HomeMy WebLinkAboutS101 FISHING PIER SPECIAL INSPECTIONSSTATEMENT OF SPECIAL INSPECTIONS THIS STATEMENT OF SPECIAL INSPECTIONS IS SUBMITTED AS A CONDITION FOR PERMIT ISSUANCE IN ACCORDANCE WITH THE SPECIAL INSPECTION AND STRUCTURAL TESTING REQUIREMENTS OF THE BUILDING CODE. IT INCLUDES A SCHEDULE OF SPECIAL INSPECTION SERVICES APPLICABLE TO THIS PROJECT, AS WELL AS THE NAME OF THE SPECIAL INSPECTOR TO BE RETAINED FOR CONDUCTING THESE INSPECTIONS AND TESTS. THIS STATEMENT OF SPECIAL INSPECTIONS ENCOMPASSES THE FOLLOWING DISCIPLINES: THE SPECIAL INSPECTOR SHALL KEEP RECORD OF ALL INSPECTIONS AND SHALL FURNISH INSPECTION REPORTS TO THE BUILDING OFFICIAL AND THE REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE. DISCOVERED DISCREPANCIES SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE CONTRACTOR FOR CORRECTION. IF SUCH DISCREPANCIES ARE NOT CORRECTED, THE DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE BUILDING OFFICIAL AND THE REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE. THE SPECIAL INSPECTION PROGRAM DOES NOT RELIEVE THE CONTRACTOR OF HIS OR HER RESPONSIBILITIES. INTERIM REPORTS SHALL BE SUBMITTED TO THE BUILDING OFFICIAL AND THE REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE. A FINAL REPORT OF SPECIAL INSPECTIONS DOCUMENTING COMPLETION OF ALL REQUIRED SPECIAL INSPECTIONS, TESTING, AND CORRECTION OF ANY DISCREPANCIES NOTED IN THE INSPECTIONS SHALL BE SUBMITTED PRIOR TO ISSUANCE OF A CERTIFICATE OF USE AND OCCUPANCY. JOB SITE SAFETY AND MEANS AND METHODS OF CONSTRUCTION ARE SOLELY THE RESPONSIBILITY OF THE CONTRACTOR. THIS STATEMENT OF SPECIAL INSPECTIONS INCLUDES THE FOLLOWING BUILDING SYSTEMS: THE FOLLOWING COMPONENTS ARE WIND-RESISTING COMPONENTS OR PART OF THE MAIN WIND-FORCE RESISTING SYSTEM AND ARE SUBJECT TO SPECIAL INSPECTIONS IN ACCORDANCE WITH THE SPECIAL INSPECTION SCHEDULE: THE FOLLOWING COMPONENTS ARE DESIGNATED SEISMIC SYSTEMS OR PART OF THE SEISMIC-FORCE RESISTING SYSTEM THAT ARE SUBJECT TO SPECIAL INSPECTIONS IN ACCORDANCE WITH THE SPECIAL INSPECTION SCHEDULE: SPECIAL INSPECTION AGENCY: X X □ARCHITECTURAL □CAST-IN-PLACE FOUNDATION ELEMENTS □HELICAL PILE FOUNDATIONS □CONCRETE CONSTRUCTION □MASONRY CONSTRUCTIONS - LEVEL B □STEEL CONSTRUCTION OTHER THAN STRUCTURAL STEEL □SPRAY FIRE-RESISTANT MATERIALS □EXTERIOR INSULATION AND FINISH SYSTEM (EIFS) □SMOKE CONTROL □SEISMIC RESISTANCE □SOILS □DRIVEN DEEP FOUNDATION ELEMENTS □CAST-IN-PLACE DEEP FOUNDATION ELEMENTS □MASONRY CONSTRUCTION - LEVEL A □STRUCTURAL STEEL CONSTRUCTION □WOOD CONSTRUCTION □MASTIC AND INTUMESCENT FIRE-RESISTANT COATINGS □FIRE-RESISTANT PENETRATIONS AND JOINTS □WIND RESISTANCE □ARCHITECTURAL □STRUCTURAL □MECHANICAL/ELECTRICAL/PLUMBING □OTHER: X X X X REQUIRED VERIFICATION AND INSPECTION OF WOOD CONSTRUCTION (IBC 2012 SECTIONS 1705.10.1/1705.11.2) VERIFICATION AND INSPECTION REQUIRED FIELD GLUING OPERATIONS CONTINUOUS PERIODIC REFERENCED STANDARD IBC REFERENCE X1.YES --- NAILING, BOLTING, ANCHORING, AND OTHER FASTENING OF COMPONENTS (INCLUDING SHEAR WALLS, WOOD DIAPHRAGMS, DRAG STRUTS, BRACES, AND HOLD-DOWNS) - 2. YES X -- REQUIRED VERIFICATION AND INSPECTION OF SOILS (IBC 2012 TABLE 1705.6) VERIFICATION AND INSPECTION REQUIRED VERIFY MATERIALS BELOW SHALLOW FOUNDATIONS ARE ADEQUATE TO ACHIEVE THE DESIGN BEARING CAPACITY. CONTINUOUS PERIODIC REFERENCED STANDARD IBC REFERENCE -1. VERIFY EXCAVATIONS ARE EXTENDED TO PROPER DEPTH AND HAVE REACHED PROPER MATERIAL. 2. YES X -- -YES X PERFORM CLASSIFICATION AND TESTING OF COMPACTED FILL MATERIALS. 3.-YES X VERIFY USE OF PROPER MATERIALS, DENSITIES AND LIFT THICKNESSES DURING PLACEMENT AND COMPACTION OF COMPACTED FILL. 4. XYES - PRIOR TO PLACEMENT OF COMPACTED FILL, OBSERVE SUBGRADE AND VERIFY THAT SITE HAS BEEN PREPARED PROPERLY. 5. -YES X -- -- -- -- *THE BUILDING OFFICIAL SHALL BE PERMITTED TO WAIVE THE REQUIREMENT FOR A GEOTECHNICAL INVESTIGATION, IN ACCORDANCE WITH IBC SECTION 1803.2. REQUIRED VERIFICATION AND INSPECTION OF CONCRETE CONSTRUCTION (IBC 2012 TABLE 1705.3) VERIFICATION AND INSPECTION REQUIRED INSPECTION OF REINFORCING STEEL, INCLUDING PRESTRESSING TENDONS, AND PLACEMENT. CONTINUOUS PERIODIC REFERENCED STANDARD IBC REFERENCE -1. INSPECTION OF REINFORCING STEEL WELDING IN ACCORDANCE WITH TABLE 1705.22, ITEM — 2B. 2. YES/NO X ACl 3l8: 3.5,7.l-7.7 1910.4 -YES/NO - AWS D1.4 ACI 318: 3.5.2 - INSPECTION OF ANCHORS CAST IN CONCRETE WHERE ALLOWABLE LOADS HAVE BEEN INCREASED OR WHERE STRENGTH DESIGN IS USED. 3. -YES/NO X ACI 318: 8.1.3, 21.2.8 1908.5, 1909.1 INSPECTION OF ANCHORS POST-INSTALLED IN HARDENED CONCRETE MEMBERS. 4.-YES/NO X ACI 318: 3.8.6, 8.1.3, 21.2.8 1909.1 VERIFYING USE OF REQUIRED DESIGN MIX.5.-YES/NO X ACI 318: Ch. 4, 5.2-5 .4 1904.2, 1910.2,1910.3 AT THE TIME FRESH CONCRETE IS SAMPLED TO FABRICATE SPECIMENS FOR STRENGTH TESTS, PERFORM SLUMP AND AIR CONTENT TESTS, AND DETERMINE THE TEMPERATURE OF THE CON- CRETE. 6. XYES/NO - ASTM C172 ASTM C31 ACI 318: 5.6, 5.8 1910.10 INSPECTION OF CONCRETE AND SHOTCRETE PLACEMENT FOR PROPER APPLICATION TECH- NIQUES. 