Loading...
HomeMy WebLinkAboutPlans & Specifications I L MEDICAL DRIVE SHOPS THE PROPOSED SITE IS LOCATED AT 154 MEDICAL DRIVE, CARMEL, INDIANA (39'57'32"N & 86'07'26"W W6584/NAD83). THE PROJECT CONSISTS OF CONSTRUCTION OF A COMMERCIAL BUILDING THAT WILL PROVIDE SPACE FOR GENERAL OFFICES, PROFESSIONAL OFFICES AND RETAIL SALES & GENERAL SERVICES. THE SITE IS BOUNDED BY MEDICAL DRIVE TO THE SOUTH, A DAY CARE FACILITY TO THE WEST, A RACQUET CLUB TO THE NORTH AND A PRESCHOOL TO THE EAST. Cl iv ~U ~.O~~< ~v ~~DD \"'"" "'" 'VI''' ~ "DC PROJECT LOCATION 0 roc i ri SCALE = l' = 500' E. 116 TH STREET E. 116TH STREET il ~ ~ 1:1 ~ :;! ~ ~ . ~ ? ~ ~, ?~ ~~ H .'0 11 ~ CARMEL Ii i PROJECT AREA MAP ~ , o h.. N .;~ /~<< iJi ~lL~ CERllFIED PLANS PREPARED FOR: CITY OF CARMEL DEPARTMENT OF COMMUNITY SERVICES ONE .CIVlC SQUARE CARMEL, INDIANA 46032 PLAN S PREPARED BY: VS ENGINEERING, INC. 4275 North High 8choolRood Indlanapol", Indiana 48254 ...rovo.nglnoerlng.com www....ngln_ng.com Phon.: (317) ~542 Fox: (317) 293-4n7 BHAGWAN C. PAllEL P.E. INDIANA REG. NO. 16003 DAllE /::_ !if: . . RECt.\\JrJ) ~I\\\ ~ 2. 1\)\)1_ . noes \ \. / / " -_/ \\\\\\\1111111111/1/ ~~'\"~d "N C.. IIIIII//;Z " u.... ,,''''''-' J9.. g'-"r%.\ST("~}"';,>-% lc[f'" NO. 0\(<'\\ ~ *! 16G03 i~ g %&STATE OF Jeff \, ........INOIA~......<.~! '. oS' ..........- ~G .. II"'IIIIIJ~~~~~\\;\\\\'\'\'" GENERAL NOTES ~ ~ 1. THE CONTRACTOR SHALL CLEAN ALL DIRT AND DEBRIS FROM MEDICAL DRIVE DAILY OR MORE TO STAY IN COMPLIANCE WITH CITY OF CARMEL ORDINANCES. 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING OR VERIFYING THAT ALL PERMITS AND APPROVALS ARE OBTAINED FROM THE RESPECTIVE CITY, COUNTY, STATE AND FEDERAL AGENCIES PRIOR TO STARTING ANY CONSTRUCTION. 3. CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR ALL EXISTING UTILITIES AND PIPING WITHIN HIS SITE LIMITS WHETHER ABOVE OR BELOW GROUND. HE SHALL NOTIFY AND COORDINATE, IN WRITING, HIS CONSTRUCTION ACTIVITIES WITH RESPECTIVE UTILITY COMPANIES OR OWNERS AND SHALL OBTAIN NECESSARY PERMITS OR APPROVALS. 4. IT SHALL BE CONTRACTOR'S REPONSIBILlTY TO MAINTAIN IN SERVICE ALL EXISTING UTILITIES AND PIPING ENCOUNTERED DURING CONSTRUCTION. 5. LOCATIONS, INVERT ELEVATIONS AND DIMENSIONS OF EXISTING UTILITIES, SEWERS, AND STRUCTURES, SHOWN ON DRAWINGS ARE APPROXIMATE AND FOR REFERENCE ONLY. CONTRACTORS SHALL ASSUME RESPONSIBILITY FOR ALL UTILITIES AND SEWERS AND SHALL VERIFY EXACT LOCATIONS, ELEVATIONS AND DIMENSIONS IN FIELD PRIOR TO ANY CONSTRUCTION. HE SHALL NOTIFY THE ENGINEER, IN WRITING, OF ANY DISCREPANCIES FOUND IN THE FIELD AND THE ENGINEER SHALL FURNISH FULL INSTRUCTIONS IF ANY CHANGES REQUIRED. 6. CONTRACTOR SHALL PROVIDE PROTECTION OF ALL EXISTING UTILITIES AND PIPING, IF NECESSARY, AND COORDINATE UTLlTY PROTECTION WITH RESPECTIVE UTILITY COMPANIES OR OWNERS. 7. THE WORK UNDER THIS CONTRACT REQUIRES COORDINATION BETWEEN THE CONTRACTOR, OTHER CONTRACTORS AND UTILITY COMPANIES FOR PRESENT AND ADDITIONAL WORK TO BE AWARDED BY THE OWNER FOR THIS PROJECT. THE CONTRACTOR SHALL FULLY COOPERATE WITH SUCH OTHER CONTRACTORS AND UTILITY AUTHORITIES AND SHALL COORDINATE HIS WORK IN SUCH A MANNER THAT THE WORK MUTUALLY INVOLVING OR AFFECTING THIS PROJECT WILL BE PERFORMED WITHOUT EXCESSIVE DELAYS OR INTERFERENCES. 8. THE CONTRACTOR SHALL VERIFY ALL FIELD CONDITIONS PRIOR TO THE START OF WORK AND REPORT ANY VARIATIONS TO THE CONSTRUCTION MANAGER. 9. ALL MATERIALS AND WORKMANSHIP SHALL COMPLY WITH ALL APPLICABLE CODES, SPECIFICATIONS, LOCAL ORDINANCES, INDUSTRY STANDARDS AND UTlLTY COMPANY REGULATIONS. 10. ANY TREES, HEDGES, BUSHES, SHRUBS, ETC. REMOVED WHICH ARE NOT DIRECTED BY THE OWNER OR ENGINEER FOR REMOVAL SHALL BE REPLACED IN KIND BY THE CONTRACTOR, AT HIS OWN EXPENSE, TO THE SATISFACTION OF THE OWNER. 11. THE MINIMUM COVER FOR ALL WATER AND FIRE PROTECTION MAINS SHALL BE 5 FEET MEASURED FROM THE FINAL FINISHED GRADE TO THE CROWN OF THE PIPE TO CLEAR THE CROSSING UTILITIES. THE CONTRACTOR MAY USE EITHER OF THE FOLLOWING METHODS TO ACHIEVE THE REQUIRED VERTICAL ALIGNMENT AND SHALL ASSURE THE PASSAGE OF BOTH THE PRESSURE TEST AND THE LEAKAGE TEST. SHOP DRAWINGS OF ALIGNMENTS AND REACTION BACKING SHALL BE SUBMITTED TO THE ENGINEER FOR APPROVAL A. WHEN USING THE VERTICAL BEND METHOD TO CROSS THE UTILITIES, THRUST BLOCKS SHALL BE PROVIDED AS SHOWN, OR DIRECTED BY THE ENGINEER. B. WHEN USING THE JOINT DEFLECTION METHOD TO CROSS THE UTILITIES, THE DEFELCTlON ANGEL PER JOINT SHALL BE LIMITED TO 4 DEGREES FOR PIPE DIAMETERS FROM 4 THROUGH 12 INCHES. 12. THE HORIZONTAL SEPARATION BETWEEN SEWERS AND POTABLE WATER MAINS SHALL BE AT LEAST 10 FEET AND VERTICAL SEPARATION SHALL BE SUCH THAT THE TOP OF THE SEWER IS AT LEAST 18 INCHES BELOW THE BOTTOM OF THE WATER MAIN. THE CONTRACTOR SHALL NOTIFY THE ENGINEER, IN WRITING, IF THESE CRITERIA CAN NOT BE MET AND THE ENGINEER SHALL FURNISH FULL INSTRUCTIONS IF ANY CHANGES ARE REQUIRED. 13. THE MATERIALS AND WORKMANSHIP FOR ALL PRECAST MANHOLES, INLETS AND CATCH BASINS SHALL CONFORM TO ASTM C-478 AND JOINTS BETWEEN SECTIONS OF PRECAST UNITS SHALL CONFORM TO ASTM C-443. OTHER TYPES OF JOINTS MAY BE USED IF APPROVED BY THE ENGINEER. ALL MANHOLES SHALL BE COATED ACCORDING TO CITY OF CARMEL STANDARDS. 14. THE MATERIALS AND WORKMANSHIP FOR PIPES SHALL MEET THE FOLLOWING STANDARDS: A. SANITARY SEWERS: FOR PIPE DIAMETERS 15 INCHES OR LESS, THE PIPE SHALL BE POLYVINYL CHLORIDE (PVC) IN ACCORDANCE WITH ASTM 0-3034, WITH FLEXIBLE GASKETED JOINTS IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS AND ASTM 0-3212. B. STORM SEWERS: FOR PIPE DIAMETERS LESS THAN 12 INCHES, THE PIPE SHALL BE PVC AS DESCRIBED ABOVE. FOR PIPE DIAMETERS 12 INCHES OR GREATER, THE PIPE SHALL BE REINFORCED CONCRETE PIPE (RCP) IN ACCORDANCE WITH ASTM C- 76, CLASS III, WALL B. JOINTS SHALL BE SEALED USING RUBBER GASKETS IN ACCORDANCE WITH ASTM C-443. OTHER TYPES OF JOINTS MAY BE USED IF APPROVED BY THE ENGINEER. C. UNDERDRAINS SHALL BE IN ACCORDANCE WITH ALL APPLICABLE PROVISIONS OF SECTION 718 OF THE INDOT STANDARD SPECIFICATIONS. D. WATER AND FIRE PROTECTION MAINS SHALL BE DUCTILE IRON (0.1.) IN ACCORDANCE WITH ANSI A21.51 (AWWA STANDARD C151), WITH A MINIMUM WORKING PRESSURE OF 150 PSI PLUS 100 PSI SURGE AND SAFETY FACTOR OF 2. MINIMUM THICKNESS CLASS SHALL BE 52 FOR ALL SIZES. THE PIPE JOINTS SHALL BE PUSH-ON TYPE, MEETING REQUIREMENTS OF ANSI/AWWA C111/A21.11. 15. FOR EXACT LOCATIONS, DIMENSIONS AND ELEVATIONS OF BUILDING SERVICE LINES SUCH AS SANITARY SERVICE, ROOF (STORM) DRAINS, WATER 'AND FIRE PROTECTION SERVICE, ETC., SEE PLUMBING DRAWINGS. LOCATIONS AND DIMENSIONS SHOWN ON THE UTILITY PLAN ARE FOR CONTRACTOR'S REFERENCE ONLY. 16. THE CONTRACTOR SHALL CAP ALL SANITARY, STORM, WATER AND FIRE PROTECTION LINES 5 FEET FROM THE BUILDING FACE AND MARK WITH FLAGGING AS SHOWN ON THE DETAIL SHEET. 17. THE FILL OR BACKFILL MATERIAL TO BE USED FOR THIS WORK SHALL BE CLEAN GRANULAR MATERIAL ("B" BORROW) AS SHOWN ON THE DRAWINGS, AND IN ACCORDANCE WITH SECTION 211 OF THE INDOT STANDARD SPECIFICATIONS. 18. ALL CURB RADII SHOWN ON SITE PLAN ARE AT THE FRONT FACE OF CURB OR EDGE OF PAVEMENT. 19. ALL EXISTING FEATURES SUCH AS STREET SIGNS, REGULATORY SIGNS, TRAFFIC SIGNS AND SIGNALS, LIGHT POLES, PLANTERS. FIRE HYDRANTS, ETC. SHALL REMAIN IN PLACE. ANY SUCH DAMAGED ITEM(S) SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR AT HIS OWN EXPENSE. 20. THE CONTRACTOR SHALL MAINTAIN AT LEAST ONE LANE OPEN TO TRAFFIC AT ALL TIMES WITH APPROPRIATE APPROVAL FOR SUCH LANE RESTRICTIONS BEING OBTAINED BY THE "BOARD OF PUBLIC WORKS AND SAFETY". 21. ALL UNPAVED DISTURBED AREAS SHALL BE SEEDED IN ACCORDANCE WITH SECTION 621 OF THE INDOT STANDARD SPECIFICATION'S. 22. NO EARTH DISTURBING ACTIVITY SHALL COMMENCE WITHOUT A PROPER STORM WATER MANAGEMENT PERMIT BEING ISSUED. 23. NO WORK IN THE RIGHT-OF-WAY SHALL COMMENCE WITHOUT A PROPER RIGHT-OF-WAY PERMIT BEING ISSUED. 24. THERE SHALL BE NO WATER VALVES OR MANHOLES WITHIN THE PAVEMENT, CURBS, SIDEWALKS OR ASPHALT PATHS OF THE RIGHT-OF-WAY. 25. ANY CURBING, SIDEWALK, SUBSURFACE DRAIN. AND/OR ASPHALT DAMAGED DURING CONSTRUCTION THAT IS NOT DETAILED IN THESE PLANS SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE. DESIGN BY: NRJ TEB SBP GENERAL NOTES AND INDEX DRAWN BY: CHECKED BY: UTILITIES UNDERGROUND UTILITY LOCATIONS HOTLINE: 1-800-382-5544 WATER/SEWER CITY OF CARMEL UTILITIES A TTN: JOHN DUFFY 317-571-2443 760 3RD AVE. SW CARMEL, IN. 46032 ELECTRIC INDIANAPOLIS POWER & LIGHT ATTN.: JANET SNODGRASS 317-261-8617 1230 W. MORRIS ST. INDIANAPOLIS, IN 46221 GAS VECTREN ENERGY ATTN.: MARTY FREDERICK 812-491-4765 1 NORTH MAIN ST. EVANSVILLE, IN 47702 PHONE AT&T INDIANA ATTN.: SCOTT OSTERMEIR 317-968-6017 240 N. MERIDIAN ST. ROOM 225 INDIANAPOLIS, IN 46204 CABLE BRIGHT HOUSE NETWORK ATTN.: JEFF FAlMER 317-632-9077 3030 ROOSEVEL T AVE. INDIANAPOLIS, IN 46218 HOLEY MOLEY SAYS .. DON'T DIG BLIND" "IT'S THE LAW" CAll. 2 WlIRKtNG DA'IS BEFORE '/W DIG 1-800-382-5544 APPROVEO BY: BCP MEDICAL DRIVE SHOPS SITEWORK DRAWINGS INDEX Cl.0 C2.0 C3.0 - C8.0 C9.0 C10.0 Cll.0 C12.0 C13.0 C14.0 C15.0 - C18.0 C19.0 - C24.0 C25.0 C26.0 - C28.0 C29.0 - C30.0 C31.0 ~"'\\\\\\\\\\'N"C'III"JIIIIJ " c,"'~........., A " f ~/""G\STr';:.;-1,,\ gl! NO. \1"% ~ *( 16003 1'* ~ % ~ \ STATE or i ~ ~ \~"""..!NOIAt\~....<~t " <"ss ............. ~G .' ?1j111"I,;,e~~~I\;\\\\\'\'"\''' GENERAL NOTES & INDEX RULE 5 INDEX SPECIFICATIONS TOPOGRAPHIC SURVEY DEMOLITION PLAN EROSION CONTROL PLAN LAYOUT PLAN GRADING PLAN STORM SEWER LAYOUT PLAN STORM SEWER PLAN AND PROFILES DETENTION SYSTEM DETAILS RETAINING WALL DETAILS STORM STRUCTURE DETAILS MISCELLANEOUS DETAILS CONCRETE CURB RAMP DETAILS . '.t.;/ .~ SCALE: HOR.: NA VER.: NA DA TE: 8/28/06 PROJECT NO. 06-2366 DRAWING NO. C1.0 ~ ~~ ~~ !l! ~c ~ i ] I s ~~ ~ md :8 ~~ i.j ~.ij : ~ c 8~l~ ~h~ ~ i; ! ~~~~ REVISIONS I~I V4!N. !~C!~~~D~!!~~N!~A 1~5~. -1[1] TEL. (317) 293-3542 FAX: (317) 293-4737 BASIC ELEMENTS Al PLAN INDEX PROVIDED BELOW A2 11 X 17 INCH PLAT SHOWING BUILDING LOT NUMBERS/BOUNDARIES AND ROAD LAYOUT NAMES IS PROVIDED ON PLAN SHEET C9.0. AJ THIS PROJECT WILL CONSIST OF A COMMERCIAL DEVELOPMENT THAT WILL HAVE THE FOLLOWING USES: OFFICE GENERAl, PROFESSIONAL OFFICE, RETAIL SALES/GENERAL SERVICE. Ai VICINITY MAP IS SHOWN ON TITLE SHEET OF THESE PLANS Al2 THE LEGAL DESCRIPTION CAN BE FOUND IN THE REPORT WHICH IS BEING SUBMITTED WITH THESE PLANS. THE LATITUDE AND LONGITUDE FOR THIS SITE CAN BE FOUND IN THE NOI LETTER WHICH IS PROVIDED SEPARATELY IN THE REPORT BEING SUBMITTED WITH THESE PLANS All LOCATION OF ALL LOTS AND PROPOSED SITE IMPROVEMENTS CAN BE FOUND ON SHEETS Cl0.0 TO C25.0 OF THESE PLANS. A1 HYDROLOGIC UNIT CODE: 05120201090040 Aa NOTATION OF ANY STATE OR FEDERAL WATER QUALITY PERMITS: NONE AS THE RUNOFF FOR THE PARKING LOT AND AND BUILDING AREAS WILL BE DETAINED USING AN UNDERGROUND STORAGE SYSTEM. AND THEN WILL DISCHARGE INTO THE CITY OF CARMEL'S STORM SEWER SYSTEM. RUNOFF FLOWING ONTO THE PROJECT SITE FROM THE NEIGHBORING PROPERTY TO THE NORTH WILL DIRECT DISCHARGE INTO THE THE CITY OF CARMEL'S STORM SEWER SYSTEM. RUNOFF FLOWING ONTO THE PROJECT SITE FROM THE NEIGHBORING PROPERTIES TO THE EAST & WEST WILL BE ROUTED THROUGH THE UNDERGROUND STORAGE SYSTEM. A1ll THERE ARE NO WETLANDS, LAKES, AND/OR WATER COURSES ON OR IMMEDIATELY ADJACENT TO THE SITE. Al.J RECEIVING WATERS: CARMEL CREEK ill POTENTIAL DISCHARGES TO GROUNDWATER: NONE AU 100 YR FLOOPLAINS. FLOODWAYS, AND FLOODWAY FRINGES: THIS LOT LIES ENTIRELY IN FLOOD HAZARD ZONE X AS SCALED FROM THE FLOOD INSURANCE RATE MAP (FIRM) FOR HAMILTON COUNTY. INDIANA. COMMUNITY NAME CITY OF CARMEL. COMMUNITY NUMBER 180081. PANEL NUMBER 0228 F, DATED FEBRUARY 19, 2003. THE FLOOD WAY MAP IS ALSO SHOWN SEPARATELY IN THE REPORT BEING SUBMITTED WITH THESE PLANS. ill PRE-CONSTRUCTION AND POST CONSTRUCTION ESTIMATE OF PEAK DISCHARGE: PRE -CONSTRUCTION DISCHARGES Q.l0YEAR = 0.93 CFS Q.l00YEAR = 2.60 CFS POST-CONSTRUCTION DISCHARGES Q,10YEAR = 0.56 CFS Q.l00YEAR = 1.45 crs ~ THE ADJACENT LANDUSES TO THIS PROJECT SITE INCLUDE, A RACQUET ClUB IMMEDIATELY TO THE NORTH, A CHILD DAY CAR FACILITY TO THE WEST, AND A PRESCHOOL TO THE EAST. MEDICAL DRIVE BORDERS THE SOUTH SIDE OF THE SITE. AND AN APARTMENT COMPLEX IS LOCATED ON THE SOUTH SIDE OF MEDICAL DRIVE. AJ..a LOCATION AND APPROXIMATE BOUNDARIES OF ALL DISTURBED AREAS: ESSENTIAL Y THE ENTIRE SITE WILL BE DISTURBED. THIS IS SHOWN ON PLAN SHEETS Cl0.0 TO C25.0. ill IDENTIFlCIATION OF EXISTING VEGETATIVE COVER: THIS IS SHOWN ON PLAN SHEET C9.0 AJ..a A COpy OF THE GEOTECHNICAL REPORT WHICH INClUDES SOIL DESCRIPTIONS AND LIMITATIONS: IS INCLUDED IN THE DESIGN SUMMARY REPORT THAT IS BEING SUBMITTED WITH THESE PLANS. A1i THE LOCATIONS, SIZE AND DIMENSIONS OF THE PROPOSED STORMWA TER SYSTEMS ARE SHOWN ON SHEETS CH.O TO C29.0 OF THESE PLANS. A2Q LOCATIONS FOR ANY OFF-SITE CONSTRUCTION ACTIVITIES ASSOCIATED WITH THIS PROJECT ARE SHOWN ON SHEETS Cl0.0 TO C25.0 OF THESE PLANS. A21 LOCATIONS OF PROPOSED SOIL STOCKPILES. BORROW AND/OR DISPOSAL AREAS WILL NOT BE UTILITZED FOR THIS SITE. ALL EXCESS SOIL SHALL BE REMOVED FROM THE SITE IMMEDIATELY. A22 EXISTING SITE TOPOGRAPHY IS SHOWN ON SHEET C9.0 OF THESE PLANS A2J PROPOSED FINAL TOPOGRAPHY IS SHOWN ON SHEET C13.0 OF THESE PLANS j ~R i~ m~ ~ I i i . ~ ~ ~~ 7 ~S 8 il~~~ ?~~~ ~ liJ ~~~;! REVISIONS STORMWA TER POLLUTION PREVENTION PLAN INDEX CONSTRUCTION COMPONENTS W EXPECTED POLLUTANTS TO STORM WATER DURING CONSTRUCTION CAN BE. BUT NOT LIMITED TO EXCESS SEDIMENT, ORGANIC MATERIALS SUCH AS LEAVES AND TWIGS. EXCESS CONCRETE. FUELS. BRAKE DUST, AND TRASH. a2 STORMWA TER QUALITY SEQUENCING: BEFORE ANY GROUND IS BROKEN THE FOLLOWING ITEMS SHALL BE COMPLETED: 1. STABILIZED CONSTRUCTION ENTRANCE (PLAN SHEET Cll.0) 2. SILT FENCE (PLAN SHEET Cll.0) 3. INLET PROTECTION FOR EXISTING INLETS (PLAN SHEET Cll.0) 4. RIPRAP CHECK DAMS (PLAN SHEET Cll.0) 5. ESTABLISH CONSTRUCTION EQUIPMENT STAGING AREAS AS FAR FROM SWALES AS POSSIBLE 6. ESTABLISH ONSITE LOCATION FOR OWNER/OPERATOR/CONTRACTOR PLACEMENT OF APPROVED PLANS AND RULE 5 NOI AND RULE 5 INSPECTION DOCUMENTS DURING CONSTRUCTION BEGINS THE FOLLOWING ITEMS SHALL BE FOLLOWED 1. ONCE EROSION AND SEDIMENT CONTROL MEASURES ARE IN PLACE, BEGIN LAND CLEARING FOLLOWED IMMEDIATELY BY ROUGH GRADING. DO NOT LEAVE LARGE AREAS UNPROTECTED FOR MORE THAN 15 DAYS. RULE 5 REQUIRES THAT ALL DISTURBED AREAS THAT POTENTIALLY WILL BE IDLE FOR 15 DAYS OR MORE SHALL BE STABILIZED (SEEDED, MULCHED, ETC.) IMMEDIATELY. THIS SHALL BE DONE ACCORDANCE WITH INDIANA DEPARTMENT OF TRANSPORTATION SPECIFICATION SECTION 621. 2. UPON FINISH OF ROUGH GRADING, PLACE STORM STRUCTURES THAT ARE LOCATED IN UNPAVED AREAS. INLET PROTECTION SHALL BE PLACED IN THESE STRUCTURES, AND THE STRUCTURES SHALL REMAIN INACTIVE UNTIL THE OIL/WATER SEPARATORS AND UNDERGROUND DETENTION SYSTEM ARE BROUGHT ONLINE. ONCE THESE STORM STRUCTURES ARE PLACED COMPLETE FINAL GRADING OF SWALES, BERMS, AND COMMON AREAS, AND IMMEDIATELY PLACE EROSION CONTROL BLANKETS AND SOD. THE FINAL GRADING OF THE BUILDING PAD SHOULD ALSO BE COMPLETED DURING THIS PHASE SO THAT THE BUILDING MAY BEGIN TO RISE VERTICALLY. 3. INSTALL SANITARY. WATER. GAS, AND ELECTRIC SERVICES. 4. UPON COMPLETION OF THE UTILITY LINES, INSTALL THE UNDERGROUND DETENTION SYSTEM. UNDER NO CIRCUMSTANCES SHALL ANY STORM WATER ENTER THE UNDERGROUND DETENTION SYSTEM UNTIL THE OIL/WATER SEPARATORS ARE INSTALLED. ALL FLOW MUST BE ROUTED THROUGH OIL/WA TER SEPERA TORS BEFORE ENTERING THE UNDERGROUND DETENTION SYSTEM. CONSTRUCTION EQUIPMENT SHALL NOT BE PLACED ABOVE THE UNDERGROUND DETENTION SYSTEM UNTIL APPROVED BY A CON TECH REPRESENTITIVE. 5. CONSTRUCT STORM SEWERS LOCATED WITHIN PAVED AREAS. INLET PROTECTION SHALL BE PLACED OVER NEWLY CONSTRUCTED INLETS IMMEDIATELY. STORM SEWERS THAT FLOW INTO THE UNDERGROUND DETENTION SYSTEM SHALL BE BROUGHT INTO SERVICE IN SUCH A MANNER THAT ALL STORM WATER IS ROUTED THROUGH THE OIL/WATER SEPARATORS BEFORE THE FLOW ENTERS THE UNDERGROUND DETENTION SYSTEM. 6. ONCE ALL STORM SEWERS ARE PLACED CONSTRUCT ALL CURBING, AND PLACE ASPHALT. BJ STABILIZED CONSTRUCTION ENTRANCES SHALL BE LOCATED ON THE WEST END OF THE PROPERTY AS SHOWN ON PLAN SHEET Cll.0. CONSTRUCTION DETAILS FOR THE STABILIZED CONSTRUCTION ENTRANCE CAN BE FOUND ON PLAN SHEET Cll.0. CONSTRUCTION EQUIPMENT SHALL NOT BE PLACED ABOVE THE UNDERGROUND DETENTION SYSTEM. Ii! SEDIMENT CONTROL MEASURES FOR SHEET FLOW AREAS CAN BE FOUND ON PLAN SHEET Cll.0. a5 SEDIMENT CONTROL MEASURES FOR CONCENTRATED FLOW AREAS CAN BE FOUND ON PLAN SHEET Cll.0. all STORM SEWER INLET PROTECTION MEASURE LOCATIONS AND SPECIFICATIONS CAN BE FOUND ON PLAN SHEET Cll.0 AND C26.0. az THERE WILL BE NO RUNOFF CONTROL MEASURES USED IN THIS PROJECT. aB THERE WILL BE NO STORMWA TER OUTLET PROTECTION USED IN THIS PROJECT. ALL STORMWA TER WILL ENTER AN ENCLOSED STORM SEWER THAT WILL NOT OUTLET ONTO THE PROJECT SITE. all GRADE STABILIZATION STRUCTURES WILL NOT BE USED IN THIS PROJECT. a.t.lJ LOCATIONS, DIMENSIONS, SPECIFICATIONS, AND CONSTRUCTION DETAILS OF EACH STORM WATER QUALITY MEASURE CAN BE FOUND ON PLAN SHEET Cll.0 AND C26.0. Illl TEMPORARY SURFACE STABILlZATIONS SHALL BE DONE IN ACCORDANCE WITH INDIANA DEPARTMENT OF TRANSPORTATION SPECIFICATION SECTION 621. ALL DISTRUBED AREAS THAT REQUIRE TEMPORARY COVER DURING CONSTRUCTION ACTIVITIES SHALL BE STABILIZED WITH MULCHING ALONE FROM DECEMBER 1 TO MARCH 14 AND FROM JUNE 16 TO AUGUST 31. SPRING MIX SHALL BE USED FROM MARCH 15 THROUGH JUNE 15, AND SHALL BE APPLIED AT THE RATE OF 150 LB/ACRE. SPRING MIX SHALL CONSIST OF OATS. FALL MIX SHALL BE USED FROM SEPTEMBER 1 THROUGH NOVEMBER 30, AND SHALL BE APPLIED AT THE RATE OF 150 LB/ACRE. FAU MIX SHALL CONSIST OF WINTER WHEAT. B.1.2 ALL UNPAVED AREAS SHALL BE SODDED ACCORDING TO INDIANA DEPARTMENT OF TRANSPORTATION SPECIFICATION SECTION 621. W THE CONTRACTOR SHALL NOTIFY THE INDIANA DEPARTMENT OF ENVIRONMENT MANAGEMENT SPILL RESPONSE TEAM, AND/OR THE CITY OF CARMEL FIRE DEPARTMENT IF ANY CONTAMINANT INCLUDING, BUT NOT LIMITED FUEL, EXCESS CONCRETE, HYDRAULIC FLUIDS, OR ANY OTHER HYDROCARBON IS RELEASED ONTO THE SITE. IDEM SPILL RESPONSE TEAM 1-317-233-7745 (LOCAL) 1-800-233-7745 (TOLL FREE) CARMEL FIRE DEPARTMENT 1-317-571-2600 (NON-EMERGENCY) 911 (EMERGENCY) DESIGN BY: NRJ Bli ALL PROPOSED POLLUTION PREVENTION MEASURES SHALL BE INSPECTED FOR DEFlCIENCES AT LEAST WEEKLY, AND AGAIN WITHIN 24 HOURS OF EVERY RAIN EVENT. THE FOLLOWING GUIDLlNES SHALL BE FOLLOWED FOR MAINTENING THE POLLUTION PREVENTION MEASURES: INLET PROTECTION 1. REPLACE FILTER BAGS PER MANUFACTURER'S REQUIREMENTS SO DESIGN FLOW CAN PASS 2. WHEN DRAINAGE AREA HAS BEEN STABILIZED, REMOVE ALL CATCH BASIN INSERTS, CONSTRUCTION MATERIAl, AND SEDIMENT AND DISPOSE OF PROPERLY. SILT FENCE 1. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOME INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIA TEL Y. 2. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT ITS LOWEST POINT, OR IS CAUSING THE FABRIC TO BULGE. 3. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT. 4. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED. REMOVE THE FENCE AND SEDIMENT DEPOSITS, BRING THE DISTURBED AREA TO GRADE AND STABILIZE. TEMPORARY SEEDING 1. INSPECT PERIODICALLY AFTER PLANTING TO SEE THAT VEGETATIVE STANDS ARE ADEQUA TEL Y ESTABLISHED; RE -SEED IF NECESSARY. 2. CHECK FOR EROSION DAMAGE AFTER STORM EVENTS AND REPAIR; RE-SEED AND MULCH IF NECESSARY. 3. TOP-DRESS FALL SEEDED WHEAT SEEDINGS WITH 50 LBS/ACRE OF NITROGEN IN FEBRUARY OR MARCH IF NITROGEN DEFICIENCY IS APPARENT. RIPRAP CHECK DAMS 1. IF SIGNIFICANT EROSION OCCURS BETWEEN DAMS, INSTALL A RIPRAP LINER IN THAT PORTION OF THE CHANNEL 2. REMOVE SEDIMENT ACCUMULATED BEHIND EACH DAM AS NEEDED TO MAINTAIN CHANNEL CAPACITY, TO ALLOW DRAINAGE THROUGH THE DAM, AND TO PREVENT LARGE FLOWS FROM DISPLACING SEDIMENT. 3. ADD RIPRAP TO THE DAMS AS NEEDED TO MAINTAIN DESIGN HEIGHT AND CROSS SECTION 4. WHEN THE DAMS ARE NO LONGER NEEDED, REMOVE THE ROCK AND STABILIZE CHANNEL, USING AN EROSION RESISTANT LINING IF NECESSARY. ~ THIS IS NOT APPLICABLE SINCE THERE IS ONLY ONE LOT, AND ALL EROSION AND SEDIMENT CONTROL SPECIFICATIONS APPLY TO THIS LOT. POST CONSTRUCTION COMPONENTS ~ POTENTIAL POST-CONSTRUCTION POLLUTANTS ARE, BUT NOT LIMITED TO: OIL, GREASE, BRAKE DUST, ANTIFREEZE. GASOLINE, DIESEL FUEl, AND DUMPSTER WATER. C2 THE FOLLOWING POST CONSTRUCTION BMP'S SHALL BE INSTALLED AT THE SAME TIME AS THE STORM WATER SYSTEM: CATCH BASIN INSERTS & OIL/WATER SEPARATORS. ALL TEMPORARY EROSION CONTROL MEASURES SHALL REMAIN IN PLACE UNTIL SUFFICIENT VEGETATIVE GROWTH HAS BEEN ESTABLISHED IN EACH AREA TO A POINT WHERE SEDIMENT/POLLUTANTS WILL NOT ENTER THE STORM WATER SYSTEM, AND CONSTRUCTION ACTIVITY HAS BEEN COMPLETED. AT THIS POINT ANY CATCH BASIN INSERTS THAT ARE LOCATED IN STRUCTURES THAT IS ROUTED THROUGH OIL/WATER SEPARATORS MAY BE REMOVED. ALL OTHER POST-CONSTRUCTION BMP'S SHALL BE CLEANED PER THE OPERATIONS AND MAINTENANCE MANUAL CJ SITE AREAS THAT WILL NOT BE FLOWING THROUGH A PAVED AREA WILL HAVE SEDIMENTS REMOVED BY MEANS OF A CATCH BASIN INSERT. AREAS THAT FLOW THROUGH A PAVED AREA WILL BE ROUTED THROUGH AN ENClOSED STORM SYSTEM, AND THEN INTO ONE OF TWO STORMCEPTOR STC 900 OIL/WATER SEPARATORS. THE TWO SEPERATORS WILL ACHIEVE AN 89% AND 92% TSS REMOVAL RESPECTIVELY. ~ THE LOCATION. DIMENSIONS, AND CONSTRUCTION DETAILS OF EACH STORM WATER QUALITY MEASURE CAN BE FOUND ON PLAN SHEET C11.0 AND C26.0. C5 OWNER SHAU PERFORM A DAILY CLEANUP OF PARKING AREA TO PREVENT TRASH FROM ENTERING STORMWATER SYSTEM. STORM STRUCTRES SHALL BE INSPECTED ON AN ANNUAL BASIS. AND CLEANED AT LEAST ONE TIME EVERY 5 YEARS. \\\\\\1111111"11111 ,,\'\\~'.s.~NC II111111 ;!c'C:J..................~"" ;!c'..~-....~GI.T<.;;...:'1~., [,l:"/" <>\...\~ "Q)' NO. ,y.:." ~ * ! 16003 I * ~ ~ ~ \ STATE OF' ! ~ g %:~........!JiD'Att~.....~~~j ~-'/I/I~SIONAL.. ~~\\\"~~ flJ,lIll1fllll1\\\\\\\ SCALE: HOR.: NA VER.: NA DATE: 12/07/06 PROJECT NO. 06-2366 DRAWING NO. C2.0 RULE 5 INDEX ~~I ~!N. ~H~C~~~~D~!!~~N~!A 1~5~. ~ [.I] TEL. (317) 293-3542 FAX: (317) 293-4737 DRAWN BY: TEB BCP MEDICAL DRIVE SHOPS CHECKED BY: APPROVED BY: EARTHWORK EARTHWORK (CONT.) SANITARY SEWER SYSTEMS (CONT.) G. Backfilling: 1. Locations not under pavement or within City of Carmel Right of Way. These locations shall be backfilled as detailed in the plan documents. 2. Sewer under pcvement, sidewalk, paved areas and within Right of Way. Bedding. Haunching. Initial Backfill: Bedding. hounching and initial backfili materials. placement and compaction for water mains, water service laterals, sanitary mains and sanitary service laterals shall be In accordance with the standard practice of the utility that has jurisdiction over the Installation. Final Bockfill: Final backfill for water mains, water service laterals, sanitary mains and sanitary service laterals under and within 5-feet of pavement or sidewalk or other paved areas and for 011 installations within City right-ot-way shaH be B-Borrow for Structure Backfill meeting the material requirements of the IN DOT. The materlol shall be approved by the City of Carmel Department of Engineering at time of installotlon. Final backfill sholl be compacted in 6-lnch moximum lifts to not iess thon 95:ll: Standard Proctor Density for the entire depth of the materlol placed. The backfill for the top 6-inches of the excavation below the start of the aggregate sub-base of the pavement shall be No. 53 Stone meeting the moterlal requirements of the INDOT and shall be compacted to not less than 95:ll: Standard Proctor Density. If the stondard practice of the utility that has jurisdiction over the Installation has a more stringent final backfill requirement, the more stringent requirement shall govern. H. Infiltration: Furnish necessary equipment to test sewers for infiltration. Infiltration rates sholl not exceed the Local Standards. All sanitary sewer lines upon completion will be required to pass 0 low pressure air test, unless otherwise directed by the City of Carmel. Said test shall be conducted according to NCPI Standard Method and shall be witnessed by on inspector authorized by the City of Carmel. Infiltration under test shall not exceed 100 gallons per inch on inside diameter of sewer pipe per mile of sewer in 24 hours and inclusive of all appurtenances within the section being tested such os manholes, house connections, etc. All section not meeting this infiltration standard shall be repaired and retested. I. Flushing Sewers: Flush all sanitary sewers except building sewers with water to obtain free flow through each line. Remove 011 slit and trash from appurtenances just prior to acceptance of work. J. Plastic Sewer Pipe Installation: Plastic sewer pipe shall be installed in accordance with ASTM D2321 per latest revision, and no plastic pipe sholl exceed a deflection of 5:ll:. K. Storm Water Connections: No. roof drains, footing drains and or surface water drains may be connected to the sanitary sewer systems, including temporary connections during construction. L. Waterline Crossing: The horizontal separation between sewers and potable water mains shall be at least 10 feet and vertical separation shall be such that the top of the sewer is at least 18 inches below the bottom of the water main. The contractor shall notify the engineer, in writing, if these criteria can not be met. The engineer shall furnish full instructions If any changes are requlred. M. Utilities: It shali be the responsibliity of each contractor to verify 011 existing utilities and conditions pertainlng to his phase of the work. It shall also be the contractors responsibility to contact the owners of the various utilities before work is started. The contractor sholl notify in writing the owners or the engineer of any changes, errors or omissions found on these plans or in the field before work Is started or resumed. N. Service Laterals: Individual fat servIce lines shall be 6" In diometer and of material equal to that specified In 2A of this section. Service lines shall be connected to the main sewer by 0 wye (or tee branch for connections to main sewers 18" and larger) at locations shown within the plan documents. Service lines sholl be extended and capped at a point 5 feet beyond the right-of-way or one pipe length for those services on the same side of the street as the main. Sewer service lines shail be marked on the curb with red paint and the end of the line with 0 6' piece of pvc pipe driven into the ground. O. Reflective Warning Tape: Reflective warning tope shall be installed 18' above 011 installed pipes. NRJ TEB SBP BCP STORM SEWER SYSTEMS I. SCOPE OF WORK The work under this section includes 011 storm sewers, storm water inlets, and related items, Including excavating and backfilling, necessary to complete the work shown an the drawings. This section does not include specifications for the underground detention system or oil/water separators. II. MATERIALS A. Storm Sewers: 1. Reinforced concrete sewer pipe shall conform to ASTM C-76, Closs III, Wall B latest revision with joints conforming to ASTM C-443 latest revision. Other types of joints may be used if approved by the engineer. B. Manholes: 1. Precast reinforced concrete manhole sections and steps shall conform to ASTM C-478 latest revision. 