Project Name: PZ-2024-00068 TAC Venture Christian Church Additions
Workflow Started: 4/22/2024 11:40:10 AM
Report Generated: 07/23/2024 03:23 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
1 1 Urban Forestry
Daren Mindham
5/2/24 12:50 PM
Comment
I have uploaded to the correspondence folder all the existing site wide
landscape plans, in addition to the stamped approved landscape plans for
this project added to the approved folder.
Info Only
2 1 Planning & Zoning
Angie Conn
5/3/24 9:37 AM
Comment
Thank you for paying the $420.50 TAC application filing fee.
Info Only
3 1 Planning & Zoning
Angie Conn
5/3/24 9:39 AM
Comment
There is concern about the "dink" noise related to use of the outdoor
pickleball courts; noise mitigation is needed - please provide info on how
this will be accomplished.
Responded by: Benjamin Houle - 6/19/24 11:50 AM
The pickleball courts are located over 200’ from the
property line. There is a heavily wooded fence line at
the property line, and a dense buffer planted along
The property line when the parking lot was installed.
There are 2 bays (4 rows) of parking between the buffer
and the courts, and we’re planting 2 additional trees
adjacent to the courts. We believe these mitigations are
over and above issues detailed in the studies that we
have researched. Additional shrubs or sound mitigation
efforts will provide minimal if any sound impacts.
Resolved
REVIEW COMMENTS
Plan Review - Review Comments Report
Project Name: PZ-2024-00068 TAC Venture Christian Church Additions
Workflow Started: 4/22/2024 11:40:10 AM
Report Generated: 07/23/2024 03:23 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
4 1 Planning & Zoning
Angie Conn
5/3/24 9:40 AM
Comment
Please extend the sidewalk that is located adjacent to the parking lot and
pantry building, out the the Hazel Dell Pkwy path, for bike and pedestrian
connectivity.
Responded by: Benjamin Houle - 7/9/24 9:39 PM
Along with the drastic elevation change from the road
and the existing accessible route to/from the path, the
Church has some pretty severe concerns from a security
standpoint and does not wish to direct the public
essentially through a 'back door' area that would not be
often traveled or monitored. While the court would be
open to the community, it is not meant to be a public
park and users should have to at least go through the
front entry drive to get there.
----------------------------------------------------------
Reviewer Response: Angie Conn - 6/21/24 3:49 PM
I will need to consult with the Planning Director about
this, because a path connection was installed with the
parking lot to the north, so why should a path
connection not also be required for the parking lot and
buildings to the south? (Especially since this area is also
meant to be accessible by the public.) Please stay tuned.
----------------------------------------------------------
Responded by: Benjamin Houle - 6/19/24 11:52 AM
The site meets the requirements for connectivity and
accessibility for connection to that trail at the main
entry. The area in question is challenging from a
grading standpoint and not as heavily trafficked as the
main entry and could present security issues. For these
reasons, the Owner respectfully requests to utilize the
existing connection.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2024-00068 TAC Venture Christian Church Additions
Workflow Started: 4/22/2024 11:40:10 AM
Report Generated: 07/23/2024 03:23 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
5 1 Planning & Zoning
Angie Conn
5/3/24 9:41 AM
Comment
Please provide the bicycle parking location and design details. (See UDO
section 5.29 for the bike parking standards). Please continue to work with
David Littlejohn to get this addressed.
Responded by: Benjamin Houle - 7/9/24 9:40 PM
The bike rack is shown, although it looks like just a line.
It is on the blow-up of the south entry to the Food Bank
and is labeled with a key note.
----------------------------------------------------------
Reviewer Response: Angie Conn - 6/21/24 3:54 PM
I see the bike rack label in the Legend, but I do not see
where the bike rack is on sheet L100 - please clarify.
----------------------------------------------------------
Responded by: Benjamin Houle - 6/19/24 11:54 AM
A covered bicycle rack has been added (see sheet L 100)
for the proposed buildings. The existing facility has
compliant bicycle parking on the front of the main
building.
Resolved
6 1 Planning & Zoning
Angie Conn
5/3/24 9:42 AM
Comment
Please provide any traffic directional or exterior signage details, if there will
be any. Please continue to work with Aliza Shalit to get this addressed.
Responded by: Benjamin Houle - 6/19/24 11:54 AM
Signage is not included at this point and will be
permitted separately if any is requested.
Resolved
7 1 Planning & Zoning
Angie Conn
5/3/24 9:42 AM
Comment
Exterior light fixture design details needed. 90 degree cutoff and
downlighting design is preferred.
Responded by: Benjamin Houle - 6/19/24 11:55 AM
Lighting and shop drawings have been included within
the resubmittal documents.
Resolved
8 1 Planning & Zoning
Angie Conn
5/3/24 9:42 AM
Comment
Please label the directionals on the exterior architectural building elevations -
north/south/east/west.
Responded by: Benjamin Houle - 6/19/24 11:55 AM
This has been updated.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2024-00068 TAC Venture Christian Church Additions
Workflow Started: 4/22/2024 11:40:10 AM
Report Generated: 07/23/2024 03:23 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
9 1 Planning & Zoning
Angie Conn
5/3/24 9:43 AM
Comment
Any way to 'beef up' the wooden posts that are holding up the porch roof?
Responded by: Benjamin Houle - 7/9/24 9:41 PM
The wooded posts are now shown as being wrapped to
give them more heft. See updated architectural plans.
----------------------------------------------------------
Reviewer Response: Angie Conn - 6/21/24 4:00 PM
Okay, thanks. I will keep this comment active.
----------------------------------------------------------
Responded by: Benjamin Houle - 6/19/24 12:02 PM
This is being reviewed with the PEMB company. We will
likely be able to provide something a little more stout!
Resolved
10 1 Planning & Zoning
Angie Conn
5/3/24 9:43 AM
Comment
Please label the proposed exterior building & roof materials on the exterior
architectural building elevations.
