Loading...
HomeMy WebLinkAboutTraffic Operations Analysis J ::~ \ J' l~ _ \ a.I ~- J I' / - J- J J J J J D ~ D o o D D D D ~ "f \ ' i \ I ./ I' ' " , "i I ) ,\ \. \ ': , [,'/ , ) ( ( /1, f, '\ " > , ,/ ~ ,,\ I , \' __, ~ i ~ _'._ \::: iJ ) / / ) ~ ./ /JRAFFIC~OPERAIIONS ANA~YSIS r - , . _ _- " .\ ,~- \ r , ( \ , \ -If / PROPOSED:CHER:RY CRE/EK E-STATES / - '\ \ \ - ,\ . \. ~-"--- ~ '1 \~) _ /', \ \ HAZEL :DELL ,PKWY& AVIAN ' WAY" "~ , ' ( 1'_,) , , CARMEL, INDIANA \ (I, ( " \ ,~ ' \_ ,I "., PREPARED ,FOR, ' I , '\ \-- PL~TINUM PROPERTIE,S , , i 1\ NOVEMBER 2002 ~, A RFCf-1,\JFD' '\'''1'1 Q ::', II _\~IJ\ 0\ ..: .' DOCS' , -. : : . ~ -: -'-' - \) -l ! A&F ENGINEERING CO.. LLC, 'CONSUL. TING ENGINEERS , 8425 KEYSTONE CROSSING, SUITE 200 INDIANAPOLIS, INDIANA 46240 ~(317) 202-0,864 -- - ~ 'I I PLATINUM PROPERTIES, LLC. 9551 Delegate's Row Indianapolis, IN 46240 Phone: 818-2900 Fax: 818-2910 Letter of Transmittal To: City of Carmel Department of Community Services One Civic Square Carmel, Indiana 46032 From: Tim Walter, P.E. Date: November 8, 2002 A TTN: Jon Dobosciewicz Project: Cherry Creek Estates RE: Traffic Study We are sending you IZI attached 0 under separate cover via personal delivery the documents as listed: COPIES 20 DESCRIPTION ~~~...~~9i..~.~~~.i.~9.g~:,I~~ff.i.~..QP~E~.!ig~~~.~_~I}'.~.i.~B~pg!:!.m these are transmitted for your action as indicated below: IZI for your use and/or file o for review & comment IZI as requested o approved as noted o returned for corrections o please sign & return original and o Retain one copy for your file o copIes REMARKS: L\S~IT::::--'i-, \ ',. )...-1-_..,.-, '.' ",/,;:._::. ---"---(..../~~"-,\" ((ll'/ ~ "".:' /) /.~~~;/ <~ \ I. . ,< \ IF?! RECEIVED \~\ ~:j NDV 8 2002 ~:~~ I \;;J Dr::" I \q~ Des i... '! '\;c/, 1'-., " /:: /<~;/ c')h. .,/*, '/' ".... / ~... / \ " ":.J.. TpTT\ ;:0.->> -..-.~_.:........J__...- - ~\ copy to File. signed If enclosures are not as noted, kindly notify us immediately. ,0 o o o o o o o o o o o .0 o iJ o LJ 10 ~~u TRAFFIC OPERATIONS ANALYSIS PROPOSED CHERRY CREEK ESTATES HAZEL DELL PKWY & AVIAN WAY CARMEL, INDIANA PREPARED FOR PLATINUM PROPERTIES NOVEMBER 2002 PREPARED By: A & F ENGINEERING CO., LLC CONSULTING ENGINEERS 8425 KEYSTONE CROSSING, SUITE 200 INDIANAPOLIS, IN 46240 PHONE 317-202-0864 FAX 317-202-0908 D D o o D D o o o D o o o D o o o o o PLATINUM PROPERTIES TRAFFIc OPERATIONS ANALYSIS COPYRlGHT This Analysis and the ideas, designs and concepts contained herein are the exclusive intellectual property of A&F Engineering Co., LLC. and are not to be used or reproduced in whole or in part, without the written consent of A&F Engineering Co., LLC. @2002, A&F Engineering Co., LLC. o D PLATINUM PROPERTIES TRAFFIc OPERATIONS ANALYSIS o TABLE OF CONTENTS LIST OF FIGURES.................................................................................................................................... ........................ II o CERTIFICATION............................. ............................................ ................................................................................... .111 INTRODUCTION ....... ....................................................... ...................................................... .... ............................. ........ ..1 D D PURPOSE................................................................................................. ............... ......................................................... 1 SCOPE OF WORK.............................................................................................. .............................................. .................1 DESCRIPTION OF THE PROJECT ... ...... ........................................................... .......................... .......... .......... ........ .... .... .....2 STUDY AREA... ...................... ..................................................................... ............................. ................... ................. ...4 o DESCRIPTION OF THE ABUTTING STREET SYSTEM .................................................... ............... ................. ..... .... .............4 D TRAFFIC DATA ................... ........................................................................................... ........................... ..... ...... ...........4 GENERATED TRAFFIC VOLUMES FOR PROPOSED DEVELOPMENT ...................................................................................5 D TABLE 1 - GENERATED TRIPS FOR PROPOSED DEVELOPMENT ...................................................................................5 INTERNAL TRIPS....................................................................................................................................... ......................5 o PASs-BY TRIPS.................................................................. ............................................................................................. 5 ASSIGNMENT AND DISTRIBUTION OF GENERATED TRIPS ................................ .... ......................... .... ........... .... .... ............ 6 o PROPOSED DEVELOPMENT GENERATED TRIPS ADDED TO THE STREET SYSTEM ............................................................6 D D o ESTIMATED TRAFFIC SHIFTING TO STUDY INTERSECTION ..............................................................................................6 CAPACITY ANALySIS.................. .............................. ....................................................................................................1 0 DESCRIPTION OF LEVELS OF SERViCE......................................................... ................. ...................................... ...........10 CAPACITY ANALYSES SCENARIOS .... .......................................................... ........ ......................................... ........... ......12 TABLE 2 - LEVEL OF SERVICE SUMMARY: HAZEL DELL PARKWAY AND AVIAN WAY /PROPOSEDDRIVE..............16 PROPOSED DRIVE SEGMENT ANALYSIS ........................................................................................................................17 o TABLE 3 - LEVEL OF SERVICE SUMMARY: PROPOSED DRIVE - HAZEL DELL P ARKW A Y TO EAST BORDER OF PROPOSED SITE................................................. ................................................................. ..................................... .17 o CONCLUSIONS ....................................................................................................................................... ..... .................. 