded by: Connor Strege - 3/13/24 9:08 AM An excel file containing hyperlinks to all product cut sheets has been uploaded to Files/Correspondence. ---------------------------------------------------------- Reviewer Response: Mike Hollibaugh - 12/28/23 11:54 AM cut sheets not provided with revised plans ---------------------------------------------------------- Responded by: Connor Strege - 12/7/23 11:34 AM See cut sheets uploaded with revisions. Question 3 1 Planning & Zoning Mike Hollibaugh 10/27/23 3:56 PM Changemark Changemark note #01 MH 20 street light in this location? Republic HQ_Lighting Plan and Photometrics.pdf Responded by: Connor Strege - 12/7/23 11:34 AM See updated Photometrics Resolved 4 1 Planning & Zoning Mike Hollibaugh 10/27/23 3:56 PM Changemark Changemark note #02 slide this MH 20 westward to better illuminate service area? Republic HQ_Lighting Plan and Photometrics.pdf Responded by: Connor Strege - 12/7/23 11:34 AM See updated Photometrics Resolved 5 1 Planning & Zoning Mike Hollibaugh 10/27/23 3:57 PM Changemark Changemark note #01 it appears from other plans in the set that a fire-hydrant is planned for this location that needs to be identified? C6.0 UTILITY PLAN.pdf Responded by: Connor Strege - 12/7/23 11:35 AM The area in question will feature a relocated hydrant. Sheet C6.0 has been updated to clearly indicate this condition. Resolved 6 1 Planning & Zoning Mike Hollibaugh 10/27/23 3:57 PM Changemark Changemark note #02 please show sidewalk, ramp and crosswalk improvements so we are certain the details will blend together and not conflict C6.0 UTILITY PLAN.pdf Responded by: Connor Strege - 12/7/23 11:35 AM Additional sidewalk has been provided extending to the north of the service drive. Crosswalk improvements have been added to Sheet C3.0. Resolved REVIEW COMMENTS Plan Review - Review Comments Report Project Name: CRC PZ-2023-00251 ADLS Republic Airways HQ Corporate Campus Workflow Started: 10/17/2023 12:26:08 PM Report Generated: 04/03/2024 09:34 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 7 1 Planning & Zoning Mike Hollibaugh 10/27/23 3:57 PM Changemark Changemark note #01 looking for completed sidewalk and E-W crosswalk for this side of the service drive. appears the hydrant placement will conflict with future sidewalk and crosswalk L-501 Planting Plan - Phase III.pdf Reviewer Response: Mike Hollibaugh - 12/28/23 11:38 AM Landscape plan needs updated to reflect improvements in Site Features Plan ---------------------------------------------------------- Responded by: Connor Strege - 12/7/23 11:35 AM See updates to Site Features Plans showing completed walk Info Only 8 1 Planning & Zoning Mike Hollibaugh 10/27/23 4:01 PM Changemark Changemark note #01 completed sidewalk, ramp and crosswalk design is needed for this area, as discussed at CRC Arch Review Committee. C3.0 SITE PLAN.pdf Reviewer Response: Mike Hollibaugh - 12/28/23 11:26 AM what's going on with stop bar and relocated stop sign isn't making sense to me - is it correct to assume that is short term fix and not part of long term, overall plan for 'Brickyard Lane'? ---------------------------------------------------------- Responded by: Connor Strege - 12/7/23 11:35 AM Additional sidewalk has been provided extending to the north of the service drive. Crosswalk improvements have been added to Sheet C3.0. Info Only 9 1 Planning & Zoning Mike Hollibaugh 10/27/23 4:01 PM Changemark Changemark note #02 do we have elevation of 'amenity wall' C3.0 SITE PLAN.pdf Reviewer Response: Mike Hollibaugh - 12/28/23 11:30 AM thanks. Is it planned that the wall include signage ? ---------------------------------------------------------- Responded by: Connor Strege - 12/7/23 11:35 AM See Sheet L-708 Info Only 10 1 Planning & Zoning Mike Hollibaugh 10/27/23 4:09 PM Changemark Changemark note #01 a little concerned about heavy reliance on hawthorn with potential for fire blight L-502 Planting Plan - Phase III.pdf Responded by: Connor Strege - 12/7/23 11:36 AM If