Loading...
HomeMy WebLinkAboutTraffic Impact Analysis I ~\ \ r) , /~' ~~I ~, I ~/I\ " '.-~ \~i \~ / '~ii (, f ~,."c ,Ii ';<u" ~~ 'U",'\ .~/ " ~ o ) ( ~~' ( ~~ , In: ~/ " ~:< U \) ! (~ f.'\ f 1\ , , f i\ TRAFfic IIM'~AOT ANALYSIS f ' ,~' ~ ,'\ >':,!' '~ ' ! \/-~' i ,'1\, f ( ',< ') , - ,_ v /'-- , '\ \ \,1 '.\ ~r '\ \ .. _~ f! y /' ", i \ \.' , -',--- " " ~I "';' f " . r " f, / J,V i _. \1 \ ( " . .\ ~ , I /"PROPOSED\),ClARIAN, H'EAL TH,HoSPITAL, iil,' ".'~ .. - ,..,,' \-, ..../'.' i (/~ ( \~11 4'.:'6\ (5 &('-- U' )S' 31 ,f , _: \ _ - 7" '\ ,'. .. " " \ " " \ -->'/ ;. / \ -j /' f _ I' , ' ~i I -) /1 ( I' i, f - / \/;~ ~ '''.\ ) .-' ~' I '( i if'! / ' A&FENGIN~ERI'NG CO.~LL\C' CONSULTING ENGINEERS ( ~> " " / ' c 8.425 KEYSTONE CROSSING, SUiTE 200 \ ,r" " ',/' ,/- . I' \I":IDIANAPOLIS,INDIAN,A 4624~ ) -;; (317r~02-p~64- ';" '. ',( ( \ (i I i) \ f f, I 'f 'CA~IVIJ;~, I~DIANA '\ '\, /- - J\ " PREPARED/FoR C~ARI~N H~ALTH ' ) I ./-- / ,- f' /./ / i, t _ ' -< ,- "\ \..~ -'- I ! " NOVE~uiER 2002 ~-, " ) ) \ \ , " ---....:~- (" \ ',,- .,,' .\ -.. r' f " \ :\ " "'x,'y/ ( , -, )' ; ," I',' I , I \\( // / 0) \ --- iiC(:1'! I, '\: \~=~'\ ,- \~ ,',) \. r i :: I I 1/ ,I _! ~ ;,~ , ! ( \, ( ~J \ ,- , ! ' J I, /J,'.l:'j i / '1"/ \ ..,-r\ \-.....j,. \." ,.. \ / r " )-; . /' c' "- [I \ )' ~, / o o o w o o o o o o o D D o D o o o '0 TRAFFIC IMPACT ANALYSIS PROPOSED CLARIAN HEALTH HOSPITAL 1-465 & U.S. 31 CARMEL, INDIANA PREPARED FOR CLARIAN HEALTH NOVEMBER 2002 PREPARED By: A & F ENGINEERING CO., LLC CONSULTING ENGINEERS 8425 KEYSTONE CROSSING, SUITE 200 INDIANAPOLIS, IN 46240 PHONE 317-202-0864 FAX 317-202-0908 o D o o D D o D D D o o o D D o D D o CLARlAN HEALTH - NORTH HOSPITAL TRAFFIC IMPACT ANALYSIS COPYRIGHT This Analysis and the ideas, designs and concepts contained herein are the exclusive intellectual property of A&F Engineering Co., LLC. and are not to be used or reproduced in whole or in part, without the written consent of A&F Engineering Co., LLC. @2002, A&F Engineering Co., LLC. ~~-- D D CLARlAN HEALTH - NORTH HOSPITAL TRAFFIC IMPACT ANALYSIS D TABLE OF CONTENTS D o LIST OF FIGURES............................................................................................................................. .............................. II CERTIFICATION ...... .... ..... ........ ........... ..... ..... .............. .......... ......................... ......... ............... ....... .................. .............. III INTRODUCTION ....... ... ....................... ... ... ............................. .... .............. ...... ............ ............ ........................ .................. 1 PURPOSE............................................................................................................................. ............ ............................... 1 SCOPE OF WORK .......... .......... .................. .... ........ .......... ...... ................. ........................ ....... ............ .............................. 1 DESCRIPTION OF THE PROJECT. ............. ........... .................... ........................ ........................ ........ .................. ................2 STUDY AREA.............. ..... ........ ......... ......................................... .............. ................ ....... ...... ........................ .................. 4 DESCRIPTION OF THE ABUTTING STREET SYSTEM ......................................................................................................... 4 TRAFFIC DATA ............ ... ............................ .......................... ..... .......... .......... ..... ...... ........ .... ........................ ...... ............5 GENERATED TRAFFIC VOLUMES FOR PROPOSED DEVELOPMENT ................................................................................... 5 TABLE 1 - GENERA TED TRIPS FOR PROPOSED DEVELOPMENT...................................................................................5 INTERNAL TRIPS.......... ..................... ........ ..... ................ ............................... ................. ....... ........ .........:..... ...................7 PASS-BY TRIPS ......................................,........................................................................................................... .. .......... 7 ANNUAL GROWTH RATE FOR BACKGROUND TRAFFIC ...................................................................................................7 TABLE 2 - ANNUAL GROWTH RATES FOR BACKGROUND TRAFFIC ........................................................................... 7 PEAK HOUR ......................... .......... .......... ........ ... ........... .... ... ..................... ... .... .............. ...... ..........................................7 ASSIGNMENT AND DISTRIBUTION OF GENERA TED TRIPS ............................................................................................... 8 PROPOSED DEVELOPMENT GENERATED TRIPS ADDED TO THE STREET SYSTEM ............................................................8 YEAR 20] 2 TRAFFIC VOLUMES. ..... .......... ..................... ........................................ ...... ......... ............ .............................. 8 CAPACITY ANALYSIS ................................................................................... ........................ .........................:.............. 11 DESCRIPTION OF LEVELS OF SERVICE ..........................................................................................................................11 CAPACITY ANALYSES SCENARIOS............... ............ ............. ... ............. ........ ....... ........... ................. ...... ............... ........ 13 TABLE 3 - LEVEL OF SERVICE SUMMARY: U.S. 3] & ] 06TH STREET ........................................................................ 18 TABLE 4 - LEVEL OF SERVICE SUMMARY: U.S. 3] & ] 03RD STREET .......................................................................19 TABLE 5 - LEVEL OF SERVICE SUMMARY : PENNSYLVANIA STREET & I06TH STREET .............................................. 21 TABLE 6 - LEVEL OF SERVICE SUMMARY: PENNSYLVANIA STREET & ] 03RD STREET .............................................. 22 TABLE 7 - LEVEL OF SERVICE SUMMARY: COLLEGE AVENUE & 1 03RD STREET ...................................................... 24 TABLE 8 - LEVEL OF SERVICE SUMMARY: COLLEGE AVENUE & PENNSYLVANIA PARKWAy.................................. 25 TABLE 9 - LEVEL OF SERVICE SUMMARY: COLLEGE AVENUE & ] 01 ST STREET .......................................................26 TABLE 10 - LEVEL OF SERVICE SUMMARY: PENNSYLVANIA PARKWAY & ACCESS DRIVE 1................................... 27 TABLE] 1 - LEVEL OF SERVICE SUMMARY: PENNSYLVANIA PARKWAY & ACCESS DRIVE 2...................................28 TABLE] 2 - LEVEL OF SERVICE SUMMARY: PENNSYLVANIA P ARKWA Y & ACCESS DRIVE 3...................................29 TABLE 13 - LEVEL OF SERVICE SUMMARY: PENNSYLVANIA PARKWAY & ACCESS DRIVE 4................................... 30 CONCLUSIONS................................................................... .......................................................................... ................. 31 RECOMMENDATIONS ............. ..................................... ... .................. ........... .... ......... ... ........................... ... ....................38 ., D o o o o o o D o o o D o o ....../-,) o o ClARlAN HEALTH - NORTH HOSPITAL TRAFFIC IMPACT ANALYSIS o LIST OF FIGURES o FIGURE 1: AREA MAP............................... ........ ................ ........................ ............. ........... ...... .................. ......................3 FIGURE 2: EXISTING INTERSECTION GEOMETRICS. ............. ........ .......... .... ... ............ ......... ........... ............. .................. .... 6 FIGURE 3: ASSIGNMENT AND DISTRIBUTION OF GENERATED TRAFFIC VOLUMES FIGURE 4: GENERATED TRAFFIC VOLUMES FOR PROPOSED DEVELOPMENT .... .......... ......... .... ....... ........ .......... .... ... ......... ........................................9 FIGURE 4: GENERATED TRAFFIC VOLUMES FOR PROPOSED DEVELOPMENT ................................................................ 10 FIGURE 5: EXISTING TRAFFIC VOLUMES ...................................................................................................................... 14 FIGURE 6: SUM OF EXISTING AND PROPOSED DEVELOPMENT TRAFFIC VOLUMES ....................................................... 15 FIGURE 7: YEAR 2012 TRAFFIC VOLUMES ...................................................................................................................16 FIGURE 8: SUM OF YEAR 2012 AND PROPOSED DEVELOPMENT TRAFFIC VOLUMES .................................................... 17 FIGURE 9: PROPOSED INTERSECTION GEOMETRICS FOR SCENARIO 2 (EXISTING AND PROPOSED DEVELOPMENT TRAFFIC VOLUMES). ..................... ........ ........ .......................... ..... ...... ... ..... .... .......... ........................ ................... 41 FIGURE 10: PROPOSED INTERSECTION GEOMETRICS FOR SCENARIO 4 (YEAR 2012 AND PROPOSED DEVELOPMENT TRAFFIC VOLUMES)........................................................................................................................... ................. 42 o D o D o o D D o D o o o D o II o o o o o D o o o o o D o o o o D o D CLARIAN HEALTH - NORTH HOSPITAL TRAFFIC IMPACT ANALYSIS CERTIFICATION I certify that this TRAFFIC IMPACT ANALYSIS has been prepared by me and under my immediate supervision and that I have experience and training in the field of traffic and transportation engmeenng. A&F ENGINEERING Co., INC. d 10. /::.-A Jl Steven J. Fehribach, P.E. Indiana Registration 890237 /;?: ~# 1!f----- R. Matt Brown P .E. Indiana Registration 10200056 ~",\\\n!lmrI!rrfllf! ~~\~.:r \-\ I=IM f:i "?I,/t, ~,.:$.~~\ \...:::~..:..~'~~~ ...."f:..... It:.....r ....::..\~T::.'..... vi'. ~ s~ ,t. .," oL.\J''-' ~ '-:"~""';'" 4-:~~ .~)... /~ <:...<)....';;t.~ iff"- i f\'n \ ~ ~ *( 1 n?j~;;r:;~~f' )*) ::; ...(it ''-' -, ',J ,-, '.h..O i r.r ~ ';".O'"12~ ('''--~-,~'~'r'lF .:I.J..J:: ~1"6\ ulhlC:V ......fl.lj ?-. - '<~""" 1/. -'" ./~-2: ~ ~~ ~......,.rvrHr'~~~""':"'~0~;;.~ ~q," \y"j..:.;::.:.::....:;..'<<, ~'$. ~r.._' ~-'IOf~1 t\ \ '~" ....;~ Q~il.'l:l!~.:::I! ;~~~;"'s~;.\~~.~ III D D o U U o o o u o o D D o o o o o D CLARlAN HEALTH - NORTH HOSPITAL TRAFFIC IMPACT ANALYSIS INTRODUCTION This TRAFFIC IMPACT ANALYSIS, prepared at the request of the Cannel Department of Community Services on behalf of Clarian Health, is for a proposed hospital and medical offices that will be located just north ofI-465 and east of U.S. 31. PURPOSE The purpose of this analysis is to determine what effect traffic generated by the proposed development, when fully occupied, will have on the existing adjacent roadway system. This analysis will identify any roadway deficiencies that may exist today or that may occur when this site is developed. Conclusions will be reached that will determine if the roadway system can accommodate the anticipated traffic volumes or will determine the modifications that will be required to the system if it is determined there will be deficiencies in the system resulting from the increased traffic volumes. Recommendations will be made that will address the conclusions resulting from this analysis. These recommendations will address feasible roadway system improvements which will accommodate the proposed development traffic volumes such that there will be safe ingress and egress, to and from the proposed development, with minimal interference to traffic on the public street system. SCOPE OF WORK The scope of work for this analysis is: First, to make traffic volume counts at the following locations: . U.S. 31 & 106th Street . U.S. 31 & 103rd Street . Pennsylvania Street & 106th Street . Pennsylvania Street & 103rd Street . College Avenue & 103rd Street . College Avenue & Pennsylvania Parkway . College Avenue & 101 st Street Second, to estimate the number of new trips that will be generated by the proposed development. o o o o o o o o o o D D D o o o D o o CLARlAN HEALTH - NORTH HOSPITAL TRAFFIC IMPACT ANALYSIS Third, to assign the generated traffic volumes to the driveways and/or roadways that will serve to provide access to the proposed development. Fourth, to distribute the generated traffic volumes from the proposed development onto the public roadway system and intersections that have been identified in the study area. Fifth, to prepare an analysis including a capacity analysis and level of service analysis for each intersection included in the study area for each of the following scenarios: SCENARIO 1: Existing Conditions - Based on existing roadway conditions and traffic volumes. SCENARIO 2: Proposed Development - Add the traffic volumes that will be generated by the proposed development to the existing traffic volumes. SCENARIO 3: Year 2012 - Project the existing traffic volumes ten years forward using a growth rate. SCENARIO 4: Year 2012 with Proposed Development - Add the traffic volumes that will be generated by the proposed development to the projected year 2012 traffic volumes. Finally, to prepare a TRAFFIC IMPACT ANALYSIS documenting all data, analyses, conclusions and recommendations to provide for the safe and efficient movement of traffic through the study area. DESCRIPTION OF THE PROJECT The proposed development will be located in the northeast quadrant of U.S. 31 and 1-465 in Carmel, Indiana. As proposed, the development will consist of 374,732 square feet of hospital use and 156,058 square feet of medical office land use. Figure 1 is an area map of the proposed site. 2 J~U\ o - CO) CI) ::j '" ~ N o I ..,. o I <.:> ~ o :i x w ..,. N o /' ..,. N o /' N o o N /' N CLARIAN HEALTH NORTH HOSPITAL 3 106TH ST. 103RD ST. 102ND ST. W :s: '<:{ ~ Iij ....j ~ () PENNSYL VANt4 PKWy. 0_ ~I~~" - ''?J IOIST ST /465 FIGURE 1 AREA MAP cg 2002. A&F EngiDeering_Co.. LLC CLARIAN HEALTH -NORTH HOSPITAL TRAFFIC IMPACT ANALYSIS 1 STUDY AREA The study area defined for this analysis will include the following intersections: ' • U.S. 31 & 106th Street • U.S. 31 & 103rd Street • Pennsylvania Street& 106th Street • Pennsylvania Street& 103rd Street • College Avenue & 103rd Street • College Avenue & Pennsylvania Parkway • College Avenue& 101St Street • All Proposed Access Points 1 DESCRIPTION OF THE ABUTTING STREET SYSTEM ' This proposed development would be served by the public roadway system that includes I-465, U.S. 31, 106th Street, 103rd Street, College Avenue and Pennsylvania Parkway. ' I-465—is a major Interstate loop that surrounds the greater Indianapolis metropolitan area. U.S. 31 — is a north-south, four-lane divided highway that runs the entire length of Indiana and ' serves as a major arterial to several mid-size cities throughout the state. This roadway becomes Meridian Street within the Indianapolis City limits. ' 106TH STREET - is an east-west, 2-lane roadway that serves several residential developments within the City of Carmel. The posted speed limit along this roadway in the vicinity of the site is 35 mph. ' 103RD STREET-is a minor east-west 2-lane roadway. The posted speed limit along this roadway in the vicinity of the site is 35 mph. ' COLLEGE AVENUE - is a north-south, 2-lane roadway that serves many residential areas throughout Marion County and Hamilton County. The posted speed limit along this roadway in the vicinity of the site is 35 mph. t* e`c7 PENNSYLVANIA PARKWAY/STREET- Pennsylvania Parkway is an east-west 4-lane roadway that becomes Pennsylvania Street north of 103rd Street. The posted speed limit along this roadway in the vicinity of the site is 35 mph. U.S. 31 & 106th Street - This intersection is currently controlled with an automatic traffic signal. tThe existing intersection geometrics are illustrated on Figure 2. U.S. 3] & 103rd Street - This intersection is currently controlled with an automatic traffic signal. The existing intersection geometrics are illustrated on Figure 2. Pennsylvania Street & 