18 D o o RECOMMENDATIONS ...... .... .............. ................................... ..... .................. .... ........... ...................... ... .................. ..... ...19 D D D o D o o D D D o D D D o D D D o PLATINUM PROPERTIES TRAFFIc OPERATIONS ANALYSIS LIST OF FIGURES FIGURE 1: AREA MAP ............ ................................... ...... ....... ............ ........................ ................ ...... .... ...........................3 FIGURE 2: ASSIGNMENT AND DISTRIBUTION OF GENERATED TRAFFIC VOLUMES FOR PROPOSED DEVELOPMENT......... 7 FIGURE 3: GENERATED TRAFFIC VOLUMES FOR PROPOSED DEVELOPMENT...................................................................8 FIGURE 4: ESTIMATED TRAFFIC SHIFTING TO STUDY INTERSECTION .............................................................................9 FIGURE 5 (SCENARIO 1): EXISTING TRAFFIC VOLUMES................................................................................................13 FIGURE 6 (SCENARIO 2): SUM OF EXISTING AND GENERATED TRAFFIC VOLUMES....................................................... 14 FIGURE 7 (SCENARIO 3): SUM OF EXISTING, GENERATED AND SHIFTED TRAFFIC VOLUMES .......................................15 II o D D o o o o o o o o D o o o o o o o PLATINUM PROPERTIES TRAFFIC OPERATIONS ANALYSIS CERTIFICATION I certify that this TRAFFIC OPERATIONS ANALYSIS has been prepared by me and under my immediate supervision and that I have experience and training in the field of traffic and transportation engineering. A&F ENGINEERING Co., LLC. ~ ~ 12-./1 Steven J. Fehribach, P.E. Indiana Registration 890237 --r-OW\ 'V~ Thomas S. Vandenberg, E.I. Transportation Engineer III D D D o o o D D o o o D o o o o o o o PLATINUM PROPERTIES TRAFFIc OPERATIONS ANALYSIS INTRODUCTION This TRAFFIC OPERATIONS ANALYSIS, prepared at the request of Platinum Properties, is for the proposed Cherry Creek Estates residential development which will be located east of Hazel Dell Parkway between 146th Street and the existing Cherry Tree Road in Carmel, Indiana. PURPOSE The purpose of this analysis is to determine what effect traffic generated by the proposed development, when fully occupied, will have on the existing adjacent roadway system. This analysis will identify any roadway deficiencies that may exist today or that may occur when this site is developed. Conclusions will be reached that will determine if the roadway system can accommodate the anticipated traffic volumes. These conclusions will determine the modifications required if there will be deficiencies in the system resulting from the increased traffic volumes. Recommendations will be made that will address the conclusions resulting from this analysis. These recommendations will address feasible roadway system improvements that will accommodate the proposed development traffic volumes such that there will be safe ingress and egress, to and from the proposed development, with minimal interference to traffic on the public street system. SCOPE OF WORK The scope of work for this analysis is: First, to obtain traffic volume counts at the intersection of Hazel Dell Parkway & Avian Way. Second, to estimate the number of new trips that will be generated by the proposed development. Third, to assign the generated traffic volumes to the driveways and/or roadways that will provide access to the proposed development. o D D D D D D o D D o o D D D o D D U PLATINUM PROPERTIES TRAFFIc OPERATIONS ANALYSIS Fourth, to distribute the generated traffic volumes from the proposed site onto the public roadway system and intersections identified in the study area. Fifth, to determine the amount of traffic from existing neighboring residential sites that will shift to the development's study intersection. Sixth, to prepare a capacity analysis and level of service analysis for the study intersection considering each of the following scenarios: SCENARIO 1 : Existing Conditions - Based on existing roadway conditions and traffic volumes. SCENARIO 2: Proposed Development - New traffic volumes that will be generated by the proposed development added to the existing traffic volumes. SCENARIO 3: Proposed Development & Shifted Traffic - New traffic volumes that will be generated by the proposed development, as well as the shifted traffic volumes, added to the existing traffic volumes. Seventh, to prepare a segment analysis for the proposed drive considering Scenario 3 traffic volumes. Finally, to prepare a TRAFFIC OPERATIONS ANALYSIS documenting all data, analyses, conclusions and recommendations to provide for the safe and efficient movement of traffic through the study area. DESCRIPTION OF THE PROJECT The proposed development will be located east of Hazel Dell Parkway between 146th Street and the existing Cherry Tree Road in Carmel, Indiana. The segment of Cherry Tree Road between Hazel Dell Parkway and Streamside Drive will be removed. Traffic currently using this segment will be able to use the development's proposed north drive that connects to Hazel Dell Parkway at Avian Way. This will most likely be traffic from Spring Creek, the residential area north ofthe proposed development. As proposed, the development will consist of 273 single-family dwelling units. Figure 1 is an area map of the proposed development. 2 D o D D D o o D o o o o o D D D: N o D~ II <.:> 01 N o /' D~ ~I /I __m_~__-:mnJ ~____:_~nn --, ,..