Loading...
HomeMy WebLinkAboutGeneral Project Information - G0.01Drawing Index SHEETDESCRIPTIONISSUEPERMIT SET 01/12/2024 PERMIT SET 01/25/2024 PERMIT SET 04/17/2024 PERMIT SET 05/08/2024GENERALCOVER SHEET●●●●G0.01INDEX●●●●DEMOLITIOND1.01DEMOLITION PLAN●●●●ARCHITECTUREA1.00WALL TYPES AND RATED ASSEMBLIES●●●●A1.01OVERALL CONSTRUCTION PLAN●●●●A1.02ARCHITECTURAL SITE PLAN●A2.00EXTERIOR ELEVATIONS●●●●A2.01RENDERED EXTERIOR ELEVATIONS●A3.00WALL SECTIONS●●A4.01ENLARGED CONSTRUCTION PLANS●●●●A4.02ENLARGED CONSTRUCTION PLANS●●●●A6.00DOOR SCHEDULE & DETAILS●●●●ELECTRICALE1.01OVERALL ELECTRICAL PLAN●●●●E6.01ELECTRICAL SCHEDULES●●●●E7.01ELECTRICAL SYMBOLS & DETAILS●●●●E9.01ELECTRICAL SPECIFICATIONS●●●●MECHANICALM0.1HVAC GENERAL NOTES●●●●M1.2HVAC ROOF PLAN, SCHEDULES, AND DETAILS●●●●M9.1HVAC SPECIFICATIONS●●●●PLUMBINGP1.01OVERRALL PLUMBING PLAN●●●●P9.01PLUMBING SPECIFICATIONS●●●●1.ALL EXISTING CONDITIONS SHALL BE VERIFIED PRIOR TO STARTING ANY DEMOLITION OR NEWCONSTRUCTION.2.THE INTENT OF THE DEMOLITION IS TO FULLY EXPOSE AND PREPARE THE EXISTING AREA/SPACE TO RECEIVETHE NEWLY DESIGNED ELEMENTS. EXPOSE AND CAREFULLY REMOVE THE INDICATED AREAS OF THEEXISTING BUILDING CONSTRUCTION, AND REMOVE ALL SUCH MATERIALS FROM THE PROJECT AREA TOPREPARE THE SPACE FOR THE NEW CONSTRUCTION (UNLESS OTHERWISE NOTED). DEMOLITION SHALL NOTBE LIMITED SOLELY TO THOSE ITEMS INDICATED WITHIN THE DEMOLITION DRAWING(S) BUT SHALL ALSOINCLUDE THE REMOVAL OF EXISTING CONSTRUCTION NECESSARY TO EXECUTE THE NEW CONSTRUCTION.3.THE GENERAL SCOPE OF DEMOLITION WORK IS DEFINED ON THE DEMOLITION SHEETS WITHIN IN THISCONSTRUCTION DOCUMENT SET. THE FULL SCOPE OF DEMOLITION REQUIRES A REVIEW OF THE ENTIREDOCUMENT SET, AS WELL AS A SITE VISIT TO REVIEW THE PROJECT SITE. CONTRACTORS SHALL REVIEWANY EXISTING DOCUMENTATION OF THE PROJECT AREA TO BETTER UNDERSTAND THE EXISTING CONDITIONS.4.REMOVE FROM THE SITE AND LEGALLY DISPOSE OF ALL REFUSE, DEBRIS, RUBBISH AND OTHER MATERIALSRESULTING FROM DEMOLITION OPERATIONS. DEBRIS SHALL BE REMOVED ON A REGULAR BASIS SO IT DOESNOT INTERFERE WITH THE DEMOLITION/CONSTRUCTION WORK OR THE NORMAL OPERATIONS OF THEFACILITY, BECOME A SAFETY HAZARD, OR EXCEED THE STRUCTURAL LOAD CAPABILITIES OF THE BUILDING.COORDINATE REMOVAL WITH APPLICABLE RESTRICTIONS ON ADJACENT RIGHTS OF WAY AND FACILITYOPERATIONS.5.CONTRACTOR(S) SHALL LEAVE THE AREA/SPACE(S) BROOM CLEAN AND READY TO RECEIVE NEWCONSTRUCTION.6.IF DIRECTED, SALVAGE ANY ITEMS SPECIFICALLY IDENTIFIED BY THE OWNER & ARCHITECT FOR REUSE.STORE ITEMS IN A PROTECTED LOCATION ON SITE, OR IF DIRECTED PROVIDE LOCAL OFF SITE STORAGE ANDLOCAL REDELIVERY.7.COORDINATE ALL DEMOLITION ACTIVITY WITH OWNER'S REPRESENTATIVE AND BUILDING ENGINEER.DELIVER ALL SALVAGED ITEMS TO LOCATION AS SPECIFIED BY OWNER'S REPRESENTATIVE.8.CONTRACTOR(S) SHALL COMPLY WITH ALL APPLICABLE LOCAL, STATE AND, FEDERAL CODES, AS WELL ASGOVERNING AUTHORITIES HAVING JURISDICTION. ADHERE TO REGULATIONS PERTAINING TO THE SAFETY OFPERSONS, PROPERTY, AND ENVIRONMENTAL PROTECTION.9.CONTRACTOR(S) SHALL TAKE NECESSARY PRECAUTIONS TO PREVENT MOVEMENT OR SETTLEMENT OFEXISTING STRUCTURES. PROVIDE AND PLACE BRACING OR SHORING AND BE RESPONSIBLE FOR SAFETY ANDSUPPORT STRUCTURES. CONTRACTOR SHALL ASSUME LIABILITY FOR SUCH MOVEMENT, SETTLEMENTDAMAGE