2. Castings sholl be of uniform quality, free from blow holes, porosity, hard spots, shrinkage distortion or other defects. They shall be smooth and weJJ- cleaned by shotblasting or by some other approved method. They shall be coated with asphalt paint which shall result in a smooth coating. Tough and tenacious when cold, not tacky or brittle. They shall be gray iron meeting ASTM A-48 iatest revision. 3. Joints - manhole sections shall be jointed with rubber type gaskets. The rubber type gaskets shali meet ASTM C-443 latest revision. C. SUBDRAINS: 1. Perforated plastic pipe sub drains shall conform to ASTM D 3034 SDR 35. III. APPLICATiON A. Permits and Codes: the intent of this section of the specifications Is that the contractor's bid on the work covered herein shall be based upon the drawings and specifications but that the work shall comply with all, applicable codes and reguiations as amended by any waivers. Contractor shall furnish all bonds necessory to get permits for cuts and connections to existing sewers. B. Local Standards: The term "Local Standards" as used herein means the standards of design and construction of the respective municipal deportment or utility company. C. Existing Improvements: Maintain In operating condition all active utilities, sewers and other drains encountered in the sewer installation. Repair to the satisfaction of the owner any damage to existing active improvements. D. Workmonship: To conform to off local state and national codes and to be approved by 011 local and state agencies having jurisdiction. E. Trenching: Lay all pipe in open trenches. except when install1ng pipe beneath Medical Drive. This pipe shall be bored in accordance with City of Carmel Standards. Open the trench sufficiently ahead of pipe-laying to revel any obstructions. The trench shall be excavated os detailed in the plan plan documents. Sheet &: brace trench as necessary to to protect workmen &; adjacent structures. All trenching shall comply with Occupational Safety and Health Administration Standards. Keep trenches free from water while construction is in progress. Under no circumstances lay pipe or appurtenances In standing water. Conduct the discharge from trench dewatering to drains or natural drainage channels. F. Special Supports: Whenever, in the opinion of the Engineer, the soil at or below the pipe grade Is unsuitable for supporting sewers ond appurtenances specified in this section, such special support, in addition to those shown or specified. shall be provided as the Engineer may direct, and the contract will be adjusted. G. Backfilling: 1. Locations not under pavement or within City of Carmel Right of Way. These locations shall be backfilled as detailed in the plan documents. SPEClRCATlONS SHEET 1 OF 6 MEDICAL DRIVE SHOPS STORM SEWER SYSTEMS (CONT.) 2. Sewer under pavement, sidewalk, paved areas and within ~Right of Way; Bedding, Haunching. initiol Backfill: Bedding and haunching for all reinforced concrete pipe installations shall be #8 stone meeting the material requirements of the INDOT. The material shall be opproved by the City of Carmel Deportment of Engineering ot time of instollation. Bedding shall be placed in the trench bottom such that after the pipe is installed to grade cnd llne, there remains a 4-inch minimum depth of material below the pipe barrel and 0 minimum of 3-inches below the bell. For pfpe srzas 66-1nches and larger, the minimum depth of material below the pipe borrel shali be 6-inches. Bedding shall be piaced to be uniform as possible. but shall be loosely placed un compacted material under the middle third of the pipe prior to placement of the pipe. If the underlying soils of the trench bottom ore soft or yielding, the soil sholl be undercut to such a depth thot when repaired with 112 stone it will produce a uniform and stable foundation along the entire length of the pipe. Haunching shall be compacted in 8-inch maximum lifts to not less than 90% Standard Proctor Density for the enUre depth of the material placed. The backfill shall be brought up evenly on both sides of the pipe far the full iength of the pipe. Haunchlng shall extend to the springline of the pipe. Minimum trench width shall be the outside diameter of the pipe plus 18-inches. Final Backfill: Final backfill for all reinforced concrete pipe instollations under and within 5-feet of pavement or sidewalk or other paved areas and for all installations within City right-of-way sholl be B-Borrow for Structure Backfill meeting the material requirements of the INDOT. The materlai shall be approved by the City of Carmel Department of Engineering at time of installation. Final backfill shall be compacted in 6-inch maximum lifts to not less than 95~ Standard Proctor Density for the entire depth of the material placed. The backfill for the top 6-inches of the excavation below the start of the aggregote sub-base of the pavement shall be No. 53 Stone meeting the material requirements of the INDOT and shall be compocted to not less than 95l1: Standard Proctor Density. Final Backfill for all reinforced concrete pipe installations greater than 5-feet from pavement, sidewalk, other paved areas or the limit of City right-at-way sholl be clean fill material free of rocks larger than 6-inches in diameter, frozen lumps of soil, wood or other extraneous material, compacted in 12-inch maximum nfts to not less than 90% Standard Proctor Density for the entire depth of the excavation. The final 6-inches of the excavation shall consist of topsoll. H. Manhole Inverts: Construct manhole flow channels of concrete pipe or br1ck, smoothly finished and of semi-circular section conforming to the inside diameter of the connecting sewers. Make changes In slze or grade gradually and changes in direction by true curves. Provide such channels for all connecting sewers at each manhole. I. Subdrains: All subdrains onsite shall be of the size as shown and shall be placed os shown on the plans. They sholl be constructed to the grades placed as shown on the plans. They shall be constructed to the grades shown. All drains constructed off site as part of the outlet drain will be located as shown. J. Utilities: It shall be the responsibility of each contractor to verify all existing utilIties and conditions pertaining to his phase of the work. It shaH also, be the contractors responsibility to contact the owners of the vorlous utilities before work Is started. The contractor shall notify in writing the owners or the engineer of any changes, errors or omissions found on these pIons or In the field before work Is started or resumed. ~~"'\\\\\~NI'C'IIIII'"" .;-' ~.. ,.......... t::> ~_ j;'_~.~.IS".;..<1/-\ 2;g! NO. \t<' ~ ~ * ( 16003 l~ ~ \~\. STATE or /.../N % ~S....~~R!~.~~,;r;,~ f "'IIIIII"~~~~\\~\\\\\\"'" SCALE: HOR.: NA VER.: NA DATE: 12/07/06 PROJECT NO. 06-2366 DRAWING NO. C3.0 I. SCDPE OF WORK ViI. SITE GRADING A. Extent: The work required under this section consists of all excavating, filling, rough grading end related items necessary to complete the work indicated on the drawings and described in the specifications. A. Grodes: Do all cutting, filling, compacting of fills and rough grading required to bring entire project area to subgrade as shown on the drawings. Undercut open areas 4" for topsoil. 1. In general the items of work to be performed under this section sholl include clearing and grubbing, removal. of trees and stumps (where required), protection of trees to remain, stripping and storage of topsoil, fill compaction and rough grading of entire site os indicated on the drawings. 2. Excavated material that is suitable may be used for fills. All unsuitable material and all surplus excavated material not required sholl be removed from the site. The location of dump and length of haul shall be the 'Contractor's responsibility. 3. Provide and place any additional fill material from off the site os may be necessary to produce the grades required. Fill obtained from off site shell be of kind and quality 05 specified for fills herein and the source approved by the Owner. 4. the Contractor shall accept the site os he finds it and shall remove all trash, rubbish and debris from the site prior to starting excavation. B. Work not included: The following items ot related work ore specified and included in other sections of these specifications. B. Rough grading: the tolerance for paved areas sholl not exceed 0.10 feet above established subgrade. all other areas shalf not exceed 0.10 feet plus or minus the established grade. Provide roundings at top and bottom of bonks and other breaks in grade. All open areas sholl be graded a minimum of 0.5% and a maximum of 3: 1 slope. VIII. SEEDING PREPARATION A. All temporary seeding shall be done in accordance with INDOT standard specification 621 B. All unpaved are os shall be sodded according to INDOT specification section 621. SANITARY SEWER SYSTEMS I. SCOPE DF WORK The work under this section includes all sanitary sewers, manholes, catch baslns c1eanouts, and related items, including excavating and backfilling necessary to complete the work shown on the drawings, starting five feet outside the buiiding walls. The ends of sewers sholl be tightly plugged or capped at the terminal points, adjacent to buildlngs, pending the connectIng of all such fines to the building drain as specified in the plumbing specifications and architectural drawings. 1. Excavation, grading and backfilling for utility lines. 2. Storm drainage systems. 3. Sanitary sewer systems. 4. Water supply systems. 5. Streets and paving. II. MATERIALS A. Sanitary Sewers 1. All gravity plastic sewer pipe and fittings shall conform to ASTM D3034. SDR-35. 2. Joints far P. V.C. ond pipe shall be compression type flexible gasketed joints In accordance with manufacturers recomendatlons &: ASTM 0-3212 II. BENCHMARKS Maintain carefully all bench marks, monuments and other reference points. If disturbed or destroyed replace as directed by engfneer. iii. REMOVAL OF TREES A. Remove all trees and stumps from area to be occupied by road and surfaced areas. Removal of trees outside these areas sholl only be done as noted on drawings or approved by the Owner. B. All brush, stumps, wood and other refuse from the trees shall be buried on site or burned with proper permits (where applicable). iV. PROTECTiON OF TREES iii. APPLlCA TlON A. Permits and Codes: The intent of this section of the specifications Is that the contractors bid on the work covered herein shall be based upon the drawings and specifications. but that the work shall comply with all applicable codes and regulations as amended by any waivers. Contractor sholl furnlsh all bonds necessary to get permits for cuts and connections to existing sewers. B. Local Standards: the term "Local Standards" as used herein means the standards of design and construction of the respective municipal department or utility company. C. Existing Improvements: Maintain in operating condition all active utilities, sewers and other drains encountered In the sewer installation. Repair to the satisfaction of the owner any damage existing active improvements. A. General Protection: the Contractor shall be responsible for the protection ot tops, trunks and roots of existing trees on the project site that are to remain. Existing trees subject to construction damage shall be boxed, fenced or otherwise protected before any work is started. do not stockpile within branch spread. Remove Interfering branches without injury to trunks and cover scars with tree paint. V. STRIPPING OF TOPSOIL A. Remove topsoil to 0 depth of 6 Inches (or more if required) from the areas to be occupied by roods, walks, buildings, and parking areas. Pile and store topsoil at a location where it will not interfere with construction operations. Top soli shall be reasonably free from subsoil, debris and stones. D. Workmanship: To conform to 011 local, state and notlonol codes and to be approved by 011 local and state agencies having jurisdiction. E. Trenching: Lay all pipe in open trenches. except when installing pipe beneath Medical Drive. This pipe sholl be bored in accordance with City of Carmel Standards. Open the trench sufficiently ahead of pipe-laying to revel any obstructions. The trench shall be excavated as detailed in the plan plan documents. Sheet & brace trench as necessary to to protect workmen & adjacent structures. All trenching sholl comply with Occupational Safety and Health Administration Standards. Keep trenches free from water while construction is in progress. Under no circumstances iay pipe or appurtenances In standing water. Conduct the discharge from trench dewatering to drains or natural drainage channels. VI. DISPDSITION OF UTllITlES A. Rules and regulations governing the respective utilities sholl be observed in executing all work under this section. N ~ ./ ~ f ~ ; ~'" ~~ ~~ . I . ~ & Ii ~ " I ~ ~ i{.e g ~~ i!I 1O:5i!i i J j~ g i~ ~~~ ~ B. It Shall be the responsibility of eoch contractor to verify all existing utilities and conditions pertaining to his phose of the work. It shall also be the contractors responsibility to contact the owners of the various utilities before work Is storted. The contractor shall notify in writing the owners of the engineers of (my changes, errors or omissions found on these plans or in the field before work is started or resumes. F. Special Supports: Whenever, in the opinion of the Engineer, the soil at or below the pipe grade is unsuitable for supporting sewers and appurtenances specified In this section, such special support, in addition to those shown or specified, shall be provided as the Engineer may direct and the contract will be adjusted. C. Where active utilities are encountered but not shown on the drawings. the Engineer shall be advised before work is continued. D. Inactive and abandoned utilities encountered in excavating and grading operations sholl be reported to the Engineer. They shall be removed. piugged or capped as directed by the Engineer. REVISIONS DESIGN BY: ~(;)I ~~N. !H~C!~~~D~~~~N~!A 1~5~. [;] [I] TEL. (317) 293-3542 FAX: (317) 293-4737 DRAWN BY: CHECKED BY: APPROVED BY: L WATER DISTRIBUTION I. SCOPE OF WORK A. The work required under this section Includes all cold water distribution lines, valves, meter pits. hydrants, and related items including excavating and backfilling necessary to complete the work shown on the drawings. The end of water service lines sholl be tightly plugged or copped ot the terminol points pending the connection to all such lines of the building piping os specified In the plumbing specifications and architectural drawings. II. MATERiALS A. Copper Tubing: Sholl be seomless, type "K" tubing Fittings shall be wrought copper or cast bronze wlth solder joints. Solder shall be of 0 composition recommended by the monufocturer of the flltlngs. S. Valves: All valves and stops sholl hove ends suited or adapters sholl be provided for the proper installation in the lines in which they are located. Valves shall be resilient seat gate valves, manufactured by Mueller. Butterfly valves shall be used for sizes over 12". Posl Cops sholl be Installed with each valve. C, Valve Boxes: Shall be Union or Tyler, and comply with local ordinances. D. Corporation stop: Corporation stops shall be manufactured, by Mueller Be comply with local ordinances. E. Boll Type Curb Stop: Sholl be Ford B44-777. The stop sholl have a compression type fitting on both ends and be supported by a concrete block. F. Meter Pit: Sholl be 0 36"x36" Frotco Meter Pit 36" in Length of N-12 or equal. G. Meter Pit Cover: Sholl be 20"x36" STO box cover. Ford #MC-36- T H. Taps: corporation stop shall be tapped direct!,Y to the water main at the horizontal position (3 o'clock). 2 ductal iron or plostlc repolr clomp with threoded 2" Smlth-Bloir #23B full circle repair clamp single band. III. APPLICATION: A. Permits and Codes: The intent of this section of the specifications Is that the contractor's bid on the work covered herein shall be based upon the drawings and specificotlons but thot the work sholl comply with oil applicable codes and regulations. Contractor shall furnish all necessary bonds to get permits for cuts and connections, 8. Local Standards: The term "Local Standards" as used herein means the standards of design and construction of the respective municipal department or utility company. C, Existing Improvements: Maintain in operating condition all active utilities and sewers and other pipe system that may be encountered. E. Trenching: Lay all pipe in open trenches, except when installing pipe beneath Medical Drive, This pipe shalf be bored fn accordance with City of Carmel Standards. Open the trench sufficiently ahead of pipe-laying to revel any obstructions. D. Width of Trench: Excavote trenches os detolled in the plan documents for proper 1nstallation of pipe. E. Sheeting and bracing: Sheet and brace trenches os necessary to protect workmen and adjacent structures. All trenching shall comply with the Occupotionol Sofety ond Heolth Admlnlstrotlon Standords. F. Water Removal: Keep trenches free from water while construction therein Is in progress. Under no circumstances lay pipe or appurtenances In standing water. Conduct the discharge from trench dewatering to drains, or natural drainage channels. N ~ ~ G. Groding trench Boltoms: The boltom quadront of the pipe sholl be fully ond uniformly supported. The full lood shall rest on the barrel of the pipe. the trench may be excavated to 0 depth of 4 Inches or more below final grade with sand, crushed stone or gravel backfill to bring It bock to pipe loying grode. For a depth of at least 12 Inches above the top of ths pipe backfill with earth or granular material free from large stones, roots or frozen clogs. tomp this bockfill thoroughly toking care not to disturb the pipe. Backfill under walks, parking areas driveways and streets with granular material only and tamp thoroughly, by approved methods. Trenches parallel to an within 10 feet of paved roadways shall be constructed the same. G. Bockfilling: 1. Locotions not under pavement or within City of Cormel Right of Woy: These locotlons shoil be bockfilled os detolled in the plan documents. WATER DISTRIBUTION (CONT.) 2. Sewer under pavement, sidewalk, paved areas and within Right of Woy: Bedding, Haunching, Initiol Backfill: Bedding, haunching and Initiol backfill materials, placement and compaction for water mains, water service laterals, sanitary mains and sanitary service loterols shall be in occordonce with the standard practice of the utility that has jurisdiction over the installation. Finol Bockfill: Final backfill for water mains, water service laterals, sanitary mains and sanitary service laterals under and within 5-feet of pavement or sidewalk or other paved areas and for all installations within City right-of-way shall be B-Borrow for Structure Backfill meeting the material requirements of the INDOT. The moteriol shall be approved by the City of Carmel Department of Engineering at time of instollotlon. Flnol bockfill sholl be compacted in 6-inch maximum lifts to not less than 95% Standard Proctor Density for the entire depth of the material placed. The backfill for the top 6-lnches of the excavation below the start of the aggregate sub-base of the pavement shall be No, 53 Stone meeting the material requirements of the INOOT and sholl be compocted to not less thon 957. Stondord Proctor Density. If the stondard proctice of the utility thot hos jurisdiction over the Instollotion hos a more stringent flnal backfill requirement, the more stringent requirement shall govern. H. Tests: Before joints are covered, fill the piping with water, opening hydrants or other outlets to expel air. Test the piping for leakoge for 0 period of ot leost two hours at a pressure of 100 pounds per square Inch. Inspect 011 joints for leakage and remedy any leaks. Upon completion of the woter distribution mains, flush out the system until the water runs clear. As soon as the system has been flushed out, it sholl be sterilized in accordance with the requirements of the City of Carmel. I. Shop Drowings: Submit Shop Orowings of hydronts ond valves to the City of Carmel fot" approval. J. A minimum horizontal distance of 10 feet shall be maintained between the water line and the sanitary sewer line. K. Utilities: It sholl be the responsibility of eoch contractor to verify all existing utilities and conditions pertolnlng to his phose of the work. It sholl also be the contractor's responsibility to contact the owners of the various utilities before work is started. The contractor shall notify in writing the owners or the engineer of any changes, errors or omissions found on these plans or In the field before work is started or resumed. L. New Water Main construction: Contractor to record dimension of each water stub and valves from nearest fire hydrant measured along water main. The locations of hydrants and water valves, along with any other construction changes are to be Incorporated on the original construction drawings and "Record Drawing" prints submitted to the City of Carmel os soon after completion of construction as possible. M, Reflective Warning Tope: Reflective warning tope shall be installed lB' obove 011 Instolled pipes. N. Troclng Wire (10 or 12 gouge): Sholl be Instolled with all water mains. There must be access to the tracer wire at each valve box, with enough wire in the valve box to Insure the proper connection to the locating machine. EROSION CONTROL A, Contt"actor shall establish erosion control as detailed in the Rule 5 documention and erosion control sheets within the plan documents. ~, ~!N. !H~C!~~~D~!!~~N~!A 1~5~a [:J [J] TEL (317) 293-3542 FAX: (317) 293-4737 CONCRETE 1. SCOPE OF WORK The work required under this section includes all concrete related items necessary to complete the work indicated on drawlngs and described in the specifications with the exception of concrete curbing, II. MATERIALS A. Concrete: Concrete shall be ready-mixed and sholl be a mix of proportioned fine and coarse aggregates with Portland cement and water. Minimum cement content shall be 6 bags per cubic yard of concrete and maximum water content shall be 5.5 U.S. gallons per sock of cement, Including moisture in the aggregate, Slump for normal weight concrete shall be 0 maximum of 4 Inches and a minimum of 2 inches, the slump of machine placed concrete shall be no less than 1-1/4 Inches nor more than 3 inches. Stondord test ASTM C-143 sholl be used to meosure slump. Compressive stt"ength of concrete at 28 days shall be 4000 psi. All exterior concrete shall hove air entrainment of 5% to 8% by volume per ASTM C-260 Retempering of delivered concrete will not be allowed. Concrete shall be composed of: 1. Portlond cement: conforming to ASTM C-150, Type IA or type iliA. 2. Aggregotes: conforming to ASTM C-33. 