106th Street - This intersection is currently controlled with an automatic ' traffic signal. The existing intersection geometrics are illustrated on Figure 2. I Q`'CZ V f IHEALTH -NORTH HOSPITAL TRAFFIC IMPACT ANALYSIS IPennsylvania Street & 103rd Street - This intersection is currently controlled as a four-way stop. ' The existing intersection geometries are illustrated on Figure 2. College Avenue & 103rd Street- This intersection is currently controlled with an automatic traffic Isignal. The existing intersection geometries are illustrated on Figure 2. College Avenue & Pennsylvania Parkway - This "T-intersection" is currently controlled with Pennsylvania Parkway stopping for College Avenue. The existing intersection geometries are illustrated on Figure 2. College Avenue & 1015` Street - This "T-intersection" is currently controlled with 101st Street stopping for College Avenue. The existing intersection geometries are illustrated on Figure 2. I TRAFFIC DATA Peak hour manual turning movement traffic volume counts were made at each of the study intersections by A&F Engineering Co., LLC. The traffic volume counts include an hourly total Iof all "through" traffic and all "turning" traffic at the intersection. The traffic volume counts were made during the hours of 6:00 AM to 9:00 AM and 3:00 PM to 6:00 PM in October 2002. IThese counts are included in Appendix A. IGENERATED TRAFFIC VOLUMES FOR PROPOSED DEVELOPMENT The estimate of traffic to be generated by the proposed development is a function of the Idevelopment size and of the character of the land use. Trip Generation report was used to calculate the number of trips that will be generated by the proposed development. This report is a 1 compilation of trip data for various land uses as collected by transportation professionals throughout the United States in order to establish the average number of trips generated by various land uses. ITable 1 summarizes the trips that will be generated by the proposed development. ITABLE 1 -GENERATED TRIPS FOR PROPOSED DEVELOPMENT DEVELOPMENT_INFORMAT ION GENERATED TRIPS ILAND USE ITE AM AM PM PM CODE SIZE ENTER EXIT ENTER EXIT Hospital 610 374,732 SF 273 101 87 277 Medical Office 720 156,058 SF 303 76 154 417 TOTAL 576 177 241 /694 0 I I i Trip Generation, Institute of Transportation Engineers, Sixth Edition, 1997. I 5 ' CLARIAN HEALTH -NORTH HOSPITAL TRAFFIC IMPACT ANALYSIS INTERNAL TRIPS An internal trip results when a trip is made between two land uses without using the roadway ' system. A small number of internal trips might occur between the land uses considered in this study. However,these trips are assumed to be negligible in order to create a worst case scenario. PASS-BY TRIPS ' Pass-by trips are trips already on the roadway system that decide to enter a land use. These trips are typically associated with retail land uses. The proposed development will consist of medical ' uses only. Therefore, no reduction is applied for pass-by trips. ' ANNUAL GROWTH RATE FOR BACKGROUND TRAFFIC In order to forecast future background traffic volumes, annual growth rates were determined on a street by street basis. The following table summarizes the annual growth rate used on each study roadway. ' TABLE 2-ANNUAL GROWTH RATES FOR BACKGROUND TRAFFIC ANNUAL STUDY ROADWAY GROWTH RATE 4° U.S. 31 1.0%per Year \.. ' 106th Street 2.5 %per Year College Avenue 2.5 %per Year 101st Street 0.25 %per Year ' 103rd Street 0.25 %per Year O`• Pennsylvania Parkway/Street (0.25 %per Year r PEAK HOUR The peak hour is based on the traffic volume counts collected at the study intersections. The peak ' hour varies by intersection. Throughout this analysis, all references to the peak hour will be for the peak hour at the individual intersections to represent the "worst case"scenario. ' CLARIAN HEALTH -NORTH HOSPITAL TRAFFIC IMPACT ANALYSIS ASSIGNMENT AND DISTRIBUTION OF GENERATED TRIPS The study methodology used to determine the traffic volumes, from the proposed development, that will be added to the street system is defined as follows: 1. The volume of traffic that will enter and exit the site must be assigned to the various access ' points and to the public street system. Using the traffic volume data collected for this analysis, traffic to and from the proposed new site has been assigned to the proposed driveways and to the public street system that will be serving the site. ' 2. To determine the volumes of traffic that will be added to the public roadway system, the generated traffic must be distributed by direction to the public roadways at their intersection with the driveway. For the proposed development, the distribution was based on the existing traffic patterns and the assignment of generated traffic. The assignment and distribution of generated traffic volumes for the proposed development are shown on Figure 3. PROPOSED DEVELOPMENT GENERATED TRIPS ADDED TO THE STREET SYSTEM Generated traffic volumes that can be expected from the proposed development have been prepared for each of the proposed access points and for each of the study area intersections. The peak hour generated traffic volumes are shown on Figure 4. These data are based.on the ' previously discussed trip generation data, assignment of generated traffic, and distribution of generated traffic. YEAR 2012 TRAFFIC VOLUMES ' To evaluate the future impact of this development on the public roadway system, the existing traffic volumes must be projected forward to a design year. The design year used for this project will be year 2012. The year 2012 projected traffic volumes are shown on Figure 6. 1 "" :i N '" I . '" I ~ C> :z: x ""' . N '" /' . N '" /' N '" '" N /' N LEGEND 00 = A..... PEAK HOUR (00) = P..... PEAK HOUR * = NEGLIGIBLE CLARIAN HEALTH NORTH HOSPITAL 106TH ST. .... 138 (541) . * (*) ~ ~ (188) 450.... ~ . 38) 92"l- - "'- C") CIj :J .... 69 (270) .11 (6) ~ ~ (94) 225.... ~ ~ (94) 225"l- _ FIGURE 4 GENERA TED TRAFFIC VOLUMES FOR PROPOSED DEVELOPMENT @ 2002. A&F Engineering Co., LLC 10 o o lJ U o o o o o o o o o D o D o o o CLARlAN HEALTH - NORTH HOSPITAL TRAFFIc IMPACT ANALYSIS CAPACITY ANALYSIS The "efficiency" of an intersection is based on its ability to accommodate the traffic volumes that approach the intersection. The "efficiency" of an intersection is designated by the Level-of- Service (LOS) of the intersection. The LOS of an intersection is determined by a series of calculations commonly called a "capacity analysis". Input data into a capacity analysis include traffic volumes, intersection geometry, number and use of lanes and, in the case of signalized intersections, traffic signal timing. To determine the level of service at each of the study intersections, a capacity analysis has been made using the recognized computer program based on the Highway Capacity Manual (HCMi. DESCRIPTI0N OF LEVELS OF SERVICE The following descriptions are for signalized intersections: Level of Service A - describes operations with a very low delay, less than or equal to 10.0 seconds per vehicle. This occurs when progression is extremely favorable, and most vehicles arrive during the green phase. Most vehicles do not stop at all. Level of Service B - describes operations with delay in the range of 10.1 to 20.0 seconds per vehicle. This generally occurs with good progression. More vehicles stop than LOS A, causing higher levels of average delay. Level of Service C - describes operation with delay in the range of 20.1 seconds to 35.0 seconds per vehicle. These higher delays may result from failed progression. The number of vehicles stopping is significant at this level, although many still pass through the intersection without stopping. 2 Transportation Research Board, National Research Council, Washington, DC, 2000. 