OR INJURY RESULTING FROM DEMOLITION WORK. CONTRACTOR SHALL SEEK PROFESSIONALADVICE IN THE DESIGN AND PLACEMENT OF SUCH SHORING AND BRACING10.CONTRACTOR(S) SHALL EXERCISE CAUTION WHEN REMOVING CONSTRUCTION WHERE THE EXISTINGCONDITIONS ARE UNCLEAR. IN SUCH CASE(S), CONTRACTOR SHALL REMOVE THE NECESSARYCONSTRUCTION TO EXPOSE THE UNDERLYING ELEMENTS PRIOR TO PROCEEDING WITH FULL DEMOLITION.WHENEVER THE REMOVAL OF BUILDING ELEMENTS MAY, OR WILL, CREATE AN UNSTABLE, OR UNSAFE,CONDITION, DO NOT PROCEED WITH DEMOLITION UNTIL THE CONCERN IS REVIEWED BY THE GENERALCONTRACTOR AND ARCHITECT. AT ANY TIME DURING DEMOLITION, CONTRACTOR SHALL CEASEOPERATIONS IF THE SAFETY OF THE STRUCTURE APPEARS TO BE ENDANGERED, THEY SHALL PROVIDEBRACING/SHORING TO STABILIZE STRUCTURE. CONTACT THE GENERAL CONTRACTOR AND ARCHITECTIMMEDIATELY TO DETERMINE AN APPROPRIATE DIRECTION. DO NOT RESUME NORMAL OPERATIONS UNTILSAFETY IS RESTORED.11.COORDINATE WITH, AND PROVIDE A MINIMUM OF 48 HOURS NOTICE TO THE OWNER AND BUILDING ENGINEERWHEN CUTTING, SHUTTING OFF OR REMOVING COMMUNICATION LINES, WET OR DRY UTILITIES OR OTHERBUILDING SERVICE ELEMENTS.12.CONTRACTOR SHALL BE RESPONSIBLE FOR MECH., ELEC., PLUMBING REMOVAL AND ABANDONMENT OF THEEXISTING CONSTRUCTION WITHIN THE PROJECT AREA. COORDINATE WITH ANY MEP DOCUMENTATION.ELECTRICAL ELEMENTS SHALL BE REMOVED TO NEAREST ACTIVE JUNCTION BOX TO REMAIN. PLUMBINGAND MECHANICAL ELEMENTS SHALL BE REMOVED BACK TO NEAREST 'LOGICAL' TERMINATION POINT SOTHAT IT IS CONCEALED BEHIND (WHERE PERMISSIBLE BY CODE) EITHER EXISTING PATCHED CONSTRUCTIONOR NEW CONSTRUCTION. CONTRACTOR SHALL BE ALERT TO SITUATIONS WHERE FIELD CONDITIONS FOREXISTING MEP OR FIRE PROTECTION SERVICE WOULD RESULT IN A "SERVICE INTERRUPTION" WITH THEREMOVAL OF SAID SERVICE PER DOCUMENTATION. IF THERE IS NO PROVISION TO RETAIN OR REPLACESERVICE, CONTACT OWNER AND ARCHITECT TO IDENTIFY A SOLUTION. DO NOT PROCEED WITH SERVICEINTERRUPTION UNTIL SUCH TIME.13.WHERE DEMOLITION WORK COMPROMISES FIRE RATED CONSTRUCTION, MOISTURE/VAPOR BARRIERS,SOUND RATED CONSTRUCTION, OR SIMILAR "CONTAINMENT" CONSTRUCTION. CONTRACTOR SHALL PATCHAND REPAIR CONSTRUCTION TO MAINTAIN THE ORIGINAL BARRIER INTEGRITY.14.IT IS THE INTENT THAT ALL DEMOLITION WORK, ADJACENT TO EXISTING SURFACES TO REMAIN AND SHALL BEREFINISHED SO AS TO PROVIDE A FLUSH/EVEN FINISH THAT MATCHES THE ADJACENT SURFACE. IN CASESWHERE REQUIRED DEMOLITION RESULTS IN AN AREA THAT IS NOT SPECIFICALLY IDENTIFIED ASFINISHED/CONCEALED/COVERED, CONTRACTOR SHALL PATCH AND REPAIR SUCH WORK SO THERE IS NOEVIDENCE OF THE DEMOLITION MATCHING FINISH, COLOR, TEXTURE AND BARRIER CONTAINMENT. UNLESSSPECIFICALLY INDICATED OTHERWISE, USE "LIKE-KIND" CONSTRUCTION FOR REPAIRS - WHERE "LIKE-KIND"CONSTRUCTION IS NOT POSSIBLE DUE TO UNIQUE MATERIALS, CONTACT ARCHITECT FOR DIRECTION.15.MINIMIZE IMPACT OF DEMOLITION ON ALL ADJACENT SURFACES, FINISHES, AND ACTIVITIES. PROVIDEBARRIER PROTECTION (PLYWOOD OR SIMILAR METHODS) OVER ADJACENT SURFACES. THE CONTRACTOR ISRESPONSIBLE FOR ALL REPAIRS TO ADJACENT WORK IF OVER-DEMOLITION OCCURS.16.IT IS THE INTENTION OF THE KEYNOTES LOCATED ON THE DEMOLITION SHEET(S) TO IDENTIFY CONSTRUCTIONELEMENTS, NOT DESCRIBE ENTIRE ASSEMBLIES. THE REMOVAL OF SAID ELEMENT SHOULD INCLUDE ALLASSOCIATED CONSTRUCTION (i.e. CERAMIC TILE SHOULD INCLUDE (BUT NOT BE LIMITED TO) THE TILE,MASTIC, GROUT, TERRAZZO STRIPS, ETC.) U.N.O. THE SAME IS APPLICABLE WHERE AN ENTIRESTRUCTURE/BUILDING IS BEING DEMOLISHED, THE REMOVAL OF SAID STRUCTURE/BUILDING SHALL BE "ALLINCLUSIVE" UNLESS OTHERWISE NOTED.Overall Project Construction NotesOverall Project Demolition NotesAbbreviations & DefinitionsABANCHOR BOLTABVABOVEA/CAIR CONDITIONINGACCACCESSIBLE ACMALUMINUM COMPOSITE MATERIALACTACOUSTICAL CEILING TILEADAAMERICANS WITH DISABILITIES ACTADJADJACENTADJUSTADJUSTABLEAFF or A.F.F.ABOVE FINISHED FLOORAL or ALUM.ALUMINUMALTALTERNATIVEAPCACOUSTICAL PANEL CEILING (EXPOSEDSUSPENSION SYSTEM)APPROXAPPROXIMATEARCHARCHITECT(URAL)ARGABUSE RESISTANT GYPSUMASFABOVE SUBFLOORATCACOUSTICAL TILE CEILING (CONCEALEDSUSPENSION SYSTEM)AVAUDIO/VISUALAVGAVERAGEB/OBOTTOM OFBBBLIND BASEBDBOARDBLDGBUILDINGBLKGBLOCKINGBMBEAMBOTBOTTOMBRGBEARINGBSBACKSPLASHCACARPETCATVCABLE TELEVISIONCIRCCIRCLE/CIRCULARCFMFCOLD FORMED METAL FRAMINGC.F.COMMUNICATION FEATURESCJ or C.J.CONTROL JOINTCLCENTERLINECLG or CLNGCEILINGCLOCLOSET CLRCLEARCMUCONCRETE MASONRY UNITC.O.CASED OPENINGCOLCOLUMNCOMPCOMPACT(ED)CONCCONCRETECONSTCONSTRUCTIONCONTCONTINUOUSCORRCORRIDORCPTCARPETCSMUCALCIUM SILICATE MASONRY UNITCTCERAMIC TILECWCURTAINWALLD  CLOTHES DRYERDBDRAWER BASEDBLDOUBLEDEPTDEPARTMENTDAFSDIRECT APPLIED FINISH SYSTEMDET/DTLDETAILDF or D.F.DRINKING FOUNTAINDIA DIAMETERDIMDIMENSIONDISPDISPENSER OR GARBAGE DISPOSALDIV     DIVISIONDNDOWNDP     DEEP/DEPTHDRDOORDRNDRAINDRW    DRAWERDS or D.S.DOWNSPOUTDW     DISHWASHERDWGDRAWINGEAEACHEIFS    EXTERIOR INSULATION FINISHSYSTEMEJ or E.J.EXPANSION JOINTELELEVATIONELEC ELECTRICELECTELECTRICELEVELEVATOR OR ELEVATIONEMERG.EMERGENCYENGENGINEEREQEQUALEQUIPEQUIPMENTEWEACH WAYEXH    EXHAUSTEXISTEXISTINGEXPEXPANSIONEXTEXTERIOREXTNEXTENSIONFD or F.D.FLOOR DRAINFDN    FOUNDATIONFEFIRE EXTINGUISHERFECFIRE EXTINGUISHER CABINETFF     FINISH FLOORFHCFIRE HOSE CABINETFINFINISHFIXTFIXTUREFL or FLRFLOORFLRFLOORFRCFIBER REINFORCED CONCRETEFRGFIBER REINFORCED GYPSUMFRPFIBER REINFORCED POLYMERFRTFIRE RETARDANT TREATEDFRZRFREEZERFT     FEET/FOOTFTGFOOTINGFURNFURNACE OR FURNITUREFV or F.V. FIELD VERIFYGA     GAUGEGALV   GALVANIZEDGBGRAB BARGCGENERAL CONTRACTORGFRC GLASS FIBER REINFORCED CONCRETEGFRGGLASS FIBER REINFORCED GYPSUMGL or GLAZGLASS OR GLAZINGGMGGLASS-MAT GYPSUM SHEATHINGGWBGYPSUM WALL BOARDG.B. or GYP GYPSUM BOARDH.B.HOSE BIBBHDWHARDWAREHDWDHARDWOODHCHOLLOW COREHCWDHOLLOW CORE WOOD DOORHGT or HT.HEIGHTHM or H.M.HOLLOW METALHMDHOLLOW METAL DOORHORIZHORIZONTALHRHOURHRDWHARDWAREHSSHOLLOW STEEL SECTIONHTGHEATINGHVACHEATING/VENTILATION/AIRCONDITIONINGHWHOT WATERHWDHARDWOODIDINSIDE DIAMETERIIC     IMPACT INSULATION CLASSININCHINCLINCLUDINGINFOINFORMATIONINSULINSULATIONINTINTERIORIRGIMPACT RESISTANT GYPSUMJANJANITOR (IAL)JC or J.C.JANITOR'S CLOSETJSTJOISTJT or JNTJOINTKITKITCHENL      LONG/LENGTHLAMLAMINATELAV    LAVATORYLB or LBS.POUNDLGMF   LIGHT GAUGE METAL FRAMINGLLLIVE LOADLLVLONG LEG VERTICALLVLLAMINATED VENEER LUMBERMAGMAGNETICMASMASONRYMAXMAXIMUMMAT'LMATERIALMDFMEDIUM DENSITY FIBERBOARDMDOMEDIUM DENSITY OVERLAYMECHMECHANICALMEPMECHANICAL/ ELECTRICAL/PLUMBINGMFR or MFG MANUFACTURERM.H.MAN HOLEMIMIRROR IMAGEMINMINIMUMMISCMISCELLANEOUSMO MASONRY OPENINGM.R.MOISTURE RESISTANTMTDMOUNTEDMTLMETALMULLMULLIONMW or MWOMICROWAVE OVENMWOMICROWAVE OVENN/ANOT APPLICABLENIC or N.I.C.NOT IN CONTRACTNONUMBERNOMNOMINALNTS or N.T.S.NOT TO SCALEO/AOVERALLO/OOUT TO OUTO.C.ON CENTERO.D.     