HomeMy WebLinkAboutApplication_ADLS_signed. .- ,.— .... y K . — ✓ . . ,..
cw. carmel. in.gov/PublicAccess/template/Login. aspx.
ADLS / ADLS Amendment Application
(ARCHITECTURE, DESIGN, LIGHTING/LANDSCAPING, and SIGNAGE)
ADLS Fee: $1,281.25 (plus $165.25/acre when not accompanied by a Development Plan App.)
ADLS Amend Fees: Sign only: $129.25, plus $31/sign
Building/Site: $849.50, plus $78.50/acre
(Fees are due after the docket number is assigned.)
Date: 04/ 17/2024 Docket No.
R1 ADLS ❑ ADLS Amend
�L DP Attached Previous DP? Yes,_allo ❑
Name of Project: Independent Senior Insurance - 146th Street Office
Type of Project: Commercial - Financial Planning Office
Project Address:_3309 E 146th St, Carmel, IN 46033
Project Tax Parcel ID #: 1 7- 1 0- 2 0_ 0 0_ 0 3- 0 1 2 0 0 0
Legal Description: (Please use separate sheet and attach)
Name of Applicant: Development Construction Representation
Applicant Address: 9204 Log Run Drive South
Contact Person: Bob Dugger Phone: 317-590-0907
Contact Email: bobdugger@dc-rep.com
Eplan Review Contact Person: David Welch
Email: dwelch@structurepoint.com
Landowner Name: Stephanie Flittner
Phone: 317-547-5580
Email: stephanie.flittner@gmail.com
Plot Size: 0.46 ac Zoning Classification: R-1 Overlay Zone:
Present Use ofPro Property: Vacant - Formerly Veterinary Office
p -
Proposed Use of Property: Commercial - Financial Planning Office
New/Revised Sign? Yes X No
New Parking? Yes X No
New Construction? Yes No X
Remodeled Construction?: Yes X No
New Landscaping? Yes X No
submitted; see below.)
(If Yes, an engineered and to -scale Landscape Plan must be
i
Revised: 1/3/2024 Filename: ADLS & ADLS Amend 2024
Review PARKING
No. of Spaces Provided: 13
No. Spaces Required: 13
DESIGN INFORMATION
Type of Building: Residential Style Office No. of Buildings:
1
Square Footage: 3311 Height: 18.38 No. of Stories 1
veneer stone, fiber cement siding, architectural roof shingles, painled trim g ray/white
Exterior Materials: Exterior Colors:
Maximum No. of Tenants:_ 1 Type of Land Uses: Commercial Office Building
Water by: Carmel Utilities Sewer by: Carmel Utilities
Type of Fixture: Various
LIGHTING
Height of Fixture: Various
No. of Fixtures: Per site lighting plan Additional Lighting:
* Plans to be submitted showing Foot-candle spreads at property lines, per the ordinance.
LANDSCAPING
* To -scale engineered Landscape Plans to be attached/submitted showing plant types, sizes, and
locations.
No. of Signs: 1
Locations): Front of building
Dimensions of each sign: match existing
SIGNAGE hanging
Type of Signs:
Square Footage of each sign: match existing
Total Height of each sign: match existing
Colors of each sign: tbd
Revised: 1/3/2024 Filename: ADLS & ADLS Amend 2024
AFFIDAVIT
I the undersigned, to the best of my knowledge and belief, submit the above information as true and correct.
Signature of
Applicant:
Title:
C�JOUqyl � 4r_ r Velr-_ Date:
(Printed Name)
STATE OF INDIANA
SS:
The undersigned, having been duly sworn upon oath says that the above info #ion is true and correct and he
is informed and believes.
(Signature of Petitioner
County of Akck r w Before me the undersigned, a Notary Public
(County in which notarization takes place)
for W Ld, ] o1 County, State of Indiana, personally appeared
(Notary Public's county i"of�residence)
SwPlo,yl Q, N (1-tI'Ltr and acknowledge the execution of the foregoing
(Property Owner, Attorney, or Power of Attorney)
i
instrument this I & " day of A70 Y) J , 20
(day) (month) (year)
Y4 c5r,,�o
Notary u Iic--Signature
w INICO E SLATa Notary PuWC, state of Indiana
3= S cm6ssiun Kwitw H�y Notary Public --Please Print
Cammisslan EXp� es
!amber 25. 203t2
My c ission pp0
s:
*************************************************************************************
Revised: 1/3/2024 Filename: ADLS & ADLS Amend 2024
Review/Approval Procedure
For ADLS / ADLS Amendment Petitions
1. Allow plenty of time for review and approval process (approximately 2-4 months). Discuss proposed
project with DOCS staff (please call for an appointment to discuss review procedure and appropriate
dates). The first week of the month works the best to begin a project.
2. As of January 1, 2019, electronic -only submittals are accepted. You can submit an electronic
application through Carmel's Public Portal, our on-line application website. Afterwards,
plans and documents are to be submitted electronically through ProjectDox, Carmel's ePlan
review software. Please see the Electronic Plan Review handout for more information on the
process and what needs to be submitted.
