HomeMy WebLinkAboutC200 EROSION CONTROL PLANWWWWWWEEEEEEEEEE
E E E
E
E
E
EEEE
E
E
E
CCCCCCCCCC
C C C
C
C
CCCCCC
C
CC
C
C
CCCCCCCC
C
CC
C
C
CC
C
CCC
CGGGGGGGGGG
G G
G
G
G
GGGGGGGG92-A
93
94
107
IP
IP
IP
IPDD
D
DD
D DDDDDD
D
D D
D
D
D DDDDDDDDDDDDDDDDDDDDDDDDDSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFS
F
S
F SFSFSF
SF
SF
SF
SF
SF
SF
SF
S
F
COLD CREEK COURTDISTURBED ACREAGE =
0.57 ± AC.
LEGEND
-CONSTRUCTION ENTRANCE
(8" OF #2 STONE ON NON-WOVEN GEOTEXTILE
FABRIC)
-STAGING AREA
(8" OF #2 STONE ON NON-WOVEN GEOTEXTILE
FABRIC)
-POSTING AREA - 4" PVC TUBE WITH END CAPS
ATTACHED TO PROJECT CONSTRUCTION SIGN TO
CONTAIN APPROVED CONSTRUCTION DRAWINGS
AND PERMITS FOR INSPECTORS.
-SHEET FLOW PROTECTION / SILT FENCE
-CONCRETE WASHOUT
- LIMITS OF CONSTRUCTION
-PROPOSED INLET PROTECTION (DANDY SACKS
AND WIRE SILT FENCES) FOR EXISTING
STRUCTURES REQUIRED. (SEE DETAILS ON SHEET
C207)
-TREE PROTECTION FENCE
IP
SF
D
C200EROSION CONTROL PLANW160409-5BCOLD CREEK COURT REDESIGN11731 COLD CREEK COURT, ZIONSVILLE, IN 46077C200 Erosion Control PlanBCPW160409-5B2024-03-28DASBCP10 9abcd 8 7 6efgh109876
5 4 3 2 Part of the SW/4 of Section 31, Township 18 North, Range 3 East, Clay Township, Hamilton County, Indiana1 PREPARED FOR:PROJECT NO.
SHEET NO.abcd5 4 3 2
e1
fhgALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.SMENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546 faxWEIHELand Surveying | Civil EngineeringLandscape Architecture04/04/2024PROJECT NO.:REVISIONS AND ISSUESDATEBYDWG NAME:DESIGNED BY:DRAWN BY:CHECKED BY:DATE:Know what's below.
before you dig.Call
R
W
S
N
E
EROSION CONTROL NOTES
1.LAND ALTERATION WHICH STRIPS THE LAND OF VEGETATION, INCLUDING REGRADING, SHALL BE DONE IN A WAY THAT
WILL MINIMIZE EROSION.
2.CONTRACTOR SHALL COMPLY WITH ALL STATE AND LOCAL ORDINANCES THAT APPLY.
3.THIS PLAN SHALL NOT BE CONSIDERED ALL INCLUSIVE AS THE CONTRACTOR SHALL TAKE ALL NECESSARY
PRECAUTIONS TO PREVENT SOIL SEDIMENT FROM LEAVING THE SITE.
4.ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES WILL BE INSTALLED IF DEEMED NECESSARY BY ONSITE
INSPECTION.
5.SEDIMENT LADEN WATER SHALL BE DETAINED BY EROSION CONTROL PRACTICES AS NEEDED TO MINIMIZE
SEDIMENTATION IN THE RECEIVING STREAM. NO STORM WATER SHALL BE DISCHARGED FROM THE SITE IN A MANNER
THAT CAUSES EROSION AT POINT OF DISCHARGE.
6.WASTES AND UNUSED BUILDING MATERIALS SHALL NOT BE ALLOWED TO BE CARRIED FROM THE SITE BY STORM
WATER RUNOFF. PROPER DISPOSAL OF ALL WASTES AND UNUSED BUILDING MATERIALS IS REQUIRED.
7.SEDIMENT BEING TRACKED ONTO PUBLIC OR PRIVATE ROADWAYS SHALL BE MINIMIZED. CLEARING OF ACCUMULATED
SEDIMENT SHALL NOT INCLUDE FLUSHING WITH WATER, CLEARED SEDIMENT SHALL BE RETURNED TO THE SITE FOR
DISPOSAL.