another tree species is preferred as an alternate, please specify Info Only Plan Review - Review Comments Report Project Name: CRC PZ-2023-00251 ADLS Republic Airways HQ Corporate Campus Workflow Started: 10/17/2023 12:26:08 PM Report Generated: 04/03/2024 09:34 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 11 1 Planning & Zoning Mike Hollibaugh 10/27/23 4:19 PM Changemark Changemark note #01 planting bed interrupts pedestrian traffic flow (it's nice, but is it necessary ? C5.0 GRADING AND DRAINAGE PLAN.pdf Responded by: Connor Strege - 12/7/23 11:36 AM Planter is capturing stormwater via shimmed planter curb detail and underdrains in planter and is protecting pedestrians from parking garage exit. RATIO has intentionally located it in the location it's in for these reasons Resolved 12 1 Carmel Redevelopment Commission Larysa Glaspie 10/30/23 4:05 PM Changemark Better integrate this area Submit a plan to better integrate this area, as discussed at CRC Architectural Review meeting. Sidewalk to be connected to future development (north and east), when completed. C3.0 SITE PLAN.pdf Responded by: Connor Strege - 12/7/23 11:36 AM Additional sidewalk has been provided extending to the north of the service drive. Crosswalk improvements have been added to Sheet C3.0. Resolved 13 1 Carmel Redevelopment Commission Larysa Glaspie 10/30/23 4:13 PM Comment Please provide solar plan details for review. Responded by: Connor Strege - 3/13/24 8:56 AM The petitioner will reengage the CRC/DOCS when this information is ready to be shared. ---------------------------------------------------------- Reviewer Response: Justin Myers - 1/24/24 11:10 AM Engage with CRC/DOCS re: this scope when information is ready to be shared. CRC views this as 'unresolved' until more information and plan is provided. ---------------------------------------------------------- Responded by: Connor Strege - 12/7/23 11:37 AM Future solar scope is still being evaluated at this time. UnResolved 14 1 Urban Forestry Daren Mindham 10/31/23 8:50 AM Changemark calipers Please put all the caliper notations in the same column on all sheets. L-501 Planting Plan - Phase III.pdf Responded by: Connor Strege - 12/7/23 11:37 AM See updated plant schedules on L-501, L-502, and L-659 Resolved 15 1 Urban Forestry Daren Mindham 10/31/23 8:51 AM Changemark L-654 This page is L-654 not L-653. Please change. L-654 Plan Enlargements - Planting Plan.pdf Responded by: Connor Strege - 12/7/23 11:37 AM L-654 has been updated w/ the correct sheet number Resolved 16 1 Urban Forestry Daren Mindham 10/31/23 8:54 AM Changemark structural soil Please note that structural soil is not to be placed in the open grated area, it is only used as needed under hardscape. Normal top soil should be used as much as possible around the rootball in the pit area. L-511 Soils Placement Plan - Phase III.pdf Responded by: Connor Strege - 12/7/23 11:38 AM See Sheet L-511 for the appropriate revision Resolved Plan Review - Review Comments Report Project Name: CRC PZ-2023-00251 ADLS Republic Airways HQ Corporate Campus Workflow Started: 10/17/2023 12:26:08 PM Report Generated: 04/03/2024 09:34 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 17 1 Urban Forestry Daren Mindham 10/31/23 9:02 AM Changemark structural soil install Structural soil is not to be placed in the grated area. Soil is to be placed around the rootball anywhere there is not hardscape above. Please note that topsoil should be backfilled around the rootball underneath all grated areas. L-707 Site Details.pdf Responded by: Connor Strege - 12/7/23 11:38 AM See updated details on L-707 Resolved 18 1 Urban Forestry Daren Mindham 10/31/23 9:12 AM Changemark remove wording It is never recommended to remove interior twigs and lateral branches on a newly planted tree. Please remove this wording. The city requires that all binding and wire baskets be removed. Please either use the city standard details or add this wording. Maintenance-wise it will be a lot harder