----------, r------------ A WAN WAY PROPosED" DRIVE SITE ----- ).; /~ ~ ..J ijj ~ ..J !ll I\j ~ ~o( I 131ST STREET CHERRY CREEK ESTATES CARMEL, IN E 146TH STREET FIGURE 1 AREA MAP @A &. F Engineering Co., LLC 2002 "ALL Rights Reserved" 3 o o D o o o D o o o o o D o o o o D D PLATINUM PROPERTIES TRAFFIc OPERATIONS ANALYSIS STUDY AREA The study area has been defined to include the intersection of Hazel Dell Parkway & Avian Way / Proposed Drive. Figure 1 shows the study intersection. DESCRIPTION OF THE ABUTTING STREET SYSTEM This proposed development would be served by the public roadway system that includes Hazel Dell Parkway HAZEL DELL PARKWAY - is a north/south two-lane road within Carmel, IN. The posted speed limit in the vicinity of the site along this roadway is 35 mph when Cherry Tree Elementary is not in session. The speed limit is 25 mph between 7:00 AM to 7:00 PM on school days. Hazel Dell Parkway & Avian Way - This T-intersection has Avian Way stopping for Hazel Dell Parkway. The northbound approach consists of one left-turn lane and one through lane. The southbound approach consists of one right-turn lane and one through lane. The right-turn lane continues south to Cherry Tree Elementary. The eastbound approach consists of one left-turn lane and one right turn lane. TRAFFIC DATA Peak hour traffic volume counts were made by A&F Engineering Co., LLC at the study intersection. The counts include an hourly total of all "through" traffic and all "turning" traffic at the intersection. The counts were made during the hours of 6:00 AM to 9:00 AM and 3:00 PM to 6:00 PM in August and October of 2002. These traffic volume counts are summarized on Figure 5 and are included in Appendix A. 4 D D D o o o o D D o o D D o o o D o o PLATINUM PROPERTIES TRAFFIc OPERATIONS ANALYSIS GENERATED TRAFFIC VOLUMES FOR PROPOSED DEVELOPMENT The estimate of traffic to be generated by the proposed development is a function of the development size and type ofland use. Trip Generationl report was used to calculate the number of trips that will be generated by the proposed development. This report is a compilation of trip data for various land uses as collected by transportation professionals throughout the United States in order to establish the average number of trips generated by various land uses. Table 1 is a summary of the trips that will be generated by the proposed development. TABLE 1 - GENERA TED TRIPS FOR PROPOSED DEVELOPMENT DEVELOPMENT INFORMATION GENERA TED TRIPS ITE AM AM PM PM LAND USE CODE SIZE ENTER EXIT ENTER EXIT Single-Family 210 273 DU 50 150 170 96 INTERNAL TRIPS An internal trip results when a trip is made between two land uses without traversing the roadway system. Since the development will consist of residential land use only, no reduction will be applied for internal trips. PASs-BY TRIPS Pass-by trips are trips already on the roadway system that decide to enter a land use. The development will consist of single-family homes, which are destination land uses. Therefore, no reduction will be applied for pass-by trips. I Trip Generation, Institute of Transportation Engineers (ITE), Sixth Edition, 1997. 5 o o D D U D o D i 0 D D D D o D D D o o PLATINUM PROPERTIES TRAFFIc OPERATIONS ANALYSIS ASSIGNMENT AND DISTRIBUTION OF GENERATED TRIPS Traffic volumes will be generated by the proposed development and added to the public street system. The study methodology used to determine the traffic volumes is defined as follows: 1. The volume of traffic that will enter and exit the site must be assigned to the various access points and to the public street system. Using the existing traffic volume data collected for this analysis, traffic to and from the proposed new site has been assigned to the proposed driveways and to the public street system that will be serving the site. 2. To determine the volumes of traffic that will be added to the public roadway system, the generated traffic must be distributed by direction to the public roadway's intersection with the driveway. For the proposed development, the distribution was based on the existing traffic patterns and the assignment of generated traffic. The assignment and distribution of the generated traffic volumes for the proposed development are shown on Figure 2. PROPOSED DEVELOPMENT GENERATED TRIPS ADDED TO THE STREET SYSTEM Generated traffic volumes that can be expected from the proposed development have been prepared for each of the study area intersections. The peak hour generated traffic volumes are shown on Figure 3. These data are based on the previously discussed trip generation data, assignment of generated traffic, and distribution of generated traffic. ESTIMATED TRAFFIC SHIFTING TO STUDY INTERSECTION The segment of Cherry Tree Road between Hazel Dell Parkway and Streamside Drive will be removed. Traffic currently using this segment will be able to use the development's proposed north drive that connects to Hazel Dell Parkway at Avian Way. Spring Creek is a residential area north of the proposed development. If the site is developed as proposed, Spring Creek will have access to the development's proposed drive. Therefore, traffic from Spring Creek may use the proposed drive and study intersection. Figure 4 shows the shifted traffic volumes. 6 o o D D D D D D D D D D D ! D D D: E 146TH STREET L 131ST STREET '" o I D; LEGEND FIGURE 2 ASSIGNMENT & DISTRIBUTION OF GENERATED TRAFFIC VOLUMES FOR PROPOSED DEVELOPMENT * = NEGLIGIBLE c.:> 3: D~ N o /' D~ CHERRY CREEK ESTATES CARMEL, IN @A &. r Engineering Co., LLC 2002 "ALL Rights Reserved" 7 D o o o o o o o o o o o o D D >< o g N C> I ..... O 'T " <.:> ,. o ~ N C> ./ N D~ ~c- '<7-1. 0-s" ~'Sb '<7<:> 131ST STREET LEGEND 00 = A.M. PEAK HOUR (00) = P.M. PEAK HOUR * = NEGLIGIBLE CHERRY CREEK ESTATES CARMEL, IN E. 146TH STREET FIGURE 3 GENERA TED TRAFFIC VOLUMES FOR PROPOSED DEVELOPMENT @A &. F Engineering Co., LLC 2002 "ALL Rights Reserved" 8 o D o o o o o o o o o o o o o o : N o I O ~ " '" 3: o i N o /' D~ E 146TH STREET )..; /~ a: -.J ill ~ -.J !d I\j ~ ~c- "V-1.: C)y~ 'Sb""O IO( 131ST STREET LEGEND 00 = A.M. PEAK HOUR (00) = P.M. PEAK HOUR * = NEGLIGIBLE FIGURE 4 ESTIMA TED TRAFFIC SHIFTING TO STUDY INTERSECTION CHERRY CREEK EST A TES CARMEL, IN @A &. r Engineering Co., llC 2002 "All Rights Reserved" 9 D D o o o o D o D o o D o o D D o o o PLATINUM PROPERTIES TRAFFIc OPERATIONS ANALYSIS CAPACITY ANALYSIS The "efficiency" of an intersection is based on its ability to accommodate the traffic volumes that approach the intersection. It is defined by the Level-of-Service (LOS) of the intersection. The LOS is determined by a series of calculations commonly called a "capacity analysis". Input data into a capacity analysis include traffic volumes, intersection geometry, number and use of lanes and, in the case of signalized intersections, traffic signal timing. To determine the LOS at each of the study intersections, a capacity analysis has been made using the recognized computer program based on the Highway Capacity Manual (HCMl. DESCRIPTION OF LEVELS OF SERVICE The following descriptions are for signalized intersections: Level of Service A - Describes operations with a very low delay, less than or equal to 10.0 seconds per vehicle. This occurs when progression is extremely favorable, and most vehicles arrive during the green phase. Most vehicles do not stop at all. Level of Service B - Describes operations with delay in the range of 10.1 to 20.0 seconds per vehicle. This generally occurs with good progression. More vehicles stop than LOS A, causing higher levels of average delay. Level of Service C - Describes operation with delay in the range of 20.1 seconds to 35.0 seconds per vehicle. These higher delays may result from failed progression. The number of vehicles stopping is significant at this level, although many still pass through the intersection without stopping. 