Responded by: Benjamin Houle - 7/9/24 9:41 PM
Please reference the updated elevation drawing
showing representation of the actual plantings to be
installed. As there is no access or windows, these plants
will block any view of the area in question with or
without the additional wainscoting.
----------------------------------------------------------
Reviewer Response: Angie Conn - 6/21/24 3:59 PM
If possible, please extend the brick wainscot along the
entire south elevation.
----------------------------------------------------------
Responded by: Benjamin Houle - 6/19/24 12:03 PM
This has been added.
Resolved
11 1 Planning & Zoning
Angie Conn
5/3/24 9:43 AM
Comment
Why is there a gravel area proposed just east of the pantry building? Is it
related to drainage and stormwater quality?
Responded by: Benjamin Houle - 6/19/24 12:03 PM
This gravel area has been removed.
Resolved
12 1 Planning & Zoning
Angie Conn
5/3/24 9:43 AM
Comment
Will the basketball court / pickleball area be lit for night time use? And, if so,
please provide the lighting details.
Responded by: Benjamin Houle - 6/19/24 12:03 PM
Please reference attached drawings and shop drawings.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2024-00068 TAC Venture Christian Church Additions
Workflow Started: 4/22/2024 11:40:10 AM
Report Generated: 07/23/2024 03:23 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
13 1 Planning & Zoning
Angie Conn
5/3/24 9:44 AM
Comment
HVAC location and screening details needed, please.
Responded by: Benjamin Houle - 6/19/24 12:04 PM
A wooden privacy fence has been added with the
location of the HVAC.
Resolved
14 1 Planning & Zoning
Angie Conn
5/3/24 9:51 AM
Changemark
building height
The proposed building height is in compliance.
Venture Food Pantry - Floor Plans &
Elevations.pdf
Resolved
15 1 CrossRoad
Engineers
Willie Hall
5/7/24 11:00 AM
Comment
Plan Sets Please clarify the difference between the civil sets as they appear to
be near identical. Please combine into one comprehensive set if possible.
Responded by: Benjamin Houle - 6/19/24 11:09 AM
Updated single civil set should now be the only one to
review.
Resolved
16 1 CrossRoad
Engineers
Willie Hall
5/7/24 11:38 AM
Changemark
102.02.v.a
Please include contour labels.
Venture Food Pantry Civil and LA.pdf Responded by: Benjamin Houle - 6/19/24 11:08 AM
Contour labels have been added to all grading plans.
Resolved
17 1 CrossRoad
Engineers
Willie Hall
5/7/24 11:38 AM
Changemark
102.02.v.b
Please identify and include critical storm elevations for dry detention basins
on site.
Venture Food Pantry Civil and LA.pdf Responded by: Benjamin Houle - 6/19/24 11:09 AM
Sheet C300-A has been added with the critical
elevations included.
Resolved
18 1 CrossRoad
Engineers
Willie Hall
5/7/24 11:38 AM
Changemark
102.02.v.d.
Existing Project Site Layout shall include one hundred (100) year floodplains,
floodway fringes, and floodways, established or identified in accordance with
the City of Carmel Flood Hazard Area Ordinance. Please note if none exists.
Venture Food Pantry Civil and LA.pdf Responded by: Benjamin Houle - 6/19/24 11:10 AM
A note has been added - none exists on site.
Resolved
19 1 CrossRoad
Engineers
Willie Hall
5/7/24 11:38 AM
Changemark
102.02.v.f
Existing Project Site Layout shall include the location of storm, sanitary,
combined sewer, and septic tank systems and outfalls with all top of casting
elevation, invert elevations, pipe sizes, and pipe material indicated. Existing
structure and pipe information shall be as-built information and not design
information.
Venture Food Pantry Civil and LA.pdf Responded by: Benjamin Houle - 6/19/24 11:12 AM
Known existing information has been added.
Additionally, an overall sheet has been added (C300-A)
to show additional existing information. The inverts and
pipes are per prior information as provided by the
Owner and Carmel. Per the areas with an updated field
survey, they appear to be as-built data.
Resolved
20 1 CrossRoad
Engineers
Willie Hall
5/7/24 11:38 AM
Changemark
102.02.v.g
Existing Project Site Layout shall include the identification and delineation of
sensitive areas.
Venture Food Pantry Civil and LA.pdf Responded by: Benjamin Houle - 6/19/24 11:12 AM
No sensitive areas on site.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2024-00068 TAC Venture Christian Church Additions
Workflow Started: 4/22/2024 11:40:10 AM
Report Generated: 07/23/2024 03:23 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
21 1 CrossRoad
Engineers
Willie Hall
5/7/24 11:38 AM
Changemark
102.02.v.j
Please note and label any legal drains, if any exist.
Venture Food Pantry Civil and LA.pdf Responded by: Benjamin Houle - 6/19/24 11:13 AM
No legal drains are on site.
Resolved
22 1 CrossRoad
Engineers
Willie Hall
5/7/24 11:38 AM
Changemark
102.02.vii
Please include Plan and Profile Sheets for the proposed storm sewer.
Venture Food Pantry Civil and LA.pdf Responded by: Benjamin Houle - 6/19/24 11:13 AM
Plan and Profiles have been added for the two short
sections of storm pipe on Sheet C301.
Resolved
23 1 CrossRoad
Engineers
Willie Hall
5/7/24 11:38 AM
Changemark
102.02.xi
the grading and drainage plan shall include existing drainage facilities,
including size, material, invert elevations and top casting information.
Venture Food Pantry Civil and LA.pdf Responded by: Benjamin Houle - 6/19/24 11:14 AM
Known existing information has been added.
Additionally, an overall sheet has been added (C300-A)
to show additional existing information. The inverts and
pipes are per prior information as provided by the
Owner and Carmel. Per the areas with an updated field
survey, they appear to be as-built data.
Resolved
24 1 CrossRoad
Engineers
Willie Hall
5/7/24 11:38 AM
Changemark
102.02.xi.d
the grading and drainage plan shall include the delineation of all proposed
land disturbing activities, including off-site activities that will provide services
to the project site.