OUTSIDE DIAMETEROH     OVERHEADOPNGOPENINGOPP    OPPOSITEOSB    ORIENTED STRAND BOARDPC     PRECASTP.L.     PROPERTY LINE OR PLASTICPL or PLAM  PLASTIC LAMINATEPLASPLASTICPLYWDPLYWOODPNL   PANELPSFPOUNDS PER SQUARE FOOTPSIPOUNDS PER SQUARE INCHPT    PRESSURE TREATED OR PAINT PTD    PAINTEDPTNPARTITIONPVC    POLYVINYLCHLORIDEPW     PLYWOODR      RADIUS OR RISERRADRADIUS OR RADIATORRL or R.L.RAIN LEADERRD or R.D.ROOF DRAINREFER     REFERENCE / REFER TOREFREFRIGERATORREINFREINFORCE/REINFORCINGREQ'DREQUIREDREV     REVISION / REVISEDRMROOMRO or R.O.ROUGH OPENINGR.O.W.    RIGHT OF WAYS/RSHELF/RODSB     SINK BASESCSOLID CORESCWDSOLID CORE WOOD DOORSCHEDSCHEDULESECTSECTIONSF or S.F. SQUARE FEET/SQUARE FOOTSHLVSHELVESSHTSHEETSHTG   SHEATHINGSIMSIMILARSOGSLAB ON GRADESPECSPECIFICATIONSQ     SQUARESS or S.S.  STAINLESS STEEL OR SOLID SURFACESTL/STLSTAINLESS STEELSTSTAIN/STAINEDSTCSOUND TRANSMISSION CLASSSTDSTANDARDSTLSTEELSTORSTORAGESTRUCTSTRUCTURALSUSP.SUSPENDEDSW     SWITCHT      TREAD OR THICKT/OTOP OFTBDTO BE DETERMINEDT&GTONGUE AND GROOVETEMP.TEMPORARY OR TEMPEREDTELTELEPHONETHKTHICKTHRUTHROUGHTME    TO MATCH EXISTINGT.O.C.TOP OF CONCRETET.O.F.TOP OF FOOTINGT.O.M.TOP OF MASONRYT.O.S.TOP OF STEELT.O.W.TOP OF WALLTVTELEVISIONTYPTYPICALUCUPPER CABINET OR UNDER COUNTEROR UNDER CABINETULUNDERWRITERS LABORATORIESU.N.O.UNLESS NOTED OTHERWISEVBVAPOR BARRIER OR VINYL BASEVCTVINYL COMPOSITION TILEVERTVERTICALVIF or V.I.F. VERIFY IN FIELDVRVAPOR RETARDERWWASHERW/WITHW/OWITHOUTW.C.WATER CLOSETWDWOODW.F.WIDE FLANGEWHWATER HEATERWINWINDOWW.P.WATERPROOFWICWALK-IN CLOSET OR WALK-INCOOLERWIF    WALK-IN FREEZERW.W.F.WELDED WIRE FABRICW.W.M.WELDED WIRE MESHWSCT.WAINSCOTWT.WEIGHTW.V.WATER VALVEYD     YARDWHERE ADDITIONAL ABBREVIATIONS OR WORD DEFINITIONS ARE DEFINED BY ANOTHER DISCIPLINE AND A CONFLICT OCCURS, THEIR DEFINITIONS SHALL TAKE PRECEDENCE OVER THE FOLLOWING ON OTHER DISCIPLINES DOCUMENTSONLY. WHERE AN ABBREVIATION IS UNDEFINED - NOTIFY THE ARCHITECT, FOR CLARIFICATION12341ROOM NAMESTRUCTURAL GRIDSECTION REFERENCESECTION REFERENCE(DETAIL)ELEVATION REFERENCE(EXTERIOR)ENLARGED REFERENCEENLARGED REFERENCEELEVATION REFERENCE(INTERIOR ONLY)SHEET REFERENCEELEVATION IDXX'-X"XXX XXXXFINISH IDENTIFICATIONWINDOW IDENTIFICATIONDOOR IDENTIFICATIONFURNITURE IDENTIFICATIONCEILING IDENTIFICATIONCEILING HEIGHTCEILING TYPEWALL PARTITION TYPEREFERENCEWALL PARTITION TYPEREFERENCE (W/ MODIFIER)SEALANTDOOR W/ MAGNEIC HOLDOPEN -REFER TO DOORSCHEDULEREVISION CLOUD & DELTAKEYNOTEROOM IDENTIFICATIONELEVATION, WORKPOINT,DATUMDrawing Symbols LegendREFER TO Ax.xxREFER TO Ax.xxMATCH LINEAALIGN CONSTRUCTION578'-00"SPOT ELEVATIONVicinity MapLocation Map1.THE 2014 EDITION OF THE INDIANA BUILDING CODE SHALL BE CONSIDERED AS PART OF THESECONSTRUCTION DOCUMENTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLIANCE OFCONSTRUCTION WITH APPLICABLE CODES AND REGULATIONS AND ALL AUTHORITIES HAVING JURISDICTION2.IN ADDITION TO THIS DRAWING SET, THE CONSTRUCTION DOCUMENTS MAY INCLUDE A SEPARATE PROJECTMANUAL (SPECIFICATIONS) A SEPARATE FF&E SPECIFICATIONS MANUAL (BINDER) AND