2 Highway Capacity Manual (HCM) Transportation Research Board, National Research Council, Washington, DC, 2000. 10 o o o o o o D o D D D D D D o o D o o PLATINUM PROPERTIES TRAFFIc OPERATIONS ANALYSIS Level of Service D - Describes operations with delay in the range of 35.1 to 55.0 seconds per vehicle. At level of service D, the influence of congestion becomes more noticeable. Longer delays may result from some combinations of unfavorable progresSIOn. Many vehicles stop, and the proportion of vehicles not stopping declines. Level of Service E - Describes operations with delay in the range of 55.1 to 80.0 seconds per vehicle. This is considered to be the limit of acceptable delay. These high delay values generally indicate poor progression and long cycle lengths. Level of Service F - Describes operations with delay in excess of 80.0 seconds per vehicle. This is considered to be unacceptable to most drivers. This condition often occurs with oversaturation, i.e., when arrival flow rates exceed the capacity of the intersection. Poor progression and long cycle lengths may also be major contributing causes to such delay levels. The following list shows the delays related to the levels of service for unsignalized intersections: Level of Service A B C D E F Control Delay (seconds/vehicle) Less than or equal to 10 Between 10.1 and 15 Between 15.1 and 25 Between 25.1 and 35 Between 35.1 and 50 greater than 50 11 o o o o o o o o o o o o o o o o o o o PLATINUM PROPERTIES TRAFFIc OPERATIONS ANALYSIS CAPACITY ANALYSES SCENARIOS To evaluate the proposed development's effect on the public street system, the existing and generated traffic volumes must be obtained to form a series of scenarios. The analysis of these scenarios determines the adequacy of the existing roadway system. From the analysis, recommendations can be made to improve the public street system so it will accommodate the increased traffic volumes. An analysis was made for the AM peak hour and PM peak hour for each of the study intersections considering the following scenarios: SCENARIO I: Existing Traffic Volumes - These are the existing traffic volumes that were obtained in October 2002. Figure 5 is a summary of the existing traffic volumes at the study intersections for the AM and PM peak hours. SCENARIO 2: Sum of Existing and Generated Traffic Volumes - Generated traffic volumes from the proposed development added to the existing volumes. Figure 6 is a summary of these traffic volumes at the study intersections for the AM and PM peak hours. SCENARIO 3: Sum of Existing, Generated and Shifted Traffic Volumes - Generated traffic volumes from the proposed development, as well as the shifted traffic volumes, added to the existing volumes. Figure 7 is a summary of these traffic volumes at the study intersections for the AM and PM peak hours. The requested analyses have been completed and the computer solutions showing the level of service results are included in Appendix A. The following table included in this report summarizes the results of the level of service analysis: Table 2 - Hazel Dell Parkway & Avian Way / Proposed Drive 12 D o D D D D D D D D D o D D D D : N o D ~ II ~c- "1"", C)s" ~-'Sb "1<) ~o( I 131ST STREET LEGEND 00 = A.M. PEAK HOUR (00) = P.M. PEAK HOUR * = NEGLIGIBLE '" ~ D ~ N o ....- D! CHERRY CREEK EST A TES CARMEL, IN E 146TH STREET FIGURE 5 (SCENARIO 1) EXISTING TRAFFIC VOLUMES 13 @A Be F Engineering Co., LLC 2002 "ALL Rights Reserved" D D D D D D D 0 0 D D D D 0 D D '" ~ ~ <.- '" N 0 I 0 ..... 0 I " ~ D 0 '" X W 0 N N 0 /' N D~ - ..... .....- ...., II") ~::;e ~84 (54 II") :8 ~ ..- * (*) ~ ~ ~ .21 (13) (6) 4"j' ~ t ,. (*) *.. ~ ~ ..... 34)81~ o;-::~ ~"'- -'" .!:::- E 146T1-f STREET )..; /~ ~ ..... irl Ci ..... ii:l I\j ~ ,Or 131ST STREET LEGEND 00 = A.M. PEAK HOUR (00) = P.M. PEAK HOUR * = NEGLIGIBLE FIGURE 6 (SCENARIO 2) SUM OF EXISTING & GENERA TED TRAFFIC VOLUMES CHERRY CREEK ESTATES CARMEL, IN @A & r Engineering Co., LLC 2002 .. ALL Rights Reserved" 14 o o o o o o D o o o o o o o o o : N o I o ~ ~ o ~ N o ./ D~ r::- ....- .., on €:::; e "t.. 84 (54 on ~ ~ .... * (*) ~ ~ ~ + 28 (17) (6) 4 j ~ t It (*) .... ~ ~ 0> 34) 81"l- 0>:::;; ..t 0> - -0> ~ ).: /~ ~ -J irl Cl -J it! Kj ~ ~c- "1"1< C'-s., ~'Sb "1<) lOr 131ST STREET LEGEND 00 = A.M. PEAK HOUR (00) = P.M. PEAK HOUR * = NEGLIGIBLE E. 146TH STREET FIGURE 7 (SCENARIO 3) SUM OF EXISTING, GENERA TED AND SHIFTED TRAFFIC VOLUMES CHERRY CREEK EST A TES CARMEL, IN 15 @A & F Engineering Co., LLC 2002 "ALL Rights Reserved" o o o o o o o o D o D D o D o D o o D PLATINUM PROPERTIES TRAFFIc OPERATIONS ANALYSIS TABLE 2 - LEVEL OF SERVICE SUMMARY: HAZEL DELL P ARKW A Y AND AVIAN WAY / PROPOSED DRIVE AM PEAK HOUR MOVEMENT SCENARIO 1 SCENARIO 2 SCENARIO 3 Northbound Left-Turn B B B Southbound Left-Turn - A A Eastbound Approach C C C Westbound Approach - C C PM PEAK HOUR MOVEMENT SCENARIO 1 SCENARIO 2 SCENARIO 3 Northbound Left-Turn A A A Southbound Left-Turn - B B Eastbound Approach B C C Westbound Approach - C C SCENARIO 1: Existing Traffic V olurnes with Existing Intersection Geometries and Existing Stop Sign Control SCENARIO 2: Sum of Existing and Generated Traffic Volumes with Proposed Intersection Improvements* and Stop Sign Control SCENARIO 3: Sum of Existing, Generated and Shifted Traffic Volumes with Proposed Intersection Improvements* and Stop Sign Control * The proposed intersection improvements consist of the following: . The addition of a left-turn