Venture Food Pantry Civil and LA.pdf Responded by: Benjamin Houle - 6/19/24 11:15 AM
The construction limits line has been added to Sheets
C300 and C400.
Resolved
25 1 CrossRoad
Engineers
Willie Hall
5/7/24 11:38 AM
Changemark
102.02.xi.h
the grading and drainage plan shall indicate as to the system being public or
private.
Venture Food Pantry Civil and LA.pdf Responded by: Benjamin Houle - 6/19/24 11:16 AM
The system is Private and a label as such has been
added.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2024-00068 TAC Venture Christian Church Additions
Workflow Started: 4/22/2024 11:40:10 AM
Report Generated: 07/23/2024 03:23 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
26 1 CrossRoad
Engineers
Willie Hall
5/7/24 11:38 AM
Changemark
102.02.xi.j
The grading and drainage plan shall include the location, size, and
dimensions of features such as permanent retention or detention facilities,
including natural or constructed wetlands, used for the purpose of
stormwater management. Include existing retention or detention facilities
that will be maintained, enlarged, or otherwise altered and new ponds or
basins to be built, critical pond elevations, pond bottom elevation, top bank
elevation, spillway location and elevation, and transverse slopes of dry
detention areas.
Venture Food Pantry Civil and LA.pdf Responded by: Benjamin Houle - 7/9/24 10:53 AM
An access easement has been added to the plans and is
being prepared with the BMP easement for recording.
----------------------------------------------------------
Reviewer Response: Willie Hall - 6/27/24 2:03 PM
Unless approved otherwise by Engineering, a 20' access
easement to public R/W will need to be provided to the
drainage/BMP easement per Section 700 of the STSM.
----------------------------------------------------------
Responded by: Benjamin Houle - 6/19/24 11:17 AM
Critical elevations of existing systems have been added
to C300A. A proposed drainage easement has been
included for the water quality infiltration trench as
proposed. No existing water quality or detention areas
on site are being modified.
Resolved
27 1 CrossRoad
Engineers
Willie Hall
5/7/24 11:39 AM
Changemark
102.02.xi.k & 303.07
The grading and drainage plan shall include the emergency flood routing
path(s) and their invert elevations from detention facilities to the receiving
system.
Venture Food Pantry Civil and LA.pdf Reviewer Response: Willie Hall - 7/23/24 2:48 PM
Comment resolved with the condition that the owner
assumes all responsibility for any potential flood
damage due to existing or proposed conditions.
----------------------------------------------------------
Responded by: Benjamin Houle - 7/9/24 4:08 PM
Emergency Flood Routing have not changed from the
existing condition. No inlets are proposed with the new
development and all flood relief comes through open
culverts into the existing water quality swale and
detention basin. Arrows have been added to show
routing in the case of an extreme event.
----------------------------------------------------------
Reviewer Response: Willie Hall - 6/27/24 1:06 PM
please include ponding limits and overflow inverts.
----------------------------------------------------------
Responded by: Benjamin Houle - 6/19/24 11:18 AM
Emergency Flood Routing Path has been added to
C300A
Info Only
Plan Review - Review Comments Report
Project Name: PZ-2024-00068 TAC Venture Christian Church Additions
Workflow Started: 4/22/2024 11:40:10 AM
Report Generated: 07/23/2024 03:23 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
28 1 CrossRoad
Engineers
Willie Hall
5/7/24 11:40 AM
Changemark
102.02.xi.m.
the grading and drainage plan shall include a drainage summary, which
summarizes the basic conditions of the drainage design, including site
acreage, off-site/upstream acreage, allowable release rates, post-developed
10-year, and 100-year flows leaving the site, volume of detention required,
volume of detention provided, and any release rate. If conforming to an
existing master plan, please also include comparison of proposed CN to
master planned CN for the subject watershed.
Venture Food Pantry Civil and LA.pdf Responded by: Benjamin Houle - 7/9/24 10:58 AM
A drainage summary has been added. The summary
includes information on the area being disturbed as well
as the overall site. As we designed to the prior master
plan, the detention volume and overall pre- and post
rates were not modeled.
----------------------------------------------------------
Reviewer Response: Willie Hall - 6/27/24 1:09 PM
Summary not found
----------------------------------------------------------
Responded by: Benjamin Houle - 6/19/24 11:20 AM
C300 now has a summary section with information on
the existing allowable rates. Additionally, information on
the proposed vs. master plan CN is also included.
Resolved
29 1 CrossRoad
Engineers
Willie Hall
5/7/24 11:41 AM
Changemark
102.02.xi.p
the grading and drainage plan shall include the definition of minimum flood
protection grade in accordance with this manual.
Venture Food Pantry Civil and LA.pdf Reviewer Response: Willie Hall - 7/23/24 2:48 PM
Comment resolved with the condition that the owner
assumes all responsibility for any potential flood
damage due to existing or proposed conditions.
----------------------------------------------------------
Responded by: Benjamin Houle - 7/9/24 8:16 PM
The lowest adjacent grade from the existing condition
for overflow has been added and it is 1' below the
existing FFE and 1.1' below the proposed building FFE.
The detention elevation as set by the prior design which
is approximately 4.5' below the FFEs. The MFPG has
been added to the building FFE on C300A.
----------------------------------------------------------
Reviewer Response: Willie Hall - 6/27/24 1:09 PM
MFPGs shall be 2' above detention overflow elevation or
1' above local ponding elevations, whichever is greater.
Please revise based on local ponding limits, if
applicable. Each building can have its own MFPG.
----------------------------------------------------------
Responded by: Benjamin Houle - 6/19/24 11:22 AM
Included on C300A
Info Only
Plan Review - Review Comments Report
Project Name: PZ-2024-00068 TAC Venture Christian Church Additions
Workflow Started: 4/22/2024 11:40:10 AM
Report Generated: 07/23/2024 03:23 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
30 1 CrossRoad
Engineers
Willie Hall
5/7/24 11:41 AM
Changemark
102.02.xi.q & r
the grading and drainage plan shall include drainage arrows indicating all
surface drainage, swales and on each side of every break in swale slopes. The
plan shall include the labeling the slopes of all surface drainage swales.