to remove a wire basket out of a tree grated hole as saws will not be able to be used to get the old rootball out. City details have been uploaded to the correspondence folder. L-751 Site Details - Planting.pdf Responded by: Connor Strege - 12/7/23 11:38 AM See updated detail on L-751 Resolved 19 1 Vectren Energy Chad Miller 10/31/23 2:46 PM Changemark CenterPoint Energy Please have the developer call the new service center at 1-800-990-1930 to have a work order created for the new gas service when they are ready. CenterPoint will need an AutoCAD file and load information on the proposed building to size the new gas meter. C6.0 UTILITY PLAN.pdf Info Only 20 1 Fire Carmel Fire 11/6/23 7:32 AM Comment All Previous CFD comments issued for project remain in place and unchanged. Info Only 21 1 Engineering Alex Jordan 11/6/23 10:45 AM Library Comment Please provide the engineering firm's email address on the cover sheet Responded by: Connor Strege - 12/7/23 12:03 PM The requested email address has been added to the Cover Sheet. Resolved 22 1 Engineering Alex Jordan 11/6/23 10:45 AM Library Comment Please provide the developer's email address on the cover sheet Responded by: Connor Strege - 12/7/23 12:03 PM The requested email address has been added to the Cover Sheet. Resolved 23 1 Engineering Alex Jordan 11/6/23 10:45 AM Library Comment Please submit a storm water management permit application Responded by: Connor Strege - 12/7/23 12:49 PM This comment has been duly noted. Resolved 24 1 Engineering Alex Jordan 11/6/23 10:45 AM Library Comment Please provide the anticipated start construction date in a comment letter or project summary Responded by: Connor Strege - 12/7/23 12:49 PM Anticipated construction start date is Winter 2023/2024. Resolved Plan Review - Review Comments Report Project Name: CRC PZ-2023-00251 ADLS Republic Airways HQ Corporate Campus Workflow Started: 10/17/2023 12:26:08 PM Report Generated: 04/03/2024 09:34 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 25 1 Engineering Alex Jordan 11/6/23 10:45 AM Library Comment Please verify that there are no direct discharge areas Responded by: Connor Strege - 12/7/23 12:50 PM Direct discharge area is included within the master drainage design. The direct discharge area delineated is not considered within the scope of this project. Resolved 26 1 Engineering Alex Jordan 11/6/23 10:45 AM Library Comment Please verify that all elevations are North American Vertical Datum of 1988 (NAVD) Responded by: Connor Strege - 12/7/23 12:50 PM Confirmation of the horizontal datum has been provided on Sheet C1.1. Resolved 27 1 Engineering Alex Jordan 11/6/23 10:45 AM Library Comment Please verify that the horizontal datum of topgraphic map is Indiana State Plane Coordinates, NAD83 Responded by: Connor Strege - 12/7/23 12:50 PM Confirmation of the horizontal datum has been provided on Sheet C1.1. Resolved 28 1 Engineering Alex Jordan 11/6/23 10:45 AM Library Comment Please verify that the locations of existing utilities with top of curb and invert elevations, pipe sizes, and direction are shown Responded by: Connor Strege - 12/7/23 1:33 PM Locations of existing utilities have been provided as requested. Resolved 29 1 Engineering Alex Jordan 11/6/23 10:45 AM Library Comment Please verify that all existing culverts, pipes, and bridges on existing drives or under the roadway are shown indicating size, type, and invert elevations Responded by: Connor Strege - 12/7/23 1:33 PM Locations of existing utilities have been provided as requested. Resolved 30 1 Engineering Alex Jordan 11/6/23 10:45 AM Library Comment Please verify that the locations of all existing electrical power vaults, transformers, power lines, gas lines, television cable , and telephone lines are shown Responded by: Connor Strege - 12/7/23 1:33 PM Locations of existing utilities have been provided as requested. Resolved 31 1 Engineering Alex Jordan 11/6/23 12:26 PM Library Comment Please clearly show the construction limits on all