lane in the southbound approach . The proposed drive developed as two outbound lanes and one inbound lane 16 o o o o o o o o o o o o o o o o o o o PLATINUM PROPERTIES TRAFFIc OPERATIONS ANALYSIS PROPOSED DRIVE SEGMENT ANALYSIS An analysis was made for the AM peak hour and PM peak hour for the proposed drive. To determine the Level-of-Service (LOS) for the segment, a capacity analysis was made using the recognized computer program based on the Highway Capacity Manual (HCM). The proposed drive was analyzed from Hazel Dell Parkway to the east border of the proposed site. It is planned that this roadway will be constructed as a two 16 foot lanes, a 12 foot median and I foot curbs. The following scenario was considered for the analysis: SCENARIO 3: Sum of Existing, Generated and Shifted Traffic Volumes - Generated traffic volumes from the proposed development, as well as the shifted traffic volumes, added to the existing volumes. The requested analyses have been completed and the computer solutions showing the level of service results are included in Appendix A. Table 3 summarizes the results of the level of service analysis: TABLE 3 - LEVEL OF SERVICE SUMMARY: PROPOSED DRIVE - HAZEL DELL P ARKW A Y TO EAST BORDER OF PROPOSED SITE MOVEMENT SCENARIO 3 AM Peak Hour B PM Peak Hour B SCENARIO 3: Sum of Existing, Generated and Shifted Traffic Volumes with Proposed Roadway Configuration 17 o o o o o o o D o o o o D o o o o o o PLATINUM PROPERTIES TRAFFIc OPERATIONS ANALYSIS CONCLUSIONS The conclusions that follow are based on: . Existing Traffic Volume Data . Trip Generation . Assignment and Distribution of Generated Traffic . Capacity Analysis with the Resulting Levels of Service for Each of the Study Intersections . Field Review Conducted at the Site These conclusions apply only to the AM peak hour and PM peak hour that were addressed in this analysis. These peak hours are when the largest volumes of traffic will occur. If the resulting level of service is adequate during these time periods, it can generally be assumed that the remaining 22 hours will have levels of service equal to or better than the peak hours. This occurs because the roadway traffic volumes during the remaining 22 hours will be equal to or less than the peak hour traffic volumes. 1. HAZEL DELL P ARKW A Y AND AVIAN WAY / PROPOSED DRNE Existing Traffic Volumes with Existing Geometries and Existing Stop Sign Control (Scenario 1) - A review ofthe level of service for each of the intersection approaches, with the existing traffic volumes and existing intersection geometries, has shown that all approaches to this intersection operate at acceptable levels of service during the peak hours. Sum of Existing and Generated Traffic Volumes with Proposed Intersection Improvements and Stop Sign Control (Scenario 2) - When the traffic volumes from the proposed development are added to the existing traffic volumes, all approaches to this intersection will continue to operate at acceptable levels of service during the peak hours with the following intersection improvements: . The addition of a left-turn lane in the southbound approach . The proposed drive developed as two outbound lanes and one inbound lane 18 D D D o o o o o o o o o o o o o D o o PLATINUM PROPERTIES ~COPERATIONSANALYms Sum of Existing, Generated and Shifted Traffic Volumes with Proposed Intersection Improvements and Stop Sign Control (Scenario 3) - When the proposed development traffic volumes and the estimated shifted traffic volumes are added to the existing traffic volumes, all approaches to this intersection will continue to operate at acceptable levels of service during the peak hours with the following intersection improvements: . The addition of a left-turn lane in the southbound approach . The proposed drive developed as two outbound lanes and one inbound lane 2. PROPOSED DRIVE: HAZEL DELL P ARKW A Y TO EAST BORDER OF PROPOSED SITE Sum of Existing, Generated and Shifted Traffic Volumes with Proposed Roadway Corifiguration (Scenario 3) - When the proposed development traffic volumes and the estimated shifted traffic volumes are added to the existing traffic volumes, the proposed drive will operate at acceptable levels of service with the following roadway configuration: . Two-lane roadway with 16 foot lanes . 12 foot median . 1 foot curbs RECOMMENDATIONS Based on this analysis and the conclusions, the following recommendations are made to ensure that the roadway system will operate at acceptable levels of service if the site is developed as proposed. HAZEL DELL P ARKW A Y AND AVIAN WAY / PROPOSED DRIVE The following intersection improvements are recommended: . The addition of a left-turn lane in the southbound approach . The proposed drive developed as two outbound lanes and one inbound lane 19 o D D D o o D D D o o D D o o o D o D PLATINUM PROPERTIES TRAFFIc OPERATIONS ANALYSIS ApPENDIX A This document contains the traffic data that were used in the TRAFFlC OPERATIONS ANALYSIS for the proposed development. Included are the intersection traffic volume counts and the intersection capacity analyses for each of the study intersections for the AM peak hour and PM peak hour. D D o o o D o o D o o D o D o o D o o PLATINUM PROPERTIES TRAFFIc OPERATIONS ANALYSIS ApPENDIX A TABLE OF CONTENTS HAZEL DELL PARKWAY AND AVIAN WAY / PROPOSED DRIVE.......................................................................................1 PROPOSED DRIVE: HAZEL DELL P ARKW A Y TO EAST BORDER OF PROPOSED SITE .......................................................14 o o o o o D o D o o o D o o o D o o D PLATINUM PROPERTIES TRAFFIc OPERATIONS ANALYSIS HAZEL DELL P ARKW A Y AND AVIAN WAY / PROPOSED DRIVE. INTERSECTION DATA TRAFFIC VOLUME COUNTS AND CAPACITY ANALYSES 1 D D D o D D o D D o o o o D D D D o D A & F ENGINEERING CO., INC. TRAFFIC VOLUME SUMMARY CLIENT LOCATION DATE PLATINUM PROPERTIES HAZEL DELL ROAD & AVIAN WAY (01) OCTOBER 30, 2002 PEAK HOUR DATA AM PEAK HR BEGIN 7:15 AM L T R TOT OFF PEAK PM PEAK HR BEGIN 3:15 PM L T R TOT T R TOT L NORTHBOUND EASTBOUND SOUTHBOUND 49 6 49 34 40 6 6 20 4 5 20 81 85 5 HOUR SUMMARY HOUR NB SB NB+SB EB TOTAL - AM - 6- 7 1 1 2 20 22 7- 8 12 4 16 71 87 8- 9 17 5 22 60 82 - PM - 3- 4 36 6 42 38 80 4- 5 36 7 43 26 69 5- 6 34 10 44 29 73 TOTAL 136 33 169 244 413 32.9% 8.0% 40.9% 59.1% 100.0% - AM