HomeMy WebLinkAboutMarathon Pipe Line LLC/ENG/City of Carmel College Ave North Reimbursement 1 REIMBURSEMENT AGREEMENT BETWEEN THE CITY OF CARMEL, INDIANA AND MARATHON PIPE LINE LLC This Reimbursement Agreement (“Agreement”) is entered into by and between the City of Carmel, Indiana, by and through its Board of Public Works and Safety (“Carmel”), and Marathon Pipe Line LLC, a Delaware limited liability company, with a mailing address of 200 East Hardin Street, Findlay, Ohio 45840 (“Marathon”), each referred to herein as a “Party” and collectively as the “Parties”. RECITALS WHEREAS, Carmel desires to expand a portion of College Avenue and perform utility improvements within said portion of College Avenue (the “Project”); and WHEREAS, Marathon owns an 8” high pressure liquid petroleum products pipeline, currently encased within a 12” casing pipe throughout the existing limits of College Avenue, which is laid under and along the right-of-way owned by Carmel at the Project’s location near the intersection of 103rd Street and College Avenue (the “Pipeline”); and WHEREAS, due to the Project, Marathon will have to remove the Pipeline’s 12” casing for safety and operational reasons (the “Work”); and WHEREAS, the Parties agree that pursuant to certain existing agreements between the Parties, Marathon is eligible for partial reimbursement for the Work. NOW THEREFORE, in consideration of the foregoing premises and the terms and conditions contained herein, the Parties agree as follows: 1. Representations. Each Party represents to the other Party that: a. Each Party has all requisite power, authority and legal right to enter into and carry out the obligations set forth in this Agreement; and b. Each Party will execute this Agreement by an authorized representative, upon which execution this Agreement will constitute a valid, legally binding obligation of the Party, enforceable by its terms, and such Party is estopped from making a claim based upon the unenforceability of this Agreement. 2. Description of the Work. Marathon shall perform the Work, as further described in Exhibit A, attached hereto and incorporated by reference, as follows: Marathon shall remove approximately 43 feet of existing 12” casing pipe throughout the DocuSign Envelope ID: 6BDF4B1B-CD17-4BCC-BA9C-91F658DA575F 2 current roadway limits of College Avenue. Additionally, Marathon’s existing signage and test station equipment will be relocated to outside of the proposed road right of way limits. 3. Work Commencement and Duration. It is anticipated that the Work shall commence in or around Summer of 2024. The Work shall be performed according to the specifications attached as Exhibit A. If necessary, the Parties shall coordinate a different commencement date and schedule. 4. Coordination between the Parties. The Parties shall each designate a representative to coordinate the performance of the Work. Carmel shall coordinate any necessary street closures and traffic control as required for the Work to be complete. 5. Estimated Cost of the Work. The Work is estimated to cost Three Hundred Eleven Thousand Dollars ($ 311,000.00) as further described in Exhibit B, attached hereto and incorporated by reference (“Estimated Cost”). Such Estimated Cost includes all the expenses associated with the Work, including, but not limited to, materials, labor, equipment cost, preliminary and construction engineering cost, administrative cost, and/or contracted services. 