Venture Food Pantry Civil and LA.pdf Responded by: Benjamin Houle - 6/19/24 11:22 AM
Included on C300 and C300A
Resolved
31 1 CrossRoad
Engineers
Willie Hall
5/7/24 11:42 AM
Changemark
102.02.xiv
the construction plans shall include a Structure Data Table, and, at a
minimum, shall include the following information: structure number
reference, upstream structure number, downstream structure number, top
casting elevation, upstream pipe elevation, downstream pipe elevation, pipe
length, pipe material, pipe size, type of structure and detail reference to type
of structure and any notes related to the structure.
Venture Food Pantry Civil and LA.pdf Responded by: Benjamin Houle - 6/19/24 11:23 AM
Drainage arrows have been added. We have one
proposed swale (with underdrain), one existing swale we
are outflowing into, and several areas of sheet runoff
and shallow concentrated flow.
Resolved
32 1 CrossRoad
Engineers
Willie Hall
5/7/24 1:55 PM
Changemark
102.03.i.b
The drainage report does not appear to include a proposed watershed map.
Please include.
Venture Food Pantry - Drainage.pdf Responded by: Benjamin Houle - 6/19/24 11:23 AM
The drainage report has been updated.
Resolved
33 1 CrossRoad
Engineers
Willie Hall
5/7/24 1:55 PM
Changemark
102.03.i.b.i
Please provide CN calculations for the proposed condition to verify proposed
CN meets the master planned 78. If the proposed site conditions do not
meet the master planned CN, additional detention may need to be provided.
Venture Food Pantry - Drainage.pdf Responded by: Benjamin Houle - 6/19/24 11:23 AM
These calculations are included within the revised
drainage report and reported on the drainage summary
on C300.
Resolved
34 1 CrossRoad
Engineers
Willie Hall
5/7/24 1:55 PM
Changemark
201.03
Please provide proposed CN calculations. for the purpose of determining the
postdeveloped conditions curve numbers, due to significant disturbance to
the upper soil layers during the construction activities, the initially
determined hydrologic soil group for disturbed areas should be changed to
the next less infiltrating capacity category (i.e., A to B, B to C, and C to D).
Venture Food Pantry - Drainage.pdf Responded by: Benjamin Houle - 6/19/24 11:24 AM
Within the drainage report, calculations are shown
including the area moved from one hydrologic soil
group to another - with the exception of impervious
which stays the same number regardless of group.
Resolved
35 1 CrossRoad
Engineers
Willie Hall
5/7/24 2:04 PM
Changemark
102.03
Please include existing dry detention pond critical storm elevations.
Venture Food Pantry - Drainage.pdf Responded by: Benjamin Houle - 7/9/24 8:29 PM
Included on C300A.
----------------------------------------------------------
Responded by: Benjamin Houle - 6/19/24 11:25 AM
Included on C300
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2024-00068 TAC Venture Christian Church Additions
Workflow Started: 4/22/2024 11:40:10 AM
Report Generated: 07/23/2024 03:23 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
36 1 CrossRoad
Engineers
Willie Hall
5/7/24 2:06 PM
Changemark
305.02
Please provide HGL calculations.
Venture Food Pantry - Drainage.pdf Responded by: Benjamin Houle - 7/9/24 8:33 PM
These are now shown on the profiles as well as listed in
the drainage report.
----------------------------------------------------------
Reviewer Response: Willie Hall - 6/27/24 2:07 PM
HGLs do not appear on C301.
----------------------------------------------------------
Responded by: Benjamin Houle - 6/19/24 11:25 AM
These are now included within the storm calculations
sheet ion the Drainage Report and shown on the plan
and profile on Sheet C301
Resolved
37 1 CrossRoad
Engineers
Willie Hall
5/7/24 2:06 PM
Changemark
305.05
Casting elevations of all inlets shall be such that the 100-year elevation of
the detention facilities, backing into the pipe system stays below the grate
elevation and remains within the limits of the property in yard and swale
areas. Please confirm.
Venture Food Pantry - Drainage.pdf Responded by: Benjamin Houle - 6/19/24 11:26 AM
There are no proposed inlets or castings with this issue.
Resolved
38 1 CrossRoad
Engineers
Willie Hall
5/7/24 2:09 PM
Changemark
305.05
The inlet grate opening provided shall be adequate to pass the design 10-
year flow with 50% of the sag inlet areas clogged. Please confirm that this
represents grates as 50% clogged.
Venture Food Pantry - Drainage.pdf Responded by: Benjamin Houle - 6/19/24 11:27 AM
There are no proposed inlets or castings with this issue.
Resolved
39 1 CrossRoad
Engineers
Willie Hall
5/7/24 2:16 PM
Changemark
104.01.1 & 303.05.7
All swales shall be installed with a subsurface drain. Minimum swale slopes
are 1.0%, unless designed to act as a stormwater quality BMP. All flow shall
be confined to the specific easements associated with each rear and side lot
swale that are part of the minor drainage system. Unless designed to act as a
stormwater quality BMP, swales shall have tile underdrains to dry the swales.
Venture Food Pantry Civil and LA.pdf Responded by: Benjamin Houle - 7/9/24 8:34 PM
This is shown on C300 with a line item in the legend and
detail on sheet C700. We have added a callout as well.
----------------------------------------------------------
Reviewer Response: Willie Hall - 6/27/24 2:09 PM
There does not appear to be an underdrain included
with the new swale.
----------------------------------------------------------
Responded by: Benjamin Houle - 6/19/24 11:27 AM
There is one constructed swale on site and calculations
are included within the drainage report. The swale is set
at 1% with an underdrain.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2024-00068 TAC Venture Christian Church Additions
Workflow Started: 4/22/2024 11:40:10 AM
Report Generated: 07/23/2024 03:23 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
40 1 CrossRoad
Engineers
Willie Hall
5/7/24 2:21 PM
Changemark
302.06.6
Debris Guard designed in accordance with Hamilton County Surveyorâ??s
Office Standard Detail D-12 shall be provided for any pipe or opening, and
the detail of such shall be included in the construction plan details.