PEAK VOLUMES - 15-MIN 12 2 42 HOUR 21 6 85 PHF 0.44 0.75 0.51 - PM PEAK VOLUMES - 15-MIN 16 3 15 HOUR 49 10 41 PHF 0.77 0.83 0.68 2 o o D o o D o o o D o U D D D D D D D A & F ENGINEERING CO., INC. TRAFFIC VOLUME SUMMARY CLIENT LOCATION DATE PLATINUM PROPERTIES HAZEL DELL ROAD & AVIAN WAY (01) OCTOBER 30, 2002 SOUTHBOUND DIRECTION OF TRAVEL HOUR LEFT THRU RIGHT TOTAL PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH AM 6- 7 1 0 1 1 0 1 7- 8 1 3 4 1 3 4 8- 9 4 1 5 4 1 5 PM 3- 4 6 0 6 6 0 6 4- 5 7 0 7 7 0 7 5- 6 10 0 10 10 0 10 PASSENGER 6 23 29 60.0% 100.0% 87.9% TRUCK 4 0 4 40.0% 0.0% 12.1% BOTH 10 23 33 30.3% 69.7% 100.0% 3 D o D o D D D D o D o D D D o D o o o A & F ENGINEERING CO., INC. TRAFFIC VOLUME SUMMARY CLIENT LOCATION DATE PLATINUM PROPERTIES HAZEL DELL ROAD & AVIAN WAY (01) OCTOBER 30, 2002 NORTHBOUND DIRECTION OF TRAVEL HOUR LEFT THRU RIGHT TOTAL PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH AM 6- 7 1 0 1 1 0 1 7- 8 12 0 12 12 0 12 8- 9 17 0 17 17 0 17 PM 3- 4 35 1 36 35 1 36 4- 5 36 0 36 36 0 36 5- 6 34 0 34 34 0 34 PASSENGER 135 135 99.3% 99.3% TRUCK 1 1 0.7% 0.7% BOTH 136 136 100.0% 100.0% DIRECTION OF TRAVEL : EASTBOUND HOUR LEFT THRU RIGHT TOTAL PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH AM 6- 7 1 0 1 19 0 19 20 0 20 7- 8 5 0 5 63 3 66 68 3 71 8- 9 2 0 2 56 2 58 58 2 60 PM 3- 4 3 1 4 32 2 34 35 3 38 4- 5 9 1 10 15 1 16 24 2 26 5- 6 7 0 7 22 0 22 29 0 29 PASSENGER 27 207 234 93.1% 96.3% 95.9% TRUCK 2 8 10 6.9% 3.7% 4.1% BOTH 29 215 244 11.9% 88.1% 100.0% 4 D o o o D D D D o D o D D D D D D o D A & F ENGINEERING CO., INC. 24 HOUR TRAFFIC VOLUMES CLIENT LOCATION DATE \>\t.;t~Y\>41"\ ~f(;?Cir+;e;:..S \-I GI:;1 0-1 \)a-\\ Pkw)l y Nc...--th o-t: A"~l\iI't W~y AUGUST 12, 2002 HOUR NB SB NB+SB TOTAL - AM - 12- 1 34 16 50 50 1- 2 12 4 16 16 2- 3 8 6 14 14 3- 4 4 8 12 12 4- 5 10 17 27 27 5- 6 30 87 117 117 6- 7 140 362 502 502 7- 8 244 882 1126 1126 8- 9 275 546 821 821 9-10 250 338 588 588 10-11 253 278 531 531 11-12 304 300 604 604 - PM - 12- 1 294 321 615 615 1- 2 292 276 568 568 2- 3 334 309 643 643 3- 4 376 317 693 693 4- 5 570 322 892 892 5- 6 799 377 1176 1176 6- 7 504 280 784 784 7- 8 343 250 593 593 8- 9 258 189 447 447 9-10 214 142 356 356 10-11 110 60 170 170 11-12 42 32 74 74 TOTAL 5700 5719 11419 11419 %TOTAL 49.9% 50.1% 100.0% 100.0% - AM PEAK VOLUMES - 15-MINUTE 88 259 HOUR 283 895 PHF 0.80 0.86 PH BEGIN 7:30 7:00 - MID PEAK VOLUMES - IS-MINUTE 91 91 HOUR 319 325 PHF 0.88 0.89 PH BEGIN 11:00 12:00 - PM PEAK VOLUMES - IS-MINUTE 227 118 HOUR 807 396 PHF 0.89 0.84 PH BEGIN 5:00 5:00 5 o o o D D D o D o D D D D U D D D D D A & F ENGINEERING CO., INC. 24 HOUR TRAFFIC VOLUMES CLIENT P\..A.T ~NY..N' ?'-"'?CL..- "t;a~ LOCATION H~'"ZQ.1 D<>,I I'kwy.J Ned"I-. of Av;""' Wo.t DIRECTION OF TRAVEL : NORTHBOUND 8/05 8/06 8/07 8/08 8/09 WEEKDAY 8/10 8/11 HOUR MON TUE WED THR FRI AVERAGE SAT SUN 2002 - AM - 12- 1 30 37 34 1- 2 10 13 12 2- 3 10 5 8 3- 4 2 7 4 4- 5 9 12 10 5- 6 33 28 30 6- 7 139 141 140 7- 8 250 237 244 8- 9 271 279 275 9-10 256 244 250 10-11 239 267 253 11-12 288 319 304 - PM - 12- 1 311 276 294 1- 2 276 309 292 2- 3 322 346 334 3- 4 381 372 376 4- 5 569 571 570 5- 6 791 807 799 6- 7 519 489 504 7- 8 333 353 343 8- 9 251 264 258 9-10 207 221 214 10-11 102 118 110 11-12 34 49 42 TOTAL 5711 5700 %AVG DAY 100% 100% - AM PEAK VOLUMES - IS-MINUTE 81 88 88 HOUR 271 283 283 PHF 0.84 0.80 0.80 PH BEGIN 8:00 7:30 7:30 - MID PEAK VOLUMES - IS-MINUTE 95 75 91 91 HOUR 311 288 319 319 PHF 0.82 0.96 0.88 0.88 PH BEGIN 12:00 11:00 11:00 11:00 - PM PEAK VOLUMES - IS-MINUTE 219 227 227 HOUR 791 807 807 PHF 0.90 0.89 0.89 PH BEGIN 5:00 5:00 5:00 6 D D D D D D D D D D D D D D D D D D D A & F ENGINEERING CO., INC. 24 HOUR TRAFFIC VOLUMES CLIENT P\o.-t;",v.1'I'l \)l'Or,co,r--t;OCY LOCATION Hl\?.lt\ \)1).1\ Pkw'1' Nu<+~ or AV;Il" Wo..'f . DIRECTION OF TRAVEL : SOUTHBOUND 8/05 8/06 8/07 8/08 8/09 WEEKDAY 8/10 8/11 HOUR MON TUE WED THR FRI AVERAGE SAT SUN 2002 - AM - 12- 1 18 15 16 1- 2 4 5 4 2- 3 8 5 6 3- 4 9 7 8 4- 5 19 15 17 5- 6 79 95 87 6- 7 352 371 362 7- 8 895 868 882 8- 9 527 564 546 9-10 357 320 338 10-11 273 284 278 11-12 290 310 300 - PM - 12- 1 325 317 321 1- 2 279 272 276 2- 3 307 311 309 3- 4 317 317 317 4- 5 312 333 322 5- 6 396 358 377 6- 7 262 298 280 7- 8 226 273 250 8- 9 187 191 189 9-10 133 152 142 10-11 54 66 60 11-12 36 28 32 TOTAL 5746 5719 %AVG DAY 100% 100% - AM PEAK VOLUMES - 15-MINUTE 259 241 259 HOUR 895 868 895 PHF 0.86 0.90 0.86 PH BEGIN 7:00 7:00 7:00 - MID PEAK VOLUMES - 15-MINUTE 91 92 91 91 HOUR 325 317 310 325 PHF 0.89 0.86 0.85 0.89 PH BEGIN 12:00 12:00 11:00 12:00 - PM PEAK VOLUMES - 15-MINUTE 118 107 118 HOUR 396 358 396 PHF 0.84 0.84 0.84 PH BEGIN 5:00 5:00 5:00 7 o o o o o o o o D D D D D D D o D D D Two-Way Stop Control Page 1 of2 TWO-WAY STOP CONTROL SUMMARY General Information Isite Information IAnalyst TSV Intersection Hazel Dell & A vian Way IAgency/Co. A&F Engineering Co., LLC ~urisdiction Carmel, IN Date Performed 11/4/2002 IAnalysis Year Sc 1 - Ex IAnalysis Time Period AM Peak Project Description Platinum Properties EastlWest Street Avian Way North/South Street Hazel Dell Pkwv Intersection Orientation: North-South IStudy Period (hrs): 0.25 Vehicle Volumes and Adjustments Maior Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R Volume 20 244 0 0 882 5 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 22 271 0 0 980 5 Percent Heavy Vehicles 5 - - 0 -- - Median Type Raised curb RT Channelized 0 0 Lanes 1 1 0 0 1 1 Configuration L T T R Upstream Signal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R lVolume 0 0 0 4 0 81 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 0 0 0 4 0 90 Percent Heavy Vehicles 0 0 0 5 0 5 Percent Grade (%) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 1 0 1 Configuration L R Delay, Queue length, and level of Service !Approach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration L L R Iv (vph) 22 4 90 ~ (m) (vph) 689 283 299 Iv/c 0.03 0.01 0.30 95% queue length 0.10 0.04 1.23 ~ontrol Delay 10.4 17.9 22.1 LOS B C C IApproach Delay - - 22.0 IApproach LOS - - C > Copyright C> 2000 University of Florida, All Rights Reserved Version 4. Ie 8 file://C:\Documents%20and%20Settings\tvandenberg.DELL 15\Local%20Settings\Temp\uL... 11/8/2002 D D D o o o o D D o o o o u u o o o o Two- Way Stop Control Page 1 of2 