sheets with plan view (not required on profile sheets) Responded by: Connor Strege - 12/7/23 1:34 PM Limits of disturbance have been added to all plan view sheets. Resolved 32 1 Engineering Alex Jordan 11/6/23 12:26 PM Library Comment Please provide all on-site and off-site flood routing through the site Responded by: Connor Strege - 12/7/23 1:34 PM Flood routing has been added to Sheet C5.0. Resolved Plan Review - Review Comments Report Project Name: CRC PZ-2023-00251 ADLS Republic Airways HQ Corporate Campus Workflow Started: 10/17/2023 12:26:08 PM Report Generated: 04/03/2024 09:34 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 33 1 Engineering Alex Jordan 11/6/23 12:26 PM Library Comment Please show the 100-year elevations of all inlets in the clogged condtions Responded by: Connor Strege - 12/7/23 1:34 PM Depth of ponding at clogged inlets has been added to Sheet C6.0. Resolved 34 1 Engineering Alex Jordan 11/6/23 12:26 PM Library Comment Please provide the minimum flood protection grade (MFPG) and minimum lowest adjacent grade (MLAG) elevations and definitions of each Responded by: Connor Strege - 12/7/23 1:34 PM MFPG and MLAG elevations, along with definitions, have been provided on Sheet C5.0. Resolved 35 1 Engineering Alex Jordan 11/6/23 12:27 PM Changemark Please have this note added to the grading plan as well We would like this note to be made on the grading plan. C2.0 EXISTING CONDITIONS AND DEMO PLAN.pdf Responded by: Connor Strege - 12/7/23 1:38 PM This note has been added to Sheet C5.0. Resolved 36 1 Engineering Alex Jordan 11/6/23 12:41 PM Changemark These items should be included in the limits of disturbance C4.0 INITIAL EROSION CONTROL PLAN.pdf Responded by: Connor Strege - 12/7/23 1:38 PM The LOD has been expanded as specified. Resolved 37 1 Engineering Alex Jordan 11/6/23 12:41 PM Changemark Perimeter protection will need to added around the pond to protect it during demolition C4.0 INITIAL EROSION CONTROL PLAN.pdf Responded by: Connor Strege - 12/7/23 1:38 PM Additional silt fence has been added to Sheets C4.X. Resolved 38 1 Engineering Alex Jordan 11/6/23 12:41 PM Changemark If this area is paved, please replace the silt fence call out with a perimeter protection that works on pavement C4.0 INITIAL EROSION CONTROL PLAN.pdf Responded by: Connor Strege - 12/7/23 1:39 PM Filter sock has been provided on Sheet C4.0. Resolved 39 1 Engineering Alex Jordan 11/6/23 2:01 PM Changemark The construction entrance will need to be 150' for this site Please show the entrance at this length on the plans and in the detail. C4.1 TEMPORARY EROSION CONTROL PLAN.pdf Responded by: Connor Strege - 12/7/23 1:39 PM The construction entrance plan view and detail have been updated accordingly. Resolved 40 1 CrossRoad Engineers Willie Hall 11/6/23 4:15 PM Changemark 102.02.v.f. Existing Project Site Layout shall include the location of storm, sanitary, combined sewer, and septic tank systems and outfalls with all top of casting elevation, invert elevations, pipe sizes, and pipe material indicated. Existing structure and pipe information shall be as-built information and not design information. C2.0 EXISTING CONDITIONS AND DEMO PLAN.pdf Responded by: Connor Strege - 12/7/23 1:41 PM Existing storm and sanitary infrastructure data from prior phases of Hamilton Crossing development are shown as "as-built". Resolved Plan Review - Review Comments Report Project Name: CRC PZ-2023-00251 ADLS Republic Airways HQ Corporate Campus Workflow Started: 10/17/2023 12:26:08 PM Report Generated: 04/03/2024 09:34 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 41 1 CrossRoad Engineers Willie Hall 11/6/23 4:15 PM Changemark Existing Contours Please provide existing contours. It does not appear that this area is a staging area now. C2.0 EXISTING CONDITIONS AND DEMO PLAN.pdf Responded by: Connor Strege - 12/7/23 1:41 PM The existing topography of the staging area is not relevant to the scope of work for this project. Resolved 42 1 CrossRoad Engineers