Loading...
HomeMy WebLinkAboutEXTERIOR - G000 - COVER SHEET1. PRIOR TO COMMENCEMENT OF THE PROJECT, THE GENERAL CONTRACTOR SHALL PROVIDE EVIDENCE OF ALL REQUIRED FORMS OF INSURANCE TO OWNER'S CONSTRUCTION MANAGER AND LOCAL AUTHORITIES. GC/PM MUST PROVIDE A LIST OF SUBCONTRACTORS, A CURRENT SCOPE OF WORK AND TIMETABLE, AND ALL OTHER LANDLORD REQUIRED DOCUMENTS, PRIOR TO WORK COMMENCING. 2. ALL REQUIRED PERMITS MUST BE OBTAINED FROM THE REQUIRED GOVERNING AGENCIES PRIOR TO THE START OF CONSTRUCTION. 3. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR AND OBTAIN ALL INSPECTIONS AND LICENSES AND PAY REQUIRED FEES. 4. CONTRACTOR SHALL KNOW AND UNDERSTAND LOCAL CODES AND PROCEDURES AND SHALL COMPLY WITH ALL REQUIREMENTS. 5. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED DRAWINGS. 6. ANY DISCREPANCIES BETWEEN THE DRAWINGS AND SPECIFICATIONS SHALL BE BROUGHT TO THE ARCHITECTS' ATTENTION IMMEDIATELY. 7. GENERAL CONTRACTOR SHALL COORDINATE WORK PERFORMED BY OTHER CONTRACTORS, INCLUDING THOSE NOT CONTRACTED DIRECTLY UNDER THEM. 8. ALL SUBSTITUTIONS MUST BE SUBMITTED TO THE ARCHITECT AND OWNER FOR APPROVAL DURING THE BIDDING PROCESS. 9. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE TIMELY ARRIVAL OF ALL MATERIALS, EQUIPMENT, FIXTURES AND ANY OTHER SUCH MATERIAL(S) TO BE UTILIZED ON THIS PROJECT. THE GENERAL CONTRACTOR SHALL NOTIFY THE OWNER & THE ARCHITECT IN WRITING WITHIN (10) DAYS OF DATE OF CONTRACT OF THOSE SPECIFIED ITEMS THAT MAY NOT BE READILY AVAILABLE. IF NOTIFICATION IS NOT RECEIVED BY THE ARCHITECT & OWNER, THE CONTRACTOR ACCEPTS RESPONSIBILITY FOR THE PROPER ORDERING AND FOLLOW-UP OF SPECIFIED ITEMS AND WILL PURSUE WHATEVER MEANS NECESSARY AT NO ADDITIONAL COST TO THE OWNER, TO ASSURE AVAILABILITY OF ALL SPECIFIED ITEMS SO AS NOT TO CREATE A HARDSHIP ON THE OWNER & NOT DELAY PROGRESS OF THE WORK. 10. MECHANICAL, ELECTRICAL AND PLUMBING DOCUMENTATION TO BE BY DESIGN/BUILD. MECHANICAL CONTRACTOR SHALL VERIFY EXACT DIMENSIONS WITH EQUIPMENT MANUFACTURERS. MECHANICAL CONTRACTOR SHALL COORDINATE ALL SIZES AND LOCATIONS OF DUCT OPENINGS BEFORE INSTALLATION AND VERIFY DISCREPANCIES WITH THE ARCHITECT, IF ANY. 11. SEALANTS: ALL OPEN JOINTS, PENETRATIONS AND OTHER OPENINGS IN THE BUILDING ENVELOPE SHALL BE SEALED, CAULKED, GASKETED, OR WEATHERSTRIPPED TO LIMIT AIR/WATER LEAKAGE AND MEET CODE REQUIREMENTS. 