TWO-WAY STOP CONTROL SUMMARY General Information Site Information Analyst TSV Intersection Hazel Dell & A vian Way Agency/Co. A&F Engineering Co., LLC Jurisdiction Carmel, IN Date Performed 11/412002 Analysis Year Sc 1-Ex Analysis Time Period PM Peak Proiect Description Platinum Properties EastlWest Street: Avian Way North/South Street: Hazel Dell Pkwy Intersection Orientation: North-South Study Period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R Volume 49 799 0 0 377 6 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 54 887 0 0 418 6 Percent Heavy Vehicles 5 - - 0 - - Median Type Raised curb RT Channelized 0 0 Lanes 1 1 0 0 1 1 Configuration L T T R Upstream Signal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R Volume 0 0 0 6 0 34 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 0 0 0 6 0 37 Percent Heavy Vehicles 0 0 0 5 0 5 Percent Grade (%) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 1 0 1 Configuration L R Delay, Queue Length, and Level of Service ~pproach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration L L R " (vph) 54 6 37 k:; (m) (vph) 1119 259 629 ~/c 0.05 0.02 0.06 [95% queue length 0.15 0.07 0.19 K:;ontrol Delay 8.4 19.2 11.1 LOS A C B ~pproach Delay - - 12.2 ~pproach LOS - - B > Copyright 0 2000 University of Florida, All Rights Reserved Version 4.lc 9 file://C :\Documents%20and%20Sertings\tvandenberg.DELL 15\Local%20Sertings\ T emp\u2k 11/8/2002 o o o o o o o o o o o o o D D o o o o Two-Way Stop Control Page 1 of2 TWO-WAY STOP CONTROL SUMMARY General Information Site Information I\nalyst TSV Intersection Hazel Dell & A vian Way I\gency/Co. A&F Engineering Co., LLC Jurisdiction Carmel, IN Date Performed 11/4/2002 I\nalysis Year Sc 2 - Ex + Gen I\nalvsis Time Period AM Peak Proiect Description Platinum Properties EastlWest Street: Avian Way INorth/South Street: Hazel Dell Pkwy Intersection Orientation: North-South IStudy Period (hrs): 0.25 ~ehicle Volumes and Adjustments Maior Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R !Volume 20 244 7 28 882 5 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 22 271 7 31 980 5 Percent Heavy Vehicles 5 - - 5 - - Median Type Raised curb RT Channelized 0 0 Lanes 1 1 0 1 1 1 ~onfjgu ration L TR L T R Upstream Signal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R Volume 21 5 84 4 5 81 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 23 5 93 4 5 90 Percent Heavy Vehicles 5 5 5 5 5 5 Percent Grade (%) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 1 1 0 1 1 0 Configuration L TR L TR Delav, Queue Lenath and Level of Service ~pproach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration L L L TR L TR r.r (vph) 22 31 23 98 4 95 ~ (m) (vph) 689 1268 129 675 198 295 r.r/c 0.03 0.02 0.18 0.15 0.02 0.32 ~5% queue length 0.10 0.08 0.62 0.51 0.06 1.35 Control Delay 10.4 7.9 38.9 11.2 23.6 22.9 LOS B A E B C C Approach Delay - - 16.5 22.9 Approach LOS - - C C > Copyright ~ 2000 University ofFJorida, All Rights Reserved Version 4.lc 10 file:/ /C:\Documents%20and%20Settings\tvandenberg.DELL I5\Local%20Settings\ T emp\u2k 11/8/2002 D D o o o o o o o o o o o o o o o o o Two-Way Stop Control Page 1 of2 TWO-WAY STOP CONTROL SUMMARY General Information Site Information fA.nalyst TSV Intersection Hazel Dell & A vian Way fA.gency/Co. A&F Engineering Co., LLC Jurisdiction Carmel, IN Date Performed 11/4/2002 Analysis Year Sc 2 - Ex + Gen fA.nalysis Time Period PM Peak Project Description Platinum Properties EastlWest Street: Avian Way INorth/South Street: Hazel Dell Pkwy Intersection Orientation: North-South IStudy Period (hrs): 0.25 Vehicle Volumes and Adjustments Maior Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R Volume 49 799 24 95 377 6 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 54 887 26 105 418 6 Percent Heavy Vehicles 5 - - 5 - - Median Type Raised curb RT Channelized 0 0 Lanes 1 1 0 1 1 1 Configuration L TR L T R Upstream SiQnal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R Volume 13 5 54 6 5 34 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 14 5 60 6 5 37 Percent Heavy Vehicles 5 5 5 5 5 5 Percent Grade (%) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 1 1 0 1 1 0 Configu ration L TR L TR Delay, Queue Length and Level of Service Approach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration L L L TR L TR v (vph) 54 105 14 65 6 42 C (m) (vph) 1119 734 159 313 90 454 vlc 0.05 0.14 0.09 0.21 0.07 0.09 95% queue length 0.15 0.50 0.29 0.77 0.21 0.30 Control Delay 8.4 10.7 29.8 19.5 47.8 13.7 LOS A B D C E B Approach Delay - - 21.3 18.0 Approach LOS -- - C C > Copyright iO 2000 University of Florida, All Rights Reserved Version 4.1 c 11 file:/lC:\Documents%20and%20Settings\tvandenberg.DELL 15\Local%20Settings\ T emp\u2k 11/8/2002 o o o D D D D D D D D D o D D D D o o Two-Way Stop Control Page 1 of2 TWO-WAY STOP CONTROL SUMMARY General Information Site Information Analyst TSV Intersection Hazel Dell & A vian Way Agency/Co. A&F Engineering Co., LLC Jurisdiction Carmel, IN Date Performed 11/4/2002 Analysis Year Sc 3 - ExGenShft Analysis Time Period AM Peak Project Description Platinum Properties EastlWest Street: Avian Way INorth/South Street: Hazel Dell Pkwv Intersection Orientation: North-South !study Period ThrSf: 0.25 lVehicle Volumes and Adjustments Maior Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R rvolume 20 244 9 28 882 5 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 22 271 10 31 980 5 Percent Heavy Vehicles 5 - - 5 - - Median Type Raised curb RT Channelized 0 0 Lanes 1 1 0 1 1 1 ~onfiguration L TR L T R Upstream Signal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R Volume 28 5 84 4 5 81 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 31 5 93 4 5 90 Percent Heavy Vehicles 5 5 5 5 5 5 Percent Grade (%) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 1 1 0 1 1 0 lConfiguration L TR L TR Delay, Queue Length and Level of Service ~pproach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration L L L TR L TR !v (vph) 22 31 31 98 4 95 K:; (m) (vph) 689 1264 129 673 197 295 !v/c 0.03 0.02 0.24 0.15 0.02 0.32 ~5% queue length 0.10 0.08 0.89 0.51 0.06 1.35 K:;ontrol Delay 10.4 7.9 41.5 11.3 23.7 22.9 LOS B A E B C C fA,pproach Delay -- - 18.5 22.9 fA,pproach LOS - - C C > Copyright \0 2000 University of Florida, All Rights Reserved Version 4. Ie 12 file://C :\Documents%20and%20Settings\tvandenberg.D ELL 15\Local%20Settings\ T emp\u2k 11/8/2002 o o o o o o o o o o o o o D o o o o o Two-Way Stop Control Page I of2 TWO-WAY STOP CONTROL SUMMARY General Information Site Information Analyst TSV Intersection Hazel Dell & A vian Way Agency/Co. A&F Engineering Co., LLC Jurisdiction Carmel, IN Date Performed 11/4/20.0.2 Analysis Year Sc 3 - ExGenShft Analysis Time Period PM Peak Project Description Platinum Properties EastlWest Street: Avian Way North/South Street: Hazel Dell Pkwy Intersection Orientation: North-South IStudy Period (hrs): 0..25 ~ehicle Volumes and Adjustments Maior Street Northbound Southbound Movement 1 2 3 4 5 6 l T R l T R !Volume 49 799 31 95 377 6 Peak-Hour Factor, PHF 0..90. 