8.SOIL WHICH HAS ACCUMULATED NEXT TO EROSION CONTROL DEVICES SHALL BE COLLECTED AND REDISTRIBUTED
ON SITE AFTER EACH RAINFALL EVENT, AND AT LEAST ONCE A WEEK.
9.IF INSTALLATION OF STORM DRAINAGE SYSTEM SHOULD BE INTERRUPTED BY WEATHER OR NIGHTFALL, THE PIPE
ENDS SHALL BE COVERED WITH FILTER FABRIC.
10.SCHEDULE OF EARTHWORK ACTIVITIES
10.a.THE DURATION OF TIME WHICH AN AREA REMAINS EXPOSED SHALL BE KEPT TO A PRACTICAL MINIMUM. THE
AREA SHALL BE STABILIZED AS SOON AS POSSIBLE. TEMPORARY VEGETATION OR MULCHING SHALL BE USED TO
PROTECT EXPOSED AREAS IF PERMANENT VEGETATION CANNOT BE SEEDED WITHIN 15 DAYS OR ACTIVITY
CEASES FOR MORE THAN 15 DAYS OR AS DIRECTED BY THE ENGINEER.
10.b.TOPSOIL REPLACEMENT SHALL TAKE PLACE FROM MARCH 1 TO OCTOBER 31. STOCKPILE TOPSOIL AT ALL
OTHER TIMES OF THE YEAR. PERMANENT AND FINAL VEGETATION AND STRUCTURAL EROSION CONTROL
DEVICES SHALL BE INSTALLED WITHIN SEVEN (7) DAYS AFTER FINAL GRADING OR AS SOON AS POSSIBLE.
11.EROSION AND SEDIMENT PLAN, FOR THIS LOT, SHALL , AT A MINIMUM, INCLUDE THE FOLLOWING MEASURES AND AT
ALL TIMES FOLLOW THE GUIDELINES FOR INDIVIDUAL RESIDENTIAL LOTS.
11.a.INSTALL AND MAINTAIN A STABLE CONSTRUCTION SITE ACCESS AT THE LOCATION OF THE PROPOSED DRIVE.
11.b.INSTALL AND MAINTAIN AN APPROPRIATE PERIMETER EROSION AND SEDIMENT CONTROL MEASURES PRIOR TO
LAND DISTURBANCE, ie SILT FENCE.
11.c.MINIMIZE SEDIMENT DISCHARGE AND TRACKING FROM THE LOT.
11.d.CLEAN-UP SEDIMENT THAT IS EITHER TRACKED OR WASHED ONTO ROADS. BULK CLEARING OF SEDIMENT SHALL
NOT INCLUDE FLUSHING THE AREA WITH WATER. CLEARED SEDIMENT MUST BE REDISTRIBUTED OR DISPOSED
OF IN A MANNER THAT IS IN COMPLIANCE WITH ALL APPLICABLE STATUTES AND RULES.
11.e.ADJACENT LOTS DISTURBED BY AN INDIVIDUAL LOT OPERATOR MUST BE REPAIRED AND STABILIZED WITH
TEMPORARY OR PERMANENT SURFACE STABILIZATION.
11.f.ADDITIONAL EROSION/SEDIMENT CONTROL MEASURES MAY BE REQUIRED UPON INSPECTION BY LOCAL
PLANNING AUTHORITY.
11.g.ADDITIONAL REQUIREMENT FOR THE SITE: SEE CITY OF CARMEL STORM WATER TECHINICAL STANDARDS
MANUAL, CHAPTER 600, SEC 602.06 "INDIVIDUAL BUILDING LOT CONTROLS" AND EXHIBIT 602-1.
NOTES:
1. AN OAT OR WHEAT COMPANION OR NURSE CROP MAY BE USED WITH ANY OF THE ABOVE PERMANENT
SEEDING MIXTURES, AT THE FOLLOWING RATES:
(A) SPRING OATS - ONE-FOURTH TO THREE-FOURTHS BUSHEL PER ACRE
(B) WHEAT - NO MORE THAN ONE-HALF BUSHEL PER ACRE
2. A HIGH POTENTIAL FOR FERTILIZER, SEED, AND MULCH TO WASH EXISTS ON STEEP BANKS, CUTS, AND IN
CHANNELS AND AREAS OF CONCENTRATED
INSTALLATION
1. GRADE THE SITE TO ACHIEVE POSITIVE DRAINAGE.
2. ADD TOPSOIL OR COMPOST MULCH TO ACHIEVE NEEDED DEPTH FOR ESTABLISHMENT OF VEGETATION.
(COMPOST MATERIAL MAY BE ADDED TO IMPROVE SOIL MOISTURE HOLDING CAPACITY, SOIL FRIABILITY,
AND NUTRIENT AVAILABILITY.)