6. Cost Increase. An invoice that increases the total invoiced Work cost above the Estimated Cost shall not be approved until Carmel has issued another purchase order to cover Carmel’s portion of the increased cost. If the invoice causes the total invoiced Work cost to exceed the Estimated Cost by more than ten percent (10%), the invoice shall not be approved until Marathon submits a revised estimate and justification for the additional cost. Carmel shall make every effort to expedite the payment of any approved cost increase above the amount originally agreed upon. 7. Obligations of Carmel. Carmel shall have the following obligations hereunder: a. Appoint a representative to act as Project coordinator with Marathon. b. Reimbursement Payments. Subject to Paragraph 6, Carmel, upon receipt of an invoice as described below, shall reimburse Marathon fifty percent (50%) of the Estimated Cost as outlined in Paragraph 5 herein. Carmel shall pay such invoice in arrears within 45 days from the date of receipt of the invoice. Marathon may submit one invoice per calendar month for Work covered by this Agreement. c. Road Closures and Traffic Coordination. Carmel shall coordinate any necessary road closure and/or traffic controls necessary for the Work to be completed. d. Comply with all applicable rules, regulations, ordinances, statutes and law concerning the Project. DocuSign Envelope ID: 6BDF4B1B-CD17-4BCC-BA9C-91F658DA575F 3 8. Obligations of Marathon. Marathon shall have the following obligations hereunder: a. Appoint a representative to act as Project coordinator with Carmel. b. Submit invoice(s) to Carmel reflecting Carmel’s portion of the reimbursable costs for the Work. c. Marathon shall be solely responsible for everything necessary to perform the Work. Marathon is responsible for the means, methods, techniques, sequences or procedures, personnel supervision, and safety precautions and programs in connection with the performance of the Work. At all times during performance of the Work, Marathon shall have experienced supervisory personnel on site. Carmel shall not have control over or charge of, and shall not be responsible for, means, methods, techniques, sequences or procedures, or for the safety precautions and programs in connection with the performance of the Work by Marathon and shall not be responsible for any omission or failure on the part of Ma rathon to properly perform its obligations under this Agreement. d. Marathon shall at its own expense take all necessary precautions to protect the Project from any damage caused by Marathon’s operations, and watch over, care for and protect from damage or injury all of Marathon’s Work, complete or otherwise, and all of its materials, supplies, tools, machinery and equipment at or near the Project. e. Marathon agrees to comply with all federal, state and local laws, executive orders, rules, regulations and codes which may be applicable to the Work, and all relevant provisions thereof are incorporated herein by this reference. Marathon agrees to indemnify and hold harmless Carmel from any loss, damage and/or liability resulting from any such violation of such laws, orders, rules, regulations and codes. This indemnification obligation shall survive the termination of this Agreement. f. In the event of a dispute with regard to the allowable reimbursable cost or any other issue under this Agreement, Marathon shall thereafter continue to maintain the accounts and records until that dispute has been finally decided and the time for all available challenges or appeals of that decision has expired. 9. No Joint Undertaking. The Parties hereby acknowledge and agree that the purpose and intent of this Agreement is not a joint undertaking. There will be no jointly held property under this Agreement. The relationship of the Parties hereto shall be as provided for in this Agreement, and neither Marathon no r any of its officers, employees, contractors, subcontractors and agents are employees of Carmel and vice versa. The DocuSign Envelope ID: 6BDF4B1B-CD17-4BCC-BA9C-91F658DA575F 4 reimbursable expenses set forth herein shall be the full and maximum compensation and monies required of Carmel to be paid to Marathon unde r or pursuant to this Agreement. 10. Dispute Resolution. Any disputes that may arise under this Agreement shall be resolved by the Parties’ respective executive officers or their designees. Failing resolution by the executive officers or their designees, the Parties shall submit the dispute to mediation. Failing resolution of the dispute by mediation, either Party may institute a suit in a court of competent jurisdiction in Hamilton County, Indiana. 