A SEPARATEMATERIALS REFERENCE MANUAL (BINDER) THAT SHALL BE UTILIZED FOR "BID AND CONSTRUCTION" ON THISPROJECT. REFERENCES TO "THESE DRAWINGS", "THE CONSTRUCTION DOCUMENT SET". SHALL REFER TOBUT NOT BE LIMITED TO ANY OF THE PREVIOUSLY MENTIONED DOCUMENTS.3.REFER TO THE SEPARATE "FF&E SPECIFICATION MANUAL AND MATERIALS REFERENCE MANUAL (BINDERS)"FOR DETAILED MANUFACTURER, MODEL, STYLE, FINISH, INSTALLATION, AND FABRICATION INFORMATION ASWELL AS THE RESPONSIBILITY SCHEDULE FOR ALL FF&E & MATERIALS FOR THIS PROJECT.4.REFERENCES ON THIS PROJECT TO "OWNER", "OWNER'S REPRESENTATIVE", OR ANY COMBINATION THEREOF,WITHIN THESE CONSTRUCTION DRAWINGS SHALL REFER TO THE OWNER'S CONSTRUCTION PROJECTMANAGER.5.THE GENERAL CONTRACTOR SHALL COORDINATE DEMOLITION AND CONSTRUCTION WORK WITH THEOWNER'S REPRESENTATIVE FOR WORK TIMES AND MEANS+METHODS TO MINIMIZE IMPACT TO PROPERTYAND IT'S OPERATIONS. THIS COORDINATION IS VERY CRITICAL TO THE SATISFACTORY COMPLETION OF THISPROJECT. THEREFORE THE CONTRACTOR MUST ENSURE THAT THEY HAVE A THOROUGH UNDERSTANDINGOF THE APPROPRIATE WINDOW FOR WORK HOURS, AND THEIR EXPECTED RESPONSIBILITIES. CONTRACTORSHALL GENERATE A CONSTRUCTION / DEMOLITION PHASING PLAN FOR REVIEW BY THE OWNER TODETERMINE THE IMPACT TO THE PROPERTY AND IT'S OPERATIONS.6.THE TERMS "CONTRACTOR" AND "SUB-CONTRACTOR" ARE USED INTERCHANGEABLE WITHIN THESEDRAWINGS AND ARE NOT INTENDED TO INDICATE A SPECIFIC CONTRACTUAL ARRANGEMENT BUT REFER TO ATRADE IN GENERAL OR SPECIFIC TERMS THAT WOULD BE RESPONSIBLE FOR A PARTICULAR PORTION OF THEPROJECT. THE TERMS "CONTRACTOR", "GENERAL CONTRACTOR" & "G.C." ARE ALSO USEDINTERCHANGEABLY WITHIN THESE DOCUMENTS.7.THESE DRAWINGS ARE PREPARED FOR THE PURPOSES OF CONSTRUCTION ONLY. THESE DRAWINGS ARENOT TO BE USED FOR MAINTENANCE PURPOSES UNLESS IDENTIFIED AS "RECORD DRAWINGS", AS ACTUALCONDITIONS MAY VARY FROM THOSE INDICATED ON THESE DRAWINGS DUE TO CHANGE ORDERS,ALTERATIONS BY OTHERS, FIELD CONDITIONS, ETC.8.DO NOT SCALE THE DRAWINGS. WRITTEN DIMENSIONS OR SPECIFIC LAYOUT DIRECTION ARE THE ONLYACCEPTABLE MEANS OF LOCATION.9.ALL DIMENSIONS ARE TO FINISH FACE OF GYPSUM BOARD AND/OR INDICATED MATERIAL, CENTERLINE OFCOLUMNS, FACE OF CONCRETE, EDGE OF SLAB OR EDGE OF OPENING (U.N.O.)10.THE GENERAL CONTRACTOR AND EACH SUB-CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATIONOF THEIR WORK WITH ADJACENT TRADES AND WITH THE WORK BEING COMPLETED PRIOR TO, AND AFTERTHEIR WORK. COORDINATION SHALL ALSO INCLUDE THE OWNER'S REPRESENTATIVE.11.THE GENERAL CONTRACTOR IS RESPONSIBLE TO EXECUTE THE DESIGN INTENT FOR ALL WORK INDICATED,OR INFERRED, WITHIN THESE CONSTRUCTION DOCUMENTS UNLESS SPECIFICALLY NOTED "BY OTHERS"AND/OR "N.I.C." IN ADDITION, THE GENERAL CONTRACTOR AND EACH SUB-CONTRACTOR SHALL BERESPONSIBLE FOR COORDINATING, AND SCHEDULING ALL CONSTRUCTION RELATED WORK, IDENTIFIED OROTHERWISE, WITHIN THESE DOCUMENTS. COORDINATION SHALL INCLUDE WORK SPECIFICALLY IDENTIFIEDAS: "BY OTHERS" AND/OR "N.I.C".12.CONTRACTORS SHALL ADHERE TO ALL DESIGN CRITERIA INCLUDED WITHIN THE CONSTRUCTIONDOCUMENTS UNLESS SPECIFICALLY MODIFIED BY AN ADDENDUM, BULLETIN, OR FIELD SKETCH AS ISSUED BYTHE ARCHITECT, INTERIOR DESIGNER OR ENGINEER(S).13.EACH CONTRACTOR SHALL NOTIFY THE GENERAL CONTRACTOR, WHO SHALL IMMEDIATELY NOTIFY