SEEDBED PREPARATION
1. TEST SOIL TO DETERMINE PH AND NUTRIENT LEVELS.
2. APPLY SOIL AMENDMENTS AS RECOMMENDED BY THE SOIL TEST AND WORK INTO THE
UPPER TWO TO FOUR INCHES OF SOIL. IF TESTING IS NOT DONE, APPLY 400 TO 600
POUNDS PER ACRE OF 12-12-12 ANALYSIS FERTILIZER, OR EQUIVALENT.
3. TILL THE SOIL TO OBTAIN A UNIFORM SEEDBED. USE A DISK OR RAKE, OPERATED ACROSS
THE SLOPE, TO WORK THE SOIL AMENDMENTS INTO THE UPPER TWO TO FOUR INCHES OF
THE SOIL.
SEEDING
OPTIMUM SEEDING DATES ARE MARCH 1 TO MAY 10 AND AUGUST 10 TO SEPTEMBER 30.
PERMANENT SEEDING DONE BETWEEN MAY 10 AND AUGUST 10 MAY NEED TO BE IRRIGATED.
SEEDING OUTSIDE OR BEYOND OPTIMUM SEEDING DATES IS STILL POSSIBLE WITH THE
UNDERSTANDING THAT RESEEDING OR OVERSEEDING MAY BE REQUIRED IF ADEQUATE SURFACE
COVER IS NOT ACHIEVED. RESEEDING OR OVERSEEDING CAN BE EASILY ACCOMPLISHED IF
THE SOIL SURFACE REMAINS WELL PROTECTED WITH MULCH.
1. SELECT A SEEDING MIXTURE AND RATE FROM TABLE 1. SELECT SEED MIXTURE BASED ON
SITE CONDITIONS, SOIL PH, INTENDED LAND USE, AND EXPECTED LEVEL OF MAINTENANCE.
2. APPLY SEED UNIFORMLY WITH A DRILL OR CULTIPACKER SEEDER OR BY BROADCASTING. PLANT OR
COVER THE SEED TO A DEPTH OF ONE-FOURTH TO ONE-HALF INCH. IF DRILLING OR BROADCASTING THE
SEED, ENSURE GOOD SEED-TO-SOIL CONTACT BY FIRMING THE SEEDBED WITH A ROLLER OR
CULTIPACKER AFTER COMPLETING SEEDING OPERATIONS. (IF SEEDING IS DONE WITH A HYDROSEEDER,
FERTILIZER AND MULCH CAN BE APPLIED WITH THE SEED IN A SLURRY MIXTURE.)
3. MULCH ALL SEEDED AREAS AND USE APPROPRIATE METHODS TO ANCHOR THE MULCH IN PLACE.
CONSIDER USING EROSION CONTROL BLANKETS ON SLOPING AREAS AND CONVEYANCE CHANNELS
MAINTENANCE
_ INSPECT WITHIN 24 HOURS OF EACH RAIN EVENT AND AT LEAST ONCE EVERY SEVEN
CALENDAR DAYS UNTIL THE VEGETATION IS SUCCESSFULLY ESTABLISHED.
_ CHARACTERISTICS OF A SUCCESSFUL STAND INCLUDE VIGOROUS DARK GREEN OR BLUISHGREEN
SEEDLINGS WITH A UNIFORM VEGETATIVE COVER DENSITY OF 90 PERCENT OR MORE.
_ CHECK FOR EROSION OR MOVEMENT OF MULCH.
_ REPAIR DAMAGED, BARE, GULLIED, OR SPARSELY VEGETATED AREAS AND THEN FERTILIZE,
RESEED, AND APPLY AND ANCHOR MULCH.