11 o o o o o D o o o o o D D D o D o o o CLARlAN HEALTH - NORTH HOSPITAL TRAFFIC IMPACT ANALYSIS Level of Service D - describes operations with delay in the range of 35.1 to 55.0 seconds per vehicle. At level of service D, the influence of congestion becomes more noticeable. Longer delays may result from some combinations of unfavorable progresSIOn. Many vehicles stop, and the proportion of vehicles not stopping declines. Level of Service E - describes operations with delay in the range of 55.1 to 80.0 seconds per vehicle. This is considered to be the limit of acceptable delay. These high delay values generally indicate poor progression and long cycle lengths. Level of Service F - describes operations with delay in excess of 80.0 seconds per vehicle. This is considered to be unacceptable to most drivers. This condition often occurs with oversaturation, i.e., when arrival flow rates exceed the capacity of the intersection. Poor progression and long cycle lengths may also be major contributing causes to such delay levels. The following list shows the delays related to the levels of service for unsignalized intersections: Level of Service A B C D E F Control Delav (seconds/vehicle) Less than or equal to 10 Between 10.1 and 15 Between 15.1 and 25 Between 25.1 and 35 Between 35.1 and 50 greater than 50 12 o o o o D D D D D D D D D D o D D o D CLARlAN HEALTH - NORTH HOSPITAL TRAFFIC IMPACT ANALYSIS CAPACITY ANALYSES SCENARIOS To evaluate the proposed development's effect on the public street system, the traffic volumes from each of the various parts must be added together to form a series of scenarios that can be analyzed. The analysis of these scenarios determines the adequacy of the existing roadway system. From the analysis, recommendations can be made to improve the public street system so it will accommodate the increased traffic volumes. An analysis has been made for the AM peak hour and PM peak hour for each of the study intersections for each of the following scenarios: SCENARIO I: Existing Traffic Volumes - These are the traffic volumes that were obtained in October 2002. Figure 5 is a summary of these traffic volumes at the study intersections. SCENARIO 2: Year 2012 Traffic Volumes + Proposed Development Traffic Volumes - Figure 6 is a summary of these traffic volumes at the study intersections for the peak hour. SCENARIO 3: Year 2012 Traffic Volumes - Figure 7 is a summary of these traffic volumes at the study intersections for the peak hour. SCENARIO 4: Year 2012 Traffic Volumes + Proposed Deve/opment Traffic Volumes - Figure 8 is a summary of these traffic volumes at the study intersections for the peak hour. The requested analyses have been completed and the computer solutions showing the level of service results are included in Appendix A. The tables that are included in this report are a summary of the results of the level of service analyses and are identified as follows: Table 3 - U.S. 31 & 106th Street Table 4 - U.S. 31 & 103rd Street Table 5 - Pennsylvania Street & 106th Street Table 6 - Pennsylvania Street & 103rd Street Table 7 - College A venue & 103rd Street Table 8 - College Avenue & Pennsylvania Parkway Table 9 - College Avenue & 101 st Street Table 10 - Pennsylvania Parkway & Access Drive 1 Table 11 - Pennsylvania Parkway & Access Drive 2 Table 12 - Pennsylvania Parkway & Access Drive 3 Table 13 - Pennsylvania Parkway & Access Drive 4 I3 3 ~ ------- -'N'~ .::...::..-=.. -t;. "" "t 0 f (II) ,7 ..~. ... gf (SLS) ~ , ..., .e- sz (61) (9Z) L ~ ~ t ~ (~6f) 66~'" . 0'1 !' ZS) 6~ "" _ N ..... ..........~..-.. .. 0""'''''' .e-N " CI) i!: (0 ~ .. :-~6: 't.. Z (S) N co I"-- ... S9 (69) +l ~ ~ .e- f6 (fOI) (fZ) 9 ~ ~ t ~ (S6) Oll'" co 0'1 ~' (SOZ) 99 ~ ~:: ~ . ...-..U"')..-.. 0'1 "" 0'1 - - <0 =.:-- - I"-- ~.- _, N "" ""-- 't.. :; ;;0 :; S (ZS) ,j 7 'f. ...LOZ (lfZ) ~ , ..., .e- 9 (ZZ) (~6) sz ~ ~ t ~ (191) W... N r' (lSZ) Sf! ~ ~ ~ .:. --0'1 """"- -,...., ,...., "t -- -- N_ I/')~~ :-;;; 't.. 9Lf (~9f) :"i7 'l'. "'lZfZ (OZZZ) ~ , ..., .e- LLl (6ft) (S~) Of ~ ~ t ~ (ZZZZ) SSSZ... _ r' (L~) OZI ~ .:. ~ ~ =-;:0--;;:;- ..:::..~~ -- - "" or::::"~ ,....,,....,- 't.. ::-:; ':i ~6f (69Z) ,j fl. ... Loa (6LSZ) ~ , ..., .e- 9ff (09) (lZ)L~~ ~ t ~ (L~9Z) ZOSZ... r' 0""" 0'1 S l) ~~ - N N ~ ...-....-....-.. .... ,.....,.,.,,..... 1"--1/') - -..._~ I--: tr) ~ 8 "'" It) UJ w ::& :;) ...I o > o - L&. L&. C a: t- ~ z i= UJ - >< w w a: :) ~ - LL ... LLZ (~6S) .e- 6Zl (L9) (oor) sIr... ~ ,. (f) rl ~ ~ ~ - - I/') -; "t. L (L~) ; 1.... LfS (SSS) (ZI) f ~ (~IS) 9fL'" I--: tr) ~ ~ "'" ~ ~ 0 ~ ~ ~ S:! ~ ~ ~ 0 ~ ':t -.l w ... - (fJ Ie sn a:: a:: :::l:::l Q~~ Z:...::...:~ Wj<!:E c..l:t!:2 ~::E .t3 . ::l! ..... W<o.::Z ~1I1111 - 00 oe* U .....J .....J o u O'l C \.- <lJ <lJ C . a-. I c W LL. 0;; <( N o o N (Q) "<t x...l t-C ...It- c- wo.. xUJ o Zx ~x a:t- co: ...10 oz ~Irl W-l>O-11 I-I DMO' - HX3l>IIW\l>IIW\WOZ\:Z 00 lO -""- ..... ""~ ~~CO ;;; ':J;; ~ 57 (139) ~ ~::: ~ 221 (202) ~ ~ '+ .233 (351) (111) 1317 ~ t ~ (256) 155.... ::::: ~ :e (175) 146. .:. ~:: m_~ ", ~ <0 - "" ", ~", ~ "" -- a;~_ ""-~ ;-X~ t 76 (33 :? ~ ~ ~ 381 (247) ~ ~ '+ .69 (13) (313) 3527 ~ t ~ (433) 146.... ~:3 co (45) 123. w::~ ""-~ - ", ~~ I06TH ST. r:::- ~ <0_ "" ..... lO ~lO .:::.~:; t44 (134) :: ~:? ~ 63 (37) ~ ~ '+ . 256 (807) (77) 10 7 ~ t ~ (53) 23.... ~:3:2 (317) 29. ", ~ ..... - -~ co ", C> -_ ~;;,a. t 26 (14 ::g ~ <0 ~88 (44) ~ ~ '+ .7 (3) (119)1687 ~ t ~ (135) 79.... ~ ~ "" (259)650. ::-;;)e -..... lO _ e~ I03RD ST. I02ND ST. ~ ~ (404) 594.... ~ * 38) 92. _ "" ~ LEGEND 00 = A.M. PEAK HOUR (00) = P.M. PEAK HOUR * = NEGLIGIBLE ~ ~ (310) 369.... ~ ~ (94) 225. _ ..... ~ ~ 154 (76) .17 (7) ~ ~ (230) 148.... ~ lO (94) 225. N o I .. o I <.:> ~ o :I i';'. .. N o ./ .. N o ~ o ~ ./ N CLARIAN HEALTH NORTH HOSPITAL ]5 e;;- m "" ",- lO ~ <0 .... ~C>~ '-23 (11 ~ u:;..... ~34 (12) ~ ~ '+ .80 (15) (80) 34 7 ~ t ~ (34) 9.... lO;;;", """, 23) 21. e;;--:: -""~ ~m e FIGURE 6 SUM OF EXISTING & GENERATED TRAFFIC VOLUMES i FOR PROPOSED DEVELOPMENT I @ 2002, A&F Engineering Co., LLC ~ .... ,-........ mc-.,-.... LI'>-O ;; :! e 'to 39 (44 ~ ~ ~ .... 276 (253) +l ~ ~ .291 (439) (139) 164 ~ ~ t rt (320) 194" N:ri R (219) 183. :::~:. ....,-....LI'> ....c-.LI'> -........ -....- ~ -- -LI'>_ LI'> <0 co ,.,., -- :;;:- t95 (41 ~ ~ ~ .... 476 (309 +l ~ ~ .86 (16) (391) 440 ~ ~ t rt 541) 183" co ~ ~ 11) 46. ~:::-;n -.... <0 ,.,., c-. N 106TH ST. -;;;- m ,.,.,....,-.... e:-3. 'to24 (11 5::: ~.... ....35 (12) +l ~ ~ .82 (15) (82) 35 ~ ~ t rt (35) 9" ~ ~ ,.,., 24) 22. c;;-:.::- -,.,.,- -c-. ~ m c-._ LI'> -c-. .::..~~ 'to 17 (31 ~ ~ ~ .... 65 (38) +l ~ ~ .147 (372) (79) 10~ ~ t rt (54) 24" (325) 30. c-. -.... ..... -,.,.,~ '-27 (14 . ~::: <0 .... 90 (45) ,+l ~ ~ .7 (3) (122) 172 ~ ~ t rt (138) 81" m.... (71) 199. u;--;:::-e 0.... -- 103RD ST. ...... <") (rj ::) 102ND ST. o '" ,. 0'::" 'to2 (9) c-. m,.,., ~ ~ .46 (15) trt SITE /465 N o I .... o I LEGEND 00 = A.M. PEAK HOUR (OO) = P.M. PEAK HOUR * = NEGLIGIBLE '" ~ o :x: x w .. N o /' .... N o ~ o ~ /' N CLARIAN HEALTH NORTH HOSPITAL 16 FIGURE 7 YEAR 2012 TRAFFIC VOLUMES @ 2002, A&F EngiDeering Co., LLC z: \2002\02114\02114EXH.DWG 1=1 11-04-02 MIK Z(") Or- ;U)> -I;U :c; :cZ O:c C/)m :2)> -Ir- )>-1 r-:C -...l @ N o o N )> R> -,., ,.,., =' <.0 II 3" . ro ro ~. , ' u5 n o e- e- n N '" N....., Ul '" "f (271) 69~ ~ t 't. 45 (15 ~ ~ 0 "'3082 (2912) ., f ~ ~ 135 (58) (62) 344~ ~ t rt (2837) 2978'" ~ 8: t (430) 773", ::. c:;;-::- 00 00 '" --Ul 0> - - 't.150 (59) e: ~ ~ ... 2901 (2480) ., f ~ ~ 124 (96) (174) 221~ ~ t rt (2546) 2580'" ~!::3 8: (455) 470 + ='':--::- . N. '" Ul 00 <D "'- -- 't.169 (351) - -~ e: ~ "'177 (165) ., f ~ ~35 (118) (132) 34 ~ ~ t rt (237) 212'" ~ ~ ~ 65) 10", 0> 't.68 (213) ... 199 (136) ., f ~ ~ 6 (24) (654) 235 ~ ~ t rt (175) 96'" ....., ~!::3 (5) 2", 3.-::- ~. C) 0) :t (f) :-'i cs ~ ~ CJ) :--l ~ ~ \j CJ) :--l *** 't. * (*) --;--;--; ... 927 (1046) ., f ~ ~3 (12) (*) * ~ ~ t rt (1083) 694'" (48) 7 '" .-.. N.-..OO . '" N -Ul- ~:;-l:/: ... 635 (498) ., f ~ ~ 7 (27) (19) 26~ ~ t rt (737) 450'" ~ l:/: ~ (11) 3", - ~ -C)- Om ;U~ ,,;UC/) ;U)>c: 0-11: "mO OC,," C/)-I< m;Um C)>)> C"";U m!! . <(")N ~<~ OON "r-j20 I:C: ml: zm -tC/) " - G) c: 2J m (X) <.