Venture Food Pantry Civil and LA.pdf Responded by: Benjamin Houle - 6/19/24 11:28 AM
Debris guards have been called out and the detail has
been added.
Resolved
41 1 CrossRoad
Engineers
Willie Hall
5/7/24 2:27 PM
Changemark
701.04
Water Quality Curve Number shall be determined utilizing formula in section
701.04 or Exhibit 701-1
Venture Food Pantry - Drainage.pdf Responded by: Benjamin Houle - 6/19/24 11:29 AM
CNwq calculations have been added within the drainage
report.
Resolved
42 1 CrossRoad
Engineers
Willie Hall
5/7/24 2:28 PM
Changemark
701
Please revise based on updated WQ CNs.
Venture Food Pantry - Drainage.pdf Responded by: Benjamin Houle - 6/19/24 11:29 AM
CNwq calculations have been added within the drainage
report.
Resolved
43 1 CrossRoad
Engineers
Willie Hall
5/7/24 2:46 PM
Changemark
303.02
Please provide swale capacity calculations.
Venture Food Pantry - Drainage.pdf Responded by: Benjamin Houle - 6/19/24 11:29 AM
Swale capacity calculation has been included within the
stormwater calculation section of the drainage report.
Resolved
44 1 Fire
Carmel Fire
5/8/24 10:14 AM
Comment
507.5.1 Where required. Where a portion of the facility or building hereafter
constructed or moved into or within the jurisdiction is more than 400 feet
(122 m) from a hydrant on a fire apparatus access road, as measured by an
approved route around the exterior of the facility or building, on-site fire
hydrants and mains shall be provided. A fire hydrant shall be located with in
400 ft. of the proposed structure as measured along the approved asphalt
fire department access road for responding fire apparatus. If this
requirement is not currently met a fire hydrant shall be installed to meet this
rule.
Responded by: Benjamin Houle - 7/9/24 9:38 PM
A new private hydrant has been added on sheet C 500.
----------------------------------------------------------
Responded by: Benjamin Houle - 6/19/24 11:45 AM
A hydrant has been added to the utility plan.
Resolved
45 1 Engineering
Alex Jordan
5/15/24 9:36 AM
Changemark
Please include the City's owner acknowledgement agreement in the O&M
I have uploaded this form to the drainage documents folder on ProjectDox
for you to access.
Venture Food Pantry - O&M.pdf Responded by: Benjamin Houle - 6/19/24 11:30 AM
This form has been added to the O&M Manual. Thank
you!
Resolved
46 1 Engineering
Alex Jordan
5/15/24 9:36 AM
Changemark
Please include a site map with the next submittal
This will need to include the location of the BMP, a BMP easement and
access easement location, and a cross-section of the BMP.
Venture Food Pantry - O&M.pdf Responded by: Benjamin Houle - 6/19/24 11:31 AM
An area grading and drainage plan has been added to
the O&M with the proposed BMP location and
proposed easement.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2024-00068 TAC Venture Christian Church Additions
Workflow Started: 4/22/2024 11:40:10 AM
Report Generated: 07/23/2024 03:23 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
47 1 Engineering
Alex Jordan
5/15/24 9:36 AM
Changemark
Please include the following note regarding the annual inspection
The first report is due one year after construction is completed, with
subsequent reports due each year within the same month of the initial
report. If there are any deficiencies found during the inspection, these should
be addressed. If the inspection report is not received within the month it is
due, if there are deficiencies which were not included in the report, or if any
deficiencies included in the report are not addressed in a timely manner, the
BMP owner faces enforcement action from the City.
Venture Food Pantry - O&M.pdf Responded by: Benjamin Houle - 6/19/24 11:31 AM
This note has been updated within the O&M.
Resolved
48 1 Engineering
Alex Jordan
5/15/24 9:51 AM
Library Comment
Please provide the Engineering firm's email address on the cover sheet
Responded by: Benjamin Houle - 7/9/24 8:39 PM
This has been added.
----------------------------------------------------------
Reviewer Response: Alex Jordan - 6/21/24 9:29 AM
We were unable to locate this on the cover sheet, please
revise.
----------------------------------------------------------
Responded by: Benjamin Houle - 6/19/24 11:35 AM
This has been updated.
Resolved
49 1 Engineering
Alex Jordan
5/15/24 9:51 AM
Library Comment
Please provide the developer's name phone and email address on the cover
sheet
Responded by: Benjamin Houle - 7/9/24 8:39 PM
The owner and the developer are the same on this
project. We have added the Pastor's name and email
address.
----------------------------------------------------------
Reviewer Response: Alex Jordan - 6/21/24 9:29 AM
We were unable to locate this on the cover sheet, please
revise.
----------------------------------------------------------
Responded by: Benjamin Houle - 6/19/24 11:35 AM
This has been updated.
Resolved
50 1 Engineering
Alex Jordan
5/15/24 9:51 AM
Library Comment
Please provide the sites zone district on the cover sheet
Responded by: Benjamin Houle - 6/19/24 11:35 AM
This has been updated.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2024-00068 TAC Venture Christian Church Additions
Workflow Started: 4/22/2024 11:40:10 AM
Report Generated: 07/23/2024 03:23 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
51 1 Engineering
Alex Jordan
5/15/24 9:51 AM
Library Comment
Please provide the setback distances on the cover sheet
Responded by: Benjamin Houle - 6/19/24 11:35 AM
This has been updated.
Resolved
52 1 Engineering
Alex Jordan
5/15/24 9:51 AM
Library Comment
Please provide all technical information required by Section 102.02(xi)(m) of
the Storm Water Technical Standards on the grading plan
Responded by: Benjamin Houle - 7/11/24 11:23 AM
We have added this information as close as we can get
without being able to re-model the entire site. We have
also included all prior information within the drainage
report.