11. Effective Date. This Agreement shall be effective upon adoption and execution of this Agreement by the appropriate body of each Party. 12. Term. This Agreement shall be in effect until all allowable reimbursable costs for the Work are reimbursed by Carmel to Marathon. 13. Notice. a. With regard to routine communications concerning the Project and Work, the Parties’ respective authorized representatives may communicate directly by whatever means they deem most effective and efficient. b. Any other type of formal notice required to be provided under this Agreement shall be sent by internationally recognized overnight courier, certified mail, facsimile or other delivery method which provides confirmation of receipt and shall be directed to the persons and addresses specified below (or such ot her persons and/or addresses as any Party may indicate by giving notice to the other Party): To Carmel: To Marathon: Department of Engineering Marathon Pipe Line LLC Attention: Director Attention: Aron Velasquez City of Carmel Room X-05-018 One Civic Square 539 South Main Street Carmel, IN 46032 Findlay, OH 45840 14. Indemnification. a. Carmel hereby agrees to indemnify, defend, exculpate, and hold harmless Marathon and its officers, employees and agents, from and against any and all claims, suits and liabilities of any kind or character, including reasonable attorneys’ fees (“Claims”) which result or arise from any negligent acts or omissions of Carmel or those for whom Carmel is responsible, including its officers, employees, agents and contractors, arising from or connected with the performance of any of Carmel’s duties or responsibilit ies under this Agreement, including construction and maintenance of the Project. DocuSign Envelope ID: 6BDF4B1B-CD17-4BCC-BA9C-91F658DA575F 5 b. Marathon agrees to indemnify, defend, exculpate, and hold harmless Carmel and its respective officers, employees and agents, from and against Claims, including reasonable attorneys’ fees, which result or arise from any negligent acts or omissions of Marathon or those for whom Marathon is responsible, including its officers, employees, agents and contractors, arising from or connected with the performance of any of the duties or responsibilities of Marathon under this Agreement. 15. Modification. The Parties may alter, change or amend the terms and conditions of this Agreement only by mutual written agreement approved by the appropriate body of each Party. 16. Entire Agreement. This Agreement constitutes the entire and complete agreement between the Parties with respect to its subject matter, supersedes any prior discussions, negotiations, and understandings between them, and cannot be altered, changed or amended except as provided for in Section 15 hereof. The Parties acknowledge that neither Carmel or Marathon, nor any of their respective officers, employees, or agents have made any representations relied upon by any other Party other than the agreements contained herein. 17. Applicable Law. This Agreement shall be construed in accordance with the laws of the State of Indiana. This Agreement shall include, and incorporate by reference, any provision, covenant or condition required or provided by law or by regul ation of any state or federal regulatory or funding agency. Suit, if any, shall be brought in the State of Indiana, County of Hamilton. 18. Interpretation. The Parties hereby acknowledge and agree that is Agreement is the result of negotiations between the Parties and their respective legal counsel, and no Party shall be deemed to be the drafter of this Agreement. The language of all parts of this Agreement shall in all cases be construed as a whole, according to its fair meaning and not strictly for or against either Party. 