----/ ~ ~ D o o o o o o o o o o o o o o o o o o CLARlAN HEALTH - NORTH HOSPITAL TRAFFIC IMPACT ANALYSIS TABLE 3 - LEVEL OF SERVICE SUMMARY: U.S. 31 & 106TH STREET AM PEAK HOUR MOVEMENT SCENARIO 1 IA 2A 3A 3B 4B Northbound Approach C D D D C C Southbound Approach F D E D C C Eastbound Approach E D D E D D Westbound Approach F E E F F F Intersection F D D E D D PM PEAK HOUR MOVEMENT SCENARIO 1 IA 2A 3A 3B 4B Northbound Approach C C C D C C Southbound Approach F C C D C C Eastbound Approach E D E E D D Westbound Approach F F F F F F Intersection F D D E D D SCENARIO 1: SCENARIO 1 A: SCENARIO 2A: SCENARIO 3A: SCENARIO 3B: SCENARIO 4B: Existing Traffic Volumes with Existing Conditions Existing Traffic Volumes with* . One additional southbound through lane Sum of Existing and Proposed Development Traffic Volumes with* . One additional southbound through lane Sum of Existing and Year 2012 Traffic Volumes with* . One additional southbound through lane Sum of Existing and Year 2012 Traffic Volumes with* . Two additional southbound through lanes . One additional northbound through lane Sum of Existing, Year 2012 and Proposed Development Traffic Volumes with* . Two additional southbound through lanes . One additional northbound through lane * All additions for each scenario are made from the existing conditions. ]8 o o o o D o o o o o o o o o o o o o o CLARlAN HEALTH - NORTH HOSPITAL TRAFFIC IMPACT ANALYSIS TABLE 4 - LEVEL OF SERVICE SUMMARY: U.S. 31 & 103RD STREET AM PEAK HOUR MOVEMENT SCENARIO 1 2 2A 2B 3 3A 4B 4C Northbound Approach D D D C E C C C Southbound Approach D D C C D C C C Eastbound Approach D D D D D D D D Westbound Approach F F F D F D E E Intersection D D D C E C C C PM PEAK HOUR MOVEMENT SCENARIO 1 2 2A 2B 3 3A 4B 4C Northbound Approach C D D D D C D C Southbound Approach C E D D D C D C Eastbound Approach F F F D F E D D Westbound Approach F F F E F F F E Intersection D F F D E D D D Note: See next page for scenario descriptions. 19 o o o o o o o o o o o D o o o o D o o CLARlAN HEALm - NORTH HOSPITAL TRAFFIC IMPACT ANALYSIS SCENARIO 1: SCENARIO 2: SCENARIO 2A: SCENARIO 2B: SCENARIO 3: SCENARIO 3A: SCENARIO 4B: SCENARIO 4C: Existing Traffic Volumes with Existing Conditions Sum of Existing and Proposed Development Traffic Volumes with Existing Conditions Sum of Existing and Proposed Development Traffic Volumes with* . One additional northbound through lane . One additional southbound through lane Sum of Existing and Proposed Development Traffic Volumes with* . One additional northbound through lane . One additional southbound through lane · One additional westbound left-turn lane Sum of Existing and Year 2012 Traffic Volumes with Existing Conditions Sum of Existing and Year 2012 Traffic Volumes with* . One additional northbound through lane . One additional southbound through lane Sum of Existing, Year 2012 and Proposed Development Traffic Volumes with* . One additional northbound through lane . One additional southbound through lane . One additional westbound left-turn lane Sum of Existing, Year 2012 and Proposed Development Traffic Volumes with* . One additional northbound through lane . One additional southbound through lane . Two additional westbound left-turn lanes * All additions for each scenario are made from the existing conditions. 20 o o o o o D o o o o o o o o o o o o D CLARlAN HEALTH - NORTH HOSPITAL TRAFFIC IMPACT ANALYSIS TABLE 5 - LEVEL OF SERVICE SUMMARY: PENNSYL VANIA STREET & 106TH STREET . MOVEMENT SCENARIO 1 2 3 4 Northbound Approach D D D D Southbound Approach C C D D Eastbound Approach C C D D Westbound Approach C C D D Intersection C C D D AM PEAK HOUR MOVEMENT SCENARIO 1 2 3 4 Northbound Approach D D C C Southbound Approach B B D C Eastbound Approach C D C D Westbound Approach B C B B Intersection C D C C PM PEAK HOUR SCENARIO 1 : Existing Traffic Volumes with Existing Conditions SCENARIO 2: Sum of Existing and Proposed Development Traffic Volumes with Existing Conditions SCENARIO 3: Sum of Existing and Year 2012 Traffic Volumes with Planned Conditions* SCENARIO 4: Sum of Existing, Year 2012 and Proposed Development Traffic Volumes with Planned Conditions* * The planned conditions consist of the following: . The addition of a northbound left-turn lane . One additional northbound through lane . The replacement of the southbound right-turn lane by an additional southbound through lane 21 o o o D o o o o o o o o o o o o o o o ClARlAN HEALTH - NORTH HOSPITAL TRAFFIC IMPACT ANALYSIS TABLE 6 - LEVEL OF SERVICE SUMMARY: PENNSYL VANIA STREET & 1 03RD STREET AM PEAK HOUR MOVEMENT SCENARIO 1 2 2S 2R 3 4S 4R Northbound Approach B E C A B C A Southbound Approach B C D A B D A Eastbound Approach B F B A B A A Westbound Approach B B B A B B A Intersection B F C A B C A PM PEAK HOUR MOVEMENT SCENARIO 1 2 2S 2R 3 4S 4R Northbound Approach B F B B B B B Southbound Approach C D C A C C A Eastbound Approach B F C A B B A Westbound Approach B B C A B C A Intersection B F C A B B A Note: See next page for scenario descriptions. 22 o o o o o o o o o o o D o o o o D o o CLARlAN HEALTH - NORTH HOSPITAL TRAFFIC IMPACT ANALYSIS SCENARIO 1 : SCENARIO 2: SCENARIO 2S: SCENARIO 2R: SCENARIO 3: SCENARIO 4S: SCENARIO 4R: Existing Traffic Volumes with Existing Conditions Sum of Existing and Proposed Development Traffic Volumes with Existing Conditions Sum of Existing and Proposed Development Traffic Volumes with Proposed Traffic Signal Conditions* Sum of Existing and Proposed Development Traffic Volumes with Proposed Roundabout Conditions* Sum of Existing and Year 2012 Traffic Volumes with Existing Conditions Sum of Existing, Year 2012 and Proposed Development Traffic Volumes with Proposed Traffic Signal Conditions* Sum of Existing, Year 2012 and Proposed Development Traffic Volumes with Proposed Roundabout Conditions* * If a traffic signal control is to be used at this intersection, the following intersection geometries are proposed: . Northbound Approach - Two left-turn lanes and a shared through/right-turn lane . Southbound Approach - One shared lane . Eastbound Approach - One left-turn lane, one through lane and one right-turn lane . Westbound Approach - One left-turn lane and a shared through/right- turn lane * If a roundabout is to be constructed at this intersection, the following conditions are proposed: . All approaches and departures should include two lanes . The minimum circulatory roadway width should be 28 feet. 23 o o o o o o o o o o o o o o o o o o o Cl-ARIAN HEALTH - NORTH HOSPITAL TRAFFIC IMPACT ANALYSIS TABLE 7 - LEVEL OF SERVICE SUMMARY: COLLEGE A VENUE & I 03RD STREET MOVEMENT SCENARIO 1 2 3 4 Northbound Approach A A A A Southbound Approach A A B B Eastbound Approach B B B B Westbound Approach B B B B Intersection A A B B AM PEAK HOUR MOVEMENT SCENARIO 1 2 3 4 Northbound Approach A A B B Southbound Approach A A A A Eastbound Approach B B B B Westbound Approach B B B B Intersection A A B B PM PEAK HOUR SCENARIO I: Existing Traffic Volumes with Existing Conditions SCENARIO 2: Sum of Existing and Proposed Development Traffic Volumes with Existing Conditions SCENARIO 3: Sum of Existing and Year 2012 Traffic Volumes with Existing Conditions SCENARIO 4: Sum of Existing, Year 2012 and Proposed Development Traffic Volumes with Existing Conditions 24 o o o o D o o o o o o D o o o D D o o CLARIAN HEALTH - NORTH HOSPITAL TRAFFIC IMPACT ANALYSIS TABLE 8 - LEVEL OF SERVICE SUMMARY: COLLEGE A VENUE & PENNSYLVANIA PARKWAY AM PEAK HOUR MOVEMENT SCENARIO 1 2 3 4 Northbound Left-Turn A A A A Eastbound Approach B B C C PM PEAK HOUR MOVEMENT SCENARIO 1 2 3 4 Northbound Left-Turn A A A A Eastbound Approach C C C C SCENARIO 1 : Existing Traffic Volumes with Existing Conditions SCENARIO 2: Sum of Existing and Proposed Development Traffic Volumes with Existing Conditions SCENARIO 3: Sum of Existing and Year 2012 Traffic Volumes with Existing Conditions SCENARIO 4: Sum of Existing, Year 2012 and Proposed Development Traffic Volumes with Existing Conditions 25 D o o o o o o o o o o o o o o o o o o CLARlAN HEALTH - NORTH HOSPITAL TRAFFIC IMPACT ANALYSIS TABLE 9 - LEVEL OF SERVICE SUMMARY: COLLEGE A VENUE & 101 ST STREET AM PEAK HOUR MOVEMENT SCENARIO I 2 3 4 Northbound