3. Water: Shall be clear and free from injurious amounts of ol1s, acids, alkalies organic materials or other deleterious substances. B: Welded Steel Wire Fabric: Where required for concrete reinforcement shall conform to ASTM A185, C: Premoulded Joint Filler: Shall be non-extruding type meeting ASTM D-544, except thot premoulded joint filler used in concrete walk construction may be either noo- extruding or resilient. D. Bituminous Pavement Materials: All materials proposed for the construction of bituminous pavements shall comply with the Indiana Deportment of Transportation Specifications, pet" latest revisions. E. Compacted Aggregate Sub-base: Sholl be crushed stone or gravel. Crushed gravel shall be a minimum of 35% crushed material. Fines shall be llmited to a maximum of 87. of the total. Material shall be free from an excess of flat, elongated, thinly laminated soft or disintet"grated pieces, and shall be free from fragments eooted with dirt. Compocted oggregote sholl be groded as follows: SIEVE SIZE 7. PASSING 1-1 2" 100 1" BO-100 3-4" 79-90 1/2" 55-BO #4 35- 60 #B 25-50 #30 12-30 #ZOO 5-10 III. APPLlCATlON A. Grading: Do any necessary grading in addition to that performed in accordance with Earthwork Section, to being subgrades, after final compaction, to the required grades and sections for site improvement. B. Preparation of Sub grade: Remove spongy and otherwise unsuitable material and replace with stable material. No traffic wlll be allowed on prepared subgrade prior to paving. C. Compaction of Subgrade: The first 6 Inches below the subgrode sholl be compocted to ot ieost 1007. of the maximum dry density as determined by the provisions of AASH) T -99. Water sholl be prevented from standing on the compocted subgrade. D. Utllity Structures: Check for correct elevation of all manhole covers, valve boxes and similar structures located within areas to be paved and mark, or have made any necessary adjustments In such structures. E. Placing Concrete: 1. Sub grade: Place concrete only on 0 moist, compocted subgrade of base free from loose material. Place no concrete on a muddy or frozen subgrade. DESIGN BY: NRJ CONCRETE (CONT.) 2. Forms: All forms shall be free from warp, tight enough to prevent leakage and substantial enough to maintain their shope and position without springing or settling, when concrete is placed. Forms sholl be clean and smooth Immediately before connecting. 3. Placing Concrete: Concrete sholl be deposited so as to require os Iiltle ploclng as procticoble. When concrete is to be placed at an atmospheric temperature of 35 degrees F, or less, paragraph 702.10 of the Indlono Oeportment of Highwoys Specifications, latest revision sholl be followed. F. Concrete Walks and Exterior Steps 1. Slopes: Provide 1/4 inch per foot cross slope. Make adjustments in slopes at walk Intersections os necessary to provide proper drainage. 2, Dimensions: Walks and steps sholl be one course construction and of widths and detolls shown on the drawin g5, 3. Finish: Screed concrete and trowel with a steel trowel to a hard dense surface after surface water has disappeared. Apply medium broom finish and scribe control joints at 5 foot spacing. Provide 1/2 expansion joints where sidewalks intersect, and at a maximum spacing of 48 feet between expansion joints. 4. Transverse Joints: Spacing between transverse joints sholl not exceed 1.25 times width. 5. Sidewalks builPwith driveways shall have 0 minimum thickness of 6" or thlckness of driveway, whichever is greater. Joints shall be tooled or sawed to a depth of t the sidewalk thickness, G. Curing Concrete: Except os otherwise specified, cure all concrete by one of the methods described in Section 501.17 of the Indiono Department of Hlghwoys Specifications, latest revision, H. Bituminous Pavement: Hot asphalt concrete pavement shall be os specified in Section 403 of the Indiana Department of Highways Specifications, latest revisions. Paving will not be permitted during unfovoroble weather or when the temperoture is 40 degrees F. and falling. l. Compacted Aggregate Sub-base: The thickness shown on the drawings is the minimum thickness of the fully compacted sub-base: Compaction shall be accomplished by rolling with a smooth wheeled roller VI. weighing 8 to 10 tons. Compact too 90% compaction using Standord Testing Procedures. Along curbs, headers and walls and at 011 placed not accessible to the roller, the oggregate material sholl be tamped with mechanical tampers or with approved tampers. V. INSPECTIONS A. All materials furnished and each part or detail of the work will be subject to inspection per Section 105,10 of the Standard Specifications for the purpose of ascertaining that the work is in substantial conformance with this policy and the approved construction documents. B. The Contractor shall notify the Engineer a minimum of 48-hours in advance of commencing any work subject to the stondords estobllshed by this policy. SPECIFICATIONS SHEET 2 OF 6 MEDICAL DRIVE SHOPS CONCRETE (CONT.) C, The Contractor shall schedule proofro1l5 with the Engineer a minimum of 48-hours in advance of such proofroHs. D. The Contractor and Engineer will conduct an inspection of the new concrete curbing for any damage, including freezing or random cracks, The inspection and all necessary repairs sholl be completed prior to backfilling operations. E. Sampling and testing of materials, equipment or construction work may be required at the expense of the Contractor at the discretion of the Engineer fot" the purpose of ascertaining that the work Is In substantial conformance with this policy and the approved construction documents. Sampling and testing sha11 conform to the requirements of the sections of the Standard Specifications applicable to the portion of the work suspected to be non-compliant or os directed by the Engineer. F, Where the Engineer determines that is necessary to confirm compliance with standards of quality or thickness, concrete curb shall be cored and tested at the expense of the Contractor. The overage thicknesses of the curb must equal or exceed the minimum prescribed by the approved construction documents, G. Such inspections shall not be construed to relieve the developers' engineers or contractors in any way from their obligations and responsibilities under their contracts. Specifically, inspection by the Engineer, or by retained engineers or testing agencies, shall not require them to assume responsibilities for the approved construction documents, for any misinterpretation of the approved construction documents by the contractors during construction, or for the means and methods of construction, nor for safety on the job site, H. Work identified to not meet the requirements of this policy or the approved construction documents, unacceptable work, whether the result of poor workmanship, use of defective materials, damage through carelessness, or any other cause found to exist prior to the finol acceptance of the work, sholl be removed immediately and replaced in an acceptable manner at the Contractor's expense. I. If the Contractor fails to comply forthwith with any order made under the provisions of this subsection, the Engineer will have authority to cause unacceptable work to be remedied or removed and replaced; to cause unauthorized work to be removed; and to deduct the costs from any monies due or to become due. J. Work done contrary to instructions provided by the Engineer shall be considered unacceptable and subject to immediate removal and replacement In accordance with the instructions provided by the Engineer. ACCEPTANCE A. Before acceptance of the concrete curb, the Engineer shal1 determine If the Improvements are In substantial compliance with this policy (except for any variances granted) and the approved construction documents. B. The Engineer may, at his sole discretion, accept work that is not in conformance with this policy provided that the work is bonded for a period greater than three years. The Engineer shall establish the extended bonding requirement. \\\\\\\\\\\\'N'IC',II""... ;/U'#.......... I:> ... /_"l';,~~..ISTCi;;/!/-\ ~ iff! NO. \(<\ % ~ *! 16003 it;; ~ \'~\ STATE 0, IS] %~ ....!^'DIA~~.... ~- g ~ -l'S ............. ~G' ~ """'IIII/~~~l\;\\\\\\\~~ SCALE: HOR.: NA VER.: NA DATE: 12/07/06 PROJECT NO. 06-2366 DRAWING NO. C4110 ~ i ! ~ i!~ i~ s~ 'I 2 . i i ~ ~ !~ 8 ~~i~ -:~~: ~ !~ :51 ~ i~~ !!;~g< oG: a.. 0 REVISIONS DRAWN BY: TEB CHECKED BY: SSP APPROVED BY: BCP ~ " ~ ~ ~ . j ~~ ~~ i~ 2 . f ; ~ ~ !r ~ !~~~ ~~~~ ~ !~ i u '~I!! !!!~9. c[LD.C CONCRETE CURBING GENERAL A. The work subject to the requirements of this policy shall include the production. hauling/delivery, excavation for, placing. installation. jointing. curing. finishing. and other work necessary to prepare foundations and soil subgrades. install aggregate bases and install concrete curbing within property within the corporate limits of the City of Carmel and existIng or proposed right-of-way. B. This policy shall be the basis for acceptance of the work by the City. Failure to adhere to the requirements of this polley may result in non-acceptance of the work or other remedies outlined in this policy. C. Workmanship, materials and quality of the work completed shall conform to the 2006 Standard Specifications of the Indiana Department of Transportation (hereinafter referred to as Standard Specifications), except where deviations are allowed or specified hereIn, or variances are granted. D. Where the minimum standards of any other governmental agency having concurrent jurisdiction exceed these standards, the higher standards shall apply. E. If any plan or other note or specification on the approved construction documents exceeds the minimum standards of this policy, the higher slondords sholl appiy. F. Nothing contained herein shall be construed os prohibiting the design and construction of Improvements meeting higher standards, nor as discouraging petitions to appropriate governing bodies for variances for alternatives which con be supported by advances In technology and are approved by other agencies with concurrent jurisdiction. G. All work sholl comply with the requirements of Section 105.03 of the Standard Specifications. H. For the purposes of this polley, where the term Engineer is used in this polley and the Standard Specifications, It shall mean: 1. The Carmel City Engineer, stoff of the Deportment of Engineering, other personnel employed by the City of Carmel, or authorized agent(s) that may be retained to represent the City of Carmel. 2. The Hamilton County Highway Engineer, stoff of the Hamilton County Highway Department, other personnel employed by Hamilton County, or authorized agent(s) that may be retained to represent Hamilton County Highway. depending on the location of the work. I. Authority of the Engineer over the work shall be per Section 105.01 of the Standard Specifications. J. Prior to commencing the work, the Contractor performing the work shall contact the Engineer to schedule a pre-construction meeting to review the Engineer's construction requirements, staff notification requirements, required Inspections for certain stages of the work and to review the authority of the Engineer as it relates to the work. K. Under no circumstances shall work subject to the standards established by this policy commence without obtaining approved construction drawings by the City of Carmel Department of Engineering. L. At the sole discretion of the Engineer, the portions of this policy related to Inspections and testing of work subject to the requirements of this polley outside of the right-of-way sholl be determined at the pre-construction meeting. M. Dimensionai and other standards for concrete curb shall be in accordance with the City of Carmel Standard Details. N. Under no circumstances shall material other than Portland Cement Concrete meeting the standards established by th1s policy be utilized to construct concrete curbs within the corporate limits of the City of CarmeL O. Under no circumstances shall extruded type curb be installed within lhe corporate limits of the City of Carmel. II. FOUNOAllON A. General 1. This work shall consist of the construction/preparation of the foundation In accordance with Section 105.03 of the Standard Specifications. 2. The foundation sholl be prepared in accordance with Section 605.03(0) of the Standard Specifications and the requirements of this policy.. REVISIONS CONCRETE CURBING (CaNT.) B. Excavation and Embankment 1. Prior to beginning excavation and embankment operations, 011 necessary clearing, grubbing, scalping and topsoil stripping and subsequent backfilling for removed items within the slope stoke limits sholl be performed in accordance with Section 201.03 and 201.04 of the Slandard Specifications. All topsail, vegelalion, roots, stumps, friable and deleterious material shall be completely removed within the limIts of the slope stokes. 2. Excavations a. After excavation operations, 011 spongy and yielding material that does not readily compact sholl be removed from within the slope stake limits and the resulting void shall be refilled with suitable material and compacted In accordance with Section 203 of the Standard Specifications. b. Any pronounced depressions within the slope stoke limits resulting after excavation operations shall be refilled with suitable material and compacted in accordance with Section 203 of the Standard Specifications. 3. Embankments a. Embankments shall be constructed in accordance with Section 203 of the Standard Specifications. b. All spongy and yielding material that does not readily compact sholl be removed from within the slope stake limits prior to embankment operations. c. Any pronounced depressions within the slope stake limits resulting after clearing. grubbing, scalplng and lops ail removal sholl be refilled with suitable moleriol and compacted in accordance with Section 203 of the Standard Specifications prior to embankment operations. C. d. Prior to the construction of any embankment, the original ground surface within the limits of the slope stokes sholl be leveled and the upper 6-inches sholl be compacted in accordance with Section 203 of the Standard Specifications. e. Embankments shall be shaped to be well drained and shall be protected to prevent erosion. f. Loose depth of each embankment 11ft, final compacted depth, compaction method and compaction requirements shall be in accordance with Section 203 of the Standard Specifications. Soil Sub grades 1. Subgrodes sholl be Installed on foundations constructed in accordance with Section 2(A) and Section 2(B) of this polley and only after the installation of 011 utilities and subsurface drains indicated on the approved construction documents to be located under the pavement are completed. Trench backfilling work of these installations shall be in accordance with the City of Carmel Trench Backfilling specifications. 2. The subgrode sholl be shaped to the required grade and sections, free from all ruts. corrugations, or other irregularities. 3. The sub grade shall be uniformly prepared, compacted and approved in accordance with Sections 207.02, 207.03 and 207.04 of the Standard Specifications. 4. Subgrodes sholl be Inspected and approved by the Engineer before any aggregate base or concrete curbs are constructed. A proofroll shall be conducted in accordance with Section 203.26 of the Standard Specifications. Unacceptable areas shall be corrected to the satisfaction of the Engineer before the placement of any Aggregate Base or concrete curbing. CONCRETE CURBING (CaNT.) 4. The Aggregate Base material shall be handled and transported to, and on, the work site in a manner that minimizes segregation and moisture loss. 5. Aggregate Bases sholl be constructed on approved soil subgrades and to thicknesses equal or greater than those indicated on the approved construction documents. B. Temperature and Seasonal limitations 1. The Aggregate Bose shall be placed in accordance with the temperature limitations of Section 301.04 of lhe Standard Specifications. 2. Frozen material shall not be placed. 3. Aggregate Bases must be placed and pass proof roll prior ta November 30 In order to allow paving in accordance with Section 4C(lv) of this policy. C. Preparation 1. The prepared soil sub grade shall be free from objectionable or foreign materials at the time of placement. 2. The subgrade sholl be subject to additional proof rolls In accordance with Section 203.26 of the Standard Specifications jusl prior to placing lhe Aggregate Bose on the subgrode in accordance with Section 2C(v) of this polley. Unacceptable areas shall be corrected to the satisfaction of the Engineer before any Aggregate Base is placed. O. Spreading and Finishing 1. The Aggregate Base shall be spread in accordance with Section 301.05 of the Standard Specifications. 2. The Aggregate Base shall be compacted in accordance with Section 301.06 of the Standard Specifications. 3. Concrete curb shall be placed over the Aggregate Base within 14 calendar days. Aggregate Bases that lay exposed for 0 period of time greater than 14 calendar days or experience a measurable rain event prior to the placement of concrete curb shall be subject to inspection and acceptance by the Engineer. At the discretion of the Engineer, additional proof rolls may be required. IV. CONCRETE CURB A. Gen eral 1. This work shall consist of placing concrete curbing on prepared soli subgrodes or Aggregate Bases In accordance with Section 105.03 of the Standard Specifications. 2. Concrete curb sholl be constructed on prepared soil subgrades or Aggregate Bases to the dimensional standards of the applicable City of Carmel Standard Details or in accordance with the curbing details of the approved construction documents. 3. Materials used in the production of the concrete for the curbing shall be in accordance with Section 605.02 of the Standard Specifications. High early strength admixtures may be utilized but shall not be conSidered In waiving any requirements of this policy. 4. Equipment utilized for concrete curbing installation work, Including but not limited to production. hauling/delivery, placing, installation. jointing, curing, finishing and miscellaneous/ancillary activity shall be In accordance with Section 508 of the Standard Specifications. 5. Concrete production, mixing and haUling/delivery shall be in accordance with Section 502.10 of the Standard Specifications. 6. Installation of the concrete curbing indicated on the approved construction documents sholl be completed in the same paving season. B. Preparation CONCRETE CURBING (CaNT.) 3. Under no circumstances shall concrete curb be placed between December 15 and March 30. 4. If a soil subgrade or Aggregate Base over which concrete curb Is to placed, is placed cnd approved by the City prior to November 30, placement of the concrete curb will be allowed up to December 15, provided that the ambIent and soil sub grade or Aggregate Bose surface temperature complies with the requirements of Section 4C(i) of this policy and the paving contractor pay for the services of a full time construction inspector and who shall act as an authorized agent of the Engineer. The Engineer shall select the construction inspector. 5. If the ambient and soil subgrade or Aggregate Base surface temperature complies with the requirements of Section 4C(I) of this policy between April 1 and April 15, concrete curb sholl be allowed 10 be placed on on approved soli sub grade or Aggregate Bose provided that the paving contractor pay for the services of a full time construction inspector and who shall oct as an authorized agent of the Engineer. The Engineer shall select the construction inspector. D. 6. The Engineer reserves the right to suspend all concrete curb placement operations if, in the opinion of the Engineer, that prevailing weather conditions and/or the condition of lhe Subgrode and/or the Aggregate Base may result In substandard concrete curb placement, curing and finishing. Placement CONCRETE CURBING (CaNT.) C. The Contractor shall schedule proofrolls with the Engineer 0 minimum of 48-hours In advance of such proofrolls. D. The Contractor and Engineer will conduct an Inspection of the new concrete curbing for any damage, including freezing or random cracks. The inspection and 011 necessary repairs shall be completed prior to backfilling operations. L Sampling and testing of materials, equipment or construction work may be required at the expense of the Contractor at the discretion of the Engineer for the purpose of ascertaining that the work is in substantial conformance with this policy and the approved construction documents. Sampling and testing shall conform to the requirements of the sections of the Standard Specifications applicable to the portIon of the work suspected to be non-compliant or as directed by the Engineer. F. Where the Engineer determines lhot is necessary to confirm compliance with standards of quality or thickness, concrete curb shall be cored and tested ot the expense of the Contractor. The average thicknesses of the curb must equal or exceed the minimum prescribed by the approved construction documents. G. Such inspections shall not be construed to relleve the developers' engineers or contractors in any way from their obligations ond responsibilities under their contracts. Specifically. inspection by the Engineer. or by retained engineers or testing agencies, shall not require them to assume responsibilities for the approved construction documents. for any misinterpretation of the approved construction documents by the contractors during construction, or for the means and methods of construction, nor for safety on the job site. H. Work identified to not meet the requirements of thls policy or the approved construction documents. unacceptable work, whether the result of poor workmanship. use of defective materials, damage through carelessness, or any other cause found 10 exist prior to the final acceptance of the work, shall be removed immediately and replaced in an acceptable manner at the Contractor's expense. I. If the Contractor fails to comply forthwith with any order made under the provisions of this subsection, the Engineer will have authority to cause unacceptable work to be remedied or removed and replaced; to cause unauthorized work to be removed; and to deduct the costs fror:n any monies due or to become due. J. Work done contrary to instructions provided by the Engineer shall be considered unacceptable and subject to immediate removal and replacement in accordance with the instructions provided by the Engineer. VI. ACCEPTANCE A. Before acceptance of the concrete curb, the Engineer sholl determine If the Improvements are in substantial compliance with this policy (except for any variances granted) and the approved construction documents. B. The Engineer may, at his sole discretion, accept work that is not in conformance with this policy provided that the work is bonded for a period greater than three years. The Engineer shall establish the extended bonding requirement. ~"'"'\\"\\\\~NI'C'III"III""" " u" .--....... A ., f"--~....~(.G\STr.t;61.)-%~ f~! NO. \~% ~ *! 16003 I';;: ~~\ STATE or lffJ ff ~..... /w ~ -=; ...!.NOI"~~..." ~ .f ",;",,,,,,,~;IO'NAL" t~~,$'" If/I/HIIIIII'\\\\\\ SCALE: HOR.: NA VER.: NA DA TE: 12/07/06 PROJECT NO. 06-2366 DRAWING NO. C5110 5. At the discretion of the Engineer, Subgrode that has satisfactorily passed a proofroll, but remains uncovered for a period of 14 calendar days prior to placing Aggregate Base or concrete curbing or Is subject to a measurable rain event prior to placing Aggregate Base or concrete curbing, shall be subject to additional proof rolls prior to placement of the Aggregate Bose or concrete curbing. ill. AGGREGATE BASES A. General 1. This work shall consist of placing 0 compacted Aggregate Base on a prepared soil sub grade In accordance with Section 105.03 of the Standard Specifications. 2. Aggregate Base materials sholl be in accordance with Section 301.02 of the Standard Specifications. 3. The Aggregate Base material sholl be obtained from a Certified Aggregate Producer in accordance with Section 917 of the Standard Specifications. DESIGN BY: ~, ~!N. ~H~!~~~D~~~~N~!A 1~5~. [;] [I] TEL. (317) 293-3542 FAX: (317) 293-4737 DRAWN BY: CHECKED BY: APPROVED BY: 1. The soil subgrade or Aggregate Base shall be subject to additional proof rolls in accordance with Section 203.26 of the Slondord Specifications jusl prior to placing the HMA courses In accordance with Section 2C( v) and 3D(iIi) of this polley. Unacceptable areas shall be corrected to the satisfaction of the Engineer before placement of any concrete curbing. C. 2. All displacement or rutting of the soil sub grade or Aggregate Base sholl be repaired prior to placing concrete curbing. . Weather and Seasonal Limitolions " 1. Concrete curb sholl be placed In accordance with Section 502.09, 502.12 and 605.04(c) and 605.04(d) of the Standard Specifications. 2. Curb machines may be utilized in accordance with Section 605.04(h) of the Standard Specifications provided that the equipment conforms to the requirements of Section 508 of the Standard Specifications. 3. Formwork shall comply with the requrrements of Section 605.04(b) of the Standard Specifications. E. 4. Forms sholl be removed In accordance with Section 502.16 and 605.04(b) of the Standard Specifications. Join Is 1. Concrete curbing shall only be placed in accordance with Section 502.11 of the Standard Specifications. There sholl be no provisIon for Installation below the temperatures specified. 2. No mixture sholl be placed on 0 frozen sub grade or Aggregate Base. NRJ TEB SBP BCP F. 1. Joints shall conform to the requirements of Section 503 and 605.04(e) of the Standard Specifications. 