19. Severability. If any provision of this Agreement is held to be invalid, illegal, or unenforceable by a court of competent jurisdiction, the provision shall be stricken, and all other provisions of this Agreement which can operate independently of such stricken provisions shall continue in full force and effect. 20. Counterparts. The Parties acknowledge that this Agreement may be executed in counterparts, each of which will be deemed to be an original and taken together will be considered as one document. [The remainder of this page left blank intentionally] DocuSign Envelope ID: 6BDF4B1B-CD17-4BCC-BA9C-91F658DA575F 6 IN WITNESS WHEREOF, the Parties hereto have executed this Agreement to be effective as of the last date specified below. MARATHON: MARATHON PIPE LINE LLC By: ______________________________ Aron Velasquez, Authorized Signatory ______________________________ Date — + - @ @ v A ? A C @ C w ? E ˜ ' 3 ( Approved as to Form Apr 12, 2024 DocuSign Envelope ID: 6BDF4B1B-CD17-4BCC-BA9C-91F658DA575F 7 CARMEL: CITY OF CARMEL, INDIANA by and through its Board of Public Works and Safety By: _______________________ Sue Finkam, Presiding Officer Laura Campbell, Member Alan Potasnik, Member Date: ATTEST: Jacob Quinn, Clerk Date: DocuSign Envelope ID: 6BDF4B1B-CD17-4BCC-BA9C-91F658DA575F 4/17/2024 4/17/2024 Summary report: Litera Compare for Word 11.2.0.54 Document comparison done on 3/29/2024 11:55:13 AM Style name: Default Style Intelligent Table Comparison: Active Original filename: City of Carmel -- Marathon Pipe Line LLC -- N_Landon Morris.doc Modified filename: MPL Draft 03.29.24 Carmel - Reimbursement Agreement.doc Changes: Add 79 Delete 64 Move From 0 Move To 0 Table Insert 0 Table Delete 0 Table moves to 0 Table moves from 0 Embedded Graphics (Visio, ChemDraw, Images etc.) 0 Embedded Excel 0 Format changes 0 Total Changes: 143 DocuSign Envelope ID: 6BDF4B1B-CD17-4BCC-BA9C-91F658DA575F G R AV E L W M W M W M W M W M W M W M W M W M W M W M F O M W M W M W M W M G M G M G M G M A/ C G M E M S S G M S S S S S S W W S S W V W S S W G M G M + 8 5 . 9 7 , 1 8 0 . 0 ' A ir C o n d it io n in g U n it + 4 3 . 5 7 , 1 5 9 . 1 ' A ir C o n d it io n in g U n it + 7 4 . 2 4 , 1 6 0 . 9 ' A ir C o n d it io n in g U n it + 4 5 . 1 4 , 1 4 5 . 2 ' A ir C o n d it io n in g U n it + 6 9 . 4 4 , 5 2 . 9 ' B e n c h m a r k + 6 0 . 0 5 , - 4 1 . 3 ' B e n c h m a r k + 8 6 . 4 8 , 1 2 9 . 2 ' M e t e r - E le c . + 7 6 . 1 5 , 1 6 7 . 8 ' M e t e r - E le c . + 6 8 . 9 9 , 2 5 . 3 ' F ib e r o p t ic m a r k e r + 8 7 . 9 7 , 1 6 9 . 6 ' M e t e r - g a s + 2 7 . 7 0 , 1 1 3 . 2 ' M e t e r - g a s + 7 4 . 1 0 , 1 1 2 . 7 ' M e t e r - g a s + 8 5 . 5 3 , 1 1 3 . 4 ' M e t e r - g a s + 6 1 . 7 0 , 1 0 3 . 7 ' M e t e r - g a s + 4 8 . 5 6 , 1 4 4 . 9 ' M e t e r - g a s + 8 7 . 4 4 , - 1 1 1 . 9 ' M e t e r - g a s + 8 1 . 7 4 , 4 8 . 2 ' G r o u n d li g h t + 6 9 . 2 3 , 4 2 . 3 ' P o le - g u y o r s t u b + 6 7 . 5 8 , 4 2 . 2 ' P o le - g u y o r s t u b + 0 6 . 5 0 , - 4 1 . 4 ' P o le - g u y o r s t u b + 8 4 . 6 8 , - 4 3 . 6 ' F ir e h y d r a n t + 6 5 . 6 9 , 2 3 . 4 ' F ir e h y d r a n t + 1 4 . 6 4 , - 2 5 . 2 ' F ir e h y d r a n t + 9 5 . 8 1 , 2 4 . 7 ' F ir e h y d r a n t + 7 4 . 5 4 , 4 2 . 9 ' F ir e h y d r a n t + 9 1 . 7 5 , 6 7 . 0 ' P o le - li g h t + 2 9 . 7 1 , 1 7 . 5 ' M a i l b o x ( s in g le b o x ) + 8 7 . 3 4 , 1 8 . 6 ' M a il b o x ( s in g le b o x ) + 0 2 . 0 3 , 1 9 . 3 ' M a il b o x ( s in g le b o x ) + 8 6 . 0 5 , 1 7 . 9 ' M a il b o x ( s in g le b o x ) + 7 3 . 3 8 , 1 8 . 5 ' M a il b o x ( s in g le b o x ) + 5 9 . 8 0 , 1 8 . 1 ' M a il b o x ( s in g le b o x ) + 3 8 . 3 0 , 1 8 . 9 ' M a il b o x ( s in g le b o x ) + 3 4 . 6 9 , 1 8 . 8 ' M a il b o x ( s in g le b o x ) + 2 1 . 8 3 , 1 8 . 3 ' M a il b o x ( s in g le b o x ) + 6 0 . 4 9 , 7 9 . 1 ' M a il b o x ( s in g le b o x ) + 8 4 . 6 6 , - 1 3 . 2 ' M a il b o x ( s in g le b o x ) + 5 1 . 7 2 , - 7 2 . 9 ' M a il b o x ( s in g le b o x ) + 5 2 . 3 3 , - 1 3 . 2 ' M a il b o x ( s in g le b o x ) + 2 4 . 4 8 , - 1 2 . 