_ IF PLANT COVER IS SPARSE OR PATCHY, EVALUATE THE PLANT MATERIALS CHOSEN, SOIL
FERTILITY, MOISTURE CONDITION, AND MULCH APPLICATION; REPAIR AFFECTED AREAS
EITHER BY OVERSEEDING OR PREPARING A NEW SEEDBED AND RESEEDING. APPLY
AND ANCHOR MULCH ON THE NEWLY SEEDED AREAS.
_ IF VEGETATION FAILS TO GROW, CONSIDER SOIL TESTING TO DETERMINE SOIL PH OR
NUTRIENT DEFICIENCY PROBLEMS. (CONTACT YOUR SOIL AND WATER CONSERVATION
DISTRICT OR COOPERATIVE EXTENSION OFFICE FOR ASSISTANCE.)
_ IF ADDITIONAL FERTILIZATION IS NEEDED TO GET A SATISFACTORY STAND, DO SO ACCORDING
TO SOIL TEST RECOMMENDATIONS.
_ ADD FERTILIZER THE FOLLOWING GROWING SEASON. FERTILIZE ACCORDING TO SOIL TEST
RECOMMENDATIONS.
_ FERTILIZE TURF AREAS ANNUALLY. APPLY FERTILIZER IN A SPLIT APPLICATION. FOR
COOL-SEASON GRASSES, APPLY ONE-HALF OF THE FERTILIZER IN LATE SPRING AND ONE HALF IN
EARLY FALL. FOR WARM-SEASON GRASSES, APPLY ONE-THIRD IN EARLY SPRING,
ONE-THIRD IN LATE SPRING, AND THE REMAINING ONE-THIRD IN MIDDLE SUMMER.
TABLE 1. PERMANENT SEEDING RECOMMENDATIONS
THIS TABLE PROVIDES SEVERAL SEED MIXTURE OPTIONS. ADDITIONAL SEED MIXTURES ARE
AVAILABLE COMMERCIALLY. WHEN SELECTING A MIXTURE, CONSIDER INTENDED LAND USE
AND SITE CONDITIONS, INCLUDING SOIL PROPERTIES (E.G., SOIL PH AND DRAINAGE), SLOPE
ASPECT, AND THE TOLERANCE OF EACH SPECIES TO SHADE AND DROUGHT.
REFERENCE IN CHAPTER 7 PAGES 35-40 IN THE INDIANA STORM WATER QUALITY MANUAL
SEED MIXTURES RATE PER ACRE PURE LIVE SEED OPTIMUM SOIL PH
1. PERENNIAL RYEGRASS
- WHITE CLOVER
70 LBS.
2 LBS.5.6 TO 7.0
2. PERENNIAL RYEGRASS
- TALL FESCUE
70 LBS.
50 LBS.5.6 TO 7.0
3. TALL FESCUE
- WHITE CLOVER
70 LBS.
2 LBS.5.5 TO 7.5
STEEP BANKS AND CUTS, LOW-MAINTENANCE AREAS (NOT MOWED)
1. SMOOTH BROME GRASS
- RED CLOVER
35 LBS.
20 LBS.
2. TALL FESCUE
- WHITE CLOVER
50 LBS.
2 LBS.
3. TALL FESCUE
- RED CLOVER
50 LBS.
20 LBS.
4. ORCHARD GRASS
- RED CLOVER
- WHITE CLOVER
30 LBS.
20 LBS.
2 LBS.
5.6 TO 7.0
5. CROWNVETCH
- TALL FESCUE
12 LBS.
30 LBS.
LAWNS AND HIGH-MAINTENANCE AREAS
1. BLUEGRASS
2. PERENNIAL RYEGRASS
(TURF TYPE)
3. TALL FESCUE (TURF TYPE)
- BLUEGRASS
170 LBS.
30 LBS.
CHANNELS AND AREAS OF CONCENTRATED FLOW
1. PERENNIAL RYEGRASS
- WHITE
2. KENTUCKY BLUEGRASS
- SMOOTH BROMEGRASS
- SWITCHGRASS
- TIMOTHY
- PERENNIAL RYEGRASS
- WHITE CLOVER
20 LBS.
10 LBS.
3 LBS.
4 LBS.
10 LBS.
2 LBS.
3. TALL FESCUE
- WHITE CLOVER
150 LBS.
2 LBS.
4. TALL FESCUE
- PERENNIAL RYEGRASS
- KENTUCKY BLUEGRASS
5.5 TO 7.5
5.5 TO 7.0
5.5 TO 7.5
5.5 TO 7.5
5.6 TO 7.0
140 LBS.5.5 TO 7.0
60 LBS.
90 LBS.5.6 TO 7.0
5.6 TO 7.5
150 LBS.
2 LBS.5.5 TO 7.0
5.5 TO 7.5
5.5 TO 7.5
150 LBS.
20 LBS.
20 LBS.
PERMANENT SEED
OPEN LOW-MAINTENANCE AREAS (REMAINING IDLE MORE
THAN SIX MONTHS)
SEED MIXTURES RATE PER ACRE PURE LIVE SEED OPTIMUM SOIL PH
SEED MIXTURES RATE PER ACRE PURE LIVE SEED OPTIMUM SOIL PH
SEED MIXTURES RATE PER ACRE PURE LIVE SEED OPTIMUM SOIL PH
1 PERENNIAL SPECIES MAY BE USED AS A TEMPORARY COVER, ESPECIALLY IF THE AREA TO BE
SEEDED WILL REMAIN IDLE FOR MORE THAN ONE YEAR.
2 SEEDING DONE OUTSIDE THE OPTIMUM SEEDING DATES INCREASES THE CHANCES OF SEEDING FAILURE. DATES
MAY BE EXTENDED OR SHORTENED BASED ON THE LOCATION OF THE PROJECT
SITE WITHIN THE STATE.
NOTES:
MULCH ALONE IS AN ACCEPTABLE TEMPORARY COVER AND MAY BE USED IN LIEU OF TEMPORARY
SEEDING, PROVIDED THAT IT IS APPROPRIATELY ANCHORED.
A HIGH POTENTIAL FOR FERTILIZER, SEED, AND MULCH TO WASH EXISTS ON STEEP BANKS, CUTS,
AND IN CHANNELS AND AREAS OF CONCENTRATED FLOW.
SEEDBED PREPARATION
1. TEST SOIL TO DETERMINE PH AND NUTRIENT LEVELS.
2. APPLY SOIL AMENDMENTS AS RECOMMENDED BY THE SOIL TEST. IF TESTING IS NOT DONE, APPLY 400 TO 600
POUNDS PER ACRE OF 12-12-12 ANALYSIS FERTILIZER, OR EQUIVALENT.
3. WORK THE SOIL AMENDMENTS INTO THE UPPER TWO TO FOUR INCHES OF THE SOIL WITH
A DISK OR RAKE OPERATED ACROSS THE SLOPE.
SEEDING
1. SELECT A SEED SPECIES OR AN APPROPRIATE SEED MIXTURE AND APPLICATION RATE FROM TABLE 1.
2. APPLY SEED UNIFORMLY WITH A DRILL OR CULTIPACKER SEEDER OR BY BROADCASTING. PLANT OR COVER SEED
TO THE DEPTH SHOWN IN TABLE 1.
NOTES:
1. IF DRILLING OR BROADCASTING THE SEED, ENSURE GOOD SEED-TO-SOIL CONTACT BY FIRMING THE SEEDBED
WITH A ROLLER OR CULTIPACKER AFTER COMPLETING SEEDING OPERATIONS.
2. DAILY SEEDING WHEN THE SOIL IS MOIST IS USUALLY MOST EFFECTIVE.
3. IF SEEDING IS DONE WITH A HYDROSEEDER, FERTILIZER AND MULCH CAN BE APPLIED WITH THE SEED IN A SLURRY
MIXTURE.
3. APPLY MULCH AND ANCHOR IT IN PLACE.
MAINTENANCE
_ INSPECT WITHIN 24 HOURS OF EACH RAIN EVENT AND AT LEAST ONCE EVERY SEVEN CALENDAR DAYS.
_ CHECK FOR EROSION OR MOVEMENT OF MULCH AND REPAIR IMMEDIATELY.
_ MONITOR FOR EROSION DAMAGE AND ADEQUATE COVER (80 PERCENT DENSITY); RESEED,
FERTILIZE, AND APPLY MULCH WHERE NECESSARY.
_ IF NITROGEN DEFICIENCY IS APPARENT, TOP-DRESS FALL SEEDED WHEAT OR RYE SEEDING WITH 50 POUNDS
PER ACRE OF NITROGEN IN FEBRUARY OR MARCH.
REFERENCE IN CHAPTER 7 PAGES 31-33 IN THE INDIANA STORM WATER QUALITY MANUAL
TEMPORARY SEED
TABLE 1. TEMPORARY SEEDING SPECIFICATIONS
AUG. 1 - SEPT. 1
GERMAN MILLET
WHEAT OR RYE 150 LBS. 1 TO 1½ INCHES SEPT. 15 - OCT. 30
SPRING OATS 100 LBS. 1 INCH MARCH 1 - APRIL 15
ANNUAL RYEGRASS 40 LBS.¼ INCH MARCH 1 - MAY 1
40 LBS.1 TO 2 INCHES MAY 1 - JUNE 1
SUDANGRASS 35 LBS.MAY 1 - JULY 30
BUCKWHEAT 60 LBS. APRIL 15 - JUNE 1
CORN (BROADCAST)300 LBS.MAY 11 - AUG. 10
SORGHUM 35 LBS.MAY 1 - JULY 15
1 TO 2 INCHES
1 TO 2 INCHES
1 TO 2 INCHES
1 TO 2 INCHES
TABLE 1. TEMPORARY SEEDING SPECIFICATIONS
AUG. 1 - SEPT. 1
GERMAN MILLET
SEED SPECIES1 RATE PER ACRE PLANTING DEPTH OPTIMUM DATES2
WHEAT OR RYE 150 LBS. 1 TO 1½ INCHES SEPT. 15 - OCT. 30
SPRING OATS 100 LBS. 1 INCH MARCH 1 - APRIL 15
ANNUAL RYEGRASS 40 LBS.¼ INCH MARCH 1 - MAY 1
40 LBS.1 TO 2 INCHES MAY 1 - JUNE 1
SUDANGRASS 35 LBS.MAY 1 - JULY 30
BUCKWHEAT 60 LBS. APRIL 15 - JUNE 1
CORN (BROADCAST)300 LBS.MAY 11 - AUG. 10
SORGHUM 35 LBS.MAY 1 - JULY 15
1 TO 2 INCHES
1 TO 2 INCHES
1 TO 2 INCHES
1 TO 2 INCHES
POSTS: STEEL T OR U TYPE, OR 2"X2" HARD WOOD POST
FENCE: WOVEN WIRE, 14-1/2 GA., 6" MAX. MESH OPENING
FABRIC: IN ACCORDANCE WITH ASTM D 6461 LATEST EDITION.
SEDIMENTATION/SILT FENCE
(NO SCALE)
100 FT.
75 FT.
50 FT.
25 FT.
15 FT.MORE THAN 20%
10 TO 20%
5 TO 10%
2 TO 5%
LESS THAN 2%
MAXIMUM LOAD SLOPE AND DISTANCE FOR
WHICH A SILT FENCE IS APPLICABLE
MAX. DISTANCE ABOVE FENCELOAD SLOPE
INSTALLATION
PREFABRICATED SILT FENCE
1. LAY OUT THE LOCATION OF THE FENCE SO THAT IT IS PARALLEL TO THE CONTOUR OF THE SLOPE AND AT LEAST 10 FEET BEYOND THE TOE OF THE SLOPE TO PROVIDE A SEDIMENT
STORAGE AREA. TURN THE ENDS OF THE FENCE UP SLOPE SUCH THAT THE POINT OF CONTACT BETWEEN THE GROUND AND THE BOTTOM OF THE FENCE END TERMINATES AT A HIGHER
ELEVATION THAN THE TOP OF THE FENCE AT ITS LOWEST POINT.
2. EXCAVATE AN EIGHT-INCH DEEP BY FOUR-INCH WIDE TRENCH ALONG THE ENTIRE LENGTH OF THE FENCE LINE. INSTALLATION BY PLOWING IS ALSO ACCEPTABLE.
3. INSTALL THE SILT FENCE WITH THE FILTER FABRIC LOCATED ON THE UP-SLOPE SIDE OF THE EXCAVATED TRENCH AND THE SUPPORT POSTS ON THE DOWN-SLOPE SIDE OF THE TRENCH.
4. DRIVE THE SUPPORT POSTS AT LEAST 18 INCHES INTO THE GROUND, TIGHTLY STRETCHING THE FABRIC BETWEEN THE POSTS AS EACH IS DRIVEN INTO THE SOIL. MINIMUM OF 12 INCHES
OF THE FILTER FABRIC SHOULD EXTEND INTO THE TRENCH.
5. LAY THE LOWER FOUR INCHES OF FILTER FABRIC ON THE BOTTOM OF THE TRENCH AND EXTEND IT TOWARD THE UP-SLOPE SIDE OF THE TRENCH.
6. BACKFILL THE TRENCH WITH SOIL MATERIAL AND COMPACT IT IN PLACE.
NOTE: IF THE SILT FENCE IS BEING CONSTRUCTED ON-SITE, ATTACH THE FILTER FABRIC TO THE SUPPORT POSTS AND ATTACH WOODEN LATHE TO SECURE THE FABRIC TO THE POSTS.
ALLOW FOR AT LEAST 12 INCHES OF FABRIC BELOW GROUND LEVEL. COMPLETE THE SILT FENCE INSTALLATION, FOLLOWINGSTEPS 1 THROUGH 6 ABOVE.
MAINTENANCE
_ INSPECT WITHIN 24 HOURS OF A RAIN EVENT AND AT LEAST ONCE EVERY SEVEN CALENDAR DAYS.
_ IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY. NOTE: ALL REPAIRS SHOULD MEET
SPECIFICATIONS AS OUTLINED WITHIN THIS MEASURE.
_ REMOVE DEPOSITED SEDIMENT WHEN IT IS CAUSING THE FILTER FABRIC TO BULGE OR WHEN IT REACHES ONE-HALF THE HEIGHT OF THE FENCE AT ITS LOWEST POINT. WHEN
CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE AND SEDIMENT DEPOSITS, GRADE THE SITE TO BLEND WITH THE SURROUNDING AREA, AND STABILIZE.
REFFERENCE IN CHAPTER 7 PAGES 215-221 IN THE INDIANA STORM WATER QUALITY MANUAL
2-WOOD POST/STAKES WRAPPED
WITH SILT FENCE AND ROTATED
AT LEAST ONE FULL TURN TO
SECURE SILT FENCE END IN PLACE
SILT FENCE
SILT FENCE
POST
TO JOIN TO ENDS
OF TWO FENCES.6"8"6"GROUND
UNDISTURBED
FLOW
FINISH GRADE
EMBEDDED SILT FENCE MATERIAL MIN. 8"
INTO GROUND W/ 4" LAID ALONG BOTTOM OF
TRENCH. SOIL SLICING IN ACCORDANCE
WITH ASTM D 6462 8.2.2 IS ALSO ACCEPTABLE.18"(MIN) 30"(MAX)GEOTEXTILE FABRIC LAID
ON DOWN SLOPE SIDE
AND BOTTOM OF TRENCH
8"X4" TRENCH TO
BE BACKFILLED
AND COMPACTED
WOVEN FILTER
FABRIC SILT FENCE
MATERIAL COVER
POST 2"X2" WOOD OR
1.33 LBS/FOOT STEEL 6'
MAX. SPACING
6"8"6"GROUND
UNDISTURBED
FLOW
FINISH GRADE
EMBEDDED SILT FENCE MATERIAL MIN. 8"
INTO GROUND W/ 4" LAID ALONG BOTTOM OF
TRENCH. SOIL SLICING IN ACCORDANCE
WITH ASTM D 6462 8.2.2 IS ALSO ACCEPTABLE.18"(MIN) 30"(MAX)GEOTEXTILE FABRIC LAID
ON DOWN SLOPE SIDE
AND BOTTOM OF TRENCH
8"X4" TRENCH TO
BE BACKFILLED
AND COMPACTED
POST 2"X2" WOOD OR
1.33 LBS/FOOT STEEL 8'
MAX. SPACING
WIRE FENCE 14 GUAGE (MIN)-6"
MESH REQ'D. IN SWALES OR
AREAS OF CONCENTRATED FLOW
NONWOVEN FILTER FABRIC
- SECURE TO POSTS WITH
2" LATH
WITHOUT WIRE SUPPORT
WITH WIRE SUPPORT
2-WOOD POST/STAKES WRAPPED WITH
SILT FENCE AND ROTATED AT LEAST
TWO FULL TURNS TO PROVIDE A
SECURE CONNECTION