2. Joints shall be installed at Intervals of 10-feet or less; 5-foot or less along radii. Joints In integral curb and sidewalks shall be located at the some location as the joints In the adjoining sidewalk. Joints may be sawed or tooled to 0 minimum depth of *-Inch. 3. Preformed expansion joints shall be placed at intervals of 50-feet or less, at all castings, the beginning and end of all curb returns, the end of each days work and where abu.ttlng existing construction. In addition to these requirements, expansion joints in integral curb and sidewalks sholl be located at the same location as the expansion joints in the adjoining sidewalk. Finishing and Curing 1. The concrete curb sholl be finished and cured in accordance with Section S02.14, 502.15, 504 and 605.04(f) of the Standard Specifications. 2. Curing compound sholl be applied to all exposed surfaces on slip-formed concrete curb. For formed concrete curb, curing compound shall be applied to 011 exposed surfaces including sldes after any forms ore removed. 3. The concrete curb shall be allowed to cure for a minimum of 5-days prior to commencing backfilling operations adjacent to the concrete curbing. G. Backfilling 1. The spaces adjacent to the concrete curb sholl be backfilled in accordance with Section 605.04(g) of the Standard Speclfications only after the concrete curbing Is inspected and accepted by the Engineer in accordance with Section 5 of this policy. 2. Backfilling operations shall be completed prior to opening the area to regular construction traffic. V. INSPECTIONS A. All materials furnished and each part or detail of the work will be subject to inspection per Section 105.10 of the Standard Specifications for the purpose of ascertaining that the work is in substantial conformance with this policy and the approved construction documents. B. The Contractor sholl notify the Engineer a minimum of 48-hours in advance of commencing any work subject to the standards established by this policy. SPEORCAllONS SHEET 3 OF 6 MEDICAL DRIVE SHOPS N ~ ~ ~ ! ; ii~ ~~ 02 -~ f i ~ E ;; ~ ! ; !r ~ ~~~!! ,.~!l ~~~~ J 1~ Hi} u '~j!! !!I-,!s. oC:ll..O HOT MIX ASPHALT PAVING (HMA) GENERAL A. The work subject to the requirements of this policy shall include the production, hauling/delivery, spreading, finishing. compaction and other work necessary to prepare foundations. install aggregate bases cnd Install one or more courses of base, Intermediate, or surface hot mix asphalt mixtures within existing or proposed right-at-way for roadways. auxiliary lanes and asphalt multi-use paths. 8. This policy shall be the basis for acceptance of the work by the City. Failure to adhere to the requirements of thIs policy may result In non-acceptance of the work or other remedies outlined in this policy. C. Workmanship. materials and quality of the work completed sholl conform to the 2006 Standard Specifications of the Indiana Department of Trarlsportation (hereinafter referred to as Standard Specifications), except where deviations ore allowed herein, or variances ore granted. D. Where the minimum standards of any other governmental agency having concurrent j,Jrisdiction exceed these standards, the higher standards sholl apply. E. If any plan or other note or specification on the approved construction documents exceeds the minimum stondords of this policy. the higher standards shall apply. F. Nothing contained herein sholl be construed as prohibiting the design and construction of Improvements meeting higher standards, nor os discouraging petitions to appropriate governing bodies for variances for alternatives which con be supported by advances in technology and are approved by other agencies with concurrent jurisdiction. HOT MIX ASPHALT PAVING (HMA) (CONT.) 3. Embankments a. Embankments shall be constructed in accordance with Section 203 of the Standard Specifications. b. All spongy and yielding material lhal does not readily compact sholl be removed from within the slope stoke limits prior to embankment operations. c. Any pronounced depressions within the slope stake limits resulting after clearing, grubbing, scalping and lopsail removal sholl be refilled with sullable material and compacted in accordance with Section 203 of the Standard Specifications prior to embankment operations. d. Prior to lhe construction of any embankment, the original ground surface within the limits of the slope stokes sholl be leveled and lhe upper 6-lnches sholl be compacted in accordance with Section 203 of the Standard Specifications. e. Embankments shall be shaped to be well drained and shall be protected to prevent erosion. f. Loose depth of each embankment lift, final compacted depth, compaction method and compaction requirements shall be In accordance with Section 203 of the Slandard Specifications. C) SOIL SUBGRADES HOT MIX ASPHALT PAVING (HMA) (CONT.) B. Temperature and Seasonal Limitations 1. The Aggregate Bose sholl be placed in accordance with the temperature limitations of Section 301.04 of the Standard Specifications. 2. Frozen material sholl not be placed. 3. Aggregate Bases must be placed and pass proof roll prior to November 30 in order to allow poving in accordance with Secllon 4C(iv) of lhis policy. C. Preparation 1. The prepared foundation shall be free from objectionable or foreign materials at the time of placement. 2. The subgrade shall be subject to additional proof rolls in accordance wlth Section 203.26 of the Standard Specifications Just prior to placing the Aggregate Bose on the sub grade In accordance with Section 2C( v) of this policy. Unacceptable areas sholl be corrected to the satisfaction of the Engineer before any Aggregate Base is placed. O. Spreading and Finishing 1. The Aggregate Base shall be spread In accordance with Secllon 301.05 of the Standard Specificalions. 2. The Aggregate Base shall be compacted in accordance with Section 301.06 of the Standard Specifications. 3. Subsequent paving courses shall be placed over the Aggregate Bose within 14 calendar days. Aggregate Bases that lay exposed for a period of time greater than 14 calendar days or experience a measurable rain event prior to the placement of subsequent paving courses shall be subject to inspection and acceptance by the Engineer. At the discretion of the Engineer, additional proof rolls may be required. ASPHALT PAVEMENT A. General 1. This work shall consist of placing one or more courses of base, intermediate, or surface hot mix asphalt (HMA) mixtures on 0 prepared foundation in accordance with Section 105.03 of the Standard Specifications. 2. HMA bose, intermediate, or surface mixtures sholl be constructed on prepared foundations and to thicknesses equal or greater than those indicated on the approved construction documents. 3. Materials used in the production of the HMA mixtures shall be In accordance with Section 401.03 of the Standard Specifications. 4. Equipment for HMA operations, including but not limited to production, hauling/transportation, laydown, compaction and miscellaneous/ancillary activity shall be in accordance with Section 409 of the Standard Specifications. 5. Installation of the full pavement section indicated on the approved construction documents for the ,entire area to be poved must be completed in the same paving season. 6. Widening operations shall comply with the following: a. The outside face of the excavated area sholl be left as nearly vertical as the nature of the material will permit and not wider than the outside limits of the widening section. b. The existing pavement adjacent to the widening area shall be sawcut to a clean edge. c. The subgrade in the widened area shall be compacted in accordance with this policy. d. Widening mixtures shall comply with the pavement section Indicated on the approved construction documents. B. e. Compaction of the widening shall be 1n accordance with Section 304.05 of the Standard Specifications. Preparation 1. The Aggregate Base shall be subject to additional proof rolls in accordance with Section 203.26 of the Standard Specifications just prior to placing the HMA courses in accordance with Section 30(111} of this policy. Unacceptable areas shall be corrected to the satisfactIon of the Engineer before any paving operations commence. HOT MIX ASPHALT PAVING (HMA) (CONT.) 4. Asphalt surfaces between courses shall be tacked In accordance with Section 406 of the Standard Specifications. 5. Contact surfaces of curbing, gutters, manholes, and other structures sholl be tacked in accordance with Section 406 of the Standard Specifications. 6. Surfaces on which a mixture is placed shall be free from objectionable or forelgn materials at the time of placement. 7. Tack Coot material shail be dislributed wilh equipment meeting the requirements of Section 409.03(0) of the Standard Specifications. C. Weather and Seasonal limitations 1. HMA courses sholl be placed when the omblent temperature and the temperature of the surface on which it is to be placed is 45'F (TC) or above. The Engineer shall determine the ambient temperature. There shall be no provision for low lemperature compaction allowed by Section 402.16 of the Standard Specifications. 2. No mixture shall be placed on a frozen sub grade. 3. Under no circumstances shall HMA mixtures be placed between December 15 and March 30. 4. If a foundation that is to receive one or more courses of base, Intermediate, or surface HMA mixtures is placed and determined to be an approved foundation by the City prior to November 30, placement of HMA courses will be allowed up to DecemO'er 15, provided that the ambient and foundation surface temperature compiles with the requirements of Section 4C(I) of lhls polley and the paving contractor pay for the services of 0 full time construction Inspeclor and who shall acl os on authorized agenl of the Engineer. The Engineer shall select the construction inspector. 5. If the ambient and foundation surface temperature complies with the requirements of Secllon 4C(i) of this polley between April 1 and April 15. HMA course sholl be allowed to be placed on an approved foundation provided that the paving contractor pay for the services of 0 full time construction Inspector and who shall act as an authorized agent of the Engineer. The Engineer sholl selecl the construction inspector. 6. The Engineer reserves the right to suspend olf paving VI. operations if, in the opinion of the Engineer, that prevailing weather conditions and/or the condition of the Subgrade and/or the Aggregate Base may result In substandard HMA placement. spreading and finishing. O. Spreading and Finishing 1. HMA courses shall be placed upon an approved foundation or other HMA course by means of laydown equipment in accordance with Section 409.03(c) of the Standard Speclflcations. 2. Segregation or flushing or bleeding of HMA mixtures will not be permitted. Corrective action sholl be taken to prevent continuation of these conditions. Segregated or flushed or bleeding HMA mixtures shall be removed if directed. 3. All areas showing an excess or deficiency of binder shall be removed and replaced. 4. All HMA mix lures that become loose ond broken, mixed with dirt, or is in any way defective sholl be removed and replaced. E. Joints 1. Joints sholl conform to the requirements of Section 4D1.15 of the Standard Specifications. F. Compaction 2. The HMA mixture sholl be compacted with equipment In accordance with Section 409.03(d) of the Standard Specifications Immediately ofter the mixture has been spread and finished. 3. Rollers shall not couse undue displacement, crocking, or shoving. v. INSPECTIONS HOT MIX ASPHALT PAVING (HMA) (CONT.) D. Sampling and testing of materials, equipment or construction work may be required at the expense of the Contractor at the discretion of the Engineer for the purpose of ascertaining that the work is in substantial conformance with this polley and the approved construction documents. Sampling and testing sholl conform to the requirements of the sections of the Standard Specifications applicable to the portion of the work suspected to be non-compliant or as directed by the Engineer. E. Where the Engineer determines that is necessary to confirm compliance with standards of quality or thickness, pavements sholl be cored and tested at the expense of the Contractor. The overage thicknesses of all courses must equal or exceed the minimum prescribed by the approved construction documents, and no single core shall show a deficiency greater than one half Inch (1/2") In any course or total thickness from the pavement section indicaled on the approved construction documents. F. Such inspections shall not be construed to relieve the developers' engineers or contractors In any way from their obligations and responsiblllties under their contracts. Specifically, Inspection by the Englneer, or by retained engineers or testing agencies, sholl not require them to assume responsibilities for the approved construction documents, for any misinterpretation of the approved construction documents by the contractors during construction, or for the means and methods of construction, nor for safety on the job site. G. Work Identified to not meet the requirements of this polley or the approved construction documents, unacceptable work, whether the result of poor workmanship, use of defective materials, damage through carelessness, or any other couse found to exist prior to the final acceptance of the work, shoff be removed immediately and replaced In an acceptable manner ot the Contractor's expense. H. If the Contractor falis to comply forthwith with ony order made under the provisions of this subsection, the Engineer will have authority to cause unacceptable work to be remedled or removed and replaced; to cause unauthorized work to be removed; and to deduct the costs from any monies due or to become due. I. Work done contrary to instructions provided by the Engineer shall be considered unacceptable and subject to Immediate removal and replacement in accordance with the instructions provided by the Engineer. ACCEPTANCE A. Before acceptance of any phose of construction, the Engineer shall determine if the improvements are in substantial compliance with this policy (except for any variances granted) and the approved construction documents. B. The Engineer may, at his sole discretion, accept work that is not in conformance with this policy provided that the work is bonded for a period greater than three years. The Engineer shall establish the extended bonding requiremen ~~\\,\\\'I~INlrCIlII/"'II' .. u~r;:.........: I:> '<, t~~",'ST"';;,1r\ ~aJi NO. '\~~ ~ *! 16003 . * ~ ~~\ STATE Of //5f %.:.%.....!ItDIAtt~.......#f ~"",~SIONAL.. ~"'~"~~' 11111 , II'" SCALE: HOR.: NA VER.: NA DA TE: 12/07/06 PROJECT NO. 06-2366 C6.0 G. All work sholl comply with the requirements of Section 105.03 of the Standard Specifications. For the purposes of this policy, where the term Engineer is used in this polley and the Standard Specifications, it shall mean: 1. The Carmel City Engineer, staff of the Department of Engineering, other personnel employed by the City of Carmel, or authorized agent(s) that may be retained to represent the City of Carmel. 1. Subgrades shall be installed on foundations constructed in accordance wilh Section 2(A) and Section 2(B) of this pollcy and only the installation of all utilities and subsurface drains Indicated on the approved construction documents to be located under the pavemenl ore completed. Trench backfilling work of these Installations shall be In accordance with the Clty of Carmel Trench Backfilling specifications. 2. The subgrade shall be shaped to the required grade and sections, free from all ruts, corrugations, or other IV. irregularities. 3. The subgrade shall be uniformly prepared, compacted and approved in accordance with Sections 207.02, 207.03 and 207.04 of the Standord Specifications. 4. Subgrades shall be inspected and approved by the Engineer before any aggregate base or hot mix asphalt pavements are constructed. A proofroll sholl be conducted In accordance with Section 203.26 of the Standard Specifications. Unacceptable areas shall be corrected to the satisfaction of the Engineer before any aggregate base or hot mix asphalt paving operations commence. 5. At the discretion of the Engineer, Subgrade that has satisfactorily passed a proofroll, but remains uncovered for a period of 14 calendar days prior to placing stone or Is subject to a measurable rain event prior to placing stone, sholl be subject to additional proof roils prior to placement of the Aggregate Bose. D) Existing Pavement 1. Milling of existing pavement surfaces shall be in accordance with Section 306.02. 306.03. 306.05, 306.07 and 306.0B of the Standard Specifications. 2. Localized weak areas of the existing pavement section uncovered during the milling process shall be repaired in accordance wllh Section 304.02, 304.03, 304.05 or 305 of the Standard Specifications. 3. Prior to opening milled areas to traffic, the milled areas shall be cleaned of all material, debris and dust resulting from the operation. 4. Mifled areas that remain open to traffic longer than those times stipulated in Section 306.05 of the Standard Specifications shall be subject to liquidated damages outlined in Section 306.05 of the Standard Specifications. The Contractor shall be responsible for payment of these liquidated damages. III. AGGREGA TE BASES 2. All displacement or rulling of the Aggregate Bose sholl be repaired prior to placing HMA mixtures. 3. Milled asphalt surfaces shall be tacked in accordance with Section 406 of lhe Standard Specificallons. NRJ TEB SBP BCP A. All materials furnished and each port or detail of the work will be subject 10 inspecllon per Section 10S.10 of the Standard Specifications for the purpose of ascertaining that the work Is in substantial conformance with this policy and the approved construction documents. B. The Contractor shall notify the Engineer a minimum of 48-hours in advance of commencing any work subject to the standards established by this policy. C. The Contractor shall schedule proofrolls with the Engineer a minimum of 48-hours in advance of such proofrolls. SPECIFlCA1l0NS SHEET 4 OF 6 MEDICAL DRIVE SHOPS DRAWING NO. H. 2. The Hamilton County Highway Engineer, staff of the Hamilton County Highway Department, other personnel employed by Hamillon County. or aulhorized agent(s) that may be retained to represent Hamilton County Highway, depending on the location of the work. Authority of the Engineer over the work sholl be per Section 105.01 of the Standard Specifications. J. Prior to commencing the work. the Cantraclar performing the work sholl contact the Engineer to schedule a pre-construction meeting to review the Engineer's construction requirements, staff notification requirements, required inspections for certain stages of the work and to revlew the authority of the Engineer as it relates to the work. K. Under no circumstances shall work subject to the standards established by this policy commence without obtaining approved construction drawings by the City of Carmel Department of Engineering. II. FOUNOA T10N A. General 1. This work shall consist of the construction/preparation of the foundation in accordance with Section 105.03 of the Standard Specifications. B. Excavation and Embankmenl 1. Prior to beginning excavotion and embankment operations, 011 necessary clearing, grubbing, scalping and topsoil stripping and subsequent backfilling for removed Items within the slope stoke limits shall be performed in accordance with Section 2D1.03 and 201.04 of the Slandard Specifications. All topsoil, vegetation. roots, stumps, friable and deleterious material shall be completely removed within the limits of the slope stokes. 2. Excavations a. After excavation operations, all spongy and yielding material that does not readily compact shall be removed from withln the slope stake limits and the resulting void shall be refilled with suitable material and compacted in accordance with Section 203 of the Standard Specifications. b. Any pronounced depressions within lhe slope stoke limits resulting after excavation operations sholl be refilled with sultable material and compacted in accordance with Section 203 of the Standard Specifications. REVISIONS A. Gen eral 1. This work shall consist of placing 0 compacted aggregate on a prepared soli subgrade In accordance with Section 105.03 of the Slandard Specificotlons. 2. Aggregate Base materials sholl be In accordance with Section 301.02 of the Slandard Speclficotlons. 3. The material sholl be obtained from 0 Certified Aggregate Producer in accordance with Section 917 of the Standard Specifications. 4. The Aggregate Base material sholl be handled and transported to, and on, the work site In a manner that minimizes segregation and moisture loss. 5. Aggregate Bases shall be constructed on prepared foundations and to thicknesses equal or greater than those Indicated on the approved construction documents. DESIGN BY: IT ~~N. ~H~C!~~~O~!!~~N~~A 1~5~. [;;] [I] TEL. (317) 293-3542 FAX: (317) 293-4737 DRAWN BY: CHECKED BY: APPROVED BY: ~ ~ i ~ ; ~'"' !~ 02 86 ~ 6 1 ! ~ ~ ~r 2 ~~i!i ~~~~ fio I ~ p.~ UNDERGROUND DETEN1l0N SYSTEM I. SCOPE OF WORK The work required under this section includes 011 work required to construct the underground detention system. II. MA TERIALS A. Unless otherwise noted, pipe sizes indicated herein or on the Drawings refer to the nominol Inside diameter (nominal pipe size. NPS). B. For underground storm water detention piping. unless specifically designated on the Drawings, the following materials shall be used as described below: 1. Only one type of pipe material may be used for an underground detention system, u~less specified otherwise on the Drawings. 2. Aluminized Type 2 Corrugated Steel Pipe (CSP): a) Application: May be used for underground detention piping where there is 0 minimum cover of 2 feet from top of pipe to top of finished grade. b) Pipe: 12 gauge helically corrugated metal pipe in accordance with ASTM A929, AASHTO M36 and ASTM A760. c) Corrugation: 2 2/3 Inch by ~ inch, 1 inch by 3 inch, or 1 inch by 5 Inch. Spiral rib may also be used only where specified on the drawings. d) Joints and gaskets: Pipes are to have "Quick Stab" joint ends as manufactured by Con tech Construction Products, Inc. of Middletown, Ohio, or equal. The Quick Stab Joint shall hove e bell end with a flare on the opposite end to receive the spigot end of the next pipe section. The joint sholl be gosketed. e) Interior lining or pavement: As specified on Drawings. .3. Corrugated Aluminum Pipe: a) Application: May be used for underground detention piping where there Is a minimum cover of 2 feet from top of pipe to top of finished grade. b) Pipe: 12 gauge hellcally corrugated metal pipe in accordance with ASTM B744, AASHTO M196 and ASTMB745. c) Corrugation: 2 2/3 Inch by ~ Inch or 1 Inch by 3 Inch. d) Joints and gaskets: Pipes ore to have "Quick Stab" joint ends as manufactured by Con tech Construction Products, Inc. of Middletown, Ohio, or equal. The Quick Stab Joint shall hove a bell end with a flare on the opposite end to receive the spigot end of the next pipe section. The joint shall be gasketed. e) Interior lining or pavement: As specified on Drawings. III. APPLlCA110N A. Regulatory requirements: All materials and work within the right-of-way or easement of any local government or other agency having jurisdiction over storm water drainage, sholl meet the requirements of such agency. B. Submittals: Each item in submittal must state that the item meets or exceeds the specified standards referenced herein. In addition, if multiple sizes or types ore Included in the submittal, clearly indicate which is to be used, and where, if applicable. C. Pro duel data: 1. Pipe, fittings. connectors and Joint materials 2. Manhole structures 3. The pipe manufacturer will be required to provide structural design calculations with the pipe shop drawings submittals. Design calculations sholl include fittings, fitting reinforcement, bulkhead, and pipe systems. Design loads shall be determined utilizing the project dead, live and hydrostatic conditions. D. Shop drawings: 1. Detention piping, piping elbows, intersections and connection saddles. 2. Reinforced concrete manholes and inlet structures, including castings, steps, sealing materials and any other required appurtenances. 3. Test reports: Submit results for all testing and inspections to Architect/Engineer REVISIONS UNDERGROUND DETEN1l0N SYSTEM (CONT.) E. Underground Detention Piping: 1. Installation References: 0) For Aluminized Type 2 Corrugated Pipe: ASTM A798. b) For Aluminum Corrugated Pipe: ASTM B788. 2. The pipe manufacturer shall provide a representative on the job site to offer the contractor technical assistance regarding placement of plpe, backfilling, joining, and other installat~on questions. The representative shall be present for the fIrst three days of assembly and then up to 4 hours 0 day for an additional 5 working days. If needed. If advice from the representative does not agree with Information given in the construction documents, the Architect/Engineer shall be notified of the discrepancy. 3. When pipes ore laid parallel to each other, a minimum separation of 1/2 pipe diameter must be maintained between pipes, unless stated otherwise on the Drawings. 