----------------------------------------------------------
Reviewer Response: Alex Jordan - 6/25/24 9:44 AM
We were unable to locate this information within the
plans. Please have a table inserted in the plans
containing all the information required by this section of
the STSM.
----------------------------------------------------------
Responded by: Benjamin Houle - 6/19/24 11:35 AM
This has been updated (see response above)
Resolved
53 1 Engineering
Alex Jordan
5/15/24 9:51 AM
Library Comment
Please include the following note on the plans: "No earth disturbing activity
may commence without an approved storm water management permit."
Responded by: Benjamin Houle - 6/19/24 11:35 AM
This has been updated and added to C300.
Resolved
54 1 Engineering
Alex Jordan
5/15/24 9:51 AM
Library Comment
Please include the following note on the plans: "Utility relocations required
by the project shall be the responsibility of the developer. Utility line
relocations required for road projects that result in a conflict with proposed
development shall be the developer to resolve with the utility. Existing pole
lines required to be relocated to within one foot of proposed right-of-way
line."
Responded by: Benjamin Houle - 6/19/24 11:36 AM
This has been updated.
Resolved
55 1 Engineering
Alex Jordan
5/15/24 9:51 AM
Library Comment
Please include the following note on the plans: "All existing perimeter road
drainage structures and bridges across the frontage of this development are
indicated on the plans. Provisions have been made to improve or replace any
drainage structures and bridges as necessary or as request by the City to
accommodate the pavement widening, auxiliary lanes, multi-use path, and
any other required improvements to the property or the roadway. The cost
to improve or replace any draiange structures and bridges will be borne by
the developer."
Responded by: Benjamin Houle - 6/19/24 11:36 AM
This has been updated.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2024-00068 TAC Venture Christian Church Additions
Workflow Started: 4/22/2024 11:40:10 AM
Report Generated: 07/23/2024 03:23 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
56 1 Engineering
Alex Jordan
5/15/24 9:51 AM
Library Comment
Please include the following note on the plans: "Damage to the exisitng
right-of-way shall be restored/repaired to the satisfaction of the City at the
completion of the project. The contractor is encouraged to inspect the right-
of-way with the city prior to the start of construction to document the
existing condition of the right-of-way."
Responded by: Benjamin Houle - 6/19/24 11:36 AM
This has been updated.
Resolved
57 1 Engineering
Alex Jordan
5/15/24 9:51 AM
Library Comment
Please include the following note on the plans: "All paving within the existing
and proposed city right -of-way shall conform to the requirements of the
Department of Engineering. The contractor shall contact the department of
Engineering to schedule a pre-construction meeting to review the
department's construction requirements, staff notification requirements,
required inspections for certain stages of the work and to review the
authority of the department as it relates to work within the existing and
proposed right-of-way."
Responded by: Benjamin Houle - 6/19/24 11:36 AM
This has been updated.
Resolved
58 1 Engineering
Alex Jordan
5/15/24 9:51 AM
Library Comment
Please provide the anticipated start construction date in a comment
response or project summary
Responded by: Benjamin Houle - 6/19/24 11:36 AM
July 15, 2024 is the anticipated start date.
Resolved
59 1 Engineering
Alex Jordan
5/15/24 9:51 AM
Library Comment
Please verify that there are no direct discharge areas
Responded by: Benjamin Houle - 6/19/24 11:37 AM
There are no direct discharge areas.
Resolved
60 1 Engineering
Alex Jordan
5/15/24 9:51 AM
Library Comment
Please verify that all elevations are North American Vertical Datum of 1988
(NAVD)
Responded by: Benjamin Houle - 6/19/24 11:37 AM
Verified.
Resolved
61 1 Engineering
Alex Jordan
5/15/24 9:51 AM
Library Comment
Please verify that the horizontal datum of topgraphic map is Indiana State
Plane Coordinates, NAD83
Responded by: Benjamin Houle - 6/19/24 11:37 AM
Verified.
Resolved
62 1 Engineering
Alex Jordan
5/15/24 9:51 AM
Library Comment
Please verify that the locations of existing utilities with top of curb and invert
elevations, pipe sizes, and direction are shown
Responded by: Benjamin Houle - 6/19/24 11:37 AM
Verified.
Resolved
63 1 Engineering
Alex Jordan
5/15/24 9:51 AM
Library Comment
Please verify that all existing culverts, pipes, and bridges on existing drives or
under the roadway are shown indicating size, type, and invert elevations
Responded by: Benjamin Houle - 6/19/24 11:37 AM
None are adjacent to the project area.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2024-00068 TAC Venture Christian Church Additions
Workflow Started: 4/22/2024 11:40:10 AM
Report Generated: 07/23/2024 03:23 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
64 1 Engineering
Alex Jordan
5/15/24 9:51 AM
Library Comment
Please verify that the locations of all existing electrical power vaults,
transformers, power lines, gas lines, television cable , and telephone lines are
shown
Responded by: Benjamin Houle - 6/19/24 11:38 AM
All are shown which are known at this time. As these
services are private, not all locations or sizes are known.
Resolved
65 1 Engineering
Alex Jordan
5/15/24 9:51 AM
Library Comment
Please provide all on-site and off-site flood routing through the site
Responded by: Benjamin Houle - 7/9/24 8:55 PM
A legend and updated flow arrows have been provided.
----------------------------------------------------------
Reviewer Response: Alex Jordan - 6/21/24 9:53 AM
Thank you for providing this sheet but please include a
legend item for the arrows to avoid confusion.
----------------------------------------------------------
Responded by: Benjamin Houle - 6/19/24 11:38 AM
Flood routing has been added to C300A.
Resolved
66 1 Engineering
Alex Jordan
5/15/24 9:51 AM
Library Comment
Please show the 100-year elevations of all inlets in the clogged condtions
Responded by: Benjamin Houle - 7/9/24 9:23 PM
This is an existing inlet with less impervious area in the
drainage area than what was prior. Additionally, the
overflow for the flood routing is just to the east of this
area. Please specify if any specific calculations are
required in this circumstance.