Left-Turn --- A --- B Southbound Left-Turn A A A A Eastbound Approach --- D --- E Westbound Approach E F F F PM PEAK HOUR MOVEMENT SCENARIO I 2 3 4 Northbound Left-Turn --- B --- B Southbound Left-Turn B B B B Eastbound Approach --- F --- F Westbound Approach F F F F SCENARIO 1: Existing Traffic Volumes with Existing Conditions SCENARIO 2: Sum of Existing and Proposed Development Traffic Volumes with Proposed Conditions* SCENARIO 3: Sum of Existing and Year 2012 Traffic Volumes with Existing Conditions SCENARIO 4: Sum of Existing, Year 2012 and Proposed Development Traffic Volumes with Proposed Conditions* * The proposed conditions consist of the following: . The addition of a northbound left-turn lane . The addition of a southbound right-turn lane . The emergency access constructed as one outbound lane and one inbound lane 26 D D D D D D o o o o D o o o o D o D o CLARlAN HEALTH - NORTH HOSPITAL TRAFFIC IMPACT ANALYSIS TABLE 10- LEVEL OF SERVICE SUMMARY: PENNSYL VANIA P ARKW A Y & ACCESS DRIVE 1 AM PEAK HOUR MOVEMENT SCENARIO 2 4 Northbound Approach C C Westbound Left-Turn A A MOVEMENT SCENARIO 2 4 Northbound Approach C C Westbound Left-Turn A A PM PEAK HOUR SCENARIO 2: Sum of Existing and Proposed Development Traffic Volumes with Proposed Conditions* SCENARIO 4: Sum of Existing, Year 2012 and Proposed Development Traffic Volumes with Proposed Conditions* * The proposed conditions consist of the following: . The addition of a westbound left-turn lane . The access constructed as one outbound lane and one inbound lane 27 o o o o o o o o D D D D o D D o o D o CLARlAN HEALTH - NORTH HOSPITAL TRAFFIC IMPACT ANALYSIS TABLE 11 - LEVEL OF SERVICE SUMMARY: PENNSYLVANIA PARKWAY & ACCESS DRIVE 2 AM PEAK HOUR MOVEMENT SCENARIO 2 4 Northbound Approach B B Westbound Left-Turn A A PM PEAK HOUR MOVEMENT SCENARIO 2 4 Northbound Approach C C Westbound Left-Turn A A SCENARIO 2: Sum of Existing and Proposed Development Traffic Volumes with Proposed Conditions* SCENARIO 4: Sum of Existing, Year 2012 and Proposed Development Traffic Volumes with Proposed Conditions* * The proposed conditions consist of the following: . The addition of a westbound left-turn lane . The access constructed as two outbound lanes two one inbound lanes 28 o o D D D D D D o D o D D D D D D o D CLARlAN HEALTH - NORTH HOSPITAL TRAFFIc IMPACT ANALYSIS TABLE 12 - LEVEL OF SERVICE SUMMARY: PENNSYLVANIA P ARKW A Y & ACCESS DRIVE 3 AM PEAK HOUR MOVEMENT SCENARIO 2 4 Northbound Approach B B Westbound Left-Turn A A PM PEAK HOUR MOVEMENT SCENARIO 2 4 Northbound Approach B C Westbound Left-Turn A A SCENARIO 2: Sum of Existing and Proposed Development Traffic Volumes with Proposed Conditions* SCENARIO 4: Sum of Existing, Year 2012 and Proposed Development Traffic Volumes with Proposed Conditions* * The proposed conditions consist of the following: . The addition of a westbound left-turn lane . The access constructed as two outbound lanes and two inbound lanes 29 D D o o o o o o o o D o o o D o o o o CLARlAN HEALTH - NORTH HOSPITAL TRAFFIC IMPACT ANALYSIS TABLE 13 - LEVEL OF SERVICE SUMMARY: PENNSYLVANIA PARKWAY & ACCESS DRIVE 4 MOVEMENT SCENARIO 2 4 Northbound Approach A A Westbound Left-Turn A A AM PEAK HOUR MOVEMENT SCENARIO 2 4 Northbound Approach A A Westbound Left-Turn A A PM PEAK HOUR SCENARIO 2: Sum of Existing and Proposed Development Traffic Volumes with Proposed Conditions* SCENARIO 4A: Sum of Existing, Year 2012 and Proposed Development Traffic Volumes with Proposed Conditions* * The proposed conditions consist of the following: . The addition of a westbound left-turn lane . The access constructed as two outbound lanes and one inbound lane 30 o o o o o u o o o o o o o o o o o o o CLARlAN HEALTH - NORTH HOSPITAL TRAFFIC IMPACT ANALYSIS CONCLUSIONS The conclusions that follow are based on existing traffic volume data, trip generation, assignment and distribution of generated traffic, capacity analyses with the resulting levels of service that have been prepared for each of the study intersections, and the field review conducted at the site. These conclusions apply only to the AM peak hour and PM peak hour that were addressed in this analysis. These peak hours are when the largest volumes oftraffic will occur. Therefore, if the resulting level of service is adequate during these time periods, it can generally be assumed the remaining 22 hours will have levels of service that are better than the peak hour, since the existing street traffic volumes will be less during the other 22 hours. 1. u.s. 31 & 106TI1 STREET Scenario 1 Analysis: Existing Traffic Volumes Scenario 1 Results: In order to achieve acceptable levels of service during the peak hours the following additions are needed to the existing intersection conditions: . One additional southbound through lane Scenario 2 Analysis: Existing Traffic Volumes & Proposed Development Traffic Volumes Scenario 2 Results: In order to achieve acceptable levels of service during the peak hours the following additions are needed to the existing intersection conditions: . One additional southbound through lane Scenario 3 Analysis: Year 2012 Traffic Volumes Scenario 3 Results: In order to achieve acceptable levels of service during the peak hours the following additions are needed to the existing intersection conditions: . Two additional southbound through lanes . One additional northbound through lane Scenario 4 Analysis: Year 2012 Traffic Volumes & Proposed Development Traffic Volumes Scenario 4 Results: In order to achieve acceptable levels of service during the peak hours the following additions are needed to the existing intersection conditions: . Two additional southbound through lanes . One additional northbound through lane 3] -~ D o o o o D o D o o o D o o o o o o o CLARlAN HEALTH - NORTH HOSPITAL TRAFFIC IMPACT ANALYSIS 2. U.S. 31 & 103RD STREET Scenario 1 Analysis: Existing Traffic Volumes Scenario 1 Results: Geometric improvements are not necessary to achieve acceptable levels of service during the peak hours. Scenario 2 Analysis: Existing Traffic Volumes & Proposed Development Traffic Volumes Scenario 2 Results: In order to achieve acceptable levels of service during the peak hours the following additions are needed to the existing intersection conditions: . One additional northbound through lane . One additional southbound through lane . One additional westbound left-turn lane Scenario 3 Analysis: Year 2012 Traffic Volumes Scenario 3 Results: In order to achieve acceptable levels of service during the peak hours the following additions are needed to the existing intersection conditions: . One additional northbound through lane . One additional southbound through lane Scenario 4 Analysis: Year 2012 Traffic Volumes & Proposed Development Traffic Volumes Scenario 4 Results: In order to achieve acceptable levels of service during the peak hours the following additions are needed to the existing intersection conditions: . One additional northbound through lane . One additional southbound through lane . Two additional westbound left-turn lanes 3. PENNSYLVANIA STREET & 106TH STREET Scenario 1 Analysis: Existing Traffic Volumes Scenario 1 Results: Geometric improvements are not necessary to achieve acceptable levels of service during the peak hours. Scenario 2 Analysis: Existing Traffic Volumes & Proposed Development Traffic Volumes Scenario 2 Results: Geometric improvements are not necessary to achieve acceptable levels of service during the peak hours. 