9 ' M a il b o x ( s in g le b o x ) + 6 3 . 3 7 , - 1 2 . 9 ' M a il b o x ( s in g le b o x ) + 7 3 . 3 8 , - 1 2 . 4 ' M a il b o x ( s in g le b o x ) + 5 2 . 5 0 , - 1 2 . 4 ' M a il b o x ( s in g le b o x ) + 7 8 . 3 2 , - 1 2 . 4 ' M a il b o x ( s in g le b o x ) + 7 3 . 5 0 , 2 7 . 8 ' M a n h o le - s e w e r + 2 1 . 8 2 , - 4 1 . 3 ' P o le - p o w e r + 6 8 . 1 1 , 5 3 . 0 ' P o le - p o w e r + 6 7 . 6 2 , 1 6 9 . 8 ' P o le - p o w e r + 1 2 . 3 5 , - 4 0 . 8 ' P o le - p o w e r + 1 0 . 4 2 , - 4 0 . 9 ' P o le - p o w e r + 1 4 . 7 6 , - 4 0 . 9 ' P o le - p o w e r + 6 1 . 2 3 , - 4 1 . 1 ' P o le - p o w e r + 6 4 . 3 6 , 1 6 5 . 0 ' P o le - p o w e r + 7 8 . 8 5 , 1 6 4 . 2 ' P o le - p o w e r + 4 1 . 2 9 , - 2 5 . 3 ' R e b a r + 6 5 . 8 8 , - 2 6 . 8 ' R e b a r + 6 4 . 7 6 , 2 7 . 8 ' S ig n - s in g le p o s t + 2 1 . 3 9 , 3 9 . 8 ' S ig n - s in g le p o s t + 0 3 . 7 6 , 2 9 . 3 ' S ig n - s in g le p o s t + 2 3 . 3 1 , 7 0 . 7 ' S ig n - s in g le p o s t + 2 3 . 6 9 , 1 4 4 . 8 ' S ig n - s in g le p o s t + 6 1 . 9 0 , 3 9 . 8 ' S ig n - s in g le p o s t + 4 6 . 0 2 , - 3 9 . 3 ' S ig n - s in g l e p o s t + 4 8 . 6 2 , - 4 2 . 4 ' S ig n - s in g l e p o s t + 5 2 . 4 5 , - 7 1 . 7 ' S ig n - s in g l e p o s t + 8 0 . 2 6 , - 6 0 . 7 ' S ig n - s in g l e p o s t + 5 2 . 3 7 , - 4 4 . 7 ' S ig n - s in g le p o s t + 2 0 . 0 6 , - 3 8 . 6 ' S ig n - s in g le p o s t + 8 9 . 6 8 , 3 8 . 4 ' S ig n - d b l p o s t + 9 5 . 6 9 , 3 8 . 3 ' S ig n - d b l p o s t + 8 0 . 0 2 , - 1 8 . 6 ' V a lv e b o x + 8 4 . 7 1 , - 1 8 . 4 ' V a lv e b o x + 8 2 . 3 4 , - 4 4 . 1 ' V a lv e b o x + 8 0 . 9 1 , - 4 6 . 7 ' V a lv e b o x + 6 5 . 9 0 , 2 1 . 3 ' V a lv e b o x + 1 4 . 4 4 , - 2 0 . 1 ' V a lv e b o x + 7 1 . 4 5 , 3 7 . 3 ' V a lv e b o x + 6 8 . 7 8 , 3 6 . 9 ' V a lv e b o x + 6 9 . 7 1 , 3 9 . 7 ' V a lv e b o x + 7 1 . 9 1 , 4 2 . 5 ' V a lv e b o x + 2 7 . 4 7 , 4 5 . 7 ' M e t e r - w a t e r + 2 8 . 6 9 , - 4 6 . 3 ' M e t e r - w a t e r + 1 2 . 1 3 , 5 0 . 7 ' M e t e r - w a t e r + 1 8 . 4 8 , 5 3 . 3 ' M e t e r - w a t e r + 8 8 . 2 3 , 4 7 . 2 ' M e t e r - w a t e r + 9 1 . 1 0 , - 3 2 . 9 ' M e t e r - w a t e r + 8 0 . 8 6 , 4 6 . 6 ' M e t e r - w a t e r + 7 0 . 0 1 , - 3 6 . 3 ' M e t e r - w a t e r + 8 4 . 9 4 , 5 0 . 7 ' M e t e r - w a t e r + 4 9 . 4 1 , - 3 4 . 8 ' M e t e r - w a t e r + 6 5 . 1 3 , 5 1 . 2 ' M e t e r - w a t e r + 7 2 . 2 4 , - 3 3 . 5 ' M e t e r - w a t e r + 4 2 . 1 1 , 4 7 . 4 ' M e t e r - w a t e r + 8 2 . 4 7 , 4 6 . 8 ' M e t e r - w a t e r + 2 3 . 7 5 , - 3 3 . 4 ' M e t e r - w a t e r + 3 4 . 4 9 , 4 9 . 3 ' S t u m p + 1 9 . 9 8 , 2 7 . 1 ' T r e e c o n if e r o u s + 2 2 . 5 3 , 3 1 . 6 ' T r e e d e c i d u o u s + 7 6 . 2 4 , 3 4 . 9 ' T r e e d e c i d u o u s + 8 0 . 4 5 , 4 0 . 7 ' T r e e d e c i d u o u s + 3 8 . 8 9 , 3 2 . 9 ' T r e e d e c i d u o u s + 1 2 . 7 7 , 3 8 . 5 ' T r e e d e c i d u o u s + 7 8 . 5 7 , 4 0 . 7 ' T r e e d e c i d u o u s + 4 6 . 9 9 , 3 7 . 0 ' T r e e d e c i d u o u s + 7 1 . 4 0 , 4 3 . 5 ' T r e e d e c i d u o u s + 9 4 . 5 8 , 3 1 . 5 ' T r e e d e c i d u o u s + 0 7 . 5 7 , 2 9 . 6 ' T r e e d e c i d u o u s + 2 9 . 8 8 , 3 2 . 1 ' T r e e d e c i d u o u s + 2 0 . 5 4 , - 3 2 . 8 ' T r e e d e c i d u o u s + 4 3 . 0 4 , - 4 2 . 6 ' T r e e d e c i d u o u s + 0 0 . 8 0 , - 4 4 . 6 ' T r e e d e c i d u o u s + 8 8 . 2 5 , - 4 1 . 5 ' T r e e d e c i d u o u s + 7 2 . 5 6 , - 4 2 . 6 ' T r e e d e c i d u o u s + 4 6 . 2 4 , - 4 4 . 1 ' T r e e d e c i d u o u s + 6 7 . 0 3 , - 3 9 . 0 ' T r e e d e c i d u o u s + 8 4 . 5 2 , - 4 8 . 