0..90. 0..90. 0..90. 0..90. 0..90. Hourly Flow Rate, HFR 54 887 34 10.5 418 6 Percent Heavy Vehicles 5 - - 5 -- - Median Type Raised curb RT Channelized 0. a lanes 1 1 a 1 1 1 ~onfjguration L TR L T R Upstream Signal a a Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R Volume 17 5 54 6 5 34 Peak-Hour Factor, PHF 0..90. 0..90. 0..90. 0..90. 0.90. 0..90. Hourly Flow Rate, HFR 18 5 60. 6 5 37 Percent Heavy Vehicles 5 5 5 5 5 5 Percent Grade (%) a a Flared Approach N N Storage a 0. RT Channelized a a Lanes 1 1 a 1 1 0. lConfiguration L TR L TR Delay, Queue Len~th and level of Service ~pproach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration L L L TR L TR ~ (vph) 54 10.5 18 65 6 42 C (m) (vph) 1119 729 158 312 89 451 v/c 0..0.5 0..14 0..11 0..21 0..0.7 0..0.9 95% queue length 0..15 0..50. 0..38 0..77 0..21 0..31 Control Delay 8.4 10..8 30..7 19.5 48.4 13.8 LOS A B D C E B Approach Delay - - 22.0. 18.1 Approach LOS -- - C C > Copyright <0 2000 University of Florida, All Rights Reserved Version 4.lc 13 file://C:\Documents%20and%20Settings\tvandenberg.DELL I 5\Local%20Settings\ T emp\u2k 11/8/2002 o o D D D D D o o o o o o D D o D D D PLATINUM PROPERTIES TRAFFIc OPERATIONS ANAL YSIS PROPOSED DRIVE: HAZEL DELL PARKWAY TO EAST BORDER OF PROPOSED SITE SEGMENT DATA CAPACITY ANALYSES 14 o o D Phone: E-Mail: o Analyst TSV O Agency/Co. A&F Engineering Date Performed 1117/2002 Analysis Time Period AM Peak O Highway Proposed Drive FromlTo Hazel Dell to East Site Border Jurisdiction Carmel, IN Analysis Year Sc 3 - ExGenShft o Description Cherry Creek Estates HCS2000: Two-lane Highways Release 4.1 c Fax: Two-Way Two-lane Highway Segment Analysis Input Data O Highway class Class 2 Shoulder width 1.0 lane width 16.0 O Segment length 0.7 Terrain type level Grade: Length mi Up/down % D Two-way hourly volume, V 149 Directional split 75 1 25 % ft Peak-hour factor, PHF 0.90 ft % Trucks and buses 5 % mi % Recreational vehicles 5 % % No-passing zones 100 % Access points/mi 0 Imi veh/h D Average Travel Speed Grade adjustment factor, fG 1.00 PCE for trucks, ET 1.7 D PCE for RVs, ER 1.0 Heavy-vehicle adjustment factor, 0.966 Two-way flow rate,(note-1) vp 171 pc/h O Highest directional split proportion (note-2) 128 pclh Free-Flow Speed from Field Measurement: Field measured speed, SFM D Observed volume, Vf Estimated Free-Flow Speed: Base free-flow speed, BFFS Adj. for lane and shoulder width, flS o Adj. for access points, fA Free-flow speed, FFS D Adjustment for no-passing zones, fnp 3.0 mi/h Average travel speed, A TS 36.5 mi/h mi/h veh/h 45.0 mi/h 4.2 mi/h 0.0 mi/h 40.8 milh Percent Time-Spent-Following D Grade adjustment factor, fG PCE for trucks, ET O PCE for RVs, ER Heavy-vehicle adjustment factor, fHV Two-way flow rate,(note-1) vp Highest directional split proportion (note-2) o Base percent time-spent-following, BPTSF 1.00 1.1 1.0 0.995 166 pc/h 125 13.6 % 15 o Adj.for directional distribution and no-passing zones, fdlnp 28.3 Percent time-spent-following, PTSF 41.8 % o o o o o o o o D D D D D D D o D D Level of Service and Other Performance Measures Level of service, LOS Volume to capacity ratio, vlc Peak 15-min vehicle-miles of travel, VMT15 Peak-hour vehicle-miles of travel, VMT60 Peak 15-min total travel time, TT15 B 0.05 29 veh-mi 104 veh-mi 0.8 veh-h Notes: 1. If vp >= 3200 pc/h, terminate analysis-the LOS is F. 2. If highest directional split vp >= 1700 pc/h, terminate analysis-the LOS is F. 16 D o o Phone: E-Mail: o D o o o o D o o o o o D o o o HCS2000: Two-Lane Highways Release 4.1 c Fax: Two-Way Two-Lane Highway Segment Analysis Analyst TSV Agency/Co. A&F Engineering Date Performed 11nt2002 Analysis Time Period PM Peak Highway Proposed Drive FromlTo Hazel Dell to East Site Border Jurisdiction Carmel, IN Analysis Year Sc 3 - ExGenShft Description Cherry Creek Estates Input Data Highway class Class 2 Shoulder width Lane width Segment length Terrain type Grade: Length Up/down 1.0 ft Peak-hour factor, PHF 0.90 16.0 ft % Trucks and buses 5 % 0.7 mi % Recreational vehicles 5 % Level % No-passing zones 100 % mi Access points/mi 0 /mi % Two-way hourly volume, V 197 Directional split 64 / 36 % veh/h Average Travel Speed Grade adjustment factor, fG 1.00 PCE for trucks, ET 1.7 peE for RVs, ER 1.0 Heavy-vehicle adjustment factor, 0.966 Two-way flow rate,(note-1) vp 227 pdh Highest directional split proportion (note-2) 145 pclh Free-Flow Speed from Field Measurement: Field measured speed, SFM Observed volume, Vf Estimated Free-Flow Speed: Base free-flow speed, BFFS Adj. for lane and shoulder width, fLS Adj. for access points, fA milh veh/h 45.0 mi/h 4.2 mi/h 0.0 mi/h Free-flow speed, FFS 40.8 milh Adjustment for no-passing zones, fnp Average travel speed, A TS 3.6 mi/h 35.4 mi/h Percent Time-Spent-Following Grade adjustment factor, fG PCE for trucks, ET PCE for RVs, ER Heavy-vehicle adjustment factor, fHV Two-way flow rate,(note-1) vp Highest directional split proportion (note-2) Base percent time-spent-following, BPTSF 1.00 1.1 1.0 0.995 220 pclh 141 17.6 % 17 U Adj.for directional distribution and no-passing zones, fdlnp 23.9 Percent time-spent-following, PTSF 41.5 % D D o D D o o o o o D D o D D o o o ~ Level of Service and Other Performance Measures Level of service, LOS Volume to capacity ratio, vlc Peak 15-min vehicle-miles of travel, VMT15 Peak-hour vehicle-miles of travel, VMT60 Peak 15-min total travel time, TT15 B 0.07 1.1 38 veh-mi 138 veh-mi veh-h Notes: 1. If vp >= 3200 pcIh, terminate analysis-the LOS is F. 2. If highest directional split vp >= 1700 pc/h, terminate analysis-the LOS is F. 18