Loading...
HomeMy WebLinkAboutDept Report 11-19-02 CARMEL/CLAY PLAN COMMISSION DEPARTMENT REPORT November 19, 2002 6h. Doc}{et No. 149-:02 DP Amend; Providence at Old Meridian (Development Plan Amendment) The applicant seeks approval of an amendment to the approved Development Plan for Providence at Old Meridian. The site is located at the northeast comer of West Carmel Drive and Old Meridian Avenue. Filed by the Buckingham Companies. The applicant is seeking to amend the Development Plan that was approved for the Providence at Old Meridian PUD. The new plan will accommodate townhomes in place of the apartments originally proposed. Please see the informational packet provided by the applicant for a brief overview ofthe proposed site layout. The Department requests the applicant provide the Plan Commission members with the following for their review: 1. A legal description and exhibit illustrating the area to be dedicated to the City for the construction of a future road at the north side of the real estate. Dedication of this area shall be required as part ofthe DP Amendment approval process. 2. An exhibit illustrating the not less than 25% of land in the District allocated to Open Space per Section 10.1 ofthe PUD Ordinance. 3. An exhibit illustrating the not less than 10% ofland in the District allocated to Recreational Space per Section 11.1 of the PUD Ordinance. 4. Additional, more detailed, exhibits illustrating the exterior of the proposed buildings to determine conformance with the Design Vocabulary of the PUD. Provide initial renderings and photos of existing structures. This will provide a point of reference when reviewing the proposed elevations. Specifically, the applicant must illustrate compliance with section 7.4 of the PUD Ordinance. 5. An exterior lighting plan, photometric plan and cut sheets illustrating the proposed site lighting features. 6. A Landscape Plan to include shrubs. All revisions must be sent to Scott Brewer for review. Mr. Brewers review and approval ofthe plans will be required prior to approval by the Plan Commission. 7. Provide detail on plans illustrating the construction of the 6' path along the south and east sides of the property to be constructed with Phase II. An alternative has been discussed but no plan has been submitted for consideration. 8. Provide additional detail regarding the transition between the detention and the proposed sidewalklbuildings. The Department recommends that this item be forwarded to the Subdivision Committee on December 3rd for further discussion.