THEARCHITECT OR INTERIOR DESIGNER WHEN DISCREPANCIES ARE FOUND WITHIN THE CONSTRUCTIONDOCUMENTS OR WHEN DISCREPANCIES BETWEEN THE DRAWINGS AND EXISTING CONDITIONS AREIDENTIFIED.14.ALL EXISTING CONDITIONS SHOWN IN THESE DRAWINGS WERE PREPARED FROM EXISTING DOCUMENTS,ON-SITE MEASUREMENTS AND OBSERVATIONS. EACH CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYINGALL EXISTING DIMENSIONS, CONDITIONS, CONSTRUCTION, MATERIALS, DETAILS, ETC. BY OBSERVATION,INVESTIGATION AND THROUGH MEASUREMENTS TAKEN AT THE JOB SITE. THEY SHALL TAKE ANY AND ALLMEASUREMENTS NECESSARY TO VERIFY THE EXISTING CONDITIONS AGAINST DRAWINGS SO AS TO PERFORMTHEIR WORK PROPERLY PRIOR TO THE PREPARATION OF SHOP DRAWINGS, FABRICATION/ORDERING OFMATERIALS, OR ACTUAL CONSTRUCTION OF THE PROJECT. THE CONTRACTOR ALONE IS RESPONSIBLE FORTHE PROPER CONNECTION AND INSTALLATION OF MATERIALS AND EQUIPMENT.15.ALL EXISTING SITE CONDITIONS SHALL BE VERIFIED, SURVEYED AND IDENTIFIED PRIOR TO STARTING ANYWORK. ALL UTILITIES SUPPLYING ADJACENT BUILDINGS SHALL BE MAINTAINED THROUGHOUT THECONSTRUCTION PERIOD. ANY REQMT. FOR TEMPORARY DISCONNECTION OF ANY UTILITY SHALL BE FIRSTREVIEWED & APPROVED BY OWNER & LOCAL CODE AUTHORITY16.EACH CONTRACTOR SHALL REFER TO ALL EXISTING DOCUMENTATION DESCRIBING THE ORIGINALCONSTRUCTION. WHERE THEY EXIST, UTILIZE "RECORD" OR "AS-BUILT" DRAWINGS OVER LIKEDOCUMENTATION WITHOUT SUCH LABELS. CONTRACTOR SHALL ASSUME ALL DOCUMENTATION NOTLABELED "RECORD" OR "AS-BUILT" IS NOT FULLY ACCURATE AND SHALL PROCEED WITH THEIR WORK ONLYAFTER A THROUGH REVIEW OF THE BUILT CONDITION. CONTRACTOR SHALL COORDINATE WITH THEARCHITECT AND INTERIOR DESIGNER ALL DISCREPANCIES BETWEEN THE DRAWINGS AND THE BUILTCONDITIONS PRIOR TO ANY PERFORMING ANY WORK.17.WHERE DEMOLITION IS NOT ALREADY INDICATED ON THE ARCHITECTURAL DRAWINGS BUT IT IS EITHERDESIRABLE, OR NECESSARY FOR THE CONTRACTOR TO CUT INTO ANOTHER PORTION OF THE BUILDING TOPERFORM THEIR WORK, CONSULT THE ARCHITECT SO THAT A SATISFACTORY REINFORCEMENT, REPAIRS,REPLACEMENT AND/OR BARRIER PROTECTION CAN BE DOCUMENTED AND EXECUTED BY THE CONTRACTOR18.CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FEES, AND INSPECTIONS BY AUTHORITIES OF JURISDICTIONREQUIRED FOR THE EXECUTION OF THE WORK, U.N.O.19.CONTRACTOR SHALL DISPOSE OF ALL DEMOLITION RELATED DEBRIS IN A SAFE AND LEGAL MANNER.20.THE CONTRACTOR IS RESPONSIBLE FOR PROTECTION OF THEIR WORK DURING FABRICATION, TRANSIT,STORAGE, INSTALLATION, AND UNTIL FINAL OWNER ACCEPTANCE. UPON COMPLETION OF CONSTRUCTION,THE CONTRACTOR SHALL CLEAN ALL WORK AREAS AS WELL AS REPAIR AND REFINISH ANY DAMAGE TO THESATISFACTION OF THE ARCHITECT, DESIGNER AND THE OWNER AS PART OF THE BASE CONTRACT.21.ALL CONSTRUCTION ELEMENTS SHALL BE INSTALLED PER THE CONSTRUCTION DOCUMENTS AND THEMANUFACTURER'S STANDARD RECOMMENDATIONS AND INSTALLATION INSTRUCTIONS. WHERE ADDITIONALU.L., ASTM, TRADE GUILD, AND/OR TRADE ASSOCIATION INFORMATION IS REFERENCED IN THESEDOCUMENTS OR MANUFACTURER'S DOCUMENTATION, THOSE REQUIREMENTS SHALL ALSO BE ADHERED TO.22.THE ARCHITECT HAS ENDEAVORED TO ENSURE CODE COMPLIANCE BUT IT IS STILL THE RESPONSIBILITY OFTHE GENERAL CONTRACTOR AND EACH SUB-CONTRACTOR TO ENSURE THAT THEIR WORK IS INSTALLEDCORRECTLY AND THAT IT MEETS THE REQUIREMENTS OF ALL APPLICABLE