12. SAFETY: ALL CONDUCT, WORK, EQUIPMENT AND MATERIALS SHALL BE IN FULL ACCORDANCE WITH THE LATEST SAFETY RULES AND REGULATIONS OF ALL AUTHORITIES AND AGENCIES HAVING JURISDICTION AND BE THE SOLE RESPONSIBILITY OF THE GENERAL CONTRACTOR. 13. ANY MATERIALS FOUND TO BE DEFECTIVE SHALL BE REMOVED AND REPLACED AT NO ADDITIONAL COST TO THE OWNER. 14. THE CONTRACTOR SHALL REMEDY, WITHOUT COST TO THE OWNER, ANY DEFECTS DUE TO FAULTY WORKMANSHIP. 15. G.C. IS RESPONSIBLE FOR KEEPING A PERMIT SET, CONSTRUCTION SET, RFI'S, ARCHITECTURAL SKETCHES, AND CONSTRUCTION SCHEDULE ON SITE AT ALL TIMES. 16. THE G.C. SHALL GUARANTEE IN WRITING ALL WORK, MATERIALS, AND EQUIPMENT FOR A MINIMUM PERIOD OF ONE YEAR FROM DATE OF FINAL ACCEPTANCE. THE G.C. SHALL PROVIDE THE OWNER WITH ALL EQUIPMENT MANUALS, WARRANTIES AND OPERATING INSTRUCTIONS UPON FINAL ACCEPTANCE. SHOULD DEFECTS OCCUR, ALL WORK SHALL BE REPLACED OR PROPERLY REPAIRED AT NO ADDITIONAL COST TO THE OWNER. 17. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR COORDINATING MECHANICAL, PLUMBING AND ELECTRICAL SYSTEMS, AND FOR PROVIDING ALL NECESSARY BLOCKING AND/OR FRAMING REQUIRED FOR THE INSTALLATION OF SAID MECHANICAL, PLUMBING, AND ELECTRICAL SYSTEMS. 18. THE G.C. SHALL BE RESPONSIBLE FOR COORDINATING WITH OWNER ON ALL WORK TO BE PERFORMED BY THE OWNER. ANY POTENTIAL CONFLICTS OR DELAYS CAUSED BY THE OWNER'S SUBCONTRACTORS MUST BE DOCUMENTED IN WRITING TO THE ARCHITECT AND THE OWNER BEFORE THE DELAY IS ACTUALLY INCURRED FOR IT TO BE CONSIDERED. OTHERWISE THE G.C. WILL BE RESPONSIBLE FOR MEETING THE SCHEDULE AS OUTLINED IN THE CONTRACT. 19. THE G.C. SHALL SUPPLY ALL MATERIALS, LABOR AND COORDINATION REQUIRED FOR THE INSTALLATION OF ALL OWNER SUPPLIED ITEMS AS DESCRIBED IN THE DOCUMENTS. 20. ALL EXTRA WORK MUST BE WRITTEN UP BY THE G.C. IN THE FORM OF A CHANGE ORDER. INDICATED ON IT MUST BE A FIRM PRICE FOR THE WORK. ALL CHANGE ORDERS MUST BE SUBMITTED TO THE OWNER FOR APPROVAL PRIOR TO COMMENCEMENT OF WORK. GENERAL PROJECT NOTES: 1. FOR TYPICAL NON-LOAD BEARING PARTITIONS. REFER USG STEEL-FRAMED DRYWALL SYSTEMS "LIMITING HEIGHT - STEEL STUD ASSEMBLIES CHART. USE THE L/240 ALLOWABLE DEFLECTION FIGURES ONLY. 2. DIMENSIONS ARE TO FACE OF GYPSUM BOARD, COLUMN LINE OR FACE OF MASONRY. 3. MINIMUM DIMENSION FROM ANY CORNER OR WALL TO FRAMING STUD AT DOOR JAMB OPENING SHALL BE 4" (U.N.O.). 