----------------------------------------------------------
Reviewer Response: Alex Jordan - 6/25/24 9:04 AM
There is a round inlet within the drainage basin south of
the building that will need to be modeled in the
clogged condition. Please revise.
----------------------------------------------------------
Responded by: Benjamin Houle - 6/19/24 11:40 AM
There are no inlets with the proposed improvements.
Info Only
Plan Review - Review Comments Report
Project Name: PZ-2024-00068 TAC Venture Christian Church Additions
Workflow Started: 4/22/2024 11:40:10 AM
Report Generated: 07/23/2024 03:23 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
67 1 Engineering
Alex Jordan
5/15/24 9:51 AM
Library Comment
Please provide the minimum flood protection grade (MFPG) and minimum
lowest adjacent grade (MLAG) elevations and definitions of each
Responded by: Benjamin Houle - 7/9/24 9:25 PM
Provided on C300A to the NE for the detention pond.
MFPG is also provided for the new building.
----------------------------------------------------------
Reviewer Response: Alex Jordan - 6/25/24 9:05 AM
We are unable to locate these elevations on this or any
other sheet. Please include them on the next submittal.
----------------------------------------------------------
Responded by: Benjamin Houle - 6/19/24 11:41 AM
These are provided on C300A.
Resolved
68 1 Engineering
Alex Jordan
5/15/24 11:00 AM
Changemark
Silt fence should be replaced with a perimeter protection that works on
pavement
Please replace the silt fence on the parking with a protection that will work
on pavement or relocate the fence to be within the grassed area.
Venture Food Pantry Civil and LA.pdf Responded by: Benjamin Houle - 6/19/24 11:41 AM
Coir logs have been added for an additional layer of
protection where there is pavement.
Resolved
69 1 Engineering
Alex Jordan
5/15/24 11:00 AM
Changemark
Please provide a rock horseshoe check dam around this end section
Venture Food Pantry Civil and LA.pdf Responded by: Benjamin Houle - 6/19/24 11:42 AM
A check dam has been added in this swale area.
Resolved
70 1 Engineering
Alex Jordan
5/15/24 11:00 AM
Changemark
Please provide inlet protection on this structure
Venture Food Pantry Civil and LA.pdf Responded by: Benjamin Houle - 6/19/24 11:42 AM
Inlet protection has been added.
Resolved
71 1 Engineering
Alex Jordan
5/15/24 11:51 AM
Changemark
Please show the construction entrance on this plan sheet
Venture Food Pantry Civil and LA.pdf Responded by: Benjamin Houle - 6/19/24 11:42 AM
A construction entrance has been added.
Resolved
72 1 Engineering
Alex Jordan
5/15/24 11:58 AM
Changemark
Please show the construction entrance on this sheet
Venture Food Pantry Civil and LA.pdf Responded by: Benjamin Houle - 6/19/24 11:42 AM
A construction entrance has been added.
Resolved
73 1 Engineering
Alex Jordan
5/15/24 11:59 AM
Changemark
Please provide inlet protection on this structure
Venture Food Pantry Civil and LA.pdf Responded by: Benjamin Houle - 6/19/24 11:42 AM
Inlet protection has been added.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2024-00068 TAC Venture Christian Church Additions
Workflow Started: 4/22/2024 11:40:10 AM
Report Generated: 07/23/2024 03:23 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
74 1 Engineering
Alex Jordan
5/15/24 12:00 PM
Changemark
Please provide inlet protection on these inlets
Venture Food Pantry Civil and LA.pdf Responded by: Benjamin Houle - 6/19/24 11:43 AM
Inlet protection has been added.
Resolved
75 1 Engineering
Alex Jordan
5/15/24 12:01 PM
Changemark
Please clearly call out the location of the BMP on this sheet once it is
determined
The BMP and access easement will also need to be provided on this sheet.
Venture Food Pantry Civil and LA.pdf Responded by: Benjamin Houle - 7/9/24 9:26 PM
There are several existing access easements which we
have found and are now showing on C300A. An
additional access easement connecting this one has also
been shown and is being prepared as a separate
instrument with the BMP easement.
----------------------------------------------------------
Reviewer Response: Alex Jordan - 6/25/24 9:41 AM
Thank you for showing the easement on the drainage
plan but we would like it to be placed on the erosion
control plan sheet as originally requested. We would
also like it to be labeled as a BMP easement rather than
a drainage easement. Please provide the access
agreement with the next submittal for our review to
ensure it provides access to the proposed BMP.
----------------------------------------------------------
Responded by: Benjamin Houle - 6/19/24 11:44 AM
The BMP easement has been added to C300. An access
agreement is in place from the prior projects on this
site.
Resolved
76 1 Engineering
Alex Jordan
5/15/24 12:03 PM
Changemark
Please provide a rock horseshoe check dam around this end section
Venture Food Pantry Civil and LA.pdf Responded by: Benjamin Houle - 6/19/24 11:44 AM
This area was redesigned and no longer requires a
check dam.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2024-00068 TAC Venture Christian Church Additions
Workflow Started: 4/22/2024 11:40:10 AM
Report Generated: 07/23/2024 03:23 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
77 1 Engineering
Alex Jordan
5/15/24 12:05 PM
Changemark
The BMP will need to be listed here once it is determined
Venture Food Pantry Civil and LA.pdf Responded by: Benjamin Houle - 7/9/24 9:31 PM
Apologies! It has been added.
----------------------------------------------------------
Reviewer Response: Alex Jordan - 6/25/24 9:43 AM
The infiltration trench was not included in this section as
previously requested, please revise.
----------------------------------------------------------
Responded by: Benjamin Houle - 6/19/24 11:44 AM
The BMP has been added to this sheet.
Resolved
78 1 Vectren Energy
Chad Miller
5/16/24 10:12 AM
Comment
No comments unless the new proposed building will need gas.
