HomeMy WebLinkAboutCorrespondencePlan Review - Review Comments Report
Project Name: PZ-2024-00059 to 67 V Meyer Additional Variances
Workflow Started: 4/17/2024 2:56:05 PM
Report Generated: 02/03/2025 10:41 AM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
1 Planning Intake
Joe Shestak
4/22/24 10:34 AM
Comment
Please upload the site plan, elevations, aerial views, etc.
Info Only
2 1 Engineering
Alex Jordan
4/23/24 2:29 PM
Changemark
Detention or a contribution will be required due to the lot coverage being
exceeded
Due to the lot coverage being exceeded, detention will need to be provided
on site or a $6,000 contribution can be made to the City's non-reverting
thoroughfare fund. Please clarify which route will be pursued.
4.11.24 Site Plan.pdf Reviewer Response: Alex Jordan - 5/14/24 9:38 AM
This contribution can be made now or at the building
permit stage of the project. Please let us know when
you would like to make this contribution.
----------------------------------------------------------
Responded by: Elizabeth Bentz Williams - 5/7/24 10:14
AM
Applicant will make the $6,000 contribution the City's
non-reverting throughfare fund
Info Only
3 1 Engineering
Alex Jordan
4/23/24 2:34 PM
Changemark
The following items we need to be included on the plot plan
- the proposed structures finished floor elevation, minimum lowest adjacent
grade, and minimum flood protection grade - all proposed grading and spot
shots at all building corners - a construction phase erosion and sediment
control plan
4.11.24 Site Plan.pdf Reviewer Response: Alex Jordan - 5/14/24 9:42 AM
The MLAG and MFPG will need to be provided even
though there is no floodplain in the area. In this case,
the MFPG can be set 6" lower than the FFE and the
MLAG should be set at the lowest grade that will be
adjacent to the proposed building. Additionally, we will
need to see the erosion control measures shown on the
site plan in addition to the details uploaded with C1.1.
----------------------------------------------------------
Responded by: Elizabeth Bentz Williams - 5/7/24 10:25
AM
Please see uploaded Plan C12 for finished floor
elevations. Please see FEMA Dynamic Map and 331
1st Street FEMA FIRM maps attached demonstrating no
flood plain in the area.
Please see uploaded Plan CI REV 20APR for grading and
the elevations at building corners.
Please see uploaded Plan C11 for construction phase
erosion and sediment control plan
Info Only
REVIEW COMMENTS
Plan Review - Review Comments Report
Project Name: PZ-2024-00059 to 67 V Meyer Additional Variances
Workflow Started: 4/17/2024 2:56:05 PM
Report Generated: 02/03/2025 10:41 AM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
4 1 Planning & Zoning
Angie Conn
4/25/24 9:40 AM
Comment
Please respond in writing to the preliminary review comments listed at the
bottom of the 04/18 docket no. assignment email, and please do that before
noon Friday, May 17. For your convenience, they are listed again, below: a)
Please make checks payable to City of Carmel if you are paying via check. b)
Provide a copy of the Official List of Adjacent Property Owners from the
Hamilton County Auditors Office. (Make sure to check Carmel BZA on their
form.) (DONE.) c) *The Current in Carmel only prints on Tuesdays, and their
filing deadline is usually 14 days prior to their printing date. Please submit
your Microsoft Word file of the legal ad to them before Noon, April 26 so
that it prints on time. Their contact info is 317-489-4444 or
legals@youarecurrent.com. (Please refer to the Handout for a template of
wording to use for the legal ad and the mailings.) d) The mailings/notices to
the neighbors should be done by first class mail with Certificate of Mailing
(not Certified Mail). (Please provide us with the certificate of mailings for the
file on or before noon Thursday., May 23.) e) Please provide the filled out &
notarized Placement of Public Notice Sign Placement Affidavit form (found in
Handout) once the sign is placed. f) Please provide the filled out & notarized
Petitioners Affidavit of Notice of Public Hearing form (found in Handout). g)
Please provide the filled out Notice of the Public Hearing form/template
(found in Handout). h) Please provide proof of notice, such as Publishers
Affidavit from the newspaper, once you receive them. i) Please make sure to
list out the true practical difficulties and hardships associated with having to
comply with the zoning ordinance. j) Please have your Findings of Fact
written out for each separate variance (five (5) total), and please write them
so that they address the specific topic of the variances requested, with more
details as to why you need that specific variance approved, etc. k) Please
provide a conceptual landscape plan, and please make sure that at least one
medium or large native shade tree from the Recommended Species List is
shown for the front yard. (here is a weblink to that list:
https://www.carmel.in.gov/home/showpublisheddocument/
21856/638472408508400000) l) Please confirm that you are working with the
Carmel Engineering Dept. and will also pay into the stormwater fund / fee if
you cannot provide on-site stormwater detention. m) Additional review
comments (if any) will be issued through ProjectDox, our online plan review
software.