4. PROVIDE METAL OR F.R.T. WOOD BLOCKING FOR ALL SIGNS AND ANY OTHER WALL MOUNTED EQUIPMENT. 5. G.C. TO VERIFY ALL FINISHED DIMENSIONS. FIELD CONDITIONS ALTERING ANY DIMENSIONS SHOULD BE BROUGHT TO THE ATTENTION OF THE OWNER AND ARCHITECT. 6. CONVENIENCE OUTLETS MOUNTED BY APPLICABLE REGULATORY REQUIREMENTS U.N.O. CONVENIENCE OUTLETS TO MATCH ADJACENT WALL COLOR AS REQUIRED. OUTLETS TO BE LOCATED SO AS TO BE AS INCONSPICUOUS AS POSSIBLE AT 18" A.F.F. U.N.O. 7. ALL EXIT DOORS SHALL BE READILY OPENED FROM THE SIDE FROM WHICH EGRESS IS TO BE MADE WITHOUT USE OF KEY OR SPECIAL KNOWLEDGE. ALL EXIT DOORS SHALL HAVE ALL HARDWARE NECESSARY TO SATISFY THE REQUIREMENTS OF THE AUTHORITIES HAVING JURISDICTION. 8. ALL INTERIOR FINISH AND TRIM MATERIALS SHALL MEET APPLICABLE REGULATORY REQUIREMENTS FOR CLASS C FLAME SPREAD INDEX 76-200 AND SMOKE DEVELOPED INDEX 0-450 RATINGS. 9. ALL WORK, MATERIALS, AND EQUIPMENT SHALL BE GUARANTEED FOR A MINIMUM PERIOD OF ONE YEAR FROM DATE OF FINAL ACCEPTANCE. THE G.C. SHALL PROVIDE THE OWNER WITH ALL EQUIPMENT MANUALS, WARRANTIES AND OPERATING INSTRUCTIONS UPON FINAL ACCEPTANCE. 10. THE G.C. SHALL SUPPLY ALL MATERIALS, LABOR AND COORDINATION REQUIRED FOR THE INSTALLATION OF ALL OWNER-SUPPLIED ITEMS AS DESCRIBED IN THE DOCUMENTS, U.N.O. 11. THE G.C. IS RESPONSIBLE FOR ALL FLOOR AND WALL PENETRATIONS FOR ELECTRICAL AND MECHANICAL WORK. ALL SUCH OPENINGS SHALL BE FRAMED AND REINFORCED. SEE STRUCTURAL DWGS. FOR REQUIREMENTS FOR ALL SLAB PENETRATIONS. 12. THE G.C. SHALL CLEAN THE SITE OF ALL UNNECESSARY DEBRIS PRIOR TO STARTING CONSTRUCTION, AND SHALL KEEP THE SITE NEAT AND CLEAN AT ALL TIMES. THE G.C. SHALL CLEAN ALL DOORS, WINDOW GLASS, INTERIOR AND EXTERIOR WALLS, CEILINGS AND FLOORS, AS WELL AS ALL INSTALLED ITEMS (FIXTURES) BEFORE FINAL TURNOVER. 13. ANY DECORATIONS USED SHALL BE NON COMBUSTIBLE OR BE FLAME RETARDANT IN AN APPROVED MANNER AS REQUIRED. 14. REFER TO ELECTRICAL DRAWINGS FOR EXACT NUMBER, LOCATION, AND TYPE OF LIGHT FIXTURES TO BE PROVIDED. SUBMIT SHOP DRAWINGS ON ALL FIXTURES. 15. IF REQUIRED ALL STRUCTURAL FRAMING, HANGERS, CHANNELS, RODS AND OTHER MISCELLANEOUS SUPPORT STEEL SHALL BE PROVIDED BY THE G.C. PROPER SUPPORT OF SUSPENDED / SUPPORTED EQUIPMENT SHALL BE FASTENED TO STEEL, CONCRETE, OR MASONRY. G.C. TO COORDINATE WITH STRUCTURAL ENGINEER, IF REQUIRED, FOR INSTALLATION OF ALL EQUIPMENT. 