Info Only
79 1 Sign Permits
Aliza Shalit
5/21/24 12:21 PM
Comment
Will there be any signage proposed for this addition?
Reviewer Response: Aliza Shalit - 7/3/24 10:59 AM
All signs require a sign permit and review process and
possibly an ADLS Amend depending on what is being
requested.
----------------------------------------------------------
Responded by: Benjamin Houle - 6/19/24 12:04 PM
Signage will be permitted separately.
Info Only
80 2 Engineering
Alex Jordan
6/25/24 12:15 PM
Changemark
These inverts are listed approximately 10-15' higher than the structures rim
elevation, please revise
Will this structure drain to the detention facility or to the northeast? The new
inverts may clarify this but currently it appears that this structure drains to
the basin to the southwest which appears to be draining to this structure.
Venture Food Pantry - Civil & LA
240618.pdf
Responded by: Benjamin Houle - 7/9/24 9:32 PM
That is an existing structure and the as-built plans had
the elevations incorrectly shown.
Info Only
81 2 Engineering
Alex Jordan
6/25/24 12:34 PM
Changemark
What information is to be included here?
Several structure call outs include these question marks. Please include the
information that is to be placed here or remove the question marks.
Venture Food Pantry - Civil & LA
240618.pdf
Responded by: Benjamin Houle - 7/9/24 9:32 PM
These have been revied.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2024-00068 TAC Venture Christian Church Additions
Workflow Started: 4/22/2024 11:40:10 AM
Report Generated: 07/23/2024 03:23 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
82 2 Engineering
Alex Jordan
6/27/24 10:11 AM
Changemark
We would like this area directed to the infiltration trench to be treated
Please look into regrading as much of this area as possible to the infiltration
trench. There may be an opportunity to grade a swale around the northwest
corner of the basketball court to discharge into the infiltration trench.
Venture Food Pantry - Civil & LA
240618.pdf
Responded by: Benjamin Houle - 7/9/24 9:34 PM
Unfortunately, in order to make grade minimums, this is
not easily possible without disturbing a lot more
ground, rebuilding existing sidewalk, and rearranging
the site. Between the new swale and the existing swale,
this area should have much more sediment removal
than the existing condition with the gravel parking lot.
Info Only
83 2 Engineering
Alex Jordan
6/27/24 10:13 AM
Changemark
Please show the roof drains for the proposed building and have them
directed into the infiltration trench
Please have these tied into the stone section rather than a structure in order
to have it filtered as much as possible.
Venture Food Pantry - Civil & LA
240618.pdf
Responded by: Benjamin Houle - 7/9/24 9:36 PM
The roof drains are now tied directly into the stone
section.
Resolved
84 2 Engineering
Alex Jordan
6/27/24 10:13 AM
Changemark
Please place cleanouts at the intersections of these underdrains
Venture Food Pantry - Civil & LA
240618.pdf
Responded by: Benjamin Houle - 7/9/24 9:36 PM
Cleanouts have been added.
Resolved
85 2 Engineering
Alex Jordan
6/27/24 10:14 AM
Changemark
Please outlet this into the stone section rather than a structure in order to
have it filtered as much as possible
Venture Food Pantry - Civil & LA
240618.pdf
Responded by: Benjamin Houle - 7/9/24 9:37 PM
These are now tied directly into the stone section.
Resolved
86 2 Engineering
Alex Jordan
6/27/24 10:32 AM
Changemark
Please label this as a BMP easement rather than a drainage easement
Venture Food Pantry - O&M
240618.pdf
Responded by: Benjamin Houle - 7/9/24 9:37 PM
The label has been udated.
Resolved
87 2 Engineering
Alex Jordan
6/27/24 10:32 AM
Changemark
Please clearly call out the infiltration trench on the site map
Venture Food Pantry - O&M
240618.pdf
Responded by: Benjamin Houle - 7/9/24 9:37 PM
An updated label has been added within C300.
Resolved
88 2 Engineering
Alex Jordan
6/27/24 10:34 AM
Changemark
The width of the trench shown in the plans is 4.5'
Please clarify the width of the infiltration trench and label it consistently
throughout the plans and O&M.
Venture Food Pantry - O&M
240618.pdf
Responded by: Benjamin Houle - 7/9/24 9:38 PM
The detail land plans have been updated.
Resolved
89 2 CrossRoad
Engineers
Willie Hall
6/27/24 2:18 PM
Comment
102.03 The drainage report shall include pre-development calculations.
Please re-include those.
Responded by: Benjamin Houle - 7/11/24 11:22 AM
Pre-development section has been re-included.
Resolved
90 3 Fire
Carmel Fire
7/15/24 7:33 AM
Comment
Section 3312.1 Fire Hydrants shall be fully functional tested and approved by
Carmel Water Utilities prior to any combustible materials arriving on the site.
Info Only
Plan Review - Review Comments Report
Project Name: PZ-2024-00068 TAC Venture Christian Church Additions
Workflow Started: 4/22/2024 11:40:10 AM
Report Generated: 07/23/2024 03:23 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
91 3 Fire
Carmel Fire
7/15/24 7:34 AM
Comment
Section 3310. Required Fire Department Vehicle Access. Approved Asphalt
fire apparatus access roads shall be provided to and through the
construction site during construction. Fire Apparatus access roads must be
capable of supporting the weight of fire apparatus and maintained clear at
all times.
Info Only
92 3 Engineering
Alex Jordan
7/23/24 3:09 PM
Comment
We have no further comments on the plans. Before we can issue a
stormwater management permit, the following items will need to be
submitted: 1. A signed and recorded O&M manual 2. A stormwater
engineers estimate for all temporary and permanent stormwater measures 3.
A non-expiring stormwater performance bond for 100% of the approved
estimate 4. A completed BMP easement agreement with an exhibit and legal
description (template uploaded to the correspondence folder) 5. A right-of-
way permit and $5,000 license and permit bond, which can be applied for
here: https://cw.carmel.in.gov/PublicAccess/login
Info Only