Willie Hall 11/6/23 4:15 PM Changemark 102.02.v.d Existing Project Site Layout shall include one hundred (100) year floodplains, floodway fringes, and floodways, established or identified in accordance with the City of Carmel Flood Hazard Area Ordinance. Please note if none exists. C2.0 EXISTING CONDITIONS AND DEMO PLAN.pdf Responded by: Connor Strege - 12/7/23 1:41 PM A note has been added on Sheet C5.0 confirming that no flood hazard areas are included within the project scope limits. Resolved 43 1 CrossRoad Engineers Willie Hall 11/6/23 4:15 PM Changemark 102.02.v.b. Please provide critical storm elevations for parking garage detention and wet pond. C2.0 EXISTING CONDITIONS AND DEMO PLAN.pdf Responded by: Connor Strege - 12/7/23 1:42 PM This information has been added to plan sheets. Resolved 44 1 CrossRoad Engineers Willie Hall 11/6/23 4:41 PM Changemark 102.02.xi.n Please provide more details for D304 that show the connection of both upstream pipes and weir plate. C6.0 UTILITY PLAN.pdf Responded by: Connor Strege - 12/7/23 1:42 PM A detail has been added to Sheets C7.X for the existing outlet control structure. Resolved 45 1 CrossRoad Engineers Willie Hall 11/6/23 4:41 PM Changemark 305.02 The minimum diameter of all storm sewers shall be 12 inches. Under no circumstances shall the pipe be less than 12-inches diameter, measured as the inside diameter. This shall apply to both public and private storm piping, unless the piping is a roof drain, footing drain or sump pump. C6.0 UTILITY PLAN.pdf Responded by: Connor Strege - 12/7/23 1:42 PM The existing 10" stub has been replaced to provide a 12" storm sewer to serve this development. Resolved 46 1 CrossRoad Engineers Willie Hall 11/6/23 4:41 PM Changemark 102.02.vii The construction plans shall include Plan and Profile Sheet(s). C6.0 UTILITY PLAN.pdf Reviewer Response: Willie Hall - 1/23/24 5:29 PM Resolved based on revised sheets C6.1 & C6.2 received 1/23/24 and uploaded by Willie Hall. ---------------------------------------------------------- Reviewer Response: Willie Hall - 12/22/23 10:04 AM Storm P&P need to include HGL. ---------------------------------------------------------- Responded by: Connor Strege - 12/7/23 1:43 PM Plan and profiles have been added. Resolved Plan Review - Review Comments Report Project Name: CRC PZ-2023-00251 ADLS Republic Airways HQ Corporate Campus Workflow Started: 10/17/2023 12:26:08 PM Report Generated: 04/03/2024 09:34 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 47 1 CrossRoad Engineers Willie Hall 11/6/23 5:09 PM Changemark Drainage Summary Please update drainage summary to be project specific. Please also include information that verifies the proposed improvements meet the masterplanned conditions of the Phase II drainage report. C5.0 GRADING AND DRAINAGE PLAN.pdf Responded by: Connor Strege - 12/7/23 1:45 PM The drainage summary has been updated to be project specific. Resolved 48 1 CrossRoad Engineers Willie Hall 11/6/23 5:09 PM Changemark 102.02.xi.a the grading and drainage plan shall include existing drainage facilities, including size, material, invert elevations and top casting information. Existing structure and pipe information shall be as-built information and not design information. C5.0 GRADING AND DRAINAGE PLAN.pdf Responded by: Connor Strege - 12/7/23 1:45 PM Existing storm and sanitary infrastructure data from prior phases of Hamilton Crossing development are shown as "as-built". Resolved 49 1 CrossRoad Engineers Willie Hall 11/6/23 5:09 PM Changemark 102.02.xi.d The grading and drainage plan shall include the delineation of all proposed land disturbing activities, including off-site activities that will provide services to the project site. C5.0 GRADING AND DRAINAGE PLAN.pdf Responded by: Connor Strege - 12/7/23 1:45 PM Limits of disturbance have been added to all plan view sheets. Resolved 50 1 CrossRoad Engineers Willie Hall 11/6/23 5:09 PM Changemark 102.02.xi. the grading and drainage plan shall include all proposed