5 ' T r e e d e c i d u o u s C O N S T R A R E A R B - 0 R B - 0 B M B M M B PZZZ P ZZZ P ZZ Z P Z ZZ P ZZZ M B P Z ZZ PZZ Z M U L C H M U LC H M U LC H M U LC H M U LC H M B M B M U LC H M B M U LC H M U LC H M B M B M U LC H M B M U LC H M U LC H M U LC H M U LC H P Z ZZ P Z ZZ PZZZ M B M B G R AV E L C O N C R E T E AS P H AL T G R A V E L AS P H ALT C O N C R E T E C O N C R E T E G R A VE L AS P H ALT C O N C R E T E C O N C R E T E C O N C R E T E G R A VE L C O N C R E T E C O N C R E T E A S P H ALT G R AVE L AS P H A LT AS P H ALT A S P H ALT AS P H ALT A S P H ALT C O N C R E T E AS P H ALT AS P H AL T G R AV E L G R AV E L AS P H ALT C O N C R E T E AS P H AL T G R A V E L G R A V E L A S P H ALT G R A VE L C O N C R E T E C O N C R E T E C O N C R E T E A S P H A LT G R AV E L A S P H A LT C O N C R E T E A S P H A LT A S P H A LT C O N C R E T E C O N C R E T E C O N C R E T E C O N C R E T E AS P H A LT A S P H ALT A S P H A LT C O N C R E T E G R A V E L AS P H A LT G R A S S G R A S S S T O N E S T O N E G R AS S G R A V E L C O N C R E T E S T O N E G R A VE L G R AS S G R AV E L G R A VE L G R AV E L M U LC H M U L C H M U LC H G R A S S S T O N E G R A S S G R A VE L M U LC H B O U L D E R B O U LD E R B O U LD E R B O U LD E R B O U LD E R M U LC H B O U LD E R B O U LD E R G R AS S M U LC H M U LC H G R A S S M U LC H M B M B M B M B M B G R A VE L M B G R AV E L M B G R A VE L M B C B C B C B C B C B C B C B C B C B C B 1" = 10' 1" = 30' PLAN AND PROFILE MDH AED MDH JSS 170 810 820 830 840 850 840 810 820 830 850 860860 870 870 M A T C H L I N E S T A . 1 2 7 + 0 0 " P R - A - 2 " M A T C H L I N E S T A . 1 3 6 + 0 0 " P R - A - 2 " COLLEGE AVE - LINE "PR-A-2" NO. 20-ENG-04 880 880 ELEV. = 842.889 STA. 135+60.05 "A", 41.34' LT. TBM #6 - RAILROAD SPIKE IN THE E. FACE OF UTILITY POLE #048-814 ELEV. = 838.154 STA. 128+69.44 "A", 52.94' RT. TBM #5 - RAILROAD SPIKE IN THE W. FACE OF UTILITY POLE #181-382 N/A N/A N/A N/A N-44 FOR APPROVAL RECOMMENDED DESIGN ENGINEER DATE DESIGNED: CHECKED: DRAWN: CHECKED: SURVEY BOOK CONTRACT DESIGNATION SHEETS of PROJECT BRIDGE FILEHORIZONTAL SCALE VERTICAL SCALE T I M E P L O T T E D : D A T E P L O T T E D : M O D E L N A M E : P A T H A N D F I L E N A M E : V : \ P r o j e c t s \ A N Y \ K 6 \ 0 6 7 0 3 1 . 0 0 0 \ 0 9 _ D e s ig n \ D r a w i n g s \ H w y \ _ M S T N \ S h e e t D r a w i n g s \ S h t P la n P r o f ile _ 3 0 _ 0 4 . d g n D e f a u lt 4 / 3 / 2 0 2 4 1 1 : 2 0 : 4 2 A M CITY OF CARMEL P . I . = 1 2 8 + 7 0 . 1 8 21 22 34 34 35 35 36 3633 37 37 38 38 39 39 40 40 91 23 24 25 26 27 28 29 46 COLLEGE AVE CURVE DATA HAMILTON CO. CLAY TWP. SEC. 11, T17N, R3E HAMILTON CO. CLAY TWP. SEC. 12, T17N, R3E NO CURVE RUN PI Sta. = 128+70.18 "PR-A-2" LINE "PR-A-2" Line "PR-A-2" to be constructed. All stationing described from Line "PR-A-2" unless noted. All topo described from Line "A". NOTE: 1 2 8 + 0 0 1 2 9 + 0 0 1 3 0 + 0 0 1 3 1 + 0 0 1 3 2 + 0 0 1 3 3 + 0 0 1 3 4 + 0 0 1 3 5 + 0 0 LINE "A" App. Ex R/W App. Ex R/W App. Ex R/W 60' Lt. +Ex. R/W 59' Lt. +Ex. R/W 63' Rt. +73 "A" Str. No. 219 Str. No. 218A Str. No. 220C Str. No. 222 223 Str. No. Str. No. 236 Str. No. 241 Str. No. 239 Str. No. 244 Str. No. 243 Str. No. 245 Str. No. 246 Str. No. 250 Str. No. 235 Str. No. 235A Str. No. 234 Str. No. 233 Str. No. 232Str. No. 232A Str. No. 229 231A Str. No. Str. No. 228A Str. No. 220 220B Str. No. Str. No. EX616Str. No. EX615 Str. No. EX617 Str. No. EX619 Str. No. EX620 Str. No. EX621 238 Str. No. Const. Limits Const. Limits Const. Limits Const. Limits Const. Limits Const. Limits L=22'-0" W=16'-00" Drive Req'd. +39.14 Class II Mod. L=34'-0" W=20'-00" Drive Req'd. +91.49 Class II Mod. L=34'-0" W=20'-00" Drive Req'd. +91.66 Class II Mod. L=20'-0" W=30'-0" Drive Req'd. +54.35 Class II Mod. L=27'-0" W=20'-00" Drive Req'd. +15.76 Class II Mod. L=31'-0" W=12'-00" Drive Req'd. +25.43 Class II Mod. L=46'-00" W=12'-00" Drive Req'd. +00.79 Class II Mod. L=32'-00" W=18'-00" Drive Req'd. +91.11 Class II Mod. L=24'-0" W=18'-00" Drive Req'd. +40.82 Class II Mod. L=35'-0" W=12'-00" Drive Req'd. +62.45 Class II Mod. L=35'-0" W=18'-00" Drive Req'd. +00.97 Class II Mod. L=48'-0" W=12'-00" Drive Req'd. +49.54 Class II Mod. Str. No. 233A Str. No. 238A Str. No. 244A Str. No. 233B 248A Str. No. 248 Str. No. Str. No. EX621A Str. No. 218 228 Str. No. 229A Str. No. Str. No. 231 E . 