Responded by: Elizabeth Bentz Williams - 5/7/24 10:38
AM
a) filing fee has been paid.
b) Done.
c) Completed, published April 30, 2024, see
Proof of Publication uploaded.
d) Completed May 2, 2024, please see
Notice, Location Map and Certificate of Mailing loaded.
e) Sign was posted May 2, 2024,
please see Affidavit of Sign Posting uploaded.
f) Please find Affidavit of mailing uploaded
g) See uploaded
h) See uploaded
i & j) See Findings uploaded as: PZ-2024-00059,
FOF, PZ-2024-00063 FOF, PZ-2024-65, PZ-2024-66 FOF
and PZ-2024-00067 FOF
k) Please see uploaded plan C-12
l) In progress
Resolved
5 1 Planning & Zoning
Angie Conn
4/25/24 9:46 AM
Comment
Please confirm with the Carmel Engineering Dept. that it is okay to have a
window well in a drainage swale.
Responded by: Elizabeth Bentz Williams - 5/8/24 3:38
PM
Applicant has discussed with Jerrod Huff and received
information that the current design of the window well
is satisfactory.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2024-00059 to 67 V Meyer Additional Variances
Workflow Started: 4/17/2024 2:56:05 PM
Report Generated: 02/03/2025 10:41 AM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
6 1 Planning & Zoning
Angie Conn
4/25/24 9:50 AM
Comment
Will the window wells have grates/covers? If so, please provide photo
examples for the proposed design details of those.
Responded by: Elizabeth Bentz Williams - 5/7/24 10:53
AM
Please see uploaded plan AZ.1 REV 30 APR
Resolved
7 1 Planning & Zoning
Angie Conn
4/25/24 9:51 AM
Comment
Per UDO section 1.07, a 5-ft wide sidewalk is required along 1st St SW, or, if
you have not yet done so, payment for what it would cost to install that
segment of sidewalk will be required (into the Thoroughfare Fund.) Please
contact Alex Jordan in the Carmel Engineering Dept. for details.
ajordan@carmel.in.gov. Please confirm that you will be adding in that
sidewalk section.
Responded by: Elizabeth Bentz Williams - 5/7/24 10:54
AM
Please see uploaded plan C1 REV 20 APR
Resolved
8 2 Planning & Zoning
Angie Conn
5/13/24 9:57 AM
Comment
What roof material will the flat roof portions be? Please provide more details
on the flat roof material and the outdoor deck.
Responded by: Elizabeth Bentz Williams - 5/15/24 3:08
PM
Materials will include composite wood decking over
tapered sleepers on a rubber membrane roofing
material over the garage.
Please see decking material image and design image,
without the show trellis, both uploaded.
Resolved
9 2 Engineering
Alex Jordan
5/14/24 9:47 AM
Comment
These items can be addressed on the building permit submittal or with this
variance request. We will mark our status as pending now but feel free to
email me with how you would like to proceed with the contribution and
remaining plot plan comments.
Info Only
10 3 Planning & Zoning
Angie Conn
5/29/24 8:33 AM
Comment
The BZA approved the variances, with the condition of you addressing all
remaining review comments.
Info Only
11 4 Engineering
John Thomas
1/23/25 2:07 PM
Comment
$6000 contribution has been received by Engineering Department for lot
coverage variance.
Info Only
12 4 Engineering
John Thomas
1/23/25 2:57 PM
Comment
Alex Jordan is no longer with the engineering department. Crossroad
Engineers will review the project on the city's behalf for drainage compliance
when the building permit is submitted. Please upload the latest plan
documents to that filing.
Info Only
13 4 CrossRoad
Engineers
Willie Hall
1/23/25 3:10 PM
Comment
We will review the site plan with the building permit submittal
Info Only
Plan Review - Review Comments Report
Project Name: PZ-2024-00059 to 67 V Meyer Additional Variances
Workflow Started: 4/17/2024 2:56:05 PM
Report Generated: 02/03/2025 10:41 AM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
14 4 Planning & Zoning
Angie Conn
1/24/25 12:32 PM
Comment
Please see the Info Only comments left by the Engineering Dept. and/or
Crossroad Engineers.
Responded by: Elizabeth Bentz Williams - 2/3/25 10:52
AM
Acknowledged
Resolved