CODES, ORDINANCES, AND ANYJURISDICTION HAVING AUTHORITY. THE CONTRACTOR SHALL OBTAIN APPROVAL AND INSPECTIONS OF THEGOVERNING AUTHORITIES.23.IT IS THE INTENTION OF THE NOTES AND KEYNOTES LOCATED WITHIN THIS DRAWING SET TO IDENTIFYCONSTRUCTION ELEMENTS, NOT NECESSARILY DESCRIBE ENTIRE ASSEMBLIES OR PROCESSES. THEINSTALLATION OF SAID ELEMENT SHOULD INCLUDE ALL ASSOCIATED CONSTRUCTION NECESSARY TOACHIEVE INSTALLATION AND OPERATION (USE) OF SAID ITEM.24.PROVIDE DRYWALL TRIM AT ALL EXPOSED EDGES & OUTSIDE CORNERS OF GYPSUM WALLBOARDCONSTRUCTION. J-BEAD OR OTHER NON-DRYWALL COMPOUND EMBEDED TRIM PIECES ARE PROHIBITED(U.N.O.)25.ALL FRAMING LUMBER, WOOD NAILERS, BLOCKING, RAISED PLATFORM FRAMING, PLYWOOD, OTHERCONCEALED WOOD MATERIALS WHERE DETAILED, OR REQUIRED, FOR THE ATTACHMENT OF FINISHEDMATERIALS SHALL BE TREATED WITH FIRE-RETARDANT (F.R.T.) CHEMICALS IN ACCORDANCE WITH ASTME84. THE MATERIAL SHALL BEAR THE IDENTIFICATION OF AN AUTHORITATIVE TESTING OR INSPECTIONAGENCY ACCEPTABLE TO THE GOVERNING AGENCY WITH THE PERFORMANCE RATING THEREOF. NO F.R.T.WOOD SHALL BE INSTALLED WITHIN A 3HR. (OR GREATER) RATED WALL, IN A RETURN AIR PLENUM OR BEEXPOSED AND ABOVE SPRINKLER COVERAGE.26.WHERE NEWLY INSTALLED CONSTRUCTION ABUTS PREVIOUSLY INSTALLED OR EXISTING MATERIALS, THESEADJACENT AREAS SHALL BE TOUCHED-UP AND FINISHED TO BLEND WITH THE NEWLY INSTALLEDCONSTRUCTION. COORDINATE WITH THE ARCHITECT OR DESIGNER AS NECESSARY.27.EXCEPT WHERE THE CONSTRUCTION DOCUMENTS AND/OR CODE REGULATIONS INCLUDE MORE STRINGENTREQUIREMENTS, ALL WORK SHALL BE DONE TO MEET OR EXCEED THE STANDARDS OF THE CONSTRUCTIONPRACTICES FOR EACH TRADE.28.ALL WORK AND FINAL FINISHED PRODUCTS SHALL BE COMPLETE IN EVERY RESPECT TO THE SATISFACTIONOF THE OWNER, ARCHITECT, DESIGNER, AND ENGINEERS.29.PRIOR TO STARTING WORK CONTRACTOR SHALL DEVELOP A DETAILED CONSTRUCTION SCHEDULE FORREVIEW AND APPROVAL BY THE OWNERS REPRESENTATIVE. SCHEDULE SHALL IDENTIFY WORK SCHEDULEWITH MILESTONE DATES, TYPICAL HOURS/DAYS OF WORK ACTIVITY, STAGING AREA AND ACCESSREQUIREMENTS AND OWNER RESPONSIBILITY REQUIREMENTS.30.CONTRACTOR SHALL PROVIDE ADEQUATE PROTECTION OF EXISTING & NEW WORK FROM VANDALISM DURINGTHE CONSTRUCTION PERIOD. WORK THAT HAS BEEN VANDALIZED WILL BE REMOVED AND REPLACED AT NOCOST TO THE OWNER.31.ALL SPRINKLER & FIRE PROTECTION SYSTEMS SHALL COMPLY W/ ALL APPLICABLE NFPA REQUIREMENT.INDIANA CERTIFIED DESIGNER SHALL PREPARE DESIGN DOCUMENTS FOR ALL SYSTEMS AND ALTERATIONSAND SUBMITTED FOR REVIEW BY ARCHITECT PRIOR TO SUBMITTING APPLICATION AND DOCUMENTATION TOLOCAL CODE AUTHORITY FOR PERMIT REVIEWProject TeamMEPThe Engineering Collaborative2410 Executive Drive, Suite 100Indianapolis, IN 46241www.tec-mep.comPh: 317-636-3941OwnerWashington Prime Group4900 East Dublin Granville RoadColumbus, OH 43081www.wpgus.comArchitectLUMINAUT1100 Sycamore Street, Suite 200Cincinnati, OH 45202www.luminaut.comCin. Ph: 513.984.1070 -702 N. Capitol AvenueIindianapolis, IN 46204Indy. Ph: 317.636.3980PROJECTLOCATIONPROJECTSITEClay TerraceBuilding "D" Demise14400 Clay Terrace Blvd., Ste 165,Carmel, IN 46032IN2305712/22/23CONSTRUCTION DOCUMENTSCOPYRIGHT © 2024 LUMINAUT, INC. - 05/09/2024 - 1:46 PM - L:\IN23057 - Clay Terrace Tenant Demise_Carmel, IN\11 Drawings\CT__g0001 General Project