topographic information at one-foot contour interval based on NAVD 1988. C5.0 GRADING AND DRAINAGE PLAN.pdf Responded by: Connor Strege - 12/7/23 1:46 PM Refer to L-40X plans for proposed grading contours within hardscape areas. Refer to Sheet C 5.1 for proposed contours for proposed grading beyond hardscape areas. Resolved 51 1 CrossRoad Engineers Willie Hall 11/6/23 5:09 PM Changemark 102.02.xi.g Include the critical storm elevations of the adjacent detention facilities as well as the MFPGs for each building. C5.0 GRADING AND DRAINAGE PLAN.pdf Responded by: Connor Strege - 12/7/23 1:46 PM The requested information has been added to Sheets C5.X. Resolved 52 1 CrossRoad Engineers Willie Hall 11/6/23 5:09 PM Changemark 102.02.xi.h the grading and drainage plan shall indicate as to the system being public or private. C5.0 GRADING AND DRAINAGE PLAN.pdf Responded by: Connor Strege - 12/7/23 1:46 PM A note has been added to Sheet C5.0 providing the requested information. Resolved 53 1 CrossRoad Engineers Willie Hall 11/6/23 5:09 PM Changemark 102.02.xi.k & 303.07 the grading and drainage plan shall include the emergency flood routing path(s) and their invert elevations from detention facilities to the receiving system. C5.0 GRADING AND DRAINAGE PLAN.pdf Responded by: Connor Strege - 12/7/23 1:47 PM Ponding limits and depths have been added to Sheets C5.0 & C6.0. Resolved Plan Review - Review Comments Report Project Name: CRC PZ-2023-00251 ADLS Republic Airways HQ Corporate Campus Workflow Started: 10/17/2023 12:26:08 PM Report Generated: 04/03/2024 09:34 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 54 1 CrossRoad Engineers Willie Hall 11/6/23 5:50 PM Changemark Easements Please include and label drainage easements on the plans. C5.0 GRADING AND DRAINAGE PLAN.pdf Responded by: Connor Strege - 12/7/23 1:47 PM Existing drainage easements have been labeled clearly on plan sheets. Resolved 55 1 CrossRoad Engineers Willie Hall 11/6/23 5:54 PM Changemark 102.03.i Please provide summary of how the proposed improvements meet the Phase II masterplan. Please do the same for the stormwater quality calculations. 170051006_DrainageReport-HQ.pdf Responded by: Connor Strege - 12/8/23 4:34 PM Additional language has been provided to the narrative as requested. Resolved 56 1 CrossRoad Engineers Willie Hall 11/6/23 5:54 PM Changemark 305.05 Please provide inlet grate calculations. 170051006_DrainageReport-HQ.pdf Responded by: Connor Strege - 12/8/23 4:16 PM Nyloplast inlet grate calculations have been added to the Drainage Report. Resolved 57 1 Engineering Alex Jordan 11/7/23 8:45 AM Changemark Can one "master planned" O&M manual be created rather than an O&M for each phase It appears that we have O&M's for phase one and two but neither are recorded. Can one O&M be generated for all the phases and submitted for review with this project? O&M Manual HQ.pdf Responded by: Connor Strege - 12/8/23 4:35 PM A consolidated O&M has been provided with this resubmittal. Resolved 58 1 Engineering Alex Jordan 11/7/23 9:31 AM Changemark What is the status of this temporary basin? From our aerials, it appears that this area is being used for staging and not as the temporary detention shown on this and previous plans. If it is not installed, we will need it to be constructed with this project. 170051006_DrainageReport-HQ.pdf Responded by: Connor Strege - 12/8/23 4:35 PM The temporary drainage basin has been added to the HQ plans. The basin will be restored by the end of the project. Resolved 59 1 Engineering Alex Jordan 11/7/23 9:54 AM Changemark Will this be a new structure or a doghouse structure over the existing line? Please clarify what type of structure will be installed here and provide a doghouse structure detail if that will be installed. C5.0 GRADING AND DRAINAGE PLAN.pdf Responded by: Connor Strege - 12/7/23 2:10 PM The structure in question is a proposed doghouse manhole. A doghouse manhole detail has been added to Sheet C7.0. Resolved 60 1 Engineering