Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Electrical Schedules - E6.01
1 E6.01 Partial Electrical Riser Diagram No Scale Tenant Space D01C Panel TP3 277/480., 3Ø, 4W. 200A MCB Panel TP3A 120/208V., 3Ø, 4W. 400A MCB Transformer 'T3' 277/480., 3Ø, 4W. to 120/208V., 3Ø, 4W. 112.5 kVATenant Space D01B Panel TP2 277/480., 3Ø, 4W. 400A MCB 4#1/0,1-1/2"C. Panel TP2A 120/208V., 3Ø, 4W. 400A MCB w/ feed thru lugs Transformer 'T2' 277/480., 3Ø, 4W. to 120/208V., 3Ø, 4W. 112.5 kVA 4#500MCM,4"C. Tenant Space D01A Panel TP1 277/480., 3Ø, 4W. 200A MCB 4#3,1-1/4"C. Panel TP1A 120/208V., 3Ø, 4W. 200A MCB Transformer 'T1' 277/480., 3Ø, 4W. to 120/208V., 3Ø, 4W. 75 kVA 4#3/0,2"C. Existing Electrical Room Existing Distribution Panel 277/480., 3Ø, 4W. 1600A MCB 4#500MCM,1#3,3-1/2"C. 4#3/0,1#6,2"C. New Tenant Circuit Breakers for Existing MDP Load Served Branch Breaker (480V) Poles Size (Amps) Bus: Copper 3 200 Panel 'TP1' Tenant D01A 3 400 3 3 200 Existing 200 Panel 'TP2' Tenant D01B Panel 'TP3' Tenant D01C Existing Equipment Tenant D01D TotalRec.= 1 Pole = 2 Pole = 3 Pole Legend Light Equip. Total Demand (KW) Heat A/C Other Total Demand Amps = 139± Demand load (KW) Connected load (KW) Wire Size: Fed From: Conduit: Feeder Calculated ± OtherLight 4Wire: Remarks 200 480/277 Amps: Phase: Voltage: 3 Heat <Load (KW)> Rec.A/C Equip. Mounting: Location: Other PANEL "TP1" 1 Pole 20 AMP U.O.N. 1 Cir. No. Cir. No.A/C <Load (KW)> Equip.Heat Rec. Tenant Space D01A Light Copper Surface Bus: Main:200 Amp MCB Remarks 115.8-58.2 -57.6 - 2 3 5 7 9 11 13 15 17 19 4 6 8 10 12 14 16 18 20 21 23 22 24 57.6 57.6 57.6 Spare Space Space Space Spare Space Space Space Space Space Space Space Space Space 58.2Transformer 'T1' RTU-3 Spare Spare Spare Spare 80 70 TotalRec.= 1 Pole = 2 Pole = 3 Pole Legend Light Equip. Total Demand (KW) Heat A/C Other Total Demand Amps = 275± Demand load (KW) Connected load (KW) Wire Size: Fed From: Conduit: Feeder Calculated ± OtherLight 4Wire: Remarks 400 480/277 Amps: Phase: Voltage: 3 Heat <Load (KW)> Rec.A/C Equip. Mounting: Location: Other PANEL "TP2" 1 Pole 20 AMP U.O.N. 1 Cir. No. Cir. No.A/C <Load (KW)> Equip.Heat Rec. Tenant Space D01B Light Copper Surface Bus: Main:400 Amp MCB Remarks -228.9-116.4 -112.5 - 2 3 5 7 9 11 13 15 17 19 4 6 8 10 12 14 16 18 20 21 23 22 24 112.5 112.5 Spare Space Space Space Spare Space Space Space RTU-5 Space Space Space Transformer 'T2' RTU-4 Spare Spare Spare Spare 150 70 TotalRec.= 1 Pole = 2 Pole = 3 Pole Legend Light Equip. Total Demand (KW) Heat A/C Other Demand load (KW) Connected load (KW) Wire Size: Fed From: Conduit: Feeder Calculated ± OtherLight 4Wire: Remarks 200 480/277 Amps: Phase: Voltage: 3 Heat <Load (KW)> Rec.A/C Equip. Mounting: Location: Other PANEL "TP3" 1 Pole 20 AMP U.O.N. 1 Cir. No. Cir. No.A/C <Load (KW)> Equip.Heat Rec. Tenant Space D01C Light Copper Surface Bus: Main:200 Amp MCB Remarks -19.9 - 2 3 5 7 9 11 13 15 17 19 4 6 8 10 12 14 16 18 20 21 23 22 24 112.5 112.5 Spare Spare Space Space Spare Space Space Space Space Space Space Space Space Space Transformer 'T3' RTU-2 Spare Spare Spare Spare 150 30 - 112.5 58.2 112.5 19.9 Total Demand Amps = 159±132.4-112.5 19.9 19.9 70 58.2 58.2 58.2 116.4 116.4 3 4#500MCM,4"C.4#1/0,1-1/2"C. 3 A B C D E F G H J K L 151413121110987654321 151413121110987654321 A B C D E F G H J K L 1100 Sycamore Street, Suite 200 Cincinnati, Ohio 45202 - Ph: 513.984.1070 702 N. Capitol Avenue Indianapolis, Indiana 46204 Ph: 317.636.3980 www.luminaut.com As NotedPROF E SSIONA L E N G NIEERSA M U E L L.HU R TINDIA N A 0 N EP1 6 .o 01087 ATS FOET R E TEGIS D ER Clay Terrace Building "D" Demise 14390 Clay Terrace Blvd., Ste 165, Carmel, IN 46032 IN23057 01/10/24 CONSTRUCTION DOCUMENTSGNIBMULP·LACITCELE·LACINAHCEM R2410 Executive Drive - Suite 100 Indianapolis, Indiana 46241 317.636.3941 www.TEC-MEP.com THEENGINEERING C O L L A B ORA T I VEMEP CLARIFICATION 01/18/2024 01/25/2024MEP CLARIFICATION 04/10/2024MEP CLARIFICATION E6.01 SJW SLH ELECTRICAL SCHEDULES