32 o o o o o o o o o o o D o o o o o o o CLARlAN HEALTH - NORTH HOSPITAL TRAFFIC IMPACT ANALYSIS Scenario 3 Analysis: Year 2012 Traffic Volumes Scenario 3 Results: In order to achieve acceptable levels of service during the peak hours the following modifications are needed to the existing intersection conditions: . One additional northbound through lane . One additional northbound left-turn lane . Modify the existing southbound right-turn lane to become a shared through/right-turn lane Scenario 4 Analysis: Year 2012 Traffic Volumes & Proposed Development Traffic Volumes Scenario 4 Results: In order to achieve acceptable levels of service during the peak hours the following modifications are needed to the existing intersection conditions: . One additional northbound through lane . One additional northbound left-turn lane . Modify the existing southbound right-turn lane to become a shared through/right-turn lane 4. PENNSYLVANIA STREET & 103RD STREET Scenario 1 Analysis: Existing Traffic Volumes Scenario 1 Results: Geometric improvements are not necessary to achieve acceptable levels of service during the peak hours. Scenario 2 Analysis: Existing Traffic Volumes & Proposed Development Traffic Volumes Scenario 2 Results: Acceptable levels of service can be achieved through the addition of a traffic signal or a roundabout at this intersection. In either case addition geometric improvements should also be made. The following summarizes these improvements for each case. If a traffic signal is installed at this location then the intersection should be reconstructed to include the following lanes: Northbound: Two left-turn lanes, one shared through/right-turn lane Southbound: One left-turn lane, one through lane & one right-turn lane Eastbound: One left-turn lane, one through lane & one right-turn lane Westbound: One left-turn lane, one shared through/right-turn lane If a roundabout is constructed at this location then all approaches and all departures should be constructed to include two lanes. In addition, the roundabout should be constructed to include at least 28 feet of circulatory roadway width. Scenario 3 Analysis: Year 2012 Traffic Volumes Scenario 3 Results: Geometric improvements are not necessary to achieve acceptable levels of service during the peak hours. 33 o D o o o D o [j o o o o o o D o o o o CLARIAN HEALTH - NORTH HOSPITAL TRAFFIC IMPACT ANALYSIS Scenario 4 Analysis: Existing Traffic Volumes & Proposed Development Traffic Volumes Scenario 4 Results: Acceptable levels of service can be achieved through the addition of a traffic signal or a roundabout at this intersection. In either case addition geometric improvements should also be made. The following summarizes these improvements for each case. If a traffic signal is installed at this location then the intersection should be reconstructed to include the following lanes: Northbound: Two left-turn lanes, one shared through/right-turn lane Southbound: One left-turn lane, one through lane & one right-turn lane Eastbound: One left-turn lane, one through lane & one right-turn lane Westbound: One left-turn lane, one shared through/right-turn lane If a roundabout is constructed at this location then all approaches and all departures should be constructed to include two lanes. In addition, the roundabout should be constructed to include at least 28 feet of circulatory roadway width. 5. COLLEGE AVENUE & 103RD STREET Scenario 1 Analysis: Existing Traffic Volumes Scenario 1 Results: Geometric improvements are not necessary to achieve acceptable levels of service during the peak hours. Scenario 2 Analysis: Existing Traffic Volumes & Proposed Development Traffic Volumes Scenario 2 Results: Geometric improvements are not necessary to achieve acceptable levels of service during the peak hours. Scenario 3 Analysis: Year 2012 Traffic Volumes Scenario 3 Results: Geometric improvements are not necessary to achieve acceptable levels of service during the peak hours. Scenario 4 Analysis: Year 2012 Traffic Volumes & Proposed Development Traffic Volumes Scenario 4 Results: Geometric improvements are not necessary to achieve acceptable levels of service during the peak hours. 6. COLLEGE AVENUE & PENNSYLVANIA PARKWAY Scenario 1 Analysis: Existing Traffic Volumes Scenario I Results: Geometric improvements are not necessary to achieve acceptable levels of service during the peak hours. 34 o o o o o o o o o o o o o o o o o o o ClARIAN HEALTH - NORTH HOSPITAL TRAFFIC IMPACT ANALYSIS Scenario 2. Analysis: Existing Traffic Volumes & Proposed Development Traffic Volumes Scenario 2 Results: Geometric improvements are not necessary to achieve acceptable levels of service during the peak hours. Scenario 3 Analysis: Year 2012 Traffic Volumes Scenario 3 Results: Geometric improvements are not necessary to achieve acceptable levels of service during the peak hours. Scenario 4 Analysis: Year 2012 Traffic Volumes & Proposed Development Traffic Volumes Scenario 4 Results: Geometric improvements are not necessary to achieve acceptable levels of service during the peak hours. 7. COLLEGE A VENUE & 101 ST STREET Scenario 1 Analysis: Existing Traffic Volumes Scenario 1 Results: The westbound approach experiences delays during the peak hours due to the amount of through traffic along College A venue. These delays cannot be substantially reduced with geometric improvements. Scenario 2 Analysis: Existing Traffic Volumes & Proposed Development Traffic Volumes Scenario 2 Results: The development of the proposed site will add a west leg to this intersection through the development of an emergency access drive. In order to facilitate the movement of traffic into this access, a northbound left-turn lane and a southbound right-turn lane should be developed along College Avenue. However, the analysis of this intersection including the additional west leg and the improvements along College A venue has shown that the eastbound and westbound approaches will experience delays during the peak hour. In addition, further analysis has shown that these delays cannot be substantially reduced with additional geometric improvements. Scenario 3 Analysis: Year 2012 Traffic Volumes Scenario 3 Results: The westbound approach experiences delays during the peak hours due to the amount of through traffic along College A venue. These delays cannot be substantially reduced with geometric improvements. 35 o o o o o o o o o o o D D D o o o o o CLARlAN HEALTH - NORTH HOSPITAL TRAFFIC IMPACT ANALYSIS Scenario 4 Analysis: Year 2012 Traffic Volumes & Proposed Development Traffic Volumes Scenario 4 Results: The development of the proposed site will add a west leg to this intersection through the development of an emergency access drive. In order to facilitate the movement of traffic into this access, a northbound left-turn lane and a southbound right-turn lane should be developed along College Avenue. However, the analysis of this intersection including the additional west leg and the improvements along College Avenue has shown that the eastbound and westbound approaches will experience delays during the peak hour. In addition, further analysis has shown that these delays cannot be substantially reduced ~ith additional geometric improvements. 8. PENNSYLVANIA PARKWAY & ACCESS DRIVE 1 Scenario 2 Analysis: Existing Traffic Volumes & Proposed Development Traffic Volumes Scenario 2 Results: This intersection will operate at acceptable levels of service during the peak hours with the following intersection modifications: . The addition of a westbound left-turn lane along Pennsylvania Parkway . The development of the access drive to include one inbound lane and one outbound lane Scenario 4 Analysis: Year 2012 Traffic Volumes & Proposed Development Traffic Volumes Scenario 4 Results: This intersection will operate at acceptable levels of service during the peak hours with the following intersection modifications: . The addition of a westbound left-turn lane along Pennsylvania Parkway . The development of the access drive to include one inbound lane and one outbound lane 9 . PENNSYLVANIA PARKWAY & ACCESS DRIVE 2 Scenario 2 Analysis: Existing Traffic Volumes & Proposed Development Traffic Volumes Scenario 2 Results: This intersection will operate at acceptable levels of service during the peak hours with the following intersection modifications: . The addition of a westbound left-turn lane along Pennsylvania Parkway . The development of the access drive to include two outbound lanes and two inbound lanes 36 o o o o D D D o o D o o o o o o o o o CLARlAN HEALTH - NORTH HOSPITAL TRAFFIC IMPACT ANALYSIS