4. Contractor shall use field installed saddles for connections of [ metal] pipe and storm sewers. 5. Contractor shall backfill pipe from the header or malnifold pipe, down the length of the pipe 6. Backfilling the pipe shall proceed carefully, placing backfill In 8"' to 12" lifts equally at each side of pipe. 7. During backfilling of pipe, the contractor shall prevent lateral movement of the pipe through balanced backfilling, per note 6 above. 8. During construction the contractor shall maintain minimum height of cover requirements for construction loads over the underground detention piping. Additional fill moleriol sholl be placed over the top of the underground detention piping after its installation to ensure protection up until pavement is laid or construction traffic is discontinued over the underground detention pipes. At a minimum the cover requirements for construction loads shall meet the following for 011 metal underground detention piping: a) For construction equipment with axle loads of up to 50,000 Ibs, at least 4 feet of soli cover must be provided over the piping. b) For construction equipment with axle loads of up to 75,000 Ibs, at least 5 feet of soil cover must be provided over the piping. c) For construction equipment with axle loads of up to 110,000 Ibs. at least 5.5 feet of soli cover must be provided. Oll/WATER SEPARATOR (VORTECH UNITS) I. SCOPE OF WORK The Contractor. and/or a manufacturer selected by the Contractor and approved by the Engineer, shall furnish all labor. materials, equipment and Incidentals required and Install all precast concrete storm water treatment systems and appurtenances in accordance with the Drawings and these specifications. II. MATERIALS A. Concrete for precast storm water treatment systems shall conform to ASTM C 857 and C 858 and meet the following additional requirements: 1. The wall thickness sholl not be less than 6 inches (152 mm) or as shown on the dimensional drawlngs. In all cases the wall thickness shall be no less than the minimum thickness necessary to sustain HS20-44 (MS18) loading requirements as determined by a Licensed Professional Engineer. 2. Sections shall hove tongue and groove or ship-lap joints with a butyt mastic sealant conforming to ASTM C 990. 3. Cement sholl be Type II Portland cement conforming to ASTM C 150. 4. All sections shall be cured by on approved method. Sections shall not be shipped untll the concrete has attained 0 compressive strength of 4,000 psi (28 MPa) or until 5 days after fabrication and/or repair, whichever Is the longer. 5. Pipe openings sholl be sized to accept pipes of the specified size(s) and materiol(s), and shall be sealed by the Contractor with a hydraulic cement conformIng to ASTM C 595M DESIGN BY: [!~I ~!N. !H~C!!~~~O~!!~~N~!A 1~5~. -1[1l TEL (317) 293-3542 FAX: (317) 293-4737 DRAWN BY: CHECKED BY: APPROVED BY: Oil/WATER SEPARATOR (VORTECH UNITS) (CONT.) B. Internal aluminum plate components shall be aluminum alloy 5052-H32 In accordance wilh ASTM B 209. C. Sealant to be utilized at the base of the swirl chamber shall be 60 durometer extruded nitrile butadiene rubber (Buna N) and shall be provided to the concrete pre caster for installation. D. Brick or masonry used to build the manhole frame to grade sholl conform to ASTM C 32 or ASTM C 139 and sholl be installed in conformance with all local requirements. E. Casting for manhole frames and covers shall be in accordance with ASTM A48, CL.30B and AASHTO M105. The manhole frame and cover sholl be equivalent to Campbell Foundry Pattern #1009A or #10120 custom cost with the CON TECH Stormwaler Solutions logo and the words "Vortechs Stormwater Treatment System". F. A bitumen sealant In conformance with ASTM C g90 sholl be utilized in the sealing of the joInt between the swirl chamber and the vault at the long wall tangent points. The butyl material shall be 3/4-inch thick by 3/4-inch wide. G. Performance: Each stormwater treatment system shall adhere to the following performance specifications at the design treatment capacities, as listed below: Table 2.2 Vortech Model # 1000 2000 3000 4000 5000 7000 gOOD 11000 15000 Design Treatment Cap. (cfs)/O/s) o - 1.6 (0 - 45) 1.6 - 2.6 (45-60) 2.6 - 4.5 (60-125) 4.5 - 6.0 (125-175) 6.0 - 6.5 (175-240) 6.5 - 11.0 (240-315) 11.0 - 14.0 (315-400) 14.0 - 17.5 (400-495) 17.5 - 25.0 (495-710) Sediment Storage (yd3)/(m3) 0.7 (0.54) 1.2 (0.91) 1.6 (1.38) 2.4 (1.84) 3.2 (2.45) 4.0 (3.06) 4.8 (3.67) 5.6 (4.26) 7.1 (5.43) Oil/WATER SEPARATOR (VORTECH UNITS) (CONT.) Ill. APPLICATION Oil/WATER SEPARATOR (VORTECH UNITS) (CONT.) 5. If the oil baffle wall (Baffle A) and flow control wall (Baffle B) ore not integrally cost-in to riser/wall sections then the Baffle wall panels shall be placed in the formed keyways or between bolted-In-place angle flanges as provided by the manufacturer. Apply non-shrink grout or Slkafle)(-1a sealant to each end of Baffle A and Baffle B at the upstream intersection wllh the side walls of the concrete vault. Prior to setting the precast roof section, bitumen sealant equal to ASTM C 990 shall be placed along the top of the 011 baffle wall (Boffie A), using more than one layer of mastic if necessary, to a thickness at least 1-lnch (25 mm) greater than the nominal gap between the top of the baffle and the roof section. The nominal gap shall be determined either by field measurement or the shop drawings. Do not seal the tap of Baffle B unless specified on the shop drawings to do so. After placement of the roof section has compressed the butyl mastic sealant in the gap over Baffle A, finish sealing the gap with on approved non-shrink grout on both sides of the gap using the butyl mastic os a backing material to which to apply the grout. If roof section is "clamshell" or "bathtub" halves, then finish sealing the ends of the Baffle walls by applying non-shrink grout or Sikoflex-1a sealant to each end of Baffle A at the upstream intersection with the side walls of the con ere Ie vault and to each end of Baffle B at the downstream intersection with the side walls of the concrete vault. After setting the precast roof section of the stormwater treatment system, set precast concrete manhole riser sections, to the height required to bring the cost iron manhole covers to grade, so that the sections are vertical and in true alignment with 0 14-lnch (6 mm) maximum tolerance allowed. Backfill in a careful manner, bringing the fill up in 6inch (152 mm) lifts an all sides. If leaks appear, clean the inside joints and caulk with lead wool to the satisfaction of the Engineer. Precast sections sholl be set In a manner that will result in a watertight joint. In 011 instances, Installation of Storm water Treatment Systems shall conform to ASTM specification C 891 "Standard Practice for Installation of Underground Precast Utl1lty Structures". Holes mode in the concrete sections for handling or other purposes shall be plugged with a non shrink grout or by using grout In combination with concrete plugs. Where holes must be cut in the precast sectIons to accommodate pipes, do all cutting before setting the sections In place to prevent any subsequent Jarring which may loosen the mortar joints. The Contractor sholl make all pipe connections. Each storm water treatment system shall Include a circular alumlnum "swirl chamber" (or "grit chamber") with a tangential inlet to Induce a swirling flow pattern that will accumulate and store settleable solids in a manner and 0 location that will prevent re-suspension of previously captured particulates. Each stormwater treatment system shall be of a hydraulic design that includes flow controls designed and certified by a professional engineer using accepted principles of fluid mechanics that raise the water surface inside the tank to 0 pre-determined level in order to prevent the re-entrainment of trapped floating contaminants. Each storm water treatment system shall be capable of removing 80 % of the net onnual Total Suspended Solids (TS5) load based on a 50-micron particle size. Annual TSS removal efficiency models shall ~e based on documented removal efficiency performance from full scale laboratory tests. Annual TSS removal efficiency models shall only be considered valid If they are corroborated by Independent third party field testing. Sold field testing sholl include Influent and effluent composite samples from a minimum of ten storms at one location. Individual storm water treatment systems shall have the Design Treatment Capacity listed in Table 2.2, and sholl not resuspend trapped sediments or re-entrain floating contaminants at flow rates up to and including the specified Design Treatment Capacity. Individual storm water treatment systems shall have usable sediment storage capacity of not less than the corresponding volume listed In Table 2.2. The systems sholl be designed such that the pump-out volume Is less than ~ of the total system volume. The systems shall be designed to not allow surcharge of the upstream piping network during dry weather conditions. A water-lock feature shall be incorporated into the design of the storm water treatment system to prevent the introduction of trapped oil and fioatable contaminants to the downstream piping during routine maintenance and to ensure that no oil escapes the system during the ensuing rain event. Direct access shall be provided to the sediment and floatable contaminant storage chambers to facilitate maintenance. There sholl be no appurtenances or restrictions within these chambers. Storm water treatment systems shall be completely housed within one rectangular structure. H. Manufacturer: Each storm water treatment system shall be of a type that has been ins lolled and used successfully for minimum of 5 years. The manufacturer of said system shall hove been regularly engaged In the engineering design and production of systems for lhe physical treatment of storm water runoff during he aforementioned period. Each stormwater treatment system shall be a Vortechs System as manufactured by CON TECH Storm water Solutions Inc., 200 Enterprise Drive, Scarborough, Moine 04074, phone: 207.885., fox: 207.885.9825; and os protected under U.S. Potent #5,759,415. NRJ TEB SBP BCP A. The quality of materials, the process of manufacture. and the finished sections shall be subject to inspection by the Engineer. Such Inspection may be made at the place of manufacture, or on the work site after delivery, or at both piaces, and the sections shall be subject to rejection at any time if material conditions fail to meet any of the specification requirements, even though sample sections may hove been accepted as satisfactory at the place of manufacture. Sections rejected after delivery to the site shall be marked for Identification and shall be removed from the site at once. All sections which have been damaged beyond repair during delivery will be rejecled and, If already installed, sholl be repaired to the Engineer's acceptance level, if permitted, or removed and replaced, entirely at the Contractor's expense. B. All sections shall be inspected for general appearance, dimensions, soundness, etc. The surface shall be dense, close textured and free of blisters, cracks, roughness and exposure of reinforcement. C. Imperfections may be repaired, subject to the acceptance of the Engineer, after demonstration by the manufacturer that strong and permanent repairs result. Repairs shall be carefully Inspecled before final acceptance. Cemenl mortar used for repairs shail have a minimum compressive strength of 4,090 psi (28 MPo) at the end of 7 days and 5,000 psi (34 MPo) at the end of 28 days when tested in 3 inch (76 mm) diameter by 6 inch (152 mm) long cylinders stored in the standard manner. Epoxy mortar may be utilized for repairs..f D. Shop Drawings Submittals The Contractor shall be provided with dimensional drawings and, when specified, utilize these drawings as the basis for preparation of shop drawings showing details for construction, reinforcing, joints and any cost-In-place appurtenances. Shop drawings shall be annotated to Indicate 011 materials to be used and all applicable standards for materials, required tests of materials and design assumptions for structural analysis. Shop drawings shall be prepared at a scale of not less than 3/16-lnches per foot (1: 75). Six (6) hard caples of said shop drawings shall be submitted to the Engineer for review and approval. E. Installation: 1. Each Storm water Treatment System shall be constructed according to the sizes shown on the Drawings and as specified herein. Install at elevations and locations shown on the Drawings or os otherwise directed by the Engineer. 2. Place the precast base unit on 0 granular subbase of minimum thickness of six inches (152 mm) after compaction or of greater thickness and compaction If specified elsewhere. The granular subbase shall be checked for level prlor to setting and the precast base section of the trap shall be checked for level at all four corners after it is set. If the slope from any comer to any other corner exceeds 0.5% the base section sholl be removed and the granular subbase material re-Ieveled. 3. Prior to setting subsequent sections place bitumen sealant In conformance wilh ASTM C 990 along lhe construction joint in the section that is already In place. 4. After setting the base and wall or riser sections, prepare to install the swirl chamber. Place the 3/4-inch (19 mm) thick by 3/4-inch (19 mm) wide butyl mastic seal vertically on the outside of the swirl chamber starting one inch above the bottom of the swirl chamber and continuing to a height equal to the elevation of the bottom of the upper aperture of the swirl chamber. The butyl mastic seal should abut the downstream side of the predrllled mounting holes that attach the swirl chamber to the long walls of the concrete vault. Next, 1nstall the extruded Buna N seal on the bottom edge of the 180 degree downstream section of the swirl chamber by first applying 0 bead of Sikaflex-1a polyurethane elastomerlc sealant Into the extruded slot then slide the seal onto the swirl chamber. The extruded seal should extend 3-inches (76 mm) upstream of the mounting holes, toward the inlet end of the vault. Set the swirl chamber into position and keep the seal approximately ~-inch (13 mm) above the floor of the concrete vault. Apply 0 continuous bead of Sikoflex-1a sealant under the cupped bottom of the seal. Set the circular swirl chamber on the floor of the vault and anchor It by bolting the swirl chamber to the side walls of the concrete vault at the three (3) tangenl points and at the Inlet tab using HIL 11 brand stainless steel drop-in wedge anchors or equivalent 3/8-inch (10 mm) diameter by 2-3/4 inch (70 mm) minimum length at heights of approximately three inches (3") (76 mm) off the floor and at fifteen Inch (15") (381 mm) intervals to approximately the same height of the butyl mastic sealant (at locations of pre-drilled hoies in aluminum components). Apply a continuous bead of Sikaflex-1 a sealant to the intersection of the Inside bottom edge of the extruded seal and the vault floor. SPECIFICATIONS SHEET 5 OF 6 MEDICAL DRIVE SHOPS 6. 7. 8. g. \\\\\\\\111111"11/1 ,$''''''\~e..~..!;~ ;;II"~" ~'..~G,'~;'G\ST<"i:"":'1;o.% f~r NO, ",\(1'1% ~ ~i 16003 1'* ~ \ "l \....~;::,~~~....4.-~] '" ~oS's ............. ~G . ""''''I'''III[,~~~~\\;\\\\\\'''''' SCALE: HOR.: NA VER.: NA DATE: 12/07/06 PROJECT NO. 06-2366 DRAWING NO. C7.0 N ~ bl ~ ~ ! ; 3~ ~~ ..a i 2 . i ; ~ ~ !~ ~ ~~~~ ;;:~~~ g l~ t leJ ~~g< oEi:o..c KEYSTONE CONCRETE RETAINING WALL I. GENERAL A. Work shall consist of designing, furnishing and construction of a KEYSTONE Compoc Unit Retaining Wall System in accordance with these specifications and in reasonably close conformity with the lines, grades, design, and dimensions shown on the plans. No alternate wall systems will be considered. B. Work Includes preparing foundation soil, furnishing and installing leveling pad, unit drainage fill and backfill to the lines and grades shown on the construction drawings. C. Work includes furnishing and installing geogrid soli reinforcement of the twe. size. location, and lengths designated on the construction drawings. II REFERENCE DOCUMENTS . A. American Society for Testing and Materials (ASTM) 1. ASTM C-1372 Specification for Segmental Retaining Wall Units 2. ASTM 0-422 Particle Size Analysis .3. ASTM 0-698 Laboratory Compaction Charocterlstlcs of Soil -Standard Effort 4. ASTM 0-4318 Liquid Limit, Plastic Limit and Plasticity Index of Soils 5. ASTM 0-4595 Tensile Properties of Geotextlles - Wide Width Strip 6. ASTM 0-5262 Unconfined Tension Creep Behavior of Geosynthetics 7. ASTM 0-3034 Polyvinyl Chloride Pipe (PVC) 8. ASTM 0-1248 Corrugated Plastic Pipe 9. ASTM 0-4475 Horizontal Shear Strength of Pultruded Reinforced Plastic Rods B. Geosynthetic Research Institute (GRI) 1. GRI-GG4 Determination of Long Term Design Strength of Geogrlds 2. GRI-GG5 Determination of Geogrld (soil) Puliout C. National Concrete Masonry Association (NCMA) 1. NCMA SRWU-1 Test Method for Determining Connection Strength of SRW 2. NCMA SRWU-2 Test Method for Determining Shear Strength of SRW III. Submittals/Certification A. Contractor shall submit a Manufacturer's certification, prior to start of work, that the retaining wall system components meet the requirements of this specification and the structure design. 8. Contractor shall submit construction drowings and design calculations for the retaining wall system prepared and stamped by 0 Professional Engineer registered in the state of the project. The engineering designs, techniques, and material evaluations shall be in accordance with the Keystone Design Manual. IV Quality Assurance A. Contractor shall submit a list of five (5) previously constructed projects of similar size and magnitude by the wall installer where the specific retaining wall system has been constructed successfully. Contact names and telephone numbers sholl be listed for each proJect. 8. Contractor sholl provide evidence that the design engineer has a minimum of five years of documental experience In the design for reinforced soil structures. The design engineer shall provide proof of current professional liability insurance with an aggregate coverage limit of not less than $2,000,000. C. Owner shall/may provide soli testing and quality assurance inspection during earthwork and wall construction operations. Contractor shall provide any quality control testing or inspection not provided by the Owner. Owner's quality assurance program does not relieve the contractor of responsibility for quality control and wall performance. V. Delivery, Storage and Handling A. Contractor shall check all materials upon delivery to assure that the proper type, grade, color, and certification hove been received. B. Contractor sholl protect all materials from damage due to jobsite conditions and in accordance with manufacturer's recommendations. Damaged materials sholl not be incorporated into the work. VI. PRODUCTS A. Keystone Unit - a concrete retaining wall element machine mode from Portland cement, water, and aggregates. REVISIONS KEYSTONE CONCRETE RETAINING WALL (CONT.) B. Structurol Geogrid - a structural element formed by a regular network of Integrally connected tensile elements with apertures of sufficient size to allow interlocking with surrounding soil. rock, or earth and functlon primarily os reinforcement. C. Unit Drainage Fill - drainage aggregate that is placed within and immediately behind the Keystone concrete units. D. Reinforced Backfill - compacted soli that Is placed within the reinforced soil volume as outlined on the plans. VII Keystone Concrete Retaining Wall Units A. Keystone concrete units sholl conform to the following architectural requirements: 1. Face color - concrete gray. The Owner may specify standard manufacturers color. 2. Face finish - sculptured rock face In angular tri-planer configuration. Other face finishes will not be allowed without written approval of Owner. 3. Bond configuration - running with bonds nominally located at midpoint vertically adjacent units, in both straight and curved alignments. 4. Exposed surfaces of units shali be free of chips, cracks or other imperfections when viewed from 0 distance of 10 feet (3 m) under diffused lighting. B. Keystone concrete materials sholl conform to the requirements of ASTM C1372 - Standard Specifications for Segmental Retaining Wall Units. C. Keystone concrete units shall conform to the following structural and geometric requirements measured In accordance with appropriate references: 1. Compressive strength: ? 3000 psi (21 MPa); 2. Absorption: t B % (670 In northern states) for standard weight aggregates; 3. Dimensional tolerances: ::I: 1/8" (3 mm) from nominal unit dimensions not inciuding rough split face, :1:1/16" (1.5 mm) unit height - top and bottom planes; 4. Unit size: 8" (203 mm) (H) x 18" (457 mm)(W) x 12" (304 mm)(D) minimum; 5. Unit weight: 75-lbs/unit (35 kg/unit) minimum for standard weight aggregates; 6. Inter-unit shear strength: 600-plf (8 kN/m) minimum at 2-psl (13 kPa) normal pressure; 7. Geogrid/unit peak connection strength: 500-plf (7 kN/m) minimum at 2-psi (13 kPa) normal force. D. Keystone concrete units sholl conform to the following constructability requirements: 1. Vertical setback: 1/8" (3 mm) :I: per course (near vertical) or 1" (25 mm) + per course per the design; 2. Alignment and grid positioning mechanism - fiberglass pins, two per unit minimum; J. Maximum horizontal gap between erected units shall be f. 1/2 Inch (13 mm). VIII. Shear Connectors A. Shear connectors sholl be 1/2-inch (12 mm) diameter thermoset Isopthalic polyester resin-pultruded fiberglass reinforcement rods to provide connection between vertically and horizontally adjacent units. Strength of shear connectors between vertical adjacent units shall be applicable over a design temperature of 10 degrees F to + 100 degrees F (-10 to 40 degrees C). B. Shear connectors shall be capable of holding the geogrld in the proper deslgn position during grid pre-tensioning and backfilling. IX. Bose Leveling Pod Material A. ~aterlal sholl consist of 0 compacted crushed stone base or non-reinforced concrete as shown on the construction drcwlngs. X. Unit Drainage Fill A. Unit drainage fill shall consist of clean 1" (25 mm) minus crushed stone or crushed grovel meeting the following gradation tested In accordance with ASTM 0-422: ~ Percent Passino 1 inch (25 mm) 100 3/4-inch (19 mm)75-100 No.4 (4.75mm) 0 - 10 No. 50 (300um) 0 - 5 DESIGN BY: ~, V4!N. ~H~!