HomeMy WebLinkAboutApplication - SIGNEDPage 1 of 2 File: Technical Advisory Committee Application 202 Revised: 13202
TECHNICAL ADVISORY COMMITTEE
APPLICATION & PROCEDURES
^)(('XHDIWHUGRFNHWQRDVVLJQPHQW $0
Property Information
Tax Parcel ID*: Area (acres):
Property Address:
Zoning District:
Legal Description: (To be typewritten separately.)
Overlay District (If applicable):
*Please attach a separate list for projects with multiple parcels.
Contact Information
Name:
Address:
Phone: Email:
Engineer Information
Name:
Address:
Phone: Email Address:
Eplan Review Contact Person: Phone:
Email:
Owner Information
Name:
Address:
Phone Day: Evening:
Email Address:
Project Description
Please include a brief summary/history of the project:
___________________________________________________________________________________________________________
___________________________________________________________________________________________________________
__________________________________________________________________________________________________
Affidavit: I, hereby swear that I am the owner/contract purchaser of property involved in this application and that the foregoing signatures, statements
and answers herein contained and the information herewith submitted are in all respects true and correct to the best of my knowledge and belief. I, the
undersigned, authorize the applicant to act on my behalf with regard to this application and subsequent hearings and testimony.
Signature of Owner: Printed: Date:
DOCKET NO. TAC DATE RECEIVED:
*This is a PDF version of the application. The official application should be filled out online at the link below or at
https://cw.carmel.in.gov/PublicAccess/template/Login.aspx?ReturnUrl=%2ftemplate%2fHome.aspx
Daniel Shelton 4/16/2024
Page 2 of 2 File: Technical Advisory Committee Application 202 Revised: 13202
TAC Review Instruction Sheet
1Initial discussion with staff regarding applicable zoning ordinances, design standards, capacity of infrastructure, and
availability of utilities. 3OHDVH FRQWDFW XV DW 31121 WR VFKHGXOH D SUHVXEPLWWDO PHHWLQJ
2Allow plenty of time for the Dept. of Community Services (DOCS) staff review and the Technical Advisory
Committee (TAC) review process (approximately 30-45 days). (See the Plan Commission Calendar for TACMeeting
filing deadlines.)
3As of January 1, 2019, electronic-only submittals are accepted. $Q HOHFWURQLF DSSOLFDWLRQ LV WR EH VXEPLWWHG LQ
&DUPHO
V 3XEOLF 3RUWDO RXU RQOLQH DSSOLFDWLRQ ZHEVLWH After a docket no. is assigned, plans are to be submitted
electronically through ProjectDox, Carmel’s ePlan review software. Please see the Electronic Plan Review handout
for more information on the process and what needs to be submitted. Plans are to be distributed to all TAC
authorities by the applicant, by thefilingdeadline.
INFORMATION NEEDED for formal DOCS staff and TAC review:
•One electronic copy of the completed TAC application with Legal Description attached (email to DOCS).
• One electronic copy of location map showing location of site in question, zoning, and existing land use of all
adjacent properties (upload to ProjectDox).
• One electronic copy of plans drawn to scale with all dimensions and depicting all existing and proposed
structures, exterior architectural building elevations, landscaping, drainage, Stormwater Pollution Prevention
(SWPPP), lighting, signage, and any other supporting documentation to fully understand the proposal. All
documents must be legible (upload to ProjectDox).
After DOCS staff review, the petitioner will be notified of the Docket Number, Meeting Date, Fees, and any
outstanding information needed to process the application.
No public notice is required for this petition type.
Filing Deadline: A complete application package of the above-referenced information must be submitted to DOCS
and to the TAC Members (see members list online) approximately 30 days prior to the meeting date
(see Plan Commission & TAC calendar). The determination of a complete application submittal is at Staff
discretion.
^Filing Fee: The filing fee, as determined by staff, must be paid at least 5 days prior to the meeting date.
Failure to pay the filing fee by this time will result in the item b eing tabled to the next month’s TAC agenda.
The property owner, property owner’s attorney, or someone with the property owner’s Power of
Attorney must be present at the Carmel Technical Advisory Committee meeting to give a short
presentation.
10The Technical Advisory Committee (TAC) generally meets the Third Wednesday of each month at 9:00 a.m. in the
DOCS Conference Room, City Hall – Third Floor, One Civic Square, Carmel, IN 46032 RU 9LUWXDOO\ WKURXJK =RRP.
(Ten days prior to the meeting, agendas are sent to petitioners and TAC members.)
11Generally, applications are acted upon by the Committee in one meeting. However, TAC, at its
discretion may table an item at any time. The petitioner may follow up with each TAC member, individually,
after the meeting is held, in order to address review comments and concerns.
DOCS Contact Info:
1 Civic Sq. 3rd Flr., Carmel, IN 46032
P: 317-571-2417 | W: www.carmeldocs.com