7. XYES/NO -ACI 318: 5.9, 5.10 1910.6, 1910.7, 1910.8 INSPECTION FOR MAINTENANCE OF SPECIFIED CURING TEMPERATURE AND TECHNIQUES. 8. -YES/NO X ACI 318: 5.11-5.13 1910.9 INSPECTION OF PRESTRESSED CONCRETE: A. APPLICATION OF PRESTRESSING FORCES. B. GROUTING OF BONDED PRESTRESSING TEN- DONS IN THE SEISMIC FORCE-RESISTING SYSTEM. 9. X XYES/NO - ACI 318: 18.20 AC1 318: l8.18.4 - ERECTION OF PRECAST CONCRETE MEMBERS.10.-YES/NO X ACI 318: Ch. 16 - VERIFICATION OF IN-SITU CONCRETE STRENGTH, PRIOR TO STRESSING OF TENDONS IN POST-TENSIONED CONCRETE AND PRIOR TO REMOVAL OF SHORES AND FORMS FROM BEAMS AND STRUCTURAL SLABS. 11.-YES/NO X ACI 318: 6.2 - INSPECT FORMWORK FOR SHAPE, LOCATION AND DIMENSIONS OF THE CONCRETE MEMBER BEING FORMED. 12. -YES/NO X ACI 318: 6.1.1 - REQUIRED SPECIAL INSPECTIONS AND TESTS OF DRIVEN DEEP FOUNDATION ELEMENTS ( IBC 2015 TABLE 1705.7) VERIFICATION AND INSPECTION REQUIRED VERIFY ELEMENT MATERAILS, SIZES, AND LENGTHS COMPLY WITH THE REQUIREMENTS. CONTINUOUS PERIODIC REFERENCED STANDARD IBC REFERENCE X1. DETERMINE CAPACITIES OF TEST ELEMENTS AND CONDUCT ADDITIONAL LOAD TESTS, AS REQUIRED. 2. YES - XYES -- INSPECT DRIVING OPERATIONS AND MAINTAIN COMPLETE AND ACCURATE RECORDS FOR EACH ELEMENT 3. XYES - VERIFY PLACEMENT LOCATIONS AND PLUMBNESS, CONFIRM TYPE AND SIZE OF HAMMER, RECORD NUMBER OF BLOWS PER FOOT OF PENETRATION TO ACHIEVE DESIGN CAPACITY, RECORD TIP AND BUTT ELEVATIONS AND DOCUMENT ANY DAMAGE TO FOUNDATION ELEMENT 4. YES - FOR STEEL ELEMENTS, PERFORM ADDITIONAL SPECIAL INSPECTIONS IN ACCORDANCE WITH SECTION 1705.2. 5. -NO FOR CONCRETE ELEMENTS AND CONCRETE- FILLED ELEMENTS, PERFORM TESTS AND ADDITIONAL SPECIAL INSPECTIONS IN ACCORDANCE WITH SECTION 1705.3. 6. NO - FOR SPECIALTY ELEMENTS, PERFORM ADDITIONAL INSPECTIONS AS DETERMINED BY THE REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE. 7. NO - - - - - - - - - - - - X - - - - - 8 A B 34567 12 C D E F G H 8 34567 12 A B C D E F G H REVISION RECORDSHEET OFDATE:DWG SCALE:DRAWN BY:CHECKED BY:APPROVED BY:PROJECT NO:DRAWING NO.:2704 Cherokee Farm Way • Suite 101 • Knoxville, TN 37920Ph: 865.977.9997 - Fax: 865.977.9919www.cecinc.comP:\310-000\311-804\-CADD\Revit\311-804_Structural_CENTRAL_R24.rvtNTSREI REAL ESTATE SERVICES, LLCFISHING PIER DESIGN11335 N. MICHIGAN ROADCARMEL, INDIANA 46077SPECIAL INSPECTIONSCRSRTJRTJ311-804JANUARY 2024S101 2 5NO DATE DESCRIPTION0 1/23/24 ISSUE FOR BID 1/23/24