Scenario 4 Analysis: Year 2012 Traffic Volumes & Proposed Development Traffic Volumes Scenario 4 Results: This intersection will operate at acceptable levels of service during the peak hours with the following intersection modifications: . The addition of a westbound left-turn lane along Pennsylvania Parkway . The development of the access drive to include two outbound lanes and two inbound lanes 1 o. PENNSYLVANIA P ARKW A Y & ACCESS DRIVE 3 Scenario 2 Analysis: Existing Traffic Volumes & Proposed Development Traffic Volumes Scenario 2 Results: This intersection will operate at acceptable levels of service during the peak hours with the following intersection modifications: . The addition of a westbound left-turn lane along Pennsylvania Parkway . The development of the access drive to include two outbound lanes and two inbound lanes Scenario 4 Analysis: Year 2012 Traffic Volumes & Proposed Development Traffic Volumes Scenario 4 Results: This intersection will operate at acceptable levels of service during the peak hours with the following intersection modifications: . The addition of a westbound left-turn lane along Pennsylvania Parkway . The development of the access drive to include two outbound lanes and two inbound lanes I 1. PENNSYLVANIA PARKWAY & ACCESS DRIVE 4 Scenario 2 Analysis: Existing Traffic Volumes & Proposed Development Traffic Volumes Scenario 2 Results: This intersection will operate at acceptable levels of service during the peak hours with the following intersection modifications: . The addition of a westbound left-turn lane along Pennsylvania Parkway . The development of the access drive to include two outbound lanes and one inbound lane 37 D o o o o o o D D o o o o o o o o o o ClARIAN HEALTH - NORTH HOSPITAL TRAFFIC IMPACT ANALYSIS Scenario 4 Analysis: Year 2012 Traffic Volumes & Proposed Development Traffic Volumes Scenario 4 Results: This intersection will operate at acceptable levels of service during the peak hours with the following intersection modifications: . The addition of a westbound left-turn lane along Pennsylvania Parkway . The development of the access drive to include two outbound lanes and one inbound lane RECOMMENDATIONS Based on this analysis and the conclusions, the following recommendations are made to ensure that the roadway system will operate at acceptable levels of service if the site is developed as proposed. All recommendations are in addition to the existing geometric conditions that exist today. 1. U.S. 31 & 1 06TH STREET . An additional southbound through lane should be added to this intersection in order to provide additional capacity. This additional lane is necessary with or without the proposed development. The recommended intersection schematic is shown on Figure 9. . Two additional southbound through lanes and one additional northbound through will be necessary as background area traffic increases over the next ten years. These additional lanes will also provide sufficient capacity for the added proposed development traffic volumes. These improvements are shown on Figure 10. 2. U.S. 31 & I 03RD STREET . When the proposed development traffic is added to the existing traffic at this intersection, the following lane additions are needed to achieve an acceptable level of service at this location: . One additional northbound through lane . One additional southbound through lane . One additional westbound left-turn lane The recommended intersection geometries are graphically summarized on Figure 9. . When the proposed development traffic is added to the projected year 2012 traffic volumes at this intersection, the following lane additions are needed to achieve an acceptable level of service at this location: . One additional northbound through lane . One additional southbound through lane . Two additional westbound left-turn lanes The recommended intersection geometries are graphically summarized on Figure 10. 38 D o D o D D o D o o o D o o o D o o o CLARlAN HEALTH - NORm HOSPITAL TRAFFIC IMPACT ANALYSIS 3. PENNSYLVANIA STREET & 106TH STREET . Improvements are not needed at this intersection due to the existing and/or proposed development traffic volumes. . The following intersection additions/modifications are needed to adequately accommodate the projected year 2012 traffic volumes. . One additional northbound through lane . One additional northbound left-turn lane . Modify the existing southbound right-turn lane to become a shared through/right-turn lane These additions/modifications will provide sufficient capacity for the added proposed development traffic volumes. Figure 10 summarizes these improvements. 4. PENNSYLVANIA STREET & 103RD STREET . In order to accommodate the increased traffic from the proposed development, a traffic signal or a roundabout is recommended at this intersection. If a traffic signal is installed the intersection should be constructed to include the following: Northbound: Two left-turn lanes, one shared through/right-turn lane Southbound: One left-turn lane, one through lane & one right-turn lane Eastbound: One left-turn lane, one through lane & one right-turn lane Westbound: One left-turn lane, one shared through/right-turn lane These geometrics are summarized on Figure 9 and Figure 10.. On the other hand, if a roundabout is constructed, all approaches and all departures should consist of two lanes and the circulatory roadway should be at least 28 feet in width. 5. COLLEGE AVENUE & 103RD STREET . Improvements are not needed at this intersection due to the existing and/or proposed development traffic volumes. . Improvements are not needed at this intersection due to the year 2012 and/or proposed development traffic volumes. 6. COLLEGE AVENUE & PENNSYLVANIA P ARKW A Y . Improvements are not needed at this intersection due to the existing and/or proposed development traffic volumes. . Improvements are not needed at this intersection due to the year 2012 and/or proposed development traffic volumes. 39 , 0 o o D I 0 o o D o o o o o o o o o o o CLARIAN HEALTH - NORTH HOSPITAL TRAFFIC IMPACT ANALYSIS 7. COLLEGE AVENUE & 101 ST STREET . In conjunction with the development of the proposed site, a west leg will be added to this intersection in order to provide emergency access into the proposed site. In addition, a left-turn lane and a right-turn lane are needed along College Avenue to facilitate the safe and efficient entrance of emergency vehicles into this site. Figure 9 and Figure 10 illustrate the proposed geometries at this location. 8. PENNSYLVANIA PARKWAY & ACCESS DRIVE 1 . In conjunction with the development of the proposed site, a westbound left-turn lane should be constructed along Pennsylvania Parkway in order to facilitate the safe and efficient entrance of vehicles into this site. . The proposed access drive should be constructed to include one inbound lane and one outbound lane. 9. PENNSYL VANIA P ARKW A Y & ACCESS DRIVE 2 . In conjunction with the development of the proposed site, a westbound left-turn lane should be constructed along Pennsylvania Parkway in order to facilitate the safe and efficient entrance of vehicles into this site. . The proposed access drive should be constructed to include two inbound lanes and two outbound lanes. 1 o. PENNSYLVANIA P ARKW A Y & ACCESS DRIVE 3 . In conjunction with the development of the proposed site, a westbound left-turn lane should be constructed along Pennsylvania Parkway in order to facilitate the safe and efficient entrance of vehicles into this site. . The proposed access drive should be constructed to include two inbound lanes and two outbound lanes. 11. PENNSYLVANIA PARKWAY & ACCESS DRIVE 4 . In conjunction with the development of the proposed site, a westbound left-turn lane should be constructed along Pennsylvania Parkway in order to facilitate the safe and efficient entrance of vehicles into this site. . The proposed access drive should be constructed to include one inbound lane and two outQound lanes. 40 J .. .J ~t~~ - ADDED III'RCNEUENTS l.l. ~ ~~ I I 106TH STREET AND US