HomeMy WebLinkAboutPlumbing Plan - P1.01D1 D2 D3 D4
DE
DF
DD.1
DD
DC.3
DC
DB.4
DB.3
DB.1
DB
D3 D4D1D2DB.1
D1.1
D1.3
D1.5
D1.7
D1.8
D1.9
D2.2
D2.4
D2.6
D2.8
DA
DA.0
DA.3
DA8.5
DA.9
DA9.1
DA9.4
DA9.8
4"W12
3
4"W12
3
3 4"W2
4"W2
4"W12
3
2"CW, connect to existing
water service, downstream
of RPZ. Field verify exact
size, location, material and
condition of existing water
line; prior to start of work.
Approximate
location of
existing 6"W
Approximate
location of
existing 6"W
2"CW
2"CW
1"CW
112"CW
112"CW 1"CW
2"CW
A.All fittings, piping, fixtures, materials, etc. to meet the
current Safe Drinking Water Act with all of its
amendments and the Reduction of Lead in Drinking
water Act.
B.All work shall comply with all national, state, local codes
and ordinances pertaining to the work in this project.
C.No piping shall pass directly over electrical power
distribution cabinets, panelboards, etc. Contractor to
coordinate panel locations prior to piping installation.
D.Dry-pipe fire protection system shall be used in all areas
subject to freezing.
General Notes:
Connect new waste line to nearest active waste line of
equal or larger size. Field verify exact size, location,
elevation, material and condition of existing waste line;
prior to start of work.
Neatly saw-cut existing slab along entire length of new
waste line. Repair slab in kind, ready for work.
4"W up to 24" A.F.F., cap for future tenant.
Plan Notes:
1
2
3
A
B
C
D
E
F
G
H
J
K
L
151413121110987654321
151413121110987654321
A
B
C
D
E
F
G
H
J
K
L
1100 Sycamore Street, Suite 200
Cincinnati, Ohio 45202 - Ph: 513.984.1070
702 N. Capitol Avenue
Indianapolis, Indiana 46204
Ph: 317.636.3980
www.luminaut.com
As NotedPROF
E
SSIONA L E N G NIEERSA M U E L L.HU
R
TINDIA N A
0
N
EP1 6
.o
01087
ATS FOET
R E TEGIS
D
ER
Clay Terrace
Building "D" Demise
14390 Clay Terrace Blvd., Ste 165,
Carmel, IN 46032
IN23057
01/10/24
CONSTRUCTION DOCUMENTSGNIBMULP·LACITCELE·LACINAHCEM R2410 Executive Drive - Suite 100
Indianapolis, Indiana 46241
317.636.3941
www.TEC-MEP.com
THEENGINEERING
C O L L A B ORA
T
I
VEMEP CLARIFICATION 01/18/2024
P1.01
GJR
SLH
1/8" = 1'-0"
7A
P1.01
OVERALL CONSTRUCTION PLAN
OVERALL PLUMBING
PLAN