16. ALL NOTED CEILING DIMENSIONS ARE INDICATED AS CLEAR ABOVE FINISHED FLOOR DIMENSIONS. ALL DIMENSIONS ARE TO FINISH FACE, U.N.O. 17. REFER ELECTRICAL DRAWINGS FOR ELECTRICAL REQUIREMENTS. 18. PAINTING MUST NOT COVER OR AFFECT THE FOLLOWING: SPRINKLER HEADS, PIPE OR CONDUIT LABELING, FIRE / SMOKE DETECTION SENSORS, AUDIO VISUAL ALARM DEVICES OR MANUFACTURER AND UL SPECIFICATION LABELS. 19. ALL WEATHER BARRIER INDICATED IN DETAILS AND SECTIONS IMPLIES COMPLETE RESISTANCE TO ALL WEATHER, AIR, WATER AND MOISTURE. ALL WEATHER BARRIER INSTALLATION TO BE PER MANUFACTURER'S STANDARDS, RECOMMENDATIONS AND DETAILS TO INSURE CLOSURE OF ALL BUILDING EDGES AND TRANSITIONS. 21. FIELD VERIFY ALL DOOR JAMB THROAT DIMENSIONS FOR DOOR FRAMES AS REQUIRED. GENERAL CONSTRUCTION NOTES: OWNER GENERAL CONTRACTOR ATA BEILHARZ ARCHITECTS 1063 CENTRAL AVE. CINCINNATI, OH. 45202 CONTACT: ROB HUMASON P: 513.241.4422 E: ROB@ATA-B.COM ARCHITECT STRUCTURAL ENGINEER CIVIL ENGINEER MECHANICAL ENGINEER PROJECT CONTACTS: CORPOREX 100 E. RIVERCENTER BLVD, SUITE 1100 COVINGTON, KY. 41011 CONTACT: MARK BISCHOFF P: 859-292-5544 E: MBISCHOFF@CORPOREX.COM DRIVEN 701 E. BRIDGER AVE SUITE 150 LAS VEGAS, NV. 89101 CONTACT: BRANDI KURKA P: 702-463-4874 E: BRANDI@CONQUERPARALYSISNOW.ORG AMERICAN STRUCTUREPOINT INC. 9025 RIVER ROAD, SUITE 200 INDIANAPOLIS, IN. 46240 CONTACT: DAVID WELCH P: 317-547-5580 E: DWELCH@STRUCTUREPOINT.COM BEILHARZ ARCHITECTS 701 1/2 WEST FIRST STREET DEFIANCE, OH. 43512 CONTACT: ZACH BEILHARZ P: 419-782-6211 E: ZACHB@BEILHARZARCHITECTS.COM THERMALTECH ENGINEERING 3960 RED BANK RD. SUITE 250 CINCINNATI, OH. 45227 CONTACT: STEVE MOORMANN P: 513-561-2271 E: SMOORMANN@THERMALTECH.COM PROJECT LOCATION PROJECT LOCATION PROJECT #: DRAWN:CHECKED: REVISIONS CERTIFICATION: 1063 Central Avenue Cincinnati Ohio, 45202 p: 513-241-4422 f: 513-241-5560 www.ATA-B.com EXTERIOR RENOVATION 23048 TS/MA KB *G000 COVER SHEET 1300 EAST 96TH STREETINDIANAPOLIS, IN 462401300 EAST 96TH STREET INDIANAPOLIS, IN 46240 SCALE:1/2" = 1'-0" VICINITY MAP SCALE:1/2" = 1'-0" REGIONAL MAP EXTERIOR IMPROVEMENTS SHEET INDEX EXTERIOR IMPROVEMENTS # NAME ISSUEREV. DATE*G000 COVER SHEET *A101 EXTERIOR WORK LEVEL 1 PLAN *A102 EXTERIOR WORK LEVEL 2 PLAN *A121 ROOF PLAN *A201 EXTERIOR ELEVATIONS *A300 EXISTING CONDITIONS PHOTOS *D101 DEMOLITION PLANS *A421 ENLARGED PORTE-COCHERE PLANS AND DETAILS # DATE DESCRIPTION 08-09-23 EXTERIOR BID SET 08-15-23 ZONING SUBMITTAL