3. INFORMATION NEEDED for formal DOCS staff and Plan Commission review:
a. Electronic copy of formal application with required information submitted by email.
b. Legal description
C. Location map showing location of subject site, zoning and existing land uses of all adjacent
properties.
d. A detailed site development plan (Submitted electronically through ProjectDox) showing:
1) Drainage: Detailed drainage plan with drainage calculations. If project is in Clay
Township, take to Kent Ward, County Surveyor's Office (776-8495). If project is in
City of Carmel, discuss with John Thomas, Storm Water Administrator (571-2441).
1a) The Hamilton County Surveyor's Office requires all Erosion Control Plans be
labeled as "Stormwater Pollution Prevention Plans," aka SWPPP Plan.
2) Lighting plan
- Footcandle limits - Size of fixture
- Type of fixture - Images of fixtures
3) Landscaping plan (showing easements, setbacks, and bufferyards)
- Location of plantings - City standard planting details
- Type and sizes of plantings - Mounding locations and details
- Planting legend
4) Signage plan and details: Size, location, materials, and colors
5) Parking plan: show disabled parking spaces, total spaces needed per zone, spaces
proposed, and also show/label the Bicycle Parking areas.
6) Site plan, to -scale, with:
- Side, rear and front yard - Dimensions of building
setbacks - Location of mechanical equipment, gas/electric
- Perimeter drainage and meters, and trash receptacle with
utility easements - Pavement and curbing details
- Sewer and water line - Proposed road improvements
locations - Sidewalks
- Special setbacks or - Loading and dock areas
greenbelts - Fire hydrant and siamese locations
- Building square footage
Revised: 1/3/2024 Filename: ADLS & ADLS Amend 2024
7) Soils map and Floodplain information
e. Building Elevations: (show all sides, and be to -scale)
- Dimensions
- Materials and colors
- Bring Samples of materials to the Plan Commission meeting
- Signage location(s)
f. Prepare an estimated construction cost to comply with the Thoroughfare Plan & Alternative
Transportation Plan per UDO Section 1.07. (Contact the Carmel Engineering Dept. for more
detail; 571-2441.)
g. Technical Advisory Committee (TAC) correspondence, if received outside of ProjectDox.
h. If public hearing is required, list of adjacent property owners two properties deep or 660 feet,
whichever is less, to be obtained from Hamilton County Transfer & Mapping Dept.
4. Once the application is emailed to DOCS, a docket number will be released and you will receive an
email from ePlans ProjectDox to upload the site plans and other drawings. The filing fee and info
packets are due by noon at least 10 days prior to the meeting, at which time the item will be placed on
the meeting agenda. The following is list of items that should be included in each Plan Commission
Member's info packet:
1. Cover page 4. Legible plans (site, landscaping, elevations, etc.)
2. Brief description of the project 5. Site plan laid over aerial view of property
3. Location Map 6. Any other supporting information
5. Petitioner or representative must appear at the Carmel Plan Commission meeting and give a
presentation. The presentation may include information relative to the project and may be presented
on a poster board so that it can be seen from 20 feet. However, an opaque projector is available, if the
meeting takes place in the Council Chambers.
6. Petitioner or representative must attend the Technical Advisory Committee (TAC) meeting, which
occurs several weeks prior to the Plan Commission meeting.
7. Petitioner or representative must attend the Special Studies Subcommittee to further review all
pertinent information (when applicable).
8. Petitioner or representative must attend the second Plan Commission meeting (when applicable) for
final vote (questions may need to be answered).
9. Once Plan Commission has voted on the project, and a Letter of Grant is issued, it is up to the
petitioner to work with the Building Permits Dept. staff to obtain proper building/sign permits.
CONTACT INFO: PLANNING/ZONING DIVISION, DEPT. OF COMMUNITY SERVICES
(DOCS), 1 Civic Square, Carmel, IN 46032. Phone: (317) 571-2417 Web: www.carmeldocs.com
5
Revised: 1 /3/2024 Filename: ADLS & ADLS Amend 2024
1711k.-F.I.A LL. "fi.-` .4".Wm
� ■
r�
LE60L.iL�_
��■ma- NA. ■- J`����fmmr-1 1
• - --�'�i-r'
7'E ■--W'M'M:1 M rt- �� 1�i_ ■ %L Wti 16'firJ ALA r iit
---;-W-1ra-�-xl%-tlr"--%m Marc F.-.mi 4
_IHf'oft%r" ■ -EMfI -
-mV bW rl--..AFMWm- F,-aMA1L7 mmmlr %�:! - t--m- mmm�m- -■
I��� J rA 7Tr♦--r i gwr w9mmOr �m -m - �� ::im
mwm::Immaw Ilia �im =min - T�-
■-;--W mjMM it="L:-f!LE—m ■'f ■i F i-mU``n H-=� -�m fj
�lr%IM 'mJa:�AJ::= A -■- m f =�
1 r 10M mi--&O = or -i rmT -M=4� m t �-■ 3 J
:Arr--Ia■iv'=j:—DEL ■�
-■-� ■ - � .tom= _--w -I:L%i -% ::L 1� -M - '■-.r I iv- i.?"
--MLHr - pmrm- �rv-mil:�m err■-o-FA ELA
i
F
■ i= t f -- i f F i -