Information.dwg ABCDEFGHJKL151413121110987654321151413121110987654321ABCDEFGHJKL1100 Sycamore Street, Suite 200Cincinnati, Ohio 45202 - Ph: 513.984.1070702 N. Capitol AvenueIndianapolis, Indiana 46204Ph: 317.636.3980www.luminaut.com G0.01GENERAL PROJECTINFORMATIONJMCJMCAs NotedSTOREFRONT REVISIONS04/23/2024ADLS COMMENTS05/08/2024Scope of Work and Code AnalyisPROJECT DESCRIPTION:THE DEMISE OF AN EXISTING SINGLE TENANT RETAIL SPACE INTO FOUR (4)SEPARATE TENANTS.APPLICABLE CODE:2014 INDIANA BUILDING CODE ( IBC 2012)ACCESSIBILITY STANDARD:2010 ADA STANDARDSENERGY CODE:ASHRAE 90.1 - 2007PERMIT APPLICATIONS:BUILDING, MECHANICAL, PLUMBING (THIS APPLICATION)USE GROUP:PER TENANT SPACED01A-M (MERCANTILE)D01B-A (ASSEMBLY)D01C-M (MERCANTILE) WITH EXERCISE ROOMD01D-B (BUSINESS)CONSTRUCTION TYPE:IIIBOCCUPANT LOAD:M OCCUPANCYFLOOR AREA=30 GROSS SF / OCCUPANTSTOCK AREA=300 GROSS SF / OCCUPANTEXERCISE ROOM=50 GROSS SF / OCCUPANTA OCCUPANCYUNCONCENTRATED (TABLES AND CHAIRS)=15 NET / OCCUPANTB OCCUPANCY=100 GROSS SF / OCCUPANTAS NO TENANTS ARE CURRENTLY IN THE SPACES, IT HAS BEEN ASSUMED2/3 OF THE FLOOR AREA FOR THE SALES FLOOR AND 1/3 FOR THE STOCKAREA.TENANT D01A (M OCCUPANCY)STOCK AREA663.88/300 = 2.21 OCCUPANTSFLOOR AREA1,327.76/30 = 44.26 OCCUPANTSTOTAL TENANT D01A OCCUPANTS = (46.47) 47 OCCUPANTS[IF ALL FLOOR AREA: 1,991.65/30 = (66.39) 67 OCCUPANTS]TENANT D01B (A OCCUPANCY)STOCK AREA884.37/300 = 2.95 OCCUPANTSFLOOR AREA1,768.74/15 = 117.92 OCCUPANTSTOTAL TENANT D01B OCCUPANTS = (120.87) 121 OCCUPANTS[IF ALL FLOOR AREA: 2,653.12/15 = (176.87) 177 OCCUPANTS]TENANT D01C (M OCCUPANCY - FITNESS)STOCK AREA525.36/300 = 1.75 OCCUPANTSFLOOR AREA1,050.72/50 = 21.01 OCCUPANTSTOTAL TENANT D01C OCCUPANTS = (22.76) 23 OCCUPANTS[IF ALL FLOOR AREA: 1,576.08/50 = (31.52) 32 OCCUPANTS]TENANT D01D (B OCCUPANCY)STOCK AREA550.18/300 = 1.83 OCCUPANTSFLOOR AREA1,100.36/100 = 11 OCCUPANTSTOTAL TENANT D01D OCCUPANTS = (12.83) 13 OCCUPANTS[IF ALL FLOOR AREA: 1,650.55/100 = (16.51) 17 OCCUPANTS]FIRE PROTECTION:FULLY SPRINKLEDFIRE ALARM SYSTEM:REQUIRED -- PERMIT TO BE SUBMITTED SEPARATELY (DESIGN/BUILD) BYLICENSED DESIGN PROFESSIONALHEIGHT & AREA:NOT APPLICABLE. EXISTING TENANT SPACE REQUIRED FIRE RESISTANCE:1 HR FIRE SEPARATION BETWEEN TENANT SPACES. 402.4.2.1708BUILDING ELEMENTS, INCLUDING STRUCTURAL FRAME, EXTERIOR WALLS,FLOORS AND ROOF ARE PERMITTED TO BE OF NON-COMBUSTIBLECONSTRUCTION.[TABLE 601]EXTERIOR WALLS ARE PERMITTED TO BE NON-RATES, NON-COMBUSTIBLECONSTRUCTION.[TABLE 602]CONTINUITY OF RATINGS:THE CONTINUITY AND INTEGRITY OF ALL FIRE RESISTANCE RATEDASSEMBLIES SHALL BE MAINTAINED IN COMPLIANCE WITH IBC CHAPTER 7AND ASSOCIATED ASTM, NFPA, AND UL REQUIREMENTS. PENETRATIONS,JOINTS AND ANNULAR SPACE SHALL RECEIVE SLEEVES, COLLARS,SEALANT/PUTTY, FIRE DAMPERS, AND FIRE RATED DOORS OR ACCESSPANELS.MEANS OF EGRESS:TRAVEL DISTANCE, MAXIMUM ALLOWED: 250' (PER TABLE 1017.2)TRAVEL DISTANCE, ACTUAL MAXIMUM:NO EXIT ACCESS TRAVEL DISTANCE EXCEEDS 76'COMMON PATH OF TRAVEL: 75' MAX (TABLE 1006.2.1)MINIMUM AISLE WIDTH: 42"MIN PER SECTION36" FOR OCCUPANCY LESS THAN 50 (TABLE 1018.2)PLUMBING FIXTURES:PLUMBING TO BE STUBBED OUT FOR FUTURE TENANT USE.PANIC HARDWARE:PANIC HARDWARE IS REQUIRED ON ALL MEANS OF EGRESS DOORSSERVING AREAS WITH AN OCCUPANT LOAD GREATER THAN 50.355