1 0 2 n d S t r e e t P.O.I. 10+00.00 "E. 102nd STREET" P.O.I. 128+67.65 "PR-A-2"= E . 1 0 3 r d S t r e e t E . 1 0 3 r d S t r e e t P.O.I. 10+00.00 "E. 103rd STREET EAST" P.O.I. 135+43.92 "PR-A-2"= P.O.I. 10+00.00 "E. 103rd STREET WEST" P.O.I. 135+37.56 "PR-A-2"= L=38'-0" W=18'-00" Drive Req'd. Class II Mod. +47.52 Str. No. 227A Str. No. 227 Str. No. 228B Ex. R/W +Lot L. Str. No. EX617A Str. No. EX618 Str. No. 233C 252 Str. No. 226A Str. No. 226 Str. No. EX622A Str. No. 255 Str. No. EX623 Str. No. 50' R/W P/L +P/L 50' App. P/L 75' Rt. +P/L P/L +P/L 59' R/W R / W 59' Lt. +P/L Ex. R/W +P/L 75' Rt. +P/L 80' Rt. +P/L 80' Rt. +P/L 63' Rt. +P/L 63' Rt. +Ex. R/W 59' R/W R / W 59' Lt. +Lot L. 59' Lt. +Ex. R/W 55' Lt. +Ex. R/W 86' Rt. +Ex. R/W 86' Rt. +73 "A" Temp. R/WTemp. R/W Temp. R/WTemp. R/W Temp. R/W Temp. R/W Temp. R/W Temp. R/W Temp. R/W Str. No. 253A EX622 Str. No. LEGEND - Existing HMA Pavement, Sidewalk, Pavers, Curbing and Median to be Removed PVI Sta. 129+40.00 Elev. = 837.23 LP Sta. 129+56.04 El. 837.40 PVI Sta. 132+70.00 Elev. = 838.46 -0.57%+0.37% +1.19% VC = 150.00'VC = 200.00' 42" Pipe Existing Existing 42" PipeExisting 42" PipeExisting 42" PipeExisting 42" PipeExisting 42" Pipe Inv. 833.50(W) Inv. 830.00(S) Inv. 830.00(N) Str. 250 Inv. 835.30(W) Inv. 829.80(S) Inv. 829.80(N) Str. 244 Inv. 834.09(S) Inv. 834.12(W) Inv. 829.67(S) Inv. 829.67(N) Str. 241 Inv. 833.01(W) Inv. 829.45(S) Inv. 829.55(N) Str. 238 Inv. 833.50(S) Inv. 829.30(S) Inv. 829.30(N) Str. 226 Inv. 835.10(SE) Inv. 829.50(W) Inv. 833.60(E) Inv. 828.51(S) Inv. 828.51(N) Str. 218 Inv. 833.83(W) Inv. 830.19(S) Inv. 830.19(N) Str. EX622A Inv. 837.10(E) Inv. 830.37(S) Inv. 830.37(N) Str. EX623 Existing 42" PipeExisting 42" PipeExisting 42" Pipe 42" Pipe Existing Inv. 829.75(E) Inv. 828.54(S) Inv. 828.54(N) Str. EX615 Inv. 828.00(S) Inv. 828.29(N) Str. EX616 Inv. 833.58(W) Inv. 830.08(S) Inv. 830.08(N) Str. 253A Inv. 835.40(W) Inv. 829.95 (S) Inv. 829.95(N) Str. 248 (Plotted 40' above Datum) Proposed Storm Sewer, Lt Str. 223 Inv. 829.84(E) Inv. 829.88(W) Inv. 833.80(N) Str. 222 1.18% 43' of 12" Pipe @ 32' of 12" Pipe @ -0.66% (Plotted 40' above Datum) Proposed Storm Sewer, Lt Inv. 836.00 Str. 245 Inv. 835.80 (S & E) Str. 246 88' of 12" Pipe @ 0.40%43' of 15" Pipe @ 0.56%67' of 18" Pipe @ 1.05%80' of 18" Pipe @ 0.30% 87' of 18" Pipe @ 0.50%135' of 12" Pipe @ 0.60%139' of 12" Pipe @ 0.68% Inv. 834.90(S) Str. 220 Inv. 832.20(S) Str. 228 Inv. 831.71(S) Inv. 833.74(E) Inv. 831.46(N) Str. 227 Inv. 834.23(E) Inv. 832.16(N) Str. 229 Inv. 833.57(N) Str. 231 Inv. 834.60(E) Inv. 834.05(N) Str. 232 Inv. 836.36(E) Inv. 835.25(N) Str. 234 Inv. 837.76(E) Inv. 836.30(N) Str. 235 127+00 128+00 129+00 130+00 131+00 132+00 133+00 134+00 135+00 136+00 8 3 8 . 5 9 8 3 8 . 3 2 8 3 8 . 0 3 8 3 7 . 7 5 8 3 7 . 5 0 8 3 7 . 4 0 8 3 7 . 4 6 8 3 7 . 6 4 8 3 7 . 8 3 8 3 8 . 0 1 8 3 8 . 2 2 8 3 8 . 5 1 8 3 8 . 9 1 8 3 9 . 4 2 8 4 0 . 0 1 8 4 0 . 6 0 8 4 1 . 2 0 8 4 1 . 7 0 8 4 2 . 0 3 8 3 8 . 9 8 3 8 . 6 8 3 8 . 3 8 3 7 . 9 8 3 7 . 7 8 3 7 . 5 8 3 7 . 7 8 3 7 . 8 8 3 8 . 0 8 3 8 . 2 8 3 8 . 4 8 3 8 . 7 8 3 9 . 2 8 3 9 . 6 8 4 0 . 2 8 4 0 . 9 8 4 1 . 5 8 4 1 . 9 8 4 2 . 3 04/02/2024: Revised Proposed Storm Drainage NO T F O R CO N S T R U C T I O N Exhibit A Approximate Limits of Marathon's existing 12" casing to be removed. Marathon Pipe Line's 8" High Pressure Petroleum Pipeline DocuSign Envelope ID: 6BDF4B1B-CD17-4BCC-BA9C-91F658DA575F Project Leader:177302 State:Indiana Date:10/17/2023 Budget Type:Level 1 Budget Year:2023 SAP Company Code:5404 0 Method:Fixed % MPMP Phase:%:10% Revised 01/03/2023 Project Description: Description SAP Code of Account Bud.Year # Req'd UOM Cost Total Cost % Cont. Civil and Piping $0 10% Mob/Demob 300 Piping Expense 2023 1 LS $24,000 $24,000 10% Labor Allowance 300 Piping Expense 2023 1 LS $94,900 $94,900 10% Equipment and Rental Allowance 300 Piping Expense 2023 1 LS $18,771 $18,771 10% Materials and Backfill Allowance 300 Piping Expense 2023 1 