HomeMy WebLinkAbout600 SPECIFICATIONSCONNECTION POINTE CHRISTIAN CHURCHDIRECTORY PATH: R:\Active\T&W Corp\Connection Pointe - Carmel Property\Design\CAD\PlansFILENAME: 1200 SPECS-CARMEL.dwgDATE/USER: 2/8/2024 2:16 PM / BvaughanDevelopment ConsultantsTransportation &600 600SPECIFICATIONSEARTHWORK
1. SCOPE OF WORK
2. BENCH MARKS
3. REMOVAL OF TREES
4. HANDLING OF TOPSOIL
5. DISPOSITION OF UTILITIES
6. SITE GRADING
7. EARTH WORK BALANCE
CITY OF CARMEL RIGHT-OF-WAY PAVING POLICY
1. GENERAL
2. FOUNDATION
CITY OF CARMEL CONCRETE CURB POLICY
1. General
2. Foundation
3. Aggregate Bases
4.Concrete Curb
STORM SEWER SYSTEMS
1. SCOPE OF WORK
2. STORM SEWER CONSTRUCTION
3. APPLICATION
3. AGGREGATE BASES
4. ASPHALT PAVEMENT
5. Inspections
6. Acceptance
3. APPLICATION
”
ADDITIONAL WATER ITEMS
1. HIGH DENSITY POLYETHYLENE (HDPE) PIPE
”
“”
2. HORIZONTAL DIRECTIONAL DRILLING (HDD)
WATER LINE SYSTEM
1. SCOPE OF WORK
2. MATERIALS
3. APPLICATION
5. INSPECTIONS
”
SANITARY SEWER SYSTEMS
1. SCOPE OF WORK
2. MATERIALS