Alex Jordan 11/7/23 10:00 AM Changemark Is there enough detention capacity in this temporary pond for this expansion? It appears that the majority of this site is bypassing the detention provided under the garage. Is they temporary detention sized for these improvements and will adequate detention be provided if there are any future phases to the north? C5.0 GRADING AND DRAINAGE PLAN.pdf Responded by: Connor Strege - 12/7/23 2:11 PM The majority of this site drains towards the Phase 1 outlet control structure Str. D304. The garage detention volume includes the pipes downstream of the detention, up to this Outlet Control Structure. Resolved Plan Review - Review Comments Report Project Name: CRC PZ-2023-00251 ADLS Republic Airways HQ Corporate Campus Workflow Started: 10/17/2023 12:26:08 PM Report Generated: 04/03/2024 09:34 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 61 1 Sign Permits Aliza Shalit 11/7/23 1:35 PM Changemark Sign Size Per UDO Sign Standards maximum sign height is 70% of spandrel panel height. Spandrel panel is as outlined. Please reduce. A-201 - EXTERIOR ELEVATIONS.pdf Responded by: Connor Strege - 3/13/24 9:09 AM This item will be addressed in a separate application and submittal by Staley Signs. ---------------------------------------------------------- Reviewer Response: Aliza Shalit - 12/18/23 3:00 PM This comment is related to signage, not run off. Please update the sign size to conform to UDO sign standards as specified. This applied to both proposed signs on this building. ---------------------------------------------------------- Responded by: Connor Strege - 12/8/23 4:37 PM The proposed expansion runoff enters existing storm sewer downstream of the master planned vault, but upstream of the outlet control structure. The runoff is adequately detained. Info Only 62 1 Sign Permits Aliza Shalit 11/7/23 1:36 PM Comment All Signs require a separate sign permit and review process. Applications are submitted through the City of Carmel Online Permitting site. Info Only 63 1 Carmel Water Operations Brett Ransford 11/8/23 8:48 AM Changemark Changemark note #01 C6.0 UTILITY PLAN.pdf Responded by: Connor Strege - 12/7/23 2:09 PM The utility plan has been revsied as indicated. Resolved 64 1 Transportation Systems David Littlejohn 11/13/23 2:47 PM Changemark Crosswalks and ramps This doesn't match what is shown on the other plans. Please revise the plan to show the crosswalks and ramps to be consistent with the other plans for this intersection. C3.0 SITE PLAN.pdf Responded by: Connor Strege - 12/8/23 4:38 PM Sheet C3.0 has been updated to provide consistency with other plans. Resolved 65 1 Transportation Systems David Littlejohn 11/13/23 2:47 PM Changemark ADA ramp leading direction Where is this ramp leading people to? It looks like a curb and landscaping is across from the ramp. Is there a pedestrian facility/route that this ramp is providing access to/from? C3.0 SITE PLAN.pdf Responded by: Connor Strege - 12/8/23 4:38 PM Additional sidewalk has been provided extending to the north of the service drive. Crosswalk improvements have been added to Sheet C3.0. Resolved Plan Review - Review Comments Report Project Name: CRC PZ-2023-00251 ADLS Republic Airways HQ Corporate Campus Workflow Started: 10/17/2023 12:26:08 PM Report Generated: 04/03/2024 09:34 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 66 1 Transportation Systems David Littlejohn 11/13/23 2:47 PM Changemark ADA compliance Please ensure that all ramps and crosswalks will comply with ADA standards. C3.0 SITE PLAN.pdf Reviewer Response: David Littlejohn - 1/9/24 1:40 PM ---------------------------------------------------------- Responded by: Connor Strege - 12/8/23 4:38 PM Refer to Grading Notes on Sheet C1.1. Resolved 67 1 Transportation Systems David Littlejohn 11/13/23 2:55 PM Changemark Bike Share station Please consider including a bike share station with this project. C3.0 SITE PLAN.pdf Reviewer Response: David Littlejohn - 1/9/24 1:55 PM ---------------------------------------------------------- Responded by: Connor Strege - 12/8/23 4:38 PM This comment has been duly noted. Info Only 68 1 Transportation Systems David Littlejohn 11/13/23 3:10 PM Changemark Long term bicycle parking Section 5.29 of the City's UDO encourages long term bicycle parking for offices at a rate of 2 spaces for each 10,000 sq ft. Will long term bicycle parking be included as part of this project? If so, please provide details for how the long term bicycle parking will be provided. C3.0 SITE PLAN.pdf Reviewer Response: David Littlejohn - 12/21/23 3:06 PM The bike racks located outside of the front door are considered short term bicycle racks not long term bicycle parking. Long term bicycle parking is covered parking that can be provided using bike lockers or locked enclosures or locked rooms. Please consider including long term bicycle parking as part of this project. ---------------------------------------------------------- Responded by: Connor Strege - 12/8/23 4:39 PM There are 6 long term bike racks located outside of the HQ front door called out on L-626 Resolved 69 1 Building & Code Services William Hohlt 11/13/23 4:46 PM Comment 1. Show guardrail for accessible ramp. Page L-627 Info Only 70 2 Sign Permits Aliza Shalit 12/18/23 3:14 PM Changemark Sign Location Please identify on the site plan where this sign will be located. A-911 - EXTERIOR SIGNAGE DETAILS.pdf Responded by: Connor Strege - 3/13/24 9:09 AM See 10-14-BW on L-621. Resolved Plan Review - Review Comments Report Project Name: CRC PZ-2023-00251 ADLS Republic Airways HQ Corporate Campus Workflow Started: 10/17/2023 12:26:08 PM Report Generated: 04/03/2024 09:34 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 71 2 Sign Permits Aliza Shalit 12/18/23 3:14 PM Changemark Sign Height Maximum height for a ground sign is 6' from grade to top of sign structure. A-911 - EXTERIOR SIGNAGE DETAILS.pdf Responded by: Connor Strege - 3/13/24 9:10 AM RATIO will issue a bulletin to revise the height of the sign to 6' high. Info Only 72 2 Sign Permits Aliza Shalit 12/18/23 3:14 PM Changemark Delineated Cornice If this is to be considered a ground sign, a delineated cornice is require per sign standards. Depending where this is located, how it will be classified. As it stands right now, it looks like a stand alone structure making it a ground sign. It will require updates or a variance. A-911 - EXTERIOR SIGNAGE DETAILS.pdf Responded by: Connor Strege - 3/13/24 9:10 AM A variance will be submitted to allow for a ground sign without a cornice. Info Only 73 2 Engineering Alex Jordan 12/22/23 12:40 PM Comment We have no further comments on the plans. Before we issue the stormwater management permit, the following items will need to be provided: 1. A signed and recorded O&M manual 2. An erosion control engineers estimate 3. A non-expiring erosion control performance bond for 100% of the approved estimate 4. A right-of-way permit application and $5,000 license and permit bond 5. Approval from Crossroad Engineers Info Only 74 2 Transportation Systems David Littlejohn 1/9/24 2:24 PM Changemark Bicycle rack installation detail Revise the plans to include a bicycle rack installation detail to ensure that they are installed in compliance with the City's bicycle parking standards. Racks are to be installed a minimum of 24" from any obstructions and with a minimum of 30" between each rack. Please refer to section 5.29 of the City's UDO for more details/information on the City's bicycle rack installation standards. L-703 Site Details.pdf Info Only 75 2 Transportation Systems David Littlejohn 1/23/24 3:30 PM Comment Approval condition - Please refer to section 5.29 of the City's UDO to view the City's bicycle rack installation standards to ensure that the bicycle racks for this project will be installed in compliance with the City's standards/requirements. If you have any questions regarding this please feel free to contact me at dlittlejohn@carmel.in.gov Info Only