LS $24,012 $24,012 10% Shoring Allowance 300 Piping Expense 2023 1 LS $22,000 $22,000 10% Traffic Control 300 Piping Expense 2023 1 LS $3,300 $3,300 10% Power Pole Support 300 Piping Expense 2023 1 LS $3,300 $3,300 10% Asb Abate/Coat Rem (if needed)300 Piping Expense 2023 1 LS $15,100 $15,100 10% Recoat (if needed)300 Piping Expense 2023 1 LS $18,000 $18,000 10% Rock Shield Allowance 300 Piping Expense 2023 1 LS $1,100 $1,100 10% $0 10% Inspector 036 Site Facilitator/Inspector Expense 2023 12 Days $1,100 $13,200 10% $0 10% Property Damages 044 Land Owner Settlements Expense 2023 1 LS $5,000 $5,000 10% $0 10% Permit 061 Permits Expense 2023 1 LS $50 $50 10% $0 10% Sub-Total $242,733 10.0% 14% Description SAP Code of Account Bud.Year # Req'd UOM Cost Total Cost S&T % Cont.EFC Test Station Materials 100 Equipment & Setting Expense 2023 1 EA $250 $250 $35 10%$314 $0 $0 10%$0 Sub-Total $250 $35 10.0%$314 Bud.Year # Req'd UOM Cost Total Cost % Cont. Expense 2023 0 lot $0 $0 0% Expense 2023 20 day $1,720 $34,400 0% Expense 2023 0 day $1,900 $0 10% Expense 2023 0 day $1,810 $0 10% Expense 2023 0 day $1,290 $0 10% Expense 2023 0 day $1,900 $0 10% Expense 2023 0 lot $0 $0 10% Sub-Total $34,400 0.0% Bud.Year # Req'd UOM Cost Total Cost % Cont. Expense 2023 10 day $750 $7,500 10% Expense 2023 1 day $800 $800 10% Operations Tech./Permit Writer Expense 2023 0 hr $75 $0 10% Expense 2023 0 hr $80 $0 10% Expense 2023 0 day $800 $0 10% Sub-Total $8,300 10.0% Estimate Sub-Total $285,718 8.8% Total Estimated Target Cost $34,400 $34,400 $0 $0 EFC Business Partner L&B Business Partner L&B Operations Tech./Permit Writer Mechanical/E&I Tech. AWARE Observer (if required by Area) Travel Expenses (Hotel, Flights, Car Rental, Meals…) 2 days of hydro-excavation for potholing, then 100% mechanical excavation. EFC All excavations will be backfilled with sand and then flow fill in road ways. Spot touch-up with removal of existing coating and recoat using liquid epoxy. Pipe may need recoated. $267,006 Shipping & Tax % $0 $0 $0 $9,130 $310,850 $311,000 Owner Supplied Materials $0 $0 $0 $55 L3S L&B L3S L&B (rate includes Supervisor) (Design and Inspection to be entered in Service Contracts) Current Costs (from Nvision, include prior years) Service Contracts Owner Supplied Materials L3S L&B RIO 8" -- College Avenue -- Casing Extension Service Contracts Engineer I (Except AK & CA) Adv. Sr. Const. Spec. (Except AK & CA) $0 $0 Engineer II (Except AK & CA) David Sehlhorst Construction duration is expected to be ten (10) total working days. Monday - Saturday, 10 hour days. Co-op (Except AK & CA) HES Professional (Except AK & CA) $0 Estimate Basis Work Days/Hours, Construction Schedule, Downtimes Other Assumptions, Allowances, Exclusions Assumes trucking and INDOT permits. Depth of cover is based on top of casing 40" deep on east side, and 69" deep on west side of road. Project could swich to become a casing extension. Scope of work includes removing 43' of casing on the RIO 8" line at the College Ave Intersection. Assumes sump to dewater trench. 24 dewatering/wellpoints are not included. Water will be discharged on ground through a filter bag. Rock excavation is not included. PROJECT ESTIMATE Definition Expense Project ID: Project Level:Contingency RIO 8" Products Project Type:Pipeline Replacement (Casing) Restoration only includes backfilling. Sidewalk repair and seed/grass not included due to other construction activities. Setting jersey wall to protect excavation and work areas from traffic included. Conventional traffic control (signs, cones, barrels, etc) included. Location/System: (see DSP for high level Scope of Work) One day for cathodic protection test station work by Marathon E&I Tech. Risks, Opportunities (or see Risk Register, if completed) $8,250 $880 Business Partner L&B Mechanical/E&I Tech. EFC $0 $24,200 $3,630 $26,400 $104,390 $3,630 $0 $20,648 $26,413 $16,610 $19,800 $1,210 $0 $5,500 $14,520 Exhibit BDocuSign Envelope ID: 6BDF4B1B-CD17-4BCC-BA9C-91F658DA575F