Loading...
HomeMy WebLinkAboutL001 The Edge Tree Protection Plan-L001LOADING ZONELOADING ZONELOADING ZONENOPARKINGRCAADJOINERADJOINER WOODHAVENSECTION ONEP.B . 9 , PGS . 22 -24THE TOWNES AT WESTON PO INTESECTION 1 INSTR . #200400067374P.C . 3 , SL IDE 4890Scale 1" = 60'-0"120'60'30'North8AB3456712CDEFGH83456712ABCDEFGHDESCRIPTIONDATENO REVISION RECORD 2 03/25/24 ADLS RESUBMITTAL PLAN DATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:311-804 JANUARY 9, 2024 APP APPXX REI REAL ESTATE SERVICES, LLC THE EDGE AT CARMEL WEST 11335 N. MICHIGAN ROAD CARMEL, INDIANA 46077 530 E. Ohio Street · Suite G - Indianapolis, IN 46204 317-655-7777 · 877-746-0749 www.cecinc.com 5825 Lawton Loop E . Dr . | Indianapolis , IN 46216317-485-6900 | www.context-design.comTree Protection Plan L0011.Underground utilities, if shown, are based on above groundindications and construction drawings on file at Butler University.There is no guarantee that all underground utilities in service orabandoned are shown. Underground utilities are shown asaccurately as possible but still may not be exact. No physicalunderground utility locations were made.2.Tree Protection Fencing locations are fixed. Install exactly whereshown on these plans. Any adjustments to fencing locations mustbe approved by the Owner. Damages will be assessed if treeprotection fence location is adjusted without Owner approval.Fence deviation from this plan or approved change will becorrected by the General Contractor prior to the start ofconstruction.3.All tree pruning and limb restraint will be performed under thedirect supervision of a Certified Arborist. Contractor shall not prunetrees or restrain limbs.4.No staging, equipment, material storage, or vehicles are allowedon non-paved areas unless indicated otherwise on plan.5.Abandon all utilities to be removed when located within aProtected Root Zone.6.Backfill all depressed and void areas with top soil followingremoval of vegetation. Soil shall be free of debris. Compact soilsto ensure settling and sedimentation do not occur.7.Owner is responsible for transplanting identified trees, as noted.Coordinate with Owner if trees to be transplanted remain on sitewhen mobilization begins.8.Cleanly cut all roots encountered during construction. Contractorto Air-knife all roots around trees around all indicated as beingessential to the campus landscape vocabulary and any tree over18" in diameter.9.Coordinate locations of Tree Protection Fencing and ConstructionFencing prior to the start of construction activities. In areas whereTree Protection and Construction Fences overlap, the Contractormay elect to install the more restrictive fence type of the twoprovided that the single fence accommodates the requirements ofboth fences.10.Trimming of existing trees shall occur no later than March 15th. Alltree trimming shall be under the direct supervision of a certifiedarborist.TREE PROTECTIONGENERAL NOTESMINIMUM PROTECTION AREASHALL EXTEND TO A RADIUS(IN FEET) OF 1.5 X THE CALIPER(IN INCHES) OF THE TREE,REFER TO PLAN.6' HIGH CHAIN LINK FENCE, ASINDICATED.METAL FENCE POST (6' O.C.MAX.)TREE PROTECTION FENCENot to ScaleTREE PRESERVATION LEGENDTree to be ProtectedTree Protection Fencing,Refer to Detail this sheet. Ifpermanent fence is installed,tree protection fence is notneeded per Carmel UrbanForester direction 03/20/24Tree Protection Fencing,Refer to Detail this sheet. Ifpermanent fence is installed,tree protection fence is notneeded per Carmel UrbanForester direction 03/20/24Tree Protection Fencing,Refer to Detail this sheet. Ifpermanent fence is installed,tree protection fence is notneeded per Carmel UrbanForester direction 03/20/24