~~~D~~~~N!!A I~s~. [:J [.I] TEL. (317) 293-3542 FAX: (317) 293-4737 DRAWN BY: CHECKED BY: APPROVED BY: KEYSTONE CONCRETE RETAINING WALL (CONT.) B. One cubic foot (0.028 m3), minimum. of drainage fill sholl be used for each square foot (0.093 m2) of wall foce. Drainoge fill shall be placed within cores of, between, and behind units to meet this requirement. XI. Reinforced Backfill A. Reinforced backfill shaH be free of debris and meet the following gradation tested In accordance with ASTM D-422: ~ 2 inch (50 mm) 3/4-inch (19 mm) No. 40 (425um) No. 200 (75um) Percent Passino 100 100-75 0-60 0-35 KEYSTONE CONCRETE RETAINING WALL (CONT.) XIV. EXECUTION Excavation A. Contractor shall excavate to the lines and grades shown on the construction drawings. Owner's representative sholl Inspect the excavation and approve prior to placement of ieveling material or fill solis. Proof roll foundation area os directed to determine if remedial work is required. B. Over-excavation and replacement of unsuitable foundation soils and replacement with approved compacted fill will be compensated os agreed upon with the Owner. XV. Base Leveling Pad A. Leveling pad materlai shall be placed to the lines and grades shown on the construction drawIngs. to 0 minimum thickness of 6 inches (150 mm) and extend laterally a minimum of 6" (150 mm) in front and behind the Keystone wall unit. B. Soil leveling pod materials sholl be compacted to a minimum of 95 " Standard Proctor density per ASTM 0-698 C. Leveling pad sholl be prepared to insure full contact to the base surface of the concrete units. XVI. Keystone Unit Instailation A. First course of unIts shall be placed on the leveling pod at the appropriate line and grode. Alignment and level sholl be checked in 011 directions and insure that all units ore in full contact with the base and properly seated. B. Place the front of units side-by-side. Do not leave gaps between adjacent units. Layout of corners and curves shall be In accordcnce with mcnufccturer's recommendations. C. Install shear/connecting devices per manufacturer's recommendations. D. Place and compact drainage fill within and behind wall units. Place and compact backfill soil behind drainage fill. Follow wall erection and drainage fill closely with structure backfill. E. Maximum stacked vertical height of wall units, prior to unit drainage fill and backfill piacement and compaction, shall not exceed two courses. XVlI.Structural Geogrid Installation A. Geogrid sholl be oriented with the highest strength axis perpendicular to the wall alignment. B. Geogrid reinforcement shaH be placed at the strengths, lengths. and elevations shown on the construction design drawings or as directed by the Engineer. C. The geogrid sholl be laid horizontally on compacted backfill and attached to the Keystone wall units. Place the next course of Keystone concrete units over the geogrid. The geogrid sholl be pulled tout, and anchored prior to backfill placement on the geogrid. D. Geogrld reinforcements shall be continuous throughout their embedment lengths and placed side-by-side to provide 100% coverage at each ievel. Spliced connections between shorter pieces of geogrld or gaps between adjacent pieces of geogrid ore not permitted. XVIII. Reinforced Backfill Placement A. Reinforced backfill shall be placed. spread, and compacted in such 0 manner that minimizes the development of slack in the geogrld and installation damage. B. Reinforced backfill shall be placed and compacted in lifts not to exceed 6 inches (150 mm) where hand compactlon Is used, or 8 - 10 inch,es (200 to 250 mm) where heavy compaction equipment is used. Lift thickness sholl be decreased to achieve the required density os required. C. Reinforced backfill shall be compacted to 95" of the maximum density as determined by ASTM D698. The moisture content of the backfill material prior to and during compaction sholl be uniformly distributed throughout each layer and shall be dry of optimum, + 0", - 3"- D. Only lightweight hand-operated equipment shall be allowed within 3 feet (1 m) from the tail of the Keystone concrete unit. E. Tracked construction equipment sholl not be operated directly upon the geogrid reinforcement. A minimum fill thickness of 6 inches (150 mm) is required prior to operation of tracked vehicles over the geogrid. Tracked vehicle turning should be kept to a minimum to prevent trccks from displacing the fill and damaging the geogrld. F. Rubber tired equipment may pass over geogrid reinforcement at slow speeds, less than 10 MPH (15 KPH). Sudden braking and sharp turning sholl be avoided. SPEORCAllONS SHEET 6 OF 6 MEDICAL DRIVE SHOPS KEYSTONE CONCRETE RETAINING WALL (CONT.) G. At the end of each day's operation. the Contractor sholl slope the lost lift of reinforced backfill away from the wall units to direct runoff away from wall face. The Contractor sholl not allow surface runoff from adjacent areas to enter the wall construction site. XIX. Cap Installation A. Cop units sholl be glued to underlying units with on all-weather adhesive recommended by the manufacturer such as Keystone Kapseal. XX. As-built Construction Tolerances A. Vertical alignment: :I: 1.5" (40 mm) over any 10' (3 m) distance. B. Wall Batter: within 2 degrees of design batter. C. Horizontal alignment: :!: 1.5" (40 mm) over any 10' (3 m) distance. Corners, bends & curves: :I:: 1 foot (300 mm) to theoretical location. D. Maximum horizontal gap between erected units sholl be f. 1/2 inch (13 mm). XXI. Field Quality Control A. Quality Assurance - The Owner sholl/may engage Inspection and testing services, Including Independent laboratories, to provide quality assurance and testing services during construction. This does not relieve the Contractor from securing the necessary construction quality control testing. B. Quality Assurance should include foundation soil inspection. Verification of geotechnical design parameters, and verification that the contractor's quality control testing Is adequate os a minimum. Quality assurance shall also include observation of construction for general compliance with design drawings and project specifications. (Quality Assurance is usually best performed by the site geotechnical engineer.) C. Quality Control - The Contractor sholl engage inspection and testing services to perform the minimum quality control testing described in the retalnlng wall design plans and specifications. Only qualified and experienced technicians and engineers shall perform testing and Inspection services. D. Quality Control testing shall include soli and backfill testing to verify soil types and compaction and verification that the retaining wall Is being constructed in accordance with the design plans and project specifications. \\\lllllIIII""I/ ~""'~~~..f;. ~///~ j _"l-~~'~.\srr.~"1,;.% ff~(" NO. ~ \~1 ~ * ! 16003 it; ~ \1\..S;ATE OF .Ii ~/ ~~~ ..../{DIA~~.... &~$ ~~////~/ONAl'" t~\\\",$''' /11/"111111111\\\ SCALE: HOR.: NA VER,: NA DA TE: 12/07/06 PROJECT NO. 06-2366 DRAWING NO. ca.o Plasticity Index (PI) <15 and Liquid Limit <40 per ASTM 0-4318. B. The maximum aggregate size shall be limited to 3/4 inch (19 mm) unless field tests hove been performed to evaluate potential strength reductions to the geogrid design due to damage during construction. C. Material con be site-excavated soils where the above requirements can be met. Unsuitable sails for backfill (high plastic clays or organic solis) sholl not be used in the backfill or In the reinforced soli mass. D. Contractor sholl submit reinforced fill sample and laboratory test results to the Architect/Engineer for approval prior to the use of any proposed reinforced fill material. XII. Geogrid Soil Reinforcement A. Geosynthetlc reinforcement shall consist of geogrids manufactured specifically for soil reinforcement applications and sholl be manufactured from high tenacity polyester yarn or high density polyethylene. Polyester geogrld shall be knitted from high tenacity polyester filament yarn with 0 molecular weight exceeding 25,000 g/m and a carboxyl end group values less than 30. Polyester geagrid shall be coated with an Impregnated PVC coatIng that resists peeling, cracking, and stripping. B. To, Long Term Allowable Tensile Design Load, of the geogrid material shail be determined as foilaws: To = Tult / (RFcr*RFd*RFid*FS) To sholl be evaluated based on 0 75-year design life. 1. Tult, Short Term Ultimate Tensile Strength Tult is based on the minimum overage roll values (MARV) 2. RFcr. Reduction Foetor for Long Term Tension Creep RFcr shall be determined from 10,OOO-hour creep testing performed in accordance with ASTM 05262. Reduction value = 1.50 minimum. 3. RFd, Reduction Factor for Durability RFd shall be determined from polymer specific durability testing covering the range of expected soli environments. RFd = 1.10 mlnimum. 4. RFld, Reduction Factor for Installation Damage RFid sholl be determined from product specific construction damage testing performed In accordance with GRI-GG4. Test results sholl be provided for each product to be used with project specific or more severe soil type. RFld = 1.05 minimum. 5. FS, Overall Design Factor of Safety FS sholl be 1.5 unless otherwise noted for the maximum allowable working stress calculation. C. The maximum design tensl1e load of the geogrid shall not exceed the laboratory tested ultimate strength of the geogrld/facing unit connection divided by a factor of safety of 1.5. The connection strength testing and computation procedures shall be in accordance with NCMA SRWU-1 Test Method for Determining Connection Strength of SRW. D. Soil interaction Coefficient, Ci Ci values sholl be determined per GRI: GG5 at a maximum 0.7S-lnch (19 mm) displacement. E. Manufacturing Quality Control The geogrid manufacturer sholl have a manufacturing quality control program that Includes QC testing by an independent laboratory. The QC testing shall include: Tensile Strength Testing Melt Fiow Index (HOPE) Moiecuiar Weight (Poiyester) XIii. Drainage Pipe A. If required, the drainage pipe shall be perforated or slotted PVC pipe manufactured in accordance with ASTht D-3034 or corrugated HOPE pipe manufactured in accordance with ASTM 0-1248. NRJ TES SBP BCP ~ ~' , \ \ \ H l. g 0 Cl .. ~G) ~ 0 - <0 o 0 ,., ....... ,,~ l3 c:i . .......z ~ ~ I-~ W 0: 0: W ~ ~ ;;!15ffif-O' 0:1:> <( 0::<0 (/) 0 a.. 0 ~ i o i ~ ~ :::I: C1J ~ f5 ...J <( o c w ::E .., 1Il a.. a.. ~ ~ 51 al .. :>: >- 1Il :>: :>: 1Il 0 1Il 1Il 0 ~ Z ~ ~ 0 ~ ~ fil g: W 0:: :I: a.. o 0 0 <( "" " o ! . (J ...." Z"'''' "''' eo.... ....1 -- '" '" <'" ..z~ AIR ~~ ,..,. 0 '" z~ Z~x --< a: ~~ W~ W~ zg ---' "0'" 0.... I'" Z <.>7 VI", a.. ~ ro .... :J: ~ " (I)~~ >~~ @-I m (II z o in 5 w II:: WO()(J:g - LOClt'ro JD"'........_.."3l't'o I,II.1D1'~N......8 03ll01d OZ""TJY:)S1'tJ(] 9MO'~ OdOl....m.........311.:1 OZ'U"3lY.JS.Ll \NVld lHelS\saNItllAVIKl\NOIS3O\.JQ J03J.pe" uo Ido'lS 9OCl-90\900l\:.:l....A~0l:l3HIO ~ ~., ~,-----' -----'~ \\\\\"111111//1111 S'\.\.'\~~~N C. 1IIIIt"I'/. . (:,................11', ! ...'t;/;.~~\STE.f;.~....?%~ o iff! NO. ,I'" " ~ * i 16003 )t; ~ t~ \ STATE or /$} '\ '?-Ss'!.~R!t:~~..~&~,~ "/'//llllf/~~~~~\\~\\\\\\\"~ /1 ::c.,l SCALE: HOR.: 1" = 20' VER.: NA DA TE: 12/07/06 PROJECT NO. 06-2366 DRA'MNG NO. C10.0 ~ ~ o ~- -----' -----,---- ------- J .____,.----' ~ II ~ ~ , fl ~~ ;. ~i ~Q ~ ~ 1 2 . 1 i ~ N ~!i I ~~ ~ !~~1l .;;~~~ ~ i~! ~~~~ EXIST. ROLL CURB & GUTTER IS NOT TO BE REMOVED. ANY DAMAGED CURB & GUTTER SHALL BE REPLACED USING THE CITY OF CARMEL STANDARD FOR ROLL CURB & GUTTER AND ANY SPECIFICATIONS PERTAINING TO PROPOSED ROLL CURB & GUTTER. REVISIONS DESIGN BY: NRJ TEB SBP DEMOunON PLAN I~I V4!N. ~~C!~~~D~!!~~N!!A 1~5~. -I [I] TEL. (317) 293-3542 FAX: (317) 293-4737 DRAWN BY: CHECKED BY: APPROVED BY: MEDICAL DRIVE SHOPS BCP - ----- "'- e' /~~., 1:; L=50' Ai ~"""""''''''''''' A GEOTEXTILE FABRIC EXISTING GROUND SIDE ELEVATION 5: 1 SLOPE EXIST. ROLL CURB & GUTTER / / / ~ R1PRAP CH~K DAM "-.- INLET _834- PROTECTION_ - - (TO..-REt#JN AFTER "tONSTRUCTION) RIPRAP CHECK DAM BEGIN RETAINING WALL ~ NOTES: 1. GEOTEXTILE FABRIC SHALL MEET THE REQUIREMENTS OF MATERIAL SPECIFICATION INDOT SECTION 913.18 AND SHALL BE PLACED OVER THE CLEARED AREA PRIOR TO THE PLACING OF ROCK. 2. ROCK OR RECLAIMED CONCRETE SHALL MEET THE FOLLOWING INDOT COURSE AGGREGATE GRADATION CA-2. 3. ANY DRAINAGE FACILITIES REQUIRED BECAUSE OF WASHING SHALL BE CONSTRUCTED ACCORDING TO MANUFACTURERS SPECIFICATIONS. E 4. IF WASH RACKS ARE USED THEY SHALL BE INSTALLED ACCORDING TO PLAN VI W THE MANUFACTURER'S SPECIFICATIONS STABILIZED CONSTRUCTION ENTRANCE PLAN · MUST EXTEND FULL WIDTH OF INGRESS AND EGRESS OPERATION. POSITIVE DRAINAGE TO SEDIMENT TRAPPING DEVICE INLET PROTECTION ~ ~ ~ ij~ II ~ l> ~ !l ~ i ~ s~ i~ e ~~ ft ~a ~ ,ll! : ~8 ~ ~~~:! ~ffi~~ ~ !; i ~~~~ :i. ~ . CD ELEVATION VIEW METAl. SYNTHETIC, OR WOOD POSTS GROUND UNE SCAlE: NONE GEOTEXTILE FABRIC SILT FENCE TIEBACK BETWEEN FENCE POSTS AT ANCHOR 4" I. ,I 6' MAX. lo~ ~~ . :i. 11)- ~ COMPACTED SOIl: ENBEDMENT DETAIL ANCHOR STAKE MIN. LENGTH 18" @ TIEBACK DETAIL SILT FENCE ELEVATION SILT FENCE GENERAL NOTES: 1. SILT FENCE SHALL BE PLACED AS CLOSE AS POSSIBLE TO EDGE OF CONSTRUCTION UMITS OR AS DIRECTED. 2. THE SPACING OF THE TIEBACKS SHALL EQUAL THE SPACING OF POSTS. ADDITIONAL POST DEPTH OR TIEBACKS MAYBE BE REQUIRED IN UNSTABLE SOILS. w SILT FENCE PLACEMENT SILT FENCE DETAIL SCALE: NONE NOTE: INLET PROTECTION CONSISTS OF ENVlROPOD DROP-IN CATCH BASIN INSERTS PROVIDED BY "STORM WATER 360" PORTLAND, OREGON. FOR DETAILS SEE MISCELLANEOUS STORM STRUCTURE DETAIL SHEET C26.0. STABIUZATING STAPLES OR STAKES ELEVATION VIEW 12" STABIUZA~I' STAPLES OR STAKES I SWALE REVETMENT RIPRAP TOP OFl 6" SWA~ ~II_ .( 51' . ~ o FLOW, ~ROSION CONTROL BLANK T LANDLOK SUP!;.RGRO NOTE: R EQUIVALENT) ALL DRAINAGE SWALES SHALL BE STABILIZED WITH AN PLAN VIEW EROSION CONTROL BLANKET EROSION CONTROL BLANKET SCALE: NONE . ... SECTION A-A RIPRAP SWALE CHECK DAM SCALE: NONE REVISIONS DESIGN BY: NRJ EROSION CONTROL PLAN ~~"\\\\\\\~NrrC'I"IIII""", .;-'u~...........:~", f~f1-.\STt't~'-f'\ 2aJI . NO. ,~: ~ * ( 16003 I * ~ %~ STATE or )t:JJ '\ .~..;.....~NOI"'v..""''''#~ . J'J' ............ ~Cj . ~/"III,':~~~~,\~\\\\\\\\\'" C11.0 ICf V:~N. ~H~C!~~~~!!~~~!A 1~5~. [;] [I] TEL (317) 293-3542 FAX: (317) 293-4737 DRAWN BY: TEB CHECKED BY: SBP SCALE: HOR.: 1" = 20' VER.: NA DATE: 12/07/06 PROJECT NO. 06-2366 DRAWING NO. MEDICAL DRIVE SHOPS APPROVED BY: BCP ~ ~ ~ ~ ~ ~ I~ ~~ ib !Ie ~ ] 1 2 i 1 ! ~~ ~ .i ~ ~" g ~~z~ <:"sh ~ 1~ ~ ~ :~ i ~~g~ cCi:Il.Q 12'x12'x6" CONCRETE DUMPSTER PAD W/6' HIGH SLATTED WOOD FENCE 1" TOP RAIL 6"x6" WOODEN POST (TYP.) 1"x4" FENCE BOARD (TYP.) II' \ \ 11 III \ \11 " ,1 !IIIIII ~ II ~ I III r ): \ I r III1 1\ II o(!) e" ;., " N I I I I I 2"x3" STRINGERS <0 in ;., N CONCRETE ENCASEMENT 2' ELECTRIC SERVICE SLATTED WOOD FENCE DETAIL SCALE: NONE 10' ELECTRIC EASEMENT d s' 7/8" DIA. HOLE (MIN.) ~~ FOR f15 REBAR PIN 5.5' SIDEWALK I . EASEMENT I 7" PLAN 7" 1:'13 REBAR ~R A ..pt .. U) A -ld- l' 2'-6" l' 2'-6" l' ELEVATION SECTION A-A NOTE: , PARKING BUMPERS SHALL BE PLACED 2 OFF OF FACE OF RETAINING WALL IN ALL LOCATIONS WHERE A PARKING SPACE IS ADJACENT TO THE RETAINING WALL \ LEGEND @ UNE, PAINT, 4", WHITE <ID LINE, PAINT, 4", BLUE = PAVEMENT MARKING, SYMBOL, HANDICAP PLANTING AREAS IN SIDEWALK CONCRETE PAVEMENlJ" FOR COMMERCIAL DRIVE: 6" PCCP ON 6" COMPACTED AGGREGATE BASE SCALE: NONE CONCRETE PARKING BUMPER DETAIL PARKING SUMMARY REO'D. PARKING SPACES PROVIDED PARKING SPACES REO'D. ADA SPACES PROVIDED ADA SPACES 35 G) 38 2 2 2" TYPE "K" COPPER WATER SERVICE UNE REVISIONS \\\\\\\1111111/111/ ~""\,~~ ""N C~ 1111111,,..... >' C,................. ~., ! !':%~G\STt"e......t;.\ f;Z:/ .. NO. D \(<\ \ ~ ~i 16003 i'* ~ <~\\ ,'.,,- \_~.... STATE OF .lti! \. t'.;...{'!.~~.~.~~....r}~,~~ 1-"I'I,'!"tONAL 't.~\"",' '/flll/llllllll\\\\\\ C12.0 SCALE: HOR.: 1" = 20' VER.: NA DA TE: 12/07/06 PROJECT NO. 06-2366 DESIGN BY: NRJ DRAWN BY: TEB CHECKED BY: SSP APPROVED BY: BCP LAYOUT PLAN DRAWING NO. '!c;). V4~ N. !H~!J~~D~!!~~N~!A 1~5~. [:J [IJ TEL. (317) 293-3542 FAX: (317) 293-4737 MEDICAL DRIVE SHOPS ~ ~ ~ ~ , 110 !~ ~i! i 1 ii 2 5 ! ! ~~ ; ~~ : ~a. ~ 8~1!5 ?~~~ ~ i; ! ~~~~ ~~!t\~~l T~ ~-:-.,........... ~... ::-,~::'~-;:;;;~-;:; ~ I 11 r'oj -- f---- --- ::::~:....::........::~':-:::........ . I B: ~ ~ '::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::" I I' I ~.' 0 ........................................ ~ II "I'I~8 ~ \::i220 : ~I .:::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ~ P I I :-r-I . L 822. BC '.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.::. I "I 8 22 BC .................................. I I I. ':::::::::::::::::::::::::::::::::.. I . .................................... tt \ I I ~ 'III IN . - - - -: - I-- - kI:::~:::::;\r\t\::::t::::::~:::::::::j:::::::::::}:: ~ P I 1'1 11 rt11 N "- 0 .::::::::::::::::.~:::::::::::::::::: , \ II" /.0 I :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::. I)J JI ~III i. ~; \ \ \ \ \Fi?~;/>" ~ 11//V,/l1~ ~/ / ",,_I ~ ~lC ~ - ~ }-y /:l/~ / I. 1" 822.03 BC { ~ ~,f'[ J I I II ~j I : "" h,::::::;- \ "\L822[8I1TC ~ Vl/ I 1/ I ~ I ", 8 2 I~"C rli I / I / I /\ ~~ _- -- -- t ./ 1/ I I I 0 : "--- . -:1IIIil. - /r I .~ ---- mIDmBCo .' .'. :'::-.'.,. I II/! II d, I Ijt j~ \ _.c"'" >in. 20 > ~ ~1'11 BEdlN RfTlliNI ~+;y~:~ ---~~r\L-- - ~--~: \':-...~~..:~:~~~:~:.~~:Y>.:":~' w,,"v I ~ \ . 0 ~ .'. CASTING: f:~~;'-:-0.' <. ~ ~ Ik/~ II I I~ ~8 /' -- .82~~..:-.-:.-::-:-:-::-....: I. I "/~ ../~20.9 ..~........ I. ..... . . 8 76' "- I 0: TC .0. :.... ~ . ~~-:-:-:.: ::- Be 2.0 ... ~.--:' .' . .' . .'. ----1 \ STRI Ndj 15 " ~1HtI \.-_- 0 ~~~ ~.::. ::'. ~ ~ \ \C~~I1JllG:IELE~ --- ~ BCI82Q.851. .- ---I . ..........~.. ....... , 821 ~6 I I I \. . .' ......,.- - .'. . ~ 11~m. J~.~ irTif;'/' >" _/~;,;:;- ~~~c \~- II 1 ~/ /)1 I" 1__--- - 0 ~ r- ~ ~/ 11 I I ro.~ ~ ___ ---'I B~ ~ ~~/~ >>' I Ir\S~J / - \-1 .~D I \, JmiIlJg ~_~ I .tl. 23-Y\~" ~ ,'/ TC8 O. '" ~ II r/~il r It' ~\\ l~~ ~ _--B [D0 ~~. I y/~ ,::;V~ ~\~ "~~ BC~ ~ \ ;' c-- YI I \ ~ - \" 8.93 ~BC -t::'.--- lb ~ v 0.- I - ~--"\ .\..--- ~ II S~~~~. J~ -~- ~\ ~ ~-~ ~ ~ ~ I / ~'\i.10 ~~ '- - D --- ~8'67 -- """ "C. lir r,., ~ / J &- ... 819~1 ~ ---...." \"""t ~d - ---r; ------= -:::::===- ~~- r" J.819I1RU? --r-___ ~ ..J ~ :::...--- -::;:::::::.- I I\,a ~~ ~m.wmI -:- ----r- ~ - ::;:::::::.::;:::::::.- - ~ ~ .\. l 81S..QRI...... -- ~- - - - '~.~_I--- =-J;w-~~~::;:::::::.~8.65 ~ - STR. NO. 21 ~ ~:m _r. 7.0' ~d::;:::::::.::;:::::::.-::::- ... -1 -::;:::::::.-""" . \ --1::;:::::::.d:-::;:::::::.::;:::::::'- ..... ~ - T ~~ I i I - STR. NO. 25 I.:. STR. NO. 22 ~ LEGEND ~ TC BC c::=:=:J It\H11\ ~_ / . /' \ 1:;- \\tll\.~ml !~o@ ---"""tl/ \TR.~/,~/ ~~~~ 1,1 I, " .-\ .-'" =-- J \;.~." - I r---- 1:lhll 1'1 '\r,;ii--=:;:a C--'~63 ./;: ~.0'mZ... ,'-1: /~I ~ l I ~68 \.51 ~~~ - I '- "" ~ ./) (1(', END RETAINING ... __ ) "- ~ \~ 8. I >- 8234610: \ WALL STR. NO. 27 ~ t. .00 ~~/' ~ --'1m 93 r;) iii = -?'ll( ~ V- \~891 \ STR NO 13 \~-- ~ \t II I ( " I '..1 ~ /''' ~l . . ~... ~ ~., .1 I 830.00 ~~_ .Vt~ I ~j! ~rr~' ----/'-- -~~--- JR23 031 ~~~::~23:::::::::}}}?::::~~: 1\ II \ _ V: \ "(;yi~ ~ S. NO --r4 _- o~~- ~,-.......................z...... t'\ l \ II i 1,1 {~I .J / / _::~ooo - ~7:::tt:H?stJ{{{::::::::::::::::::::::}~t::}}I. ~~ \ \ o III !I. - ~ II!. -_, v ~~-:,,,";;J&/,;,,~;;;;;:?ffjf/!f/fffiif!/fj7;/j!{rrf;jjj'E;'J, ~\~/ ~ It,., 0 --- f~""""""""""""""""""""""::::"'"_............................:';':','.~.:0:...........:;r..., 11/1 ~ 1- f::C::::::::::'\4.::::::::::::.:.:-:.:.:.:.:.:.::::::::1::1:0::::.:.:.:.:.:.:.:.::S:7:0:S:0:7'::s?:5:S:~::::::::::::::::::::::::::::::::::\;/.:?:.::::::::::} 0 --J I 1/ 0>....-- .::::;.:?'0................................:::::::::::::..o0Sf..O......................~.......,.....:;;!f..::::::::::ji/ 1.l ./ ~ I.: /' ~ ~ :1--- c..j ---W:-:-\E'::::::::'::4}%{;:::;:;:::;:::::::;:::::;:::::::::::~::::::::::::::~:{:;:;:::::~~~to\t'tti1:f:0fH+:4diLgt::WByt:::?k ~ \ ~ - r._ 8 !/ I. vi'1: u- --- lQ ":::::::::::::::::::;::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::.:.... "....," 82.~'-k::::::::::s:::::::::::s.:;::':':':':':':':':':':':':':':P?::7:\:::::\.. "I' - 0 I I f~ m g .............................................~-:.:;,>:............................................ . . ~.:.;..\, ~ \ I , 8 3 3 h ~ / ___~ - ~ ':"-\.:.:;::::;:::~I.:::.::.:::::::;:::;:::::?}f:Hf:tt:::::::}::}::::::::::}::~:})Et:;@B{:;:::::::r&{:~:::::::::~:::::::::::p:::r:::.'::':':, ~S,\" ~ ~ J! ~I/ ','yfl,) /11 40- --- Vtttttt:::::::::::. ..tt:~:~~:ttttEZb{:::::~:t::::}2E:0:0':~'::"::' -), \\ -= ~ v::::::::::::::::' .......:::.~:::.:.:.:.:.:.:.:.:: :.::::::.... --- -- 1822 R71TC ~,~~N t ~~: - ~.:zy::::::::::::::.:.:.:.::::.~~.-e~~\ :;~~~~.'\..~ D~ STR. NO. 16 _ ,.-1 ,/I /.,( / I k'~ \ ~ TC:'';)-:::: ~C.::: , ~~ \ ~ ~~C CASTING ELEV. ~~ ~r t/ III "" 1 ~ \." . ...:" :?'1'" . ::':?C'.~' :t~::' \ ~ ~BC 821.68 .. r r.tJ ~: TC . " :'{ "1\ .' ': .'. :'~C1lR?:1'R~ ':"\ .l- 1 '- STR. NO. 12 /-1V /(11 I ____" ! ~-=-.. .....~.;.......:....:::...:: ..~:....a. .:'.'::~,:~Tj j~ ~ i 1) 0 __'\ ..~...l . "':Nn:;;~:-".. ..:..1\ x-;.....;:-:..El. 1. ~~~ \ r (>. i820.501 ~;~~ RETAININ~ ~ IIA II 7 ~ ~..- '. ~'*'~1:.. ...... . " .;~...... .:: ::"':-' ~\ \ 8'J1'73IRC ~ ~ .--..., )1r-!k1 '41<: '-...Xooo ,,;..,.~:~ ":\8: $. ~"'~'-\" ___ TC ~~ ~ ~:-.- L. h ~ GI:JRlt"I~AMP .~.'. . . ',:X- . ~ BC - - -=---- ~- STR. NO. 15 _.- /1 II 'f ~E A;"'':'" <:,. - ",- ~ ~ ~ ~ CASTlNGELEV. I tl /01 _-,-- _ - \ ~~ r89 ~ \'.--:::; .'0 821.66 . _ ~/ 'VI~":' '\ ...\-___- ~\ ~:-::::::- .--:::; .A-:.~3;rt () g Vhl ';;JtJ)]7 I _ ..~ ,;::::;'" ~. ~ ~ l 1r1 ~ ~ - ~ ---;\ ..--:;,;::::;,;::::; STR NO 17 STR. NO. 12 STR. NO. 24//1 :~.O..I - I -----:?:~ . . ..... ?" l Nj \- -\ -" ,;::::; ~>..... CASTING ELEV. STR NO 23 ---::. J- 1I'b" L _ \.r <1 ___Y:T J; -;:;.:;;:~-;::::::: \ S"tR: NO. 18 821.16 ., .- \ Q..-l. _---- ,;::::;c::=- / CASTING ELEV. STR. NO. 10 ."""'" ~ - _'- .:.~~\::::1" ~~~r;;;;.y ...../ 820.65 __- ---====- L .D.!! =-""\. -...... .-..1lII" \\ STR NO 19 ___ _ ~ ~';::::;"""",, - CASTING' ELEV. ~ 1_ 6:0';::::;';::::;-==""'-- "'/~ ~ 820.22 SITE GRADING PLAN _ "",.." ___ ~ ~ ~I STR. NO. 21 SCALE: 1" - 20' ~ ........!III"'" -- --.. I~I ~ STR. NO. 25 ~~ ~~MP STR. NO. 22 PROPOSED ELEVATION TOP OF CURB ELEVATION BOTTOM OF CURB ELEVATION UMITS OF UNDERGROUND DETENTION SYSTEM I, ~~ . () EXIST. GROUND UNE: \ . 3 'NP. I ..:--- ~~'" ~t~ f-1~~~ ~ ~ .J~ ~l~~ ~LOW PERMEABIUTY ~t.X~~~1f SOIL 1: 3/4" CLEAN - ....d. CRUSHEO STONE --v TYPICAL SWALE SECTION STR. NO. 19 CASTING ELEV. 820.22 RETAINING WALL ENLARGED DETAIL SCALE: 1" = 10' SCALE: NONE REVISIONS NRJ TEB DESIGN BY: DRAWN BY: CHECKEO BY: APPROVED BY: BCP [!cr V:!, !N=,!!~~"~~~!4.~ 1!42' I [J] TEL (317) 293-3542 FAX: (317) 293-4737 SBP SEE ENLARGED DETAIL, THIS SHEET NOTE: FOR PROPOSEO UNDERGROUND DETENTION SYSTEM AND PROPOSED STORM SEWER DETAILS. SEE STORM LAYOUT PLAN. GRADING PLAN ,:...$'\\\\\\\\1\llNUC"/llf/11f// SCALE: ~ r~e-......... t:> . HOR AS NOTED DRAWING NO <"t-"Y..~G\sTr'i:""',)0- .: . ~~j q;: (J...."""'~ \n:"R NA FClJi NO. '?l .o..: ~*l 16003 \*; C13 0 11.\ STATE or Je;l DATE: 12/07/06 . \.~".".!NOI~tt"'/"#j PRO "'"",~SIONAL"'~"'~"/ JEeT NO. 1IIIIIIIIHIl1\\\\\\\\\\ 06 2366 MEDICAL DRIVE SHOPS STR. NO. 27 Iii I II 1 \1111'1 4 IIII i j 11\1..1.::: RETAINING WALL o q f \ \ \ ~ \ d \ \ \ \ UNDERGROUND DElENll0N SYSTEM ~9 ty.i!>\;nQ eU! ----_ ~- -=~~ ~=- ~ ~ ~ ~~ Ii l> ~ f il ~ 6 ~~ E iliq ~ G~ ~ ~~ I '~ ~ ~~ ~ 82);:>j ~~~~ i I; I ~~~~ 20' STORM SEWER EASEMENT BEGIN RETAINING WALL STR. NO. 23 STR. NO. 24 STR. NO. 12 20' STORM SEWER EASEMENT STR. NO. 10 NOTE: FOR PROPOSED UNDERGROUND DETENll0N SYSTEM AND STORM STRUCTURE DETAILS, SEE DETENll0N SYSTEM DETAIL SHEETS --- REVISIONS DESIGN BY: DRAWN BY: NRJ TEB SBP BCP MEDICAL DRIVE SHOPS STORM SEWER LAYOUT PLAN ~T ~~, ~!!~~~~o~!I~!I"~. 1!4:" I [IJ "TEl. (317) 293-3542 FAX: (317) 293-4737 CHECKED BY: APPROVED BY: STR. NO. 10 INLET TYPE "E-7" AND 77.6' OF 12" R.C. PIPE REO'D. TOP OF CASllNG ELEV. 819.10 STR. NO. (UPSTREAM) SWALE STR. NO. (DOWNSTREAM) 19 INVERT ELEVAll0NS: UPSTREAM 817.57 DOWNSTREAM 817.30 STRUCTURE DATA STR. NO, 19 INLET TYPE "1.1-10" AND 4.0' OF 15" R.C. PIPE REO'D. TOP OF CASllNG ELEV. 820.22 STR. NO. (UPSTREAM) 10 & 18 STR. NO. (DOWNSTREAM) 20 INVERT ELEVAll0NS: UPSTREAM 817.30 DOWNSTREAM 817.14 STR. NO. 11 INLET TYPE "F-7" AND 101.1' OF 18" R.C. PIPE REO'D. TOP OF CASllNG ELEV. 831.51 STR. NO. (UPSTREAM) SWALE STR. NO. (DOWNSTREAM) 27 INVERT ELEVAllONS: UPSTREAM 827.96 DOWNSTREAM 827.30 STR. NO. 12 INLET TYPE "F-7" AND 45.8' OF 12" R.C. PIPE REO'D. TOP OF CASTING ELEV. 820.25 STR. NO. (UPSTREAM) SWALE STR. NO. (DOWNSTREAM) 17 INVERT ELEVAll0NS: UPSTREAM 817.85 DOWNSTREAM 817.69 STR. NO. 13 INLET TYPE "A-2" AND 74.1' OF 12" R.C. PIPE REO'D. TOP OF CASTING ELEV. 822.80 STR. NO. ~UPSTREAM) NA STR. NO. DOWNSTREAM) 14 INVERT EL VAll0NS: UPSTREAM 819.38 DOWNSTREAM 819.08 STR. NO. 14 INLET TYPE "A-2" AND 98.6' OF 12" R.C. PIPE REO'D. TOP OF CASllNG ELEV. 822.68 STR. NO. ~UPSTREAM) 13 STR. NO. DOWNSTREAM) 15 INVERT EL VAll0NS: UPSTREAM 818.42 DOWNSTREAM 817.57 STR. NO. 15 INLET TYPE "A-2" AND 8.0' OF 15" R.C. PIPE REO'D. TOP OF CASllNG ELEV. 821.66 STR. NO. ~UPSTREAM) 14 STR. NO. DOWNSTREAM) 16 INVERT EL VAll0NS: UPSTREAM 817.32 DOWNSTREAM 817.15 STR. NO. 16 OIL / WATER SEPERATOR AND 6.2' OF 15" C.M. PIPE REO'D. TOP OF CASllNG ELEV. 821.68 STR. NO'jUPSTREAM) 15 STR. NO. DOWNSTREAM) 26 INVERT E VAll0NS: UPSTREAM 817.15 DOWNSTREAM 817.10 STR. NO, 17 INLET TYPE "M-10" AND 51.0' OF 12" R.C. PIPE REO'D. TOP OF CASllNG ELEV. 821.16 STR. NO. (UPSTREAM) 12 STR. NO. (DOWNSTREAM) 18 INVERT ELEVAll0NS: UPSTREAM 817.69 DOWNSTREAM 817.51 STR. NO. 1 B INLET TYPE "M-l0" AND 60.0' OF 12" R.C. PIPE REO'D. TOP OF CASllNG ELEV. 820.65 STR. NO. (UPSTREAM) 17 STR. NO. (DOWNSTREAM) 19 INVERT ELEVAll0NS: UPSTREAM 817.51 DOWNSTREAM 817.30 <""'G ..........J;""., g~~ \STE'H;:6'~\ f 0:/1 NO. .~ % ~ *! 16003 j'* ~ ~ "'0' : Q: :;: \~..... STATE OF /itj I ~ ~s!.~~!!:.~~-~&~,f /'fll"II'~~~~~\\;\'\\\\'\'" STR. NO. 20 OIL / WATER SEPERA TOR AND 5.5' OF 15" R.C. PIPE REO'D. TOP OF CASllNG ELEV. 820.56 STR. NO. (UPSTREAM) 19 STR. NO. (DOWNSTREAM) 26 INVERT ELEVAll0NS: UPSTREAM 817.14 DOWNSTREAM 817.10 STR. NO, 21 EXIST. INLET NO CHANGE REO'D TOP OF CASllNG ELEV. NA STR. NO. jUPSTREAM) NA STR. NO. DOWNSTREAM) NA INVERT E VAll0NS: UPSTREAM EXIST. DOWNSTREAM EXIST. STR. NO, 22 EXIST. INLET NO CHANGE REO'D. TOP OF CASllNG ELEV. NA STR. NO. (UPSTREAM) NA STR. NO. (DOWNSTREAM) NA INVERT ELEVAll0NS: UPSTREAM EXIST. DOWNSTREAM EXIST. STR. NO. 23 MOD. MANHOLE TYPE "K-4" AND 30.0' OF 18" R.C. PIPE REO'D. TOP OF CASllNG ELEV. 821.04 STR. NO. ~PSTREAM) 26 STR. NO. DOWNSTREAM) 24 INVERT E A 110NS: UPSTREAM 814.59 DOWNSTREAM 814.50 STR. NO. 24 EXIST. MANHOLE CONNECll0NS FROM STRUCTURE TOP OF CASllNG ELEV. EXIST. STR. NO. jUPSTREAM) 23 STR. NO. DOWNSTREAM) NA INVERT E VAll0NS: UPSTREAM EXIST, DOWNSTREAM EXIST. STR. NO. 25 REMOVE 10' OF EXIST. PIPE AND PLUG IN.PLACE TOP OF CASllNG ELEV. EXIST. STR. NO. ~PSTREAM) NA STR. NO. DOWNSTREAM) NA INVERT EL A TlONS: UPSTREAM EXIST. DOWNSTREAM EXIST. STR. NO. 26 UNDERGROUND DETENll0N SYSTEM 42.1' OF 10" C.M. PIPE REO'D. TOP OF CASTING ELEV. NA STR. NO'jUPSTREAM) 16 & 20 STR. NO. DOWNSTREAM) 23 INVERT E VAll0NS: UPSTREAM 814.75 DOWNSTREAM 814.63 STR. NO. 27 EXIST. MANHOLE CONNECll0NS FROM STRUCTURE TOP OF CASTING ELEV. EXIST. STR. NO. (UPSTREAM) 11 STR. NO. (DOWNSTREAM) 24 INVERT ELEVATIONS: UPSTREAM EXIST. DOWNSTREAM EXIST. SCALE: HOR.: I" = 20' VER.: NA DATE: 12/07/06 C14110 PROJECT NO. 06-2366 DRAWING NO. ~ ~ g ~ ~ ~ ~ ~ ~ I~ 5~ ]~ 11 2 6 ~ E ~ ~ ~ .:i ~ I I ~ ~~ ~ ~~~~ 5~~~ ~ !~i'! ~~~;5 REVISIONS PRC POSE D GR UNO PRO hLE- AS VE -5 ORM SEW R 1\ \ z ~ ,/ . ,,; \,/ ~ Ul Ul \ 98.& OF 2" PPE 4.1' F 12 PIP ft , ft~~' "ft~ .,.;>. 1>> +p.86 REC D. +0.14-0% EQ 0 C +2.1 ."lI;,~QD. .,/ \ OP C CA llNG\ r OP F C SllN ELE . 82 .68 -.,/ I LEV. 822.E 8 LEV. 822. 0 ELE. 82.68~ I-TOFII.Of ASll~_ ELE. B2." ELE . 82." ~ "'.~. ~ a +O.El% R QD. 830 825 OP IF" C STlN OP F C SllNI OP F C SllN( 820 815 - ......... / ...... EXI T. GR UNO _ ROFIL~ --. / ABVES RM,WER! '\ y / v ~-I----- INV. 819. 8-.1 2+00 DESIGN BY: NRJ 830 825 820 2+50 815 111111 ~ ID II \ \~STR. NO. 27 0, -=~ 11\ \~III o(!) ~~=- ,-STORM SEWER PROFILE fI5 --:; ~ =- >..;;.;J- I1I111 I I ~--~ :~ !~/d ~I~ ~ rf I ~ SlUO. 13 ~~ III jiB g S1R.NO~ ~ \ \ \ (~. snm. SE_ Aro~ ~ ~ ~j ~ II i~)\) ~~':. II ~ 1 i \ illlil. .,," ~ 4 \~ :: :,: /: III j I ~~~ ~ ~.%IA\\\ S1R NO ...I1~L....t'" S1R NO l' "' "'1 ,\\ \ \ I \ ~ ~ ~ -d I I ~ -- \ ~ 1 \ " -:;::::::::--:;::::::::- -:;::::::::--:;:::::::;-- "'U' .D I ~ -=~ TR. NO. 12 I I \ ....,. -=-:;::::::::--:::::" =-~\\J1IUllt STR. NO. 2J III 1 .!-_ ~=\ -:;::::::::--:;::::::::- = -:;::::::::-=- !STR. NO. 17 STR. NO. 10 ~ - ~-:;::::::::-~= STR. NO. 18 -----\1 ~ \ ------=:---:1 ~ -= STORM SEWER PROFILE #2 :~~~ STR. NO. 20 li:.~-:;::::::::--:;::::::::--:;::::::::- ~. _~ i""'f STR. NO. 19 =""'~- ~ \ I STORM SEWER PROFILE #3 to ~ ~ d z DRAWN BY: TES STORM SEWER PLAN AND PROFILES PROFILE i1 MEDICAL DRIVE SHOPS .........,,\"'\\\IN'ICWII/II'ffl;'. /c,~........., f;>"<:;, ./...'t'?:<.G'STr.;;-.:::'1,;.\ tiSl .. NO. () \l"\ ~ * I 16003 it;;; ~ \:!I.\ STm or /~~f ~._~~. N'" ~ A....!IiOIJ.,.'t\........ ~ ~ ", '~s '........... ~<S- ~' "lj-Ilflflf;,~~~~\\~\,\......,......" C15110 ,/ - ~ - ~ "'-IN II. 81~.08 '\ INV. 18.4 CHECKED BY: SBP SCALE: HOR.: 1. = 20' VER.: 1. = 2' DATE: 12/07/06 PROJECT NO. 06 2366 DRAWING NO. !)YSTI M '\~ "" -t' \ '-IN . 81 .57 ..... ._ Oft ~I V. 87.15 INV. 817. 0 I NV. 14.31U - 0+00 0+50 1+50 1+00 STORM SEWER PROFILE #1 [!iT V.!t !~~~~~,~~~,~. I~,~. I [I] TEL. (317) 293-3542 FAX: (317) 293-4737 APPROVED BY: BCP II ~ ~ ~ ~ i ~ll i~ E~ 11 ~ i ~ ~ ~ ~ N I ! ~ 8~.", ;S!N ilii ~~~~ ~ ~ ~ 825 820 815 2+00 NRJ TEB SBP BCP STR. NO. 24 J;....- -= -===- - ~=- ---- -=~ -==- ~=- O .",.,.....~;< q#'- ~ \ \ ~ \ d \ \ \ \ \ d \ \ \ ~ STR. NO. 23 STORM SEWER PROFILE 112 S . NO. 20 STORM SEWER PROFILE 113 STORM SEWER PLAN AND PROFILES PROFILE *2 AND *3 MEDICAL DRIVE SHOPS \\\\1\111111111///( :\"'\\~~pr..NC.""f',,,,; .' V'" ~'''''''''' ~ ., }'~ :.---...'5rr.;,..",,>- '" !i' /'" 0 \""'" fa;, I NO. ,'''% ~ * i 16003 ir; ~ ~ ~.. STATE or tg f '\ (\......!.NO,.~~"..<~ ~ "-.",S'S'IONAl." ~~~"',"" 111111/1/111111111\\\\\1\\\ SCALE: HOR.: 1" = 20' VER.: 1" = 2' DATE: 12/07/06 PROJECT NO. 06-2366 DRAWING NO. C16.0 ~ z z ",' III III z fl!.' III ( 825 0.0' OF 1 " PI E o + .35% REO' . 1.0' OF 1 " PIP lJ +0 35% EO'[. 4 .8' F 12 PIP +0. 5% EOD 820 4.0' OF 5 P E <<) 4.00 RE D. 5.f' OF 5" IIPE o 0.7" RErD. ~: 820.6 1'-. ~~ TOP OF C~Sll~ ~ ,-TO OF jeAS NG ,-, 1/ ELE\ 82(.22 ~ ~ 1--1 l ...J ~~ ritoP 0 CA llNG I r OP (F CAlmNG II LEV. 20.~ 5 Y LEV. 8~ \. ~ -'\ / ^ l^ 1 ~~ r '" t-"' I \ \ \ \ I \...IN . 81 .51 \ \...11 V. 8 7.69 I'-PR POSI D GRpUND PRO ILE AB VE ~ ORM SEW R \ '-I V. 8 7.85 815 ......- \ ,"-..... '-IN\. 811 30 '\ INV. 817. 4 1\ ~I V. 8 7.14 INV.817.10 IV IV V UNC ERGRDUND D TEN ON 0+00 I I I 1+00 1+50 0+50 STORM SEWER PROFILE #2 ~ Ol .... 0 0 z z ~ 77. ' OF 1 2" IPE I!: III 0 0.3~ " RE D. 5' DEW LK fE P 0 CAf llNG .E.V. 20.2 T P 01 CAS nNG Ii n 820 820 E EV. 19.1( \ ~ \ II l - - V .....- IV .a 1'\ INV. 817.' ....... INV. ~17.3 815 815 810 810 0+00 0+50 1+00 1+50 STORM SEWER PROFILE #3 REVISIONS DESIGN BY: !~I ~!N. !H~!~~~D~!!~~N~!A 1~5~. [;] [.I] TEL. (317) 293-3542 FAX: (317) 293-4737 DRAWN BY: CHECKED BY: APPROVED BY: 830 825 820 815 i f ~ i ~ ; iI~ ~~ iO 2 i j. E : ~ = ~ ~ I ~ ~ S\l... ,~~; ~lil ~~~~ REVISIONS E 1ST. G OUNe PROF LE ~ I A OYE TORM SEWEf ~ z ,,' (I) : : II II 1,11 II III /~NV. 14.50 Ii '/ IN\. 81 ~ 59.1 - BohoM Of"""'" / 30.0' If" 18 PIP~ / CD +o.~o" kEQ'O / 0+00 ~(!; o~ ZN CD 5' SIDE AU< F:I"': (1)"- /, I J- - - - -- ,,-- 830 825 820 815 '-- 1+00 l!i@. ~!N. !H~C!~~~D~!!~~N!~A 1~5~D -11Il TEL. (317) 293-3542 FAX: (317) 293-4737 DESIGN BY: DRAWN BY: CHECKED BY: APPROVED BY: SlR. NO. 11 J;..- --=-~~-____ ~~:::=- ~~ o ~-,....-", q' ~ \ \ ~ \ d \ \ \ \ \ ~ \ \ \ ~ SlR. NO. 23 SlR. NO. 24 SlR. NO. 17 SlR. NO. 10 1 STORM SEWER PROFILE 1/2 SlR. NO. 20 DRAWING NO. C17.0 ~PR POS 0 Gf OUN! PRC f"ILE AB :lVE TORI SEll R / / 11\\ / II \, I/P\\ 'V'" F NlRANCE INV. 814. 3 5~ INV. 814. 5 INV. 814. oj 42.1 Of" 8" f IPE @ 0.29 RE 'D. STORM SEWER PROFILE #4 0+50 STORM SEWER PROf"ILE 1/3 NRJ TEB ~~,\\,\\\\\\1I1N"Clffll'I"III" .'f:3~"""""~. /~,-;'.\STEi~(;.;(/\ 2IJ:JI NO. \~, ~ *! 16003 ! * ~ Hl, STATE OF / G j % tl....!NOIA"'........ u~ .f ~~,II~~/ONAL...t~,\,\"\.$' IIJII/1I11l11\1\\\\\ DATE: 12/07/06 PROJECT NO. 06-2366 SCALE: HOR.: 1" = 20' VER.: 1" = 2' STORM SEWER PLAN AND PROFILES PROFILE M MEDICAL DRIVE SHOPS SBP BCP ~ ~ 840 840 ..... N ::: d d z Z A. .. " ~.. ~ ..- f!: @ 0.65 f!: en en 835 I 835 I I EST. G DUND ~~\ LE, A DVE TORM 11\ '" - I- - - I- :L- - i- II - - TOP OF C STlN ~ t--- t-- / ELE\ 831 51 - ~ Il 1/ 1--1- - I-- 830 P OPO ED WAU PRe FILE II J OVE STOI M SI WER 830 II -- II ElOS .12 ~I~" IJl -- '" IV.8 7.96 NV. 827. 0 825 LIN . 82 .19 825 0+00 0+50 1+00 1+50 STORM SEWER PROFILE #4 STR. NO. 27 Ii g Iii ~ ~ STORM SEWER PROFILE iI3 STORM SEWER PROFILE #4 i ~ ~ iI~ ~~ ;~ .lI i 2 & ~ ~ ~ ~ ill 8 g~.2~ t~~~ ,1 j~ j IJ~~ ~cr ~!N. !H~C!!~~~D~!!~~N~~A 1~5~. [:] [.I] TEL. (317) 293-3542 FAX: (317) 293-4737 DESIGN BY: DRAWN BY: NRJ TEB BCP STORM SEWER PLAN AND PROALES PROALE IS MEDICAL DRIVE SHOPPS ;::.~,\,,\\\\\\\\lN"CI('JIIII/111 .u~..........t:><; /~~.\S"i~;;.~.)o.\ lco / NO. \(<\~ ~ * ( 16003 I';; ~ ~ 1.\ STATE OF i~ J \~~;...!.NOIA~~../~~j "'0"'IIISIONAL" ~~\\\"'~~ IlIfI""llllI\\I\\\\\ SCALE: HOR.: 1" = 20' VER.: 1" = 2' DRAWING NO. REVISIONS CHECKED BY: APPROVED BY: DA TE: 12/07/06 PROJECT NO. 06-2366 C18.0 N ~ b! ~- ~~ ~~ ~2 ~i3 ~ 111 ~ I . ~~ K :~ ~ REVISIONS ~~ I J,c ,... olj 0 !~!~ li:c~;; ~ I~ i I~~~ 1/ II II II S1R. NO. 24 ~ _ rr -(j) IISTR. NO. 23 /1 OUllET CON OL STRUCTURE (SEE DETAI ON SHEET C28.0) 0='1 TR. NO. 15 / I , I ~ 1/150' V _--:01"1,.0;:' f~7,~ 6. 0 6. I mr U,{1jfflllllllllllll 111111111111111111 ITIlIIIIIIIIIIIIIII 11111111111111111111111111111111 11111 )= / - /' // - ~ t11 U{U1111111111111111111111111111111111111111111111111111111111111111111111111111111I1I1111111111111 - - / / - ~rl~1111111111111111111111111111111111111111111111111111111111111I111111111111111111111111111111111111 - / - ~flllll1m111111111111111111111 i 1111.1 III 1II1111111111111111 11111'1111111 T 111111111111111111:e- ~ I ' 110 c 011 ~ UNl ERGR( UNO ~ _ DE ENTlm SYST M _ \ STR. NO. 20 STR. NO. 18 ~ STR. NO. 19 1 I I I I I I ~ =-nOOq- 'lR. N~ " / I .J i:Il C'l \ 60" DIA. CMP J HEADER PIPE (TYP.) I .. STR. .10/ ... /r- 1- _ .--J ~ r - // - '1m 'FE f\...-.:::::?' I I I I I io r~O" DIA. CMP HEADER PIPE (TYP.) i:Il C'l in r= ~ - =--- - -- l ~ ,\\\\\\11111111111/ SCALE .."'~P.N C. """,'. : " G ,............<?, 'l, HOR' NA l~,,'{.~G\STt.9~C...?\ 0: ft:1Jf NO. \~~ VER.. NA t*\ 16003 J*! DATE: 12/07'06 %~\ STATE OF /~j {' 'l"~" . 'R~ '\ ('S~'''~~!~.~'';G',f PROJECT NO. ~1/llf"I!'e~~~I\;\\\\\'\'\' 06- 2366 J j ~~ A STR. NO. 12 DRA'MNG NO. C19.0 \,\, --l- STR. NO. 17 - , -- - / - ~ DESIGN INFORMATION CASE 1 INVERT ELEVATION = 814.30 CROWN ELEVATlON= 819.30 STORAGE AVAILABLE = 12919 ftJ ORIFICE 1 ELEVATION = 814.75 ft ORIFICE 1 OPENING SIZE = 1 In ORIFICE 2 ELEVATION = 817.8 ft ORIFICE 2 OPENING SIZE '" 3.5 in EMERGENCY OVERFLOW WEIR ELEV. = 818.75 10 YR STORM STORAGE USED = 7862.68 ftJ PEAK STAGE = 817.41 ft ALLOWABLE oumow DISCHARGE = 0.053 cfs PEAK oumow DISCHARGE = 0.043 'cfs PEAK INFLOW DISCHARGE = 3.368 cfs 100 YR STORM STORAGE USED = 11680.22 ftJ PEAK STAGE'" 818.72 ft ALLOWABLE oumow DISCHARGE = 0.408 cfs PEAK oumow DISCHARGE = 0.363 cfs PEAK INFLOW DISCHARGE = 5.903 cfs NOTES: CASE 1: CASE 2 INVERT ELEVATION'" 814.30 CROWN ELEVATlON= 819.30 STORAGE AVAILABLE '" 11780 ftJ ORIFICE 1 ELEVATION = 814.75 ft ORIFICE 1 OPENING SIZE = 6 In ORIFICE 2 ELEVATION'" 817.8 ft (NOT ACTIVATED IN 100 YR EVENT) ORIFICE 2 OPENING SIZE = 3.5 in (NOT ACTIVATED IN 100 YR EVENT) EMERGENCY OVERFLOW WEIR ELEV. = 818.75 10 YR STORM J STORAGE USED'" 3412.02 ft PEAK STAGE'" 815.85 ft ALLOWABLE oumow DISCHARGE = 0.053 cfs PEAK oumow DISCHARGE '" 1.025 cfs PEAK INFLOW DISCHARGE = 3.368 cfs 100 YR STORM J STORAGE USED = 6361.23 ft PEAK STAGE = 816.77 ft ALLOWABLE oumow DISCHARGE = 0.408 cfs PEAK oumow DISCHARGE '" 1.389 cfs PEAK INFLOW DISCHARGE'" 5.903 cfs CASE 1 IS SIZED. ASSUMING THAT AN ORIFICE SIZE SMALLER THAN 6" 'MLL BE USED TO RESTRICT FLOW LEAVING THE DETENTION BASIN. THE DETENTION BASIN WAS SIZED USING CASE 1 CASE 2; CASE 2 IS CALCULATED FOLLO'MNG CITY CARMEL ORDINANCE STATING THAT THE MINIMUM ORIFICE SIZE ALLOWABLE IS 6". CASE 2 'MLL BE CONSTRUCTED. DESIGN BY: I~ Y.!N !~~~~!!~~,~, I~,~' I [I] TEL. (317) 293-3542 FAX: (317) 293-4737 DRAWN BY; CHECKED BY: APPROVED BY: NRJ TEB SSP DETENTION SYSTEM DETAILS MEDICAL DRIVE SHOPS SCP N ~~ ~~ M~ ~ ! ; ~ 11! ~ u !~ 5~ ~e E ~o ~ ~~ r.: 7e : ~o ~ io.:;... -?:~i~ i1;1 ~~~~ REVISIONS A~I~IU..rAU8 ~ ~ ;:;;~.... - -- Ir1I J~~Iii~. - -- STORMWA~ --.... '--- SOLUTIONS IIIC. 6011f(J UNDERGROUND DETENTION SYSTEM MEDICAL DRIVE SHOPS CARMEL, IN ... 3 2. 01/03/07 1 11/1 :;/06 NO. DATE REVISED PRElJMIHARY LAYOUT PREUNINARY LAYOUT DESCRIP1lON RlF RlF DRAWN BY APPRO'IED BY lNDE:.X: COVE"; SHEET 2 ASSEMBl.Y 3 DETAILS 4 CONSTRUCTION DE i AiLS SPECIFICATIONS FOR ALUMINIZED TYPE 2 SlEEL: SCQE.E:... THIS SPEOFlCATION COVERS THE MANUFAClURE AND INSTALLATION OF THE CORRUGAlED SlEEL PIPE (CSP) DETAILED IN THE PROJECT PLANS. MAlERIAL: THE ALUMINIZED TYPE 2 STEEL COILS SHALL CONFORM TO THE APPLICABLE REQUIREMENTS OF AASHTO 114 274 OR ASTM A 929. ~ THE CSP SHALL BE MANUFAClURED IN ACCORDANCE WITH THE APPLICABLE RECUIREMENTS OF AASHTO 114-36 OR ASTM 11.760. THE PIPE SIZES, GAUGES AND CORRUGATIONS SHALL BE AS SHOWN ON THE PROJECT PLANS. ALL FABRICATION OF THE PRODUCT SHALL OCCUR WITHIN THE UNITED STATES. 1 HANDLING & ASSEMBL~ SHALL BE IN ACCORDANCE WITH NCSPA'S (NATIONAL CORRUGATED STEEL PIPE ASSOCIAllON) RECOMMENDATIONS. INSTALLATION: SHALL BE IN ACCORDANCE WITH AASHTO STANDARD SPECIFICATIONS FOR HIGHWAY BRIDGES. SECTION 26. DIVISION II OR ASTM A 798 AND IN CONFORMANCE WITH THE PROJECT PLANS AND SPECIFICATIONS. IF THERE ARE ANY INCONSISTENCIES OR CONFLICTS THE CONTRACTOR SHOULD DISCUSS AND RESOLVE WITH THE PROJECT ENGINEER. IT IS ALWAYS THE CONTRACTOR'S RESPONSIBILITY TO FOLLOW OSHA GUIDELINES fOR SAFE PRACTICES. CONSTRUCTION LOADS: CONSTRUCTION LOADS MAY BE HIGHER THAN FINAL LOADS. fOLLOW THE MANUFAClURER'S OR NCSPA GUIDELINES. NRJ PRELIMINARY NOT APPROVED FOR FABRICATION OR CONSTRUCTION NOTE: 1. LOCATION Of ALL MANHOLES, STUBS, INlETS, OUTLETS AND OUTLET CONTROL STRUClURE5. TO BE SPECIFIED BY PROJECT ENGINEER OF RECORD PRIOR TO FABRICATION. 2. ALL RECOMMENDED REINFORCING ON THE SYSlEM WILL BE DESIGNED BY MANUFACTURER TO CONFORM TO ASTM A998 AFTER PURCHASE ORDER IS ISSUED. INSTALLAllON SPECIFlCAllON PRE-CONSTRUCllON MEETING PRIOR TO INSTALLATION OF THE DElENTION SYSlEM A PRE-CONSTRUCTION MEETING SHALL BE CONDUCTED. THOSE REQUIRED TO ArlEND ARE THE SUPPUER OF THE DETENTION SYSlEM. THE GENERAL CONTRACTOR. SUB CONTRACTORS AND THE ENGINEER. fOUNDATION /BEDDING PREPARATION PRIOR TO PLACING THE BEDDING. THE fOUNDATION MUST BE CONSTRUCTED TO A UNIFORM AND STABLE GRADE. IN THE EVENT THAT UNSUITABLE FOUNDATION MATERIALS ARE ENCOUNTERED DURING EXCAVATION. THEY SHALL BE REMOVED AND BROUGHT BACK TO THE GRADE WITH A FILL MATERIAL AS APPROVED BY THE ENGINEER. ONCE THE FOUNDATION PREPARATION IS COMPLETE, THE 4 INCHES Of A ~LL-GRADED GRANULAR MATERIAL SHALL BE PLACED AS THE BEDDING. BACKFILL THE BACKFILL SHALL BE AN AI, A2 OR A3 GRANULAR FILL PER AASHTO M-145 OR A WELL-GRADED GRANULAR FILL AS APPROVED BY THE ENGINEER (SEE INSTALLATION GUIDEUNES). THE MATERIAL SHALL BE PLACED IN B-INCH LOOSE LIFTS AND COMPACTED TO 90% AASHTO T99 STANDARD PROCTOR DENSITY. WHEN PLACING THE fiRST LIFTS Of BACKFILL IT IS IMPORTANT TO MAKE SURE THAT THE BACKFILL IS PROPERLY COMPAClED UNDER AND AROUND THE PIPE HAUNCHES. BACKFILL SHALL BE PLACED SUCH THAT THERE IS NO MORE THAN A TWO un DifFERENTIAL BETWEEN ANY OF THE PIPES AT ANY TIME DURING THE BACKFILL PROCESS. THE BACKFILL SHALL BE ADVANCED ALONG THE LENGTH OF THE DETENTION SYSlEM AT THE SAME RAlE TO AVOID DIFFERENTIAL LOADING ON THE PIPE. OTHER ALTERN AlE BACKFILL MATERIAL MAY BE ALLO~D DEPENDING ON SllE SPECIFIC CONDITIONS. REFER TO TYPICAL BACKFILL DETAIL WITHIN THIS SET OF PLANS FOR TYPE OF MAlERIAL REQUIRED. MINIMUM COVER BACKFILL SHALL BE PLACED TO THE PROPER ELEVATION OVER THE SYSTEM AS OUTLINED IN THE PLANS. MINIMUM COVER FOR CONSTRUCTION LOADING NEEDS TO BE DETlERMINED BASED ON THE TYPE OF EQUIPMENT THAT IS PLANNED FOR CONSTRUCllON. PROPER COVER FOR CONSTRUC110N EQUIPMENT SHALL BE DETlERMINED PRIOR TO THE PRE-CONSTRUCTION MEEllNG BY THE ENGINEER. CONTECH PROJECT ID # 9816 ,,,,'\\\\\\\\\\\\NIIC"'IIII'I'I' "1:3~"""""~<' ./...... ~~(;\STr"i:".<f/-%. ~.;l;'/" ~'(<\~ fQ;j! NO. \....% ~ * i 16003 i * ~ \~.. STATE OF ../ei ~" ~...!."'Ol"'t'~......;ff-.f <''''''' SION~I." 'i."'~,,"" ////1111111111111\\\\\\\\\ SCALE: HOR.: Nil. VER.: NA DA TE: 12/07/06 PROJECT NO. 06-2366 DRAWING NO. TEB BCP DETENTION SYSTEM DETAILS BY CONTECH STORMWATER SOLUTIONS MEDICAL DRIVE SHOPPS C20.0 THE UNOERSIGNED HEREBY APPROVES THE ATTACHED (4) PAGES. ~ B :> ., CUSTOMER DATE NOTES: 1> ALL ELEVATIONS, DIMENSIONS AND LOCATIONS OF RISlERS AND INLETS. SHALL BE VERIFIED BY THE ENGINEER PRIOR TO RELEASING FOR fABRICATION. 2) IN SllUATlONS WHERE A FINE-GRAINED BACKFILL MATERIAL IS USED ADJACENT TO THE PIPE SYSTEM. AND ESPECIALLY IN SITUATIONS INVOLVING HIGH GROUNDWAlER TABLES, CONSIDERATION SHOULD BE GIVEN TO THE USE OF GASKETEO PIPE JOINTS. AT THE VERY LEAST. THE PIPE JOINTS SHOULD BE WRAPPED IN A SUITABLE, NON-WOVEN GEOTEXTlLE FABRIC TO PREVENT INFILTRATION OF FINES INTO THE PIPE SYSlEM. 3) ALL FITTINGS AND REINFORCEMENT COMPLY WITH ASTM A998. 4) SYSTEM MADE fROM: 60" Ill. S"x1", ALT2. 16go.. CMP. 5) MINIMUM COVER HEIGHT FOR PIPE DESCRIBED IN NOTE #4 IS 12". 6) CONSIDERATIONS FOR CONSTRUCTION EQUIPMENT LOADS MUST BE TAKEN INTO ACCOUNT. SEE DETAIL 3, PAGE 4. 7) ALL PIPE DIMENSIONS ARE SUBJECT TO MANUFACTURERS TOLERANCES. B) ALL RISERS AND SlUBS ARE 2 %" X ~" CORRUGATION AND 16 GAGE. UNLESS OTHERWISE NOTED. 9) RISERS TO BE FJELD TRIMMED TO FINAL GRADE. 10) SYSlEM IS DESIGNED FOR H20 AND H25 LOADING. DESIGN BY: l!i~1 ~~N. !H~C!~~~D~!!~~N~!A 1~5~. -11Il TEL. (317) 293-3542 FAX: (317) 293-4737 DRAWN BY: CHECKED BY: APPROVED BY: ., ~~ ~; ~c f . j iI 111 ~ n iL ~ . ~~ ~ N~ I ~O ~ 8g~S j~~~ ~ !~ ! ~dg~ Q!i:a..c REVISIONS ~ III W " ., '" ,0 iJ " 'i =.\- 15"' INV.= 817.09' 60"' INV.= TBO STUB 18"' INV.= 814.75' 60"' INV.... 180 PRELIMINARY NOT APPROVED fOR FABRICATION OR CONSTRUCTION 4 J 2 1 NO. 01/03/07 11 /15/ll6 DATE REVISED PRWMINARY LAYOUT PRalWlNARY LAYOUT DESCRlP1lON R1F R1F DRAVItl BY APPROVED BY 150'-0" F F . o I en <"l -.e __ ft 1m' 1lI_ RW.1I'r. FA Illft _ 20F4 SCALE: HOR.: NA VER.: NA DATE: 12/07/06 PROJECT NO. 06-2366 DRAWING NO. C21110 l!i(j). V4!N. !H~C!~~~D~!!~~N~!A 1~5~. -I [I] TEL. (317) 293-3542 FAX: (317) 293-4737 F F F F F RISER 30"~ RIM= TeD 60"eIl INV.= TBD CONTECH 60'" S"Xl", 1690. AlT2, CMP. (3.0' SPACING TYPICAL) B 33' -6" H12 HUGGER BAND SEE DETAil EB . o '" 3 ASSEMBLY SCALE: ," = 20' STORAGE VOLUME PROVIDED = 12.134.40 C.F. NOTE: 1. LOCA nON Of ALL MANHOLES, STUBS, INLETS, OUTLETS AND OUTlET CONTROL STRUClURES. TO BE SPECIFIED BY PROJECT ENGINEER OF RECORD PRIOR TO fABRICATION. 2 ALL RECOMMENDED REINFORCING ON THE SYSTEM . WILL BE DESIGNED BY MANUFAcruRER TO CONFORM TO ASTM A998 AfTER PURCHASE ORDER IS ISSUED. CONTECHS ~RMWA~ --sDWTlDNS_ TBD TO BE DETERMINED "~E CEU1P.f P~.lE aRliE, !llJlIT L!XI \!iE'STct![~rn. ~K) 4lKIlii r;~ l.flOO..s;5!I.ll"l- f....~ '1.3.64 ::3001 CONTECH IDtI 98.1.8 DESIGN BY: NRJ 1Il1S PIIIHf II DWNED BY ClONIECH lJI'ORMWATER SOUlllONll, INC. ANI) _E RElIIRIIIIl UPON IIEIIUBI'. NI7f 111 E COPIED. ASSEMBLY eoD. UNDERGROUND DETENTlON SYSTEM MEDICAL DRIVE SHOPS CARMEL, IN DRAWN BY: TEB BCP DETEN110N SYSTEM DEl AILS BY CONTECH STORMWATER SOLUTIONS MEDICAL DRIVE SHOPPS ",'\\\\\\\\\\\\NIIC'IJI'II"I/11 ,'r~F>:.......".A . .$:'rV''''i..G\STE'~e'''~/-% t"...~!...~ NO. () "\(!\% ~ * 1 16003 jt;; ~ \~..... SUTE OF ./ig 1 ~ ~ ....!"'Ol"l\~..... ~- $-" .~""J'J'/ONAL"~~~""'" Ifl/III/II/IIIIII\I\\II\\\\ CHECKED BY: APPROVED BY: ... ~~ ~~ ~~ ~ ; c ; ~ i ~!i ~~ 5~ ~ E ~~ ~ REVISIONS ~~ : 80 0 n..3 ~8~~ iJiJ aG:~~ " r .. ., @ EXISTING GROUND 1.) RIGID OR FLEXIBLE PAVElAENT 2.) GRANULAR ROAD BASE 3.) NORt.lAL ROADWAY ElABANKt.lENT FILL PLACED IN 8" LIFTS AND COMPACTED TO MIN. 90:1 STANDARD DENSITY PER AASHTO T-99. 7.) 54"fIl THRU 144"fIl 3" X 1w OR 5" X 1" CSP GAGE PER AASHTO SECTION 12. 8.) STANDARD SPACING IN TABLE, SPECIAl SPACING IS SUBJECT TO APPROVAl BY CONlECH CONSTRUCTION PRODUCTS INC. SPACING CHART PER AISI AND NCSPA GUIDELINES DIAMETER REQUIRED SPACING UP TO 24" 12w 24" - 72" 1/2 PIPE DIA 72" AND UP .36" 9.) CONTECH C40 NON-WOVEN GEOlEXTlLE AS REQUIRED TO PREVENT SOIL MIGRATION. 10.) RELATIVELY LOOSE GRANULAR BEDDING. ROUGHL Y SHAPED TO fiT BOTTOM Of PIPE, 4w TO 6" IN DEPTH. <#57 OR fI8 OR OTHER SUITABLE GRANULAR) U' 12-1/8" 4.) 12" MIN. FOR DIAMETERS THROUGH 96" 18" MIN. FOR DIAMETERS FROM 102" AND UP MEASURED FROM TOP OF RIGID OR BOTT. OF FLEXIBLE PAVEMENT. 5.) SElECT GRANULAR FILL PER AASHTO M145 A-1, A-2 OR A-3 OR APPROVED EQUAl. (COMPACTED TO MIN. 90K STANDARD DENSITY PER AASHTO T-99.) 6.) 12". THRU 84". 2 2/3" X 1/2" CSP. GAGE PER AASHTO SECTION 12. 1 TYPICAL BACKFILL DETAIL 3 SCALE: N. T.S. PRELIMINARY NOT APPROVED FOR FABRICATION OR CONSTRUCTION NOlE: 1. LOCATION OF ALL MANHOLES, STUBS, INLETS, OUTLETS AND OUTLET CONTROL STRUClURES. TO BE SPECIFIED BY PROJECT ENGINEER OF RECORD PRIOR TO fABRICATION. 2. All RECOMMENDED REINFORCING ON THE SYSTEM WILL BE DESIGNED BY MANUFAClURER TO CONFORM TO ASTM A998 AflER PURCHASE ORDER IS ISSUED. O-RING GASKET H-12 HUGGER BAND .. 3 2 01/DJ/07 11/15/06 NO. OA 1E .J' O-RING GASKET BOLT, BAR &: STRAP CONNECTOR H-12 HUGGER 7/8". BAR 1/2". BOLT 1 3/8" THK. 7" WIDE FLAT NEOPRENE GASKET ~~;;~/@~'?':/.{- II j i>;c~f.?Jr'/;:,..r.m:~/.~N~(.,Pff. :: 1 III lll: III1 III I II1I I FLAT GASKET I III 1111 Ilil ~ H-12 HUGGER BAND CONNECTION DETAIL SIt:ffiI.E. BOl~ BAR &: STRAP NO GASKET GASKETED SECTION GENERAL NOlES: 1. REFER TO CONTlECH BAND SELECTION GUIDE FOR BAND WIDTH. GAGE. AND FASTENER TYPES. 2 BANDS FOR PIPE-ARCH ARE THE SAME AS FOR EQUIVALENT DIAMETER ROUND PIPE. 3. BANDS ARE NORMALLY FURNISHED AS FOLLOWS: 12" THRU 48" 1-PIECE 54" THRU 96" 2-PIECE 102" THRU 144" 3-PIECES. 4. BAND FASTlENERS ARE ATTACHED WITH SPOT WELDS. RIVETS OR HAND WELDS. ALL ALUMINUM BANDS. BOTH SINGLE AND DOUBLE BB&:S. ARE FURNISHED Vt1TH A 14 GAGE ALUMINUM BACK-UP PLATE WELDED TO THE BAND AND THE STRAP. 5. REROLlED ANNULAR END CORRUGATIONS ARE NORMAllY 2-2/3" X 1/2". DIMENSIONS ARE SUBJECT TO MANUFACTURING TOLERANCES. 6. ORDER SHALL DESIGNATE GASKET OPTION. 2 H12 HUGGER BAND DETAIL 3 SCALE: N. T.S. RlF RlF DRAWN BY APPROVED BY CONIICHS ~RMWA1ER...--.... ~SOwn()NS. lIlIS PIIINf B IIWNEIIIIT OOmat lmJIIMWAlal SOWTlONS, Ire. AND MU8T 81 RIMlNID UPON 1IElI\lBrI'. NClT 111 II COPIIII. DETAILS eo". UNDERGROUND DE1'EN11ON SYSTEM MEDICAL DRIVE SHOPS CARMB.,IN -... ..- DffAWN 11'1: A'1"F ....... UI_ .W AI - ......, 30F4 9;:25 :~r~~~':; ~~iE.= 4.t<) !'H: 1.BOO..sJ8.1l2a r,t.. 4)."3D \\\\\\\\1111111111// ,:~",\~~"N C. 1lllffffl/ . U................ ~ ~ ! ..~....~i.G\STr";.~....?\ ~~I NO. "~' ~ *! 16003 it;;; ~ , "l \.....~;::,~~~:..<!N ,,~ss ................G . /11//111111:~~~1~1\;\\\\\'\"\' SCALE: HOR.: NA VER.: NA DATE: 12/07/06 PROJECT NO. 06-2366 DRAWING NO. I;> V~;?, ~"I'!,~~~~~!1~~,~, I~p. I [I] lEL. (317) 293-3542 FAX: (317) 293-4737 DETENllON SYSTEM DETAILS BY CONTECH STORMWATER SOLUTIONS MEDICAL DRIVE SHOPPS C22.0 RE\IISEO PREUIIINAR'l' LA 'l'lXJT PRElIlIINARY LAYCllT DESCRlpnON TBD = TO BE DETlERMINED CONTECH IDt 9ti8 DESIGN BY: NRJ DRAWN BY: TEB CHECKED BY: BCP APPROVED BY: ~ ~~ ~~ ~o ~ ~ lO J ~ ~ ~ n i~ i-~ , ~o , ~~ ~ fj'~ : 80 0 ~~E~ ~~~a ~lil ~do~ i5G:t~ REVISIONS }; / " '" .. '" '" ~ ill "- " c B 15 " ~ I::J ., U I ~ () ~ o l- e w ~ ~i5 !5!F= 8gCII >-1=5i! ~CII0 <jrt...J 5<:s 11. ~~ ~ TRAFFIC RATED MANHOLE OR CATCH BASIN (BY CONTRACTOR) VlEHICULAR WEARING SURFACE (BY CONTRACTOR) j);::~~ !...L-t.....I..f\~ , , iff:) 1 RA TE FRAME INSIDE DIAMETER SHOULD EQUAL APPROXIMATELY (RISER III + 3") noes FINISHED GRADE ; / COMPACTED SUB GRADE CUT RISER TO FINAL ELEVATION IN FlELO IZE. REINFORCING BY ENGINEER CONSTRUCTION LOADS: FOR TEMPORARY CONSTRUCTION VEHICLE LOADS. AN EXTRA AMOUNT OF COMPACTED COVlER MAY BE REQUIRED OVER THE TOP OF THE PIPE. THE HEIGHT-OF-COVER SHALL MEET THE MINIMUM REQUIREMENTS SHOWN IN THE TABLE BELOW. THE USE OF HEAVY CONSTRUCTION EQUIPMENT NECESSITATES GREATER PROTECTION FOR THE PIPE THAN FINISHED GRADE COVlER MINIMUMS FOR NORMAL HIGHWAY TRAF1FIC. ACCESS LADDER (TYPICALLY BY OTHERS) SECTION IrA ASE COLLAR ISLAS (BY CONTRACTOR) USE FLEXIBLE JOINT MATERIAL TO PREVENT CONCRETE FROM CONTACTING THE RISER IN ANY WAY PIPE SPAN INCHES AXLE LOADS (kips) A-A 12-42 2.0 48-72 3.0 76-120 3.0 126-144 3.5 3.0 4.0 4.0 4.5 .IMNIMlJMCOVER MllYVARY, ~ ON L~ CONOITIONS. THE CONTRACTOR MUST PROVIDE THEADDITIONAL COval REQUIRED TO AVOID 0AMA6E TO THE PIPE. Irf1NIMlJM COVER IS MEASURED FROM THE TOP OF THE PIPE TO THE TOP OF THE IlA/lllTAINED CONSTRUCTION ROADWAY SURFACE. REINfORCED CONCRETE MANHOLE t:mIES;.. CAP DESIGNED BY ENGINEER 1. THE CONCRETE CAP SHALL BE SIZED AND DESIGNED BY OTHERS SO THAT THE LOADS ARE TRANSMITTED TO THE SOIL. AND NOT THE RISER. 2. THE CONCRETE CAP SHALL BE SIZED TO PROVIDE AN ADEQUATE BOTTOM AREA BASED ON THE ALLOWABLE BEARING CAPACITY OF THE SOIL 3. THE FLEXIBLE JOINT MATERIAL (RECYCLED VINYL OR EQ.) TO BE STIFF ENOUGH SO THAT THE CONCRETE CAN NEVER ENGAGE WITH THE RISER CORRUGATIONS. CD =~N~T~:' CAP DETAIL CONlECHC ~RMWA1lR____ ~SOwnONS. CONSTRUCTION DETAILS 60"11 UNDERGROUND DETEN110N SYSTEM MEDICAL DRIVE SHOPS CARMEL, IN <<:Au> .._ -""..... DAn! 1lI_ AIV.W FIt - ......, 40F4 2.5 :3.0 :3.5 4-.0 (]) CONSTRUCTION LOADING DIAGRAM 4 SCALE: N. T.S. PRELIMINARY NOT APPROVED FOR FABRICATION OR CONSTRUCTION NOTE: 1. LOCATION Of ALL MANHOLES, STUBS, INLETS, OUTLETS AND OUTLET CONTROL STRUCTURES. TO BE SPECIFIED BY PROJECT ENGINEER OF RECORD PRIOR TO FABRICATION. 2. ALL RECOMMENDED REINFORCING ON THE SYSTEM WILL BE DESIGNED BY MANUFACTURER TO CONFORlA TO ASTM A996 AFTER PURCHASE ORDER IS ISSUED. 1111& PRINT ISlIWIlED 1ft" 0lINTICII11lIR_ IOWIIOIII.III:. _ 1IIlIIr.. RIlURNID UPOII RIIII&I'.NGl'llI .. COI'IID. 4 3 2 01 /07 11 /15/06 DA1E REVISED PRElJIIINARV LA VllUT PRELlMlNARV LA 'I'OIIT DESCRIP1ION R1F RTF DRAYm BV APPROVED BY !lIll',';i CEU"IPf PCl!"1c CRl:;,F. SUi1'E 6.00 w(Sr CHESOt a,r" 45069 PH! 1.B::JO.;s;se.1l:U: F.-X: ~lJ.64 DETENTION SYSTEM DETAILS BY CONTECH STOAMWATER SOLlmONS MEDICAL DRIVE SHOPPS ,,\\\\\\\\\\\\IN"C'llllff'lf/ " u~~........., I:J '<, l~/~G\STr';:D.1",\ ft:rj( NO. \~% ~ * I 16003 i * = \~;ss;;~~~~:~:ll -'/fllllllll~~~~~\\;\\\\\\\\\'\ C23.0 NO. TBD TO BE DETERMINED CONnCH 1M 9818 SCALE: HOR.: NA VER.: NA DATE: 12/07/06 PROJECT NO. 06-2366 DRAWING NO. DESIGN BY: NRJ !(;). ~~N. !H~C!!~~~D~!!~~N~!A I!!~. !:J[I] TEL. (317) 293-3542 FAX: (317) 293-4737 DRAWN BY: TES CHECKED BY: Bep APPROVED BY: 11' 10' B"TYP. S"TYP. 1'-6" 1'.2" a"TYP. rr= r--- I " 1// 5' 4' lli ~ PLAN VIEW SCAlE: 114" = 1'..(}" <" I rF K-~-;'- c:l> i, $ . II I 1 I I 6' 5' + :: ~ + ilL 1\ I II ~ I 2'''' 1\ 1 II ~II I I', / II 2 II I L__~~~~~______ll_LJJ____J MANHOLE FRAMES AND COVERS ARE PROVIDED BY CONTECH STDRMWATER SOLUTIONS. RISERS, GRADE RING,OR BLOCK REQUlRED TO BRING THE MANHOLE COVERS UP TO FINISHED GRADE ARE NOT PROVIDED BY CONTECH STORMWATER SOLUTIONS 0" 8'-2" r- 12I2'-C)"TYP INLET/OUTLET I- 3'-4112"TYP INLETJOUTLET 12' 2'-6" PLAN VIEW SCAlE: 114" = 1'..(}" MANHOLE FRAMES AND COVERS ARE PROVIDED BY CONTECH STDRMWATER SOLUTIONS. RISERS, GRADE RING,OR BLOCK REQUIRED TO BRING THE MANHOLE COVERS UP TO FINISHED GRADE ARE NOT PROVIDED BY CONTECH STORMWATER SOLUTIONS 1/2" GAP TO BE FILLED WITH BUTYL MASTIC SEALANT 0" -',-"--1 6" 11/- ',\1 L~t+-t I r ~1 ,_~"/I I II I I II I I I II I I I 4'-10" II I : 1111 I I O' : I I I l___________t=~~ JJ____J ELEVATION VIEW (SWIRL CHAMBER NOT SHOWN FOR ClARITY) SCALE: 1/4" = 1'-0" This CAOa file Is for the purpose of specifying stormwater treatment equipment to be furnished by CONTECH Stormwater Solutions and may only be transferred to other documents exactly as provIded by CONTECH Stormwater Solutions. Title block Information, excluding the CONTECH Stormwater Solutions logo and the Vortechs Stormwater Treatment System designation and patent nwnber, may be deleted If necessary. Revisions to any part of this CAOO file without prior coordination with CDNTECH Stormwater Solutions shall be considered unauthorized use of proprietary information. MEDICAL DRIVE SHOPPS INDIANAPOLIS, IN STORMWATER TREATMENT SYSTEM for SYSTEM: 20 VORTECH~ MODEL 2000 U.S. PATENT No. 5,759.415 CATE: 11/16106 SCALE: AS NOTED FILE NAME: 241010020 DRAWN: JBS CHECKED: JKR SCALE: HOR.: NA VER.: NA DATE: 12/07/06 PROJECT NO. 06-2366 DRAWING NO. C24110 r 6" PROJECT No. 24101 SYSTEM INFORMATION: RIM ELEVATION =821.68' +/- OlITSIDE TOP OF TANK ELEVATION = 821.07' INLET PIPE INVERT ELEVATION" 817.15' INLET PIPE = 15" RCP OunET PIPE INVERT ELEVATION = 817.15' OUTLET PIPE" 15" RCP OUTSIDE BOTTOM OF TANK ELEVATION = 812.90' (3) 24" DIA Jt 4~ H MANHOLE FRAMES AND PERFORATED COVERS SHALL BE PROVIDED BY CONTECH STORMWATER SOLUTIONS AND SHALL BE CAMPBELL CASTING 1#1009A _~~.....-r_U" ~~fii ii liivn ~ORMWATEI!.-----.. ~SOlUTIONS_ N ~~ ii ~ ! ; ~ ~ ~ i~ 2S 6~ i~ ili! ! ~" '" ~i5 I 8~ S "0 l'l ~~~!I -:~~~ ~ i; I ~d9~ cl:&:ac contechstonnwater.com REVISIONS 112~ GAP TO BE FILLED WITH BUTYL MASTIC SEALANT O' STR. NO. 20 I!Ir V,~, !~~~~!,~!l~~~!' I!I~C. I [I] TEL. (317) 293-3542 FAX: (317) 293-4737 DETENTION SYSTEM DETAILS BY CONTECH STORMWATER SOLUTIONS MEDICAL DRIVE SHOPS ",,\\\\\\\\\\IN"ClffIIJIIII/ .. ~~P::........."I:> '<, f~~:'-;"~G\STf,;~~'1!~~ 20' NO. ,(<\~ ~ * ( 16003 )'* ~ % ~\ STATE OF '$2 %, ~~...!.NDU.t'~.....~~ f ~~"I,,~/O'NAL" ~~\\\\\"~" IUlrlllmll\\I\\ 7" ", ,- -',-~ --1 i II n I I i I II I -i II 0" II ~ I II L" I i II tj : 1 II fll r I II II I I I I II I I II 3.... I I I I II III I I 10" II I I I l_____________t=~~_ JJ____J 1ZS2'..C)"TYP INLET/OUTLET 8'.2" 7' 6" ELEVATION VIEW (SWlRL CHAMBER NOT SHOWN FOR CLARITY) SCALE: 1/4- = 1'-0" PROJECT No. 24101 SYSTEM INFORMATION: RIM ELEVATION =820.56' +/- OUTSIDE TOP OF TANK ELEVATION = 819.98' INLET PIPE INVERT ELEVATION'" 817.14' INLET PIPE = 15- RCP OUTLET PIPE INVERT ELEVATION = 817.14' OUTLET PIPE = 15" RCP OUTSIDE BOTTOM OF TANK ElEVATION = 811.81' This CACD file Is for the purpc:5eJ of specifying stormwater treatment equipment to be furnished by CONTEa-t Stormwater Solutions and may only be transferred to other documents exactly as provided by CONTECH Stormwater Solutions. Tille block Information, excuding the CONTECH Stormwster Solutions logo and the Vortechs Stormwater Treatment System designation and patent number, may be deleted If necessary. RevIsIons to any part of this CADD file without prior coordination with CONTECH Stormwater $ohJtJons shall be considered unauthorized use of proprietary Information. (2)24" OIA x 4" H MANHOLE FRAMES AND PERFORATED COVERS SHALL BE PROVIDED BY CONTECH STORMWATER SOLUTIONS AND SHAlL BE CAMPBELL CASTING 1#1009A. MEDICAL DRIVE SHOPPS INDIANAPOLIS, IN STORMWATER TREATMENT SYSTEM for SYSTEM: 16 VORTECH~ MODEL 3000 U.S. PATENT No 5.759,415 A~u..-r...u" V~~iVi i liivn ~RMWATE~ -----------SOLUTIONS. DATE; 11/16J06 SCALE: AS NOTED FILE NAME: 241010016 DRAWN: JBS contechstormwatar.com CHECKED: JKR STR. NO. 16 DESIGN BY: NRJ DRAWN BY: TEB CHECKED BY: SBP APPROVED BY: BCP L~_ ~ ~ ~ I i~ !~ is. r I 6 i ~ ~~ ~ 81 s /' l'l ! .l!i'l ~~~~ ~ j~ j ~ i~ i ~~9~ ot:o.a CAP END I POST..J in ~ ?~ti '-' ~lL - l' DIA. (TYP.) 10' I 0.177" DIA. TENSION WIRE '- :>; SSTRETCHER BAR ~ >ill"xt FLAT A 10' I ~~ )<~ 10' DIA. TRUSS RO TIES OR .. Y CLIPS l' O.C. J m ~ ~ 10' I r CORN'" OR PIIU. POST II! i · l~ G- J~ll, ~ · - ...- - "~~:,=~.. A ~ A jE.....@bIN'\""'::'.':,,308.",:g i\ !!'!!o~ "'\1 \ ~ ! ~ \ _ ,"",,",;,;;;}~;iIM'.mlm;!!mll!ll!m& \ 1 333." I! I '--;';;i;m.iijlj!ljjj;l!l!~!!il!II'ij.i!"i'i[ij.!';'!j't,,~;!;,!.~\ 1 ~Il i J -~l) \ \ \ \ \ J.. '~ \\\ \\1 I 11\\\\ ~ ~ ' /1/1 : .L.. ' 00 \ 1\\11 1\\\\1 \\\ \\\\\\11 II\\~ ':. \ 'i I I ~\\I .J)I\\\I I~~~III\\\\\III\\\\\\\I\\\\\~~~\\\\\\\\\\IIII\ ~" \ II: ) \ \\ 1\\\\1 \\ I 1\\\\ \~~~~~~I~\\\\I\\II~\\I\\I I~I~~~~~ \\ \\I\\\I\\II\\I~~~\\ \\1\\ ~\\III 1\\\ \ \ I 1 /" ~ ~~I\\ \\\\\\1\\ \\II\\~\ \\1\\\\1\\\\\\\\\\\ 1\\\ \\ \\1\\ ~I\\I\ 11\\\i I ~ \ l J ...~~.,& ~i ~ ~ ;~~mt \ \ ==== ~--~ ... ~.I -~ -=- ..... ......1...\... _===- ~a""'" .::.......... (( ~ --=:;:::::==- 11 ~ -==~ .\ \ L:=-d ~===- ~ ====-- 1 \.:)1 \ ~=== \ -\J _== ~::;::.==- ==- ~~- = 7 o q~ ~ 175.5 ~ 35.25 12.75 I !e....0l ~ CORNER ~6o:l in :il ~ ~ POST........... ;50..0 ~ Iii Q."j s.;:: .., .., ifi'" ___ END POST 4. ~_ I 15'--- l ~~ \ \ \ \ 845 840 835 830 825 820 815 810 DRAWING NO. C25.0 ~ =r 9 GAUGE CHANLlNK FABRIC CONCRETE CAP STRETCHER BAR <.;< ill"x!"f~Tv v v' '>< 7BRACE t CIA. TRUSS ROD ~m > 0.177" DIA. TENSION WIRE 'yyy =t TIES 2' O.C.] .~ NOM. WEIGHT DIA. LB/FT (IN.) END, CORNER, 2 AND PULL POSTS 3.65 NOTES: 1. HEIGHT OF FENCE = 5' 2. ALL FENCE ITEMS SHALL HAVE A BLACK VINYL COATING LINE POSTS BRACE 1 !" 1 !" 2.27 2.27 RETAINING WALL FENCE DETAIL SCALE: NONE r STEEL FENCE POST PAVEMENT\ ////////~ / EXIST. GROUND LINE: \ KEYSTONE MINI CAP UNITl /' - - (18"Wx8"Hx12"D) lL SW:E~_ -::d -- < ~~" -~~ KEYSTONE COMPAQ UNIT, ~ T (18"Wx8"Hx12"D) f--- b-T AJ,.."j LOW PERMEABILITY _ H1::{ H1::{ ~~ SOIL GEOGRID AS REQ'D. -........ f!, ~.r..~J~ljr~Q:w BY MANUFACTURER --=:::..~ ~ w ~ r: 71 3/4" CLEAN ANGULAR ~~~~l CRUSHEO STON~ ~~ ro 840 - "1~ 1f1 835 / 830 LDRAINAGE PIPE PER 825 SPECIFICATIONS (OUTlET DRAIN PIPE TO STR. NO. 23) 820 815 810 16" MIN. WALL EMBEDMENT DEPTH / 6" COMPo AGG. #53 COMPACTED TO 95% MAX. DENSITY REVISIONS SECTION A-A SCALE: NONE 9 4 STEPS <<>> 7 STEPS STEP ~ 12.75 = 51 <<>> 3.75 <<>> 5.2E ~ ",,".""0 10.t: . . ;., ;" . 0 EL 826.18, ~ ~ Ii 01 g ft' END POST 0 42.17' ,I ~ ~EL. 8"350 / 55.00' EL 822.27 -- ~ I- " EXIST. G OUND LINE ~~,..: ALUNG t "\,;t. ur WALL- ;5n. ~ rCORNER ~ EL. 833.55l I I )I fW' I I I 1\ ryp; I ~...in 'b z:!!:: . ~ ~ ~ /~g~~ER ~ I 116.88', I I EL. 8 2.93 /8 0.00' / c:: EL 821.84 EL. 820.49 64.5' ~ [EL. 821.16~ / I~ <D 27.75' 01 -C.126~~:O,) ;: 100 127.17' EL. 52".5 '''''''~ - - - - -- L. 823.89 '-EL. 8~ !.50 PROP. GROl 0 LINE "'LV'''' r "'''' -oF ~ 139.5' 200 333 39' ~L 8 '~.03 o 50 DESIGN BY: NRJ IT ~!N. !H~!!~~~D~!!~~N~!A 1~5~D [:::J [.I] TEL. (317) 293-3542 FAX: (317) 293-4737 DRAWN BY: TEB CHECKED BY: APPROVED BY: SBP BCP 308.. ~, nn_ n. EL 82 .46 244.05' I b EL. 824.00 ~ 10 N 01 .., I.... I::J 75.3 ' 300 350 150 250 , RETAINING WALL DETAILS ,,"'\'\\\\\\\\N!IC/II'II"II" .. V~-""':' '" ~ l~ ~GISTt~..~\ ~Ojr NO. ,(<'I~ ~ * \ 16003 it; i \~\ STATE or /$ j ~ ~ ....!,.,Ol...~)o.... iF ~ . ol'ol'............. ~G . "1t//IIIII/!'e~~~\\~\,\\\'I.\\'" SCALE: HOR.: 1" = 20' VER.: 1" = 2' DATE: 12/07/06 PROJECT NO. 06 2366 MEDICAL DRIVE SHOPS N ~ ;- lil~ ~ .2 ~" , ~ ~ "8 ~ S ~~ ~a k REVISIONS ~~ ~ go S /~ ~ ~5~~ ~~~~ ~ i~ u '~i4 ~~~~ GENERAL NOTES I) ENVIROPOD BY STORMWATER360. PORTlAND. OREGON (/lOO) 548-4667. 2) ENVIROPOD CAN BE USED IN DROP IN OR CURB INlET APPLICATIONS. 3) STANDARD fRAME SIZES IN STOCK, CUSTOM SIZES AVAIlABLE. 4) STANDARD BAGS RETAIN PARTICLES 1000 MICRONS OR lARGER.. BAGS ARE ALSO AVAIlABLE IN ALTERNATE MESH SIZES. 5) BOTTOM Of BAG MUST BE HIGHER THAN CROWN Of OUTLET/INlET PIPES. STANDARD UNIT ALLOWS 24', SHALLOW UNITS AVAIlABLE. 6) REPlACEABLE OIL ABSORBENT POUCHES STANDARD IN EVERY BAG. 7) ALL ENVIROPODS REQUIRE REGUlAR MAINTENANCE TO PERfORM AT SPECifiED fLOW RATES. REfER TO OPERATION AND MAINTENANCE GUIDELINES fOR MORE INFORMATION. UV RESISTANT DIVERTER PANELS . '.4 . ...: .... :'. ";{ r- ~TAlNLESS STEEL . / FRAME I Ii ~ \.U ~ I ~ - "--" PLAN FRAME AND COVER AS SPECIFIED "" PRECAST CONC. '\ ADJUSTER RING ~" CEMENT MORTAR ECCENTRIC CONE, CONCENTRIC CONE, OR PRECAST COVER iF~. 4" MIN. 't-1- 24" DIA. 0 x .I ~ BUTYL RUBBER BASE . EXTERIOR BACKPLASTER MATERIAL Y4" MINIMUM ~ ~ lHlCKNESS FROM 2" BELOW - '~ , TOP OF CONE TO CASTING, . . ~ N PER SPECS. -.. > . CD -- ::: . o .I ~ N ---- I- . CD f-- 1Il LU Q1 ~ ...."" FLOW 6" 3'-0" 6" I " .. ~ ( n ) ( ) f 4" MIN. 4" MIN. - - I-- _ STR's. NO. 17 & 18 INLETTYPEM . CD .~ . t' FLOW PLAN .. .<l'L]" Z :i .<t"ll 4 ~.JII SCREENING BAG -./. . ..' A . ..... .II .... ..d .. .- . N - --== - 4 . <1' 4 6" 3'-0" ELEVATION NTS 6" 3'-0" =--- "" =.--- ~. 6 ~ r-- -..;:: ENVIROPOD - PLAN VIEW fT\ = NoT.$. G7 4 " .[- ! - ~. '.4 :.: 41 .4 4 ""... - . ~ 6" 6" I 4 <3 . -= - CONCRETE CATCH BASIN (BY OTHERS) /'NlET GRATE .A:' " '. r ". '. ..... .~ PRECAST MANHOLE ____ ' " SECTION --.... ", _: ,: . o , 1Il<D . ~ ~ ~ >. lD o < " Q1 ~ O-RING GASKET BETWEEN ALL RISER AND CONE SECllONS, PLUS ~. EXTRUDABLE GASKET (KENT SEAL OR EQUAL) =-- - = - - -~l- . o ~ ~ -- . CD 1Il LU Q1 ~ ~ -- . ~ ~ STR. NO. 19 INLET TYPE M ,~-=- /~ 11,4, 11.6 .,4'4 :1 - --:.~ r ~- r~, r-c ,...' II '11 II II A , PLAN "" -- 4' -' - <3- .A' 6" DRAWING NO. C26.0 STAINLESS STEEL fRAME --... -< ....... STAINLESS STEEL EXTERNAL BAG fRAME - '-;. SCREENING BAG ~....... INLET PIPE ~ . ~ " . '-- UV RESISTANT . . DIVERTER PANELS ~ - BYPASS OPENING 2'-2' MIN =r 6 .. -!-. . ',4.' .. ,," "!. .... ENVIROPOD - SECTION J1f~ G) UNIT CATCH BASIN SIZES DEBR.lS CAPACITY EPDI1818 18" X 18' TO 24' X 24' I . I CU fT EPDI2424 24' X 24' TO 34' X 34' 2.8 CU fT EPDI2436 24' X 36' TO 36' X 48' 3.9 CU. fT EPDI3535 35' X 35" TO 48' X 48" 5.4 CU fT STOCK UNITS SHOWN; OTHERS AVAIlABLE. PEAK BYPASS FLOW RATE 2.6 CFS 3.9 Cf5 4.8 CfS 5.8 CfS WATER QUAUTY fLOW RATE 1.8Cf5 3.2 Cf5 4.0 CfS 5.4 Cf5 gp.!:.mwate8 ENVIROPOD - DROP-IN CATCH BASIN INSERT PLAN AND SECTION VIEWS STANDARD DETAIL www.stonnwater380.com DRAWN: MJW T CHECKED: Ba OATE:09J21105 SCALE: NONE FILE NAME: EP-C-DTL DESIGN BY: " ~!?N. !H~C!~~-:~!!~~N~~A 1~5~a r:l [I] TEL. (317) 293-3542 FAX: (317) 293-4737 DRAWN BY: CHECKED BY: APPROVED BY: 48" DIA. - .. .', 1- - ',~ "d@h J:~ '., ~'r' .... . 'i~<"= --;/;. I .' ~~"'. 1~1~... ."!..:.... '-- ..' '. ''':,:.q~'':> ~ - ::.'" LIFT HOOKS - 114 @ 6" O.C. BOlHWA YS 6" BEDDING #2 STONE MANHOLE TYPE .C" NOTES: NTS MANHOLE CONFORMS TO ASTM.C-478 JOINT CONFORMS TO ASTM C-443. ALL MANHOLES SHALL BE COATED PER CITY OF CARMEL ORDINANCES. NRJ TEB , STORM STRUCTURE DETAILS SBP MEDICAL DRIVE SHOPS BCP <t '4 Z :i k1 ~ ~ =-=- f" ~ (~ A1 '- --'~, . 11 <3"' 4 ~. . 6" 3'-0" ELEVA TlON NTS \\\\\llllllWJ//flf ~~,\\~~, ~ N C '/1/1//,,,- . (,~.:........... ~ ~ /~~G\Srrf;iJ",?\ ~a:J! NO. \~~ ~*( 16003 j*; \~\ STATE OF /15} ~ '.. I ... ~~ "1- S.....ItDrA.t\~.....G-~ ~ ~~/,II,~/ONAL"" 'i.~\,,\\\"-:" /11/11111111\\\\\\ SCALE: HOR.: AS NOTED VER.: NA DA TE: 12/07/06 PROJECT NO. 06-2366 ~ 4 ~ ,- ~- ~ h ~" ; ~ ~ ~ 1 2 . "\1 io ~ 6i!:l ~ ~~ '< I~ ~ ~(.) ~ ~~"11 ;(d~ ~ ilii l ~ :~ i ~~~~ in ~ 0 00000000 b b b 00000000 I" I I" 0 0 N N ';- 00000000 00000000 , ~ 0 11) 1" 1'-10" 1" 5" 2'-0" 5" 2'-10" 3' 6" 3 3/4"- 17'-11 1/~ ~ 3/4" ,/ , "- I "., "., ~ . ~ A ~1/;~ 1 to ~ L -- 2 1/f:.. I 0 irl I" .J N ~ 6' 2' 6" , <0 ~ , "- .::!: PLAN "., "., N J J/"~ 2 1/4" I 3'-6" 2'-10 1/2" ;:!.a 3/4" I H-2 1/4" .; . 1" 1" ~r-, ~~ ~ VI . w~ 0::::;; ~~ * 70 ...: ~ 00000000 00000000 ~ 00000000 ! 00000000 I 1'-9 'II. I ~I -lIL~ j y~ t:I U t:I ~ r:l NPk 1- ~l ~l NOTE: RING AND COVER TO BE MACHINED TO SECURE UNIFORM BEARING CASTING TYPE 2 NTS 70 A A L ~ J N 6" 22" 6" , <0 PLAN * io aJ ~ ....... "', ' . .. ",':,~l..:, .. ..-:.....: "', ,', SECTION A-A INLET TYPE A SCALE: 1"=1' DESIGN BY: I' V.,~, !N,,"C!'~~~!,~~~, I~p. I [I] TEL. (317) 293-3542 FAX: (317) 293-4737 , OJ I N ~~~~ ~~ ~~ ~~~~~~~~~~~ D~ PLAN '- 2" SECTION 0-0 C J 70 3 3/4" 3/4" VI w 0: :; , 00 SCALE: HOR.: AS NOTED VER.: NA DA TE: 12/07/06 PROJECT NO. 06-2366 DRAWING NO. C27.0 2'_6" . ~.~,:. ~ b VII ~N ~ 0 ...:.... >70 I b :~ DRAWN BY: CHECKED BY: APPROVED BY: .. " Q; E o Ci , 00 SECTION C-C CASTING TYPE 7 * IN SPECIAL CASES OR WHERE INLET PIPE IS REQ'D. DIMENSION A & B SHALL BE INCREASED OR DECREASED 12", AS DIRECTED. ** 2" PIPE DRAIN FROM BOTTOM OF CURB TO INLET. *"** 3" MIN. DIA PIPE TO BE KEPT OPEN FOR DRAINAGE OF SUBGRADE OR BASE UNTIL SURFACE IS PLACED. NRJ TEB SBP BCP NTS "- "., "., ~ "- ~A r ;; L irl I" N 6" N A J ;:!.a 3/4" I H-2 1/4" .: ;- :~ ;,. "6" . '.4. 2-#5 BARS 3'-0" LONG 4" '6". . 'p ;,. "6" . '.4. 2-#5 BARS 3' -0" LONG j.. . ~. ,,' . . p .' . \.. d. . . .. b .' '. . .b. ..... j . ~. SECTION A-A INLET TYPE F NTS REVISIONS 2 1/4" 70 2 1/4" I N 2'-6" ~ "., "., PLAN J J/'~~ 21/4" 3'-6" 2'-10 1/2" 2'-6" , OJ ,I N X ...: :::;; ."" . Use Type 7 , ~ Casting VI 'j' !:!'N J.. a::: 0 '6". ~ ~ I ., b j. .' ~. ,,' . . p . j .' ~ .. ',,: . . . . b .: . .b. ....j SECTION A-A INLET TYPE E STORM STRUCllJRE DETAILS MEDICAL DRIVE SHOPS j ~. . NTS ,:::.",\\\\\\\\\I"N"'C1I"lf"",/ ,$'f:3~"'"''''''~''' ~ _~7.~G\STe.;:',..:1/-% faf! " NO. /) \('\\ ~ *! 16003 \~ ~ ~~. STATE OF' /~ ff \, ('}..!..OIA.~...{~/ 1-~//II/~/ONAL.. ~~\\\\\,,\~ 111/111111111\1\\\\\ I" dia. anchor bolt holes on a 29 1/8" 4 reqd. G ~ ~ (; 6 ~~ ~ ~ ! ~ 'i 2 & "\1 l~ ! REVISIONS ~~ ';: ~e I IDO 2: i~~5 ~~i~ ~ i; i ~~~~ ~ ~ "" ""-- 2- Open pickholes tJ ~ -<)0 ~ 6 7/8" la' 5/32" 3/8" 1 25/32'1 k Fa .... "'- ~ M C\I ) ~ Fa N N .... ;;... M Co M "'- ~ ~ 25/32'~ .... lo I.r:l C\I C\l C\I .... ~ 0 .... 0:> C\I M C\I C\l C\I M "'- .... ". 25/32'U =;:r ':r.> ;;... ~ ..fI"AN.. 7'-0" ~IA I 24" I I . . . c====== '-' I ~. STANOARD INDOT TYPE 4 RING AND COVER 1/2" CEMENT MORTAR WEIR ELEV. 818.75 O!r'TLET CONTROL ASSEMBLY 6 INV. 818.13 O!r'TLET CONTROL ASSEMBLY 6 INV. 815.08 PRECAST CONC. MH OUTLET CONTROL STRUCTURE NOTES: OUTLET CONTROL ASSEMBLIES CONSIST OF HARCO SDR-35 PVC GASKETED SEWER FITTINGS AS FOLLOWS: CAP PART NO. 249-060 6" ELBOW PART NO. 218-0S0 S" OUTLET PIPE 7" SDR-35 PVC AN EQUAL PRODUCT MAY BE USED GENERAL NOTES CD ALL GRATES AND MANHOLE COVERS SHALL BE CAST OF DUCTILE IRON OR STEEL AND ALL FRAMES, RINGS AND CURB BOXES SHALL BE CAST OF GRAY IRON, UNLESS OTHERWISE SPECIFIED. SEE SECTION 909.05 OF THE "STANDARD SPECIFICATIONS". <ID BOLTS CONNECTING CURB CASTINGS TO CASTING FRAME SHALL BE TORQUED TO A MIN. OF 120 FT.-LBS. · GALVANIZED OR STAINLESS 3/4"-10 UNC x 3 1/2" ROUND HEAD, SQUARE SHOULDERED BOLTS WITH 1 FLAT WASHER, 1 LOCK WASHER AND 1 NUT EACH. CASTING TYPE 4 NlS I' ~!?N. !~C!~~~D~!!~~N~!A 1~5~. [:=l [I] TEL. (317) 293-3542 FAX: (317) 293-4737 DESIGN BY: DRAWN BY: CHECKED BY: APPROVED BY: NRJ CURB CASTING SECTION CASTINGS TYPE 8 & 10 8 J SECTION A-A CASllNG TYPE 10 NlS SECTION 8-8 OPENING ADDIT10NALL Y REINFORCED WITH THE EQUIVALENT OF 0.20 SQ. IN./FT. 0 90' " '" I ",. " '" I ~ CD " o .. CD MIN. STEEL AREA 0.12 SQ IN./LIN. FT. OF WIDTH IN BOTH DIRECTIONS. 3" HOLE DRILLED IN CAP 2-12" x 1/2" THREADED BOLTS EMBEDDED IN WALL t STEEL PLATE 24"xS"x1/2" \\ BOLTED TO TOP OF WALL -.. \ \ ./ r,- \ \ I -----r '\------- ~ 14-#4 x IS" (7 EA. SIDE) DRILL AND GROUT BARS INTO WAlL OF STRUCTURE 1123. CASTING ELEV. 821.04 NO CAP IN THIS OUTLET CONTROL ASSEMBLY. IF REQUIRED. A CAP WITH A I" DRILLED HOLE MAY BE INSERTED TO CONTROL OUTFLOW IN FUTURE BY OWNER. fW ~~J x 12" - V 12" - +- I-- I ~Qf) I I 3" DRILL I I HOLE I I C x I " < '1'2 I in< I "ll.. II) I :t~ I~ I ..... I I 4-#4 S-#4 x 7-#4 x IS" DRILL AND GROUT BARS INTO WALL OF STRUCTURE 1123. / I 1 ~~ co ,..,:1: S" STR. NO. 23 MANHOLE TYPE K-4. MODIFIED OUTLET CONTROL STRUCTURE NTS 7-14 x s' -S" o 12 SPA. MAX. MEDICAL DRIVE SHOPS ...,,\\\\\\\\lIIN"ClllllllfJ/ll/ ..' (,~........, ~ ..... $''...~ ~G\STE'.fe-.<f"..~ f'ofl'" NO. b \1"'\ ~ * I 16003 It; ~ \~... STATE OF /$i \. ~.s.s~~p.!.~~~.-~&~ I ;.'1/llfll/ IONAL 't.: \\\\'''''~ fJIIII'IIJlll11\\\\\\ C28.0 SCALE: HOR.: AS NOTED VER.: NA DATE: 12/07/06 PROJECT NO. 06-2366 TEB STORM STRUCTURE DETAILS DRAWING NO. SBP BCP THRUST BLOCK DIMENSIONS D A B C E F G H I J 4" 4 3/4" 1'-3" a" 11" 11" 3'-0" 2'-6" 2'-6" 6 1/2" u.. 6" 51/4" 1'-3" a" 1'-0" 1'-1" 3'-0" 2'-6" 2'-6" a" ----- a" g" 1'-a" a" 1'-1" 1'-2" 4'-0" 3'-0" 2'-9" g" 10" 11" 2'-1" 10" 1'-2" l' -3" 4'-6" 4'-0" 3'-0" 11M u.. 12" l' -0" 2'-6" 1'-0" 1'-3" l' -6" 4'_gM 4'-6" 3'-6" 1'_OM 24" 1'_3M 2'-0" 1'-10" 1'-10" 1'-10M ~ARRY CONCRETE a TO rlOUND NOTES: 1. BEARING AREA TO BE SYMETRICAL ABOUT { OF PIPE 2. POUR THRUST BLOCKS AGAINST UNDISTURBED SOIL. 3. PREVENT MASS CONCRETE FROM TOUCHING M.Jo'S. 4. PROVIDE THRUST BLOCKS AT ALL BURIED ENDS, TEES, PLUGS AND VALVES OF WATER MAINS AND FORCE MAINS. - 2/3 D (a"MIN.) E' , ~ $~ :', ~ :.:.: '~~'?':':.:~."'~~; I --- ':~~+:~~ ;;';':.:~:,F~:.:.;',.~~ lJJ D/4 ir s:.-P ~--~ A,-r /~ I"B', W ,", ~ E.LAtf I u.. ,. '" !.t;].. . .' ~ <il ".N,. N." ;:~./\.':; <( :'::::' -~-,......--,-"-- -------- '::':<':\'. .~;: <( I:\::'~. " -p \ U PLAN ~ I -----~P_- ))}) ~> -----~--- I -- ~-- u.. PLAN E.LAtf - ~ ! I g" MIN. I .. V:~IES ~;: !;; u ::.:, c~_:_i~Cjl~:'Y;-= CARRY CONCRETE V L TO SOLID GROUND ~ CARRY CONCRETE TO SOLID GROUND SECTION VERTICAL ELBOW </~ D (8~1. ..;'/At. ) DBL. ACTING STEEL WEDGE ~- L ~.: ~~~,~", ~ ~<il' C ~A~~NS I - J ~ ~', ,.~ _: --- ~:-;;~~+::t UJ ':~'~'::':~~ ..,.. '. '. . . ~ 7:'~/' .' II :', Ii ., 'to, Ii ~ II ' " II , '/1 ., If f>' 4 II , II' ,II . II . '~ QII"II' ,'V<" . <l ,,,, . CARRY CONCRETE TO SOLID GROUND SECTION HORIZONTAL BEND . o .1 ~ 'Q' ~ I v,' , !I II, 4 EMBED NO. 6 BARS-22M & PAINT WITH TWO COATS OF BITUMINOUS PAINT. ~-- . .4', C :Z 3i .! ~CARRY CONCRETE TO SOLID GROUND SECTION TEE G TRENCH SCHEDULE SIZE "W" nu".. liT" s" 2'-S" 2'-0" 4" a" 2'-S" 2'-1" 4" 10" 2'-s" 2'-3" 4" 12" 2'-9" 2'-5" 4" 15" 3'-0" 2'-a" 5" IS" 3'-3" 2'-10" 5" la" 3'-S" 3'-0" 5" 21" 3'-11" 3'-4" s" 24" 4'-3" 3'-a" s" 27" 5'-S" 3'-11" s" 30" 5'-9" 4'-4" S" 3S" S'-3" 5'-2" s" 42" 6'-11" a" 48" 7'-4" g" 54" a'-o" g" so" a'-s" g" SS" 9'-1" g" 72" g'-a" 10" 7a" 10'-3" 10" SECTION VERTICAL 1 /16 & 1 /8 BEND THRUST BLOCKS NOT TO SCALE 1 1/2M HMA SURFACE TYPE MA" ON 3" HMA INTERMEDIATE TYPE MA" ON 6" COMPo AGGR. aASE NO. 53 ON 3" COMPo AGGR. NO.2 BITUMINOUS MATERIAL FOR PRIME COAT ELEV. AS SHOWN ON GRADING PLAN 5'-0" if\, I(;ELEV' AS SHOWN ON GRADING PLAN LA.,. EXIST. CONC. 2.0" ~ -l CURB AND GUTTER \ \ 4" PCCP SIDEWAJ---~~~~] BITUMINOUS MATERIAL ~GRANULAR FILL STRAIGHT CONC. CURB ~IL VA IES VA'tE~J< 3:1 A. COMPACTED SUBGRADE OR FILL COMPACTED IN 8M LIFTS WHERE REO'D. '- FOR TACK COAT COMPACTED TO 95% OF ITS MAXIMUM DRY DENSITY TYPICAL SIDEWALK SECTION AT STREET NOT TO SCALE .. ~ OUTSIDE OF - r- aUILDING WALL--....", '-..... I r~LEV. AS SHOWN BITUMINOUS MATERIA~ (fOMBINED CONC. CURB & V ON GRADING PLAN FOR TACK COAT SIDEWALK ~ 2" .,. BITUMINOUS MATERIAL SLOPE .Jf- FOR PRIME COAT LJAVARI:S ~-4M ~CCP\IDEWALK '-1 1/2" HMA SURFACE TYPE "A" ON COMPACTED SUB GRADE OR FILL 3" HMA INTERMEDIATE TYPE "A" ON GRANULAR FILL COMPACTED IN a" L '6" COMPo AGGR. BASE NO. 53 ON COMPACTED TO 95" OF IFTS WHERE REO D. 3" COMP, AGGR. NO. 2 ITS MAXIMUM DRY DENSITY COMPACTED.J AGGREGATE ..4 ELEV. AS SHOWN ON GRADING PLAN r-- '/:;y L'l /~ ~~ ;/~ . o . - .... ~ ~/ ~ ~ 3- ~ ~- j~ ii~ Iil~ ~ 11 'ii ~ TYPICAL SIDEWALK SECTION AT BUILDING NOT TO SCALE CONCRETE ROLL CURB & GUTTER NOT TO SCALE i E ili ~ ~ ~~ ~ ~~ ,.. ;1-~ ~ "~~Il ~;~: ! i~ ~ 1m u '~t<! ~~g. cli:lI..O REVISIONS DESIGN BY: NRJ TEB , MISCELLANEOUS DETAILS DRAWING NO. IT ~~, !N=!~~~~~~,~, I!,~. I [I] TEL. (317) 293-3542 FAX: (317) 293-4737 DRAWN BY: CHECKED BY: SBP MEDICAL DRIVE SHOPS APPROVED BY: BCP 1'-0" MIN MATCH EXIST. PAVEMENT UNDISTURBED (!MATERIAL AND lHlCKNESS EXIST. PAVEMENT, SAW GROUND CUT STRAIGHT EDGE '\f- I /:PPROVED EXCAVAlED MATERIAL IN UNPAVED I AREAS UNLESS OlHERWlSE DIREClED. I - - - ~~t'0~""""'\jJ."~<<<'~~< - r- - "'-'{,"'-"j-.J / / / ,.' '.' ..... ~~ BLUE ~~ nn! , '~F ,y,,< .(.(.(.( I ' , 'v;.''< REfLECTIVE TAr;'F;~ .( .( , " y~~QR FLEXIBLE PIPE WllH SOUD OR PROFILE 1a ABOVE .(;< .(.( .( " .:: .... ;.;(WALLS, SAND SHALL BE PLACED AND HAND NEW PIPE ~~. ,> ~TAMPED IN S" LAYERS TO A MINIMUM OF ~, .(.(.(.( I"',~:"" ~1'-0" ABOVE PIPE. '0%' .(.(.(.( t: ;'" "y/", ~ nn .....'0?~ 1'-0" >>")5. .(.(.(.( ,i ", y/\ .--:---=- V, .(.(.(.( , '.;' .. V" '>/;. .(.(.(.( , ~". /, //.(.( /(, ~ //.(. % .<- '/ >" ",'l.V .. v' /'-. . . . . . . .(/ ~ :::::::- j-::::~ .>>BED PIPE IN SAND HAND TAMPED IN 6" "r I ' 0-'Y..,;...'f0-'Y..,;...~~LAYERS TO 12" ABOVE PIPE. BEDDING MATERIAL ~ .\: ~)>*>0 Y SHALL CONFORM TO INDOT 903.02, SIZE NO. 8 MW' OR MU" AT TOP OF PIPE SEE SPECIRCA liONS FOR REQUIREMENTS WllHlN S' OF PAVEMENT OR WllHlN CITY OF CARMEL, RIGHT-OF-WAY .. TABLE IS FOR ASlM D-3034, WALL THICKNESS CLASS SDR 35 FOR 6"-15" AND AS1M F-S79 WALL lHlCKNESS CLASS T-1 FOR 18"-36". FOR OlHER FLEXIBLE PIPES, MINIMUM lRENCH WlDlH "U" SHALL MEET MANUFACTURER'S REQUIREMENTS. FOR STORM SEWERS, SANITARY SEWERS, WATER/FIRE MAINS TRENCH DETAIL AND TRENCH SCHEDULE NOT TO SCALE NOTES: 1. UNDER EXlSllNG SEWERS, WATER UNES, GAS UNES, TELEPHONE CABLES AND ELEClRlCAL CONDUITS, BACKRLL WllH SAND TO lHE CENTERUNE OF lHE EXISlING UlIUTY UNE5. 2. "vr IS lHE MAXIMUM WlDlH FOR RIGID PIPES. "U" IS lHE MINIMUM WIDTH FOR FLEXIBLE PIPES IN ACCORDANCE WllH ASlM D-2321. CURB NOTES: INTEGRAL CURB WITH CONCRETE PAVEMENT AND/OR SIDEWALK SHALL BE SIMILAR SHAPE. ALL WORK ASSOCIATED WITH THE INSTALLAll0N OF THIS CURBING SHALL CONFORM TO THE LA TESE REVISION OF THE CITY OF CARMEL ~ CONCRETE CURB POLICY. (SEE SPECIFICATIONS) S" r~ONCRETE SIDEWALK J 4.5" / OR 3" TOP SOIL 11= ~ ~~n L'l .~ ~ \ ....~ //q~. d~. ~CLASS "A" Ll ~ ~ CONCRETE ~) / -:0(,........... CLASS "A"./ ~ ~ COMPACTED CONCRETE ~~ AGGREGATE Ll~ W STRAIGHT CURB DETAIL NOT TO SCALE 24" ~"\\\\\\\\\\\\N"CII'I'I'""" "f:3~...........t:),. ./_-q-r~G\STt";c1">'\ g if! NO. ',,(<\ '- ~ * i 16003 )~ ~ \~\. STATE OF /~j ':, ~.,.!.~o".~..,.. &~ ..f ~~""I"I~/O'NAL' 't~\\\\\...\.$' 11I11111111111\l\\\\ SCALE: HOR.: AS NOTED VER.: NA DATE: 12/07/06 PROJECT NO. 06-2366 C29.0 ~ &l ~ ~~ ~5 j~ lIc Ii! ~ .. ~ ~ i ![i ~ ~~ ~ g~ ~ /1;; ~ !~~~ 1l.::i!i~ ~ Ii I ~~~~ 3 16. FLARE WIDTH WITH 1. DIA. TYP(2) -if? 09 ~~ ~< ZO ~~ ~13 ..... Cl a::::> ...J ~~ -ici _0 Cl . 0 >- ....0 ~ a:: ~ o u Z ':i CORPORATION STOP MUELlER H-1S008 WATER MAIN TAPPED SERVICE ClAMP ..... z n · SERVICE ClAMP MUST BE OMITTED FOR SERVICES 1. ANO SMALLER AND DIRECT TAPS MADE TO DUCTILE IRON PIPE, ClASS 350 OR GREATER. (VERIFY WITH OWNER FOR PRESSURE ClASS DIP) .. FOR ALL 2. SERVICE LINES INSTALLED UNDER PAVEMENT INSTALL 3. HOPE SLEEVE. CONTRACTOR TO FIELD STAKE LOCATION OF END OF SERVICE LINE USING A 6' PIECE OF PVC PIPE NOTES 1. 1 1/2. AND 2. SERVICE LINES SHALL USE 'bRAP AROUND ClAMPS. SMITH BLAIR 226 OR EQUIVALENT. 2. SERVICE LINE TAP SHALL BE INSTALLED WITH A MIN. HORIZONTAL SEPARATION OF 24.. 3. 2. TAPS AND SMALLER SHALL NOT BE INSTALLED WITHIN 18. OF MECHANICAL JOINT BELLS. CONTRACTOR TO FIELD STAKE LOCATION OF END OF SERVICE LINE USING A 6' PIECE OF PVC PIPE WATER SERVICE DETAIL NOT TO SCALE . .1- r 'I 1\ .~. ~ 1 ; "'I " . ", I> b " lJ .~I "... .1 . ',I'j . -~. t> 6. TEE OR W'IE AS SPECIFIED 6. CONNECTION SCALE: HOR.: AS NOTED VER.: NA DA TE: 12/07/06 PROJECT NO. 06 2366 DRAWING NO. C30.0 96. TAPER LENGTH 1 ,," INSIDE 1. CONTRACTOR SHALL NOT BACKFILL SERVICE CONNECTION UNTIL THE CITY HAS INSPECTED AND TAKEN MEASUREMENTS, ELEVATIONS AND OTHER INFORMATION REQUIRED FOR PURPOSE OF RECORD. 2. ALL TEE AND W'IE BRANCHES IN THE MAIN SEWER LINE ROTATED MORE THAN 30' FROM HORIZONTAL SHALL BE ENCASED IN 6" MIN. OF ClASS "B" CONCRETE. 3. TEE BRANCHES MAY BE USED IN LIEU OF W'IE BRANCHES FOR CONNECTIONS TO MAIN SEWERS 18" AND LARGER, SEWER CONNECTION DETAIL NOT TO SCALE Z ':i . U) I .. NOTES SPECIFIED BEDDING MATERIAL CONFORMING TO INDOT 903.02, SIZE NO. 8 ENCASE IN CLASS "B. CONC, (6" MIN.) MAIN SEWER AS SHOWN ON PLANS 34 NOTCHES EQUALLY SPACED ON 7 S/8" DIA. NOTCH PROFlLE. 3/16. DIA. WITH 1/32" BLEND RADII WITH 7 S/8" DIA. RAISED 1/8. ABOVE CAP FROM 7 5/8" DIA. TO 7 7/8" DIA. TAPERED ON CENTER LINE ON OUTER SURFACE OF CAP (7 5/8" DIA.) FOR S/8" LENGTH TO FLUSH WITH CAP. POSI-CAP VALVE BOX ALIGNER 45158 NOT TO SCALE N 1.9" 1r ~ DEGREE OF BEND MOUNTING SURFACE . . .1 . <r . . .. . 7.S" 7.S" BIKE RACK DETAIL NOT TO SCALE PRESSURE PIPE JOINT RESTRAINT TABLE LENGTH OF PIPE TO BE RESTRAINED IN EACH DIRECTION FROM 1/4 OF BEND BASED ON 150 PSI TEST PRESSURE 6" 8" 10" 50' 14" 16" 18" 20" 24" 30" 27' 35' 42' 50' 58' 65' 73' 80' 95' 115' 7' 9' 11' 13' IS' 17' 19' 21' 24' 29' 3' 4' 5' 6' 7' 8' 9' 10' 12' 14' 2' 2' 3' 3' 4' 4' 4' 5' 6' 7' ~ Cl Z < b I ~ 90', TEES AND PLUGS 45' 22 1/2' 11 1/4' REVISIONS DESIGN BY: NRJ TEB " ~!?N. ~H~C!~~~D~!!~~N~~A 1~5~. I::J [I] TEL. (317) 293-3542 FAX: (317) 293-4737 DRAWN BY: CHECKED BY: SBP APPROVED BY: BCP MISCELLANEOUS DETAILS MEDICAL DRIVE SHOPS ~",\\\\\\\\\\IN'''Cllllfll''/I'' ~~~~""",,'I:>',< # _"l' ;qi.o\STEq'l;,-1,;-"- f ~I NO, \(<'\\ ~ * \ 16003 lr; ~ \~'\, STATE or /$ J %~ ... 'NOU.~" .... ~ ~ "'- $$ ~'".",.".".~<J' ". ~IIJIIIII~~~~~\\~\'\\\\'\'\ 4" PCCP SIDEWALK 5' 3' 5' ~~ RECEiVED . - '] G""l(j_ {, t.Ut}/ Co 822.09 TC 821.59 BC 822.53 TC 822.03 BC 822.17 TC 822.09 TC 821.59 BC CONCRETE CURB RAMP, TYPE 4 SCALE: NONE 11I1111111 I 1111111 I I I SCALE: NONE CONCRETE CURB RAMP, TYPE 3 SCALE: NONE ) CONCRETE CURB RAMP, TYPE 2 ------- :s ~ IIJ C lii n. U U n. ... .... ..... ... .... ... ... .... ~ .. ... .... .... ... ..... .. ... .... "'<. ... .... .... ..... ..... .... ... .... .... .... ... ... ... ... ... .... .... .... .... + .... ... ... ,j,-\", + '" '" .... '" '" + .... '" + 6' .... 't .... ,6' '" '" ... .... .... .... ... .... .... ... ... .... .... .... .... .... ~ .... ... .... .... ... ... .... ... .... ... ... ... ... .... ... ... .... ... ... ... ... .... ... ... .6'.... '" '" .... 6'... ..... .... + + 4" PCCP SIDEWALK ~~ffi ::lCln. Ur;j< in:I:1- in 4" PCCP SIDEWALK . .,. '" .... + .... .... .... .... .... .... .... .... in 819.02 ~ LEXIST. CONCRETE ROLL CURB AND GUTTER .... ........ '" '" .... '" .... ... '" .... + .... .... .... ... * ... .... +' ... __________----*~____>l<____>Io -------------------=========-=================~. ======== . MEDICAL DRIVE \ ...- ~ ~ ~ ;~ Ii !lC ~ 'Ii 'ii 2 5 i ~ :i ~ REVISIONS ~C I ~ ~ ~~~l!3 ~~~~ ~ Ii i ~~~~ CONCRETE CURB RAMP, TYPE 1 SCALE: NONE MEDICAL DRIVE SHOPS \,\\\\\11111111/11/ ~~"\';~.~..f. i;',,~ '" ...G_-.\STt~"",~,<, ~ :J!"/"~ ""'C ~ 2aJi NO. {\~ ~ * i 16003 ;~ ~ ~ 'l\_ STATE Of /$] '\.~"...!.NOI"~"...... ~ f <'_ Ss ..........- ~G .' "'II/IIII~e~~~\\;\\\\\\'\\' SCALE: HOR.: AS NOTED VER.: NA DA TE: 12/07/06 PROJECT NO. 06 2366 DRAWING NO. DESIGN BY: NRJ TEB CONCRETE CURB RAMP DETAILS ii' V.!, ~~~~~~~!~~~,~, I!!~. I [I] TEL. (317) 293-3542 FAX: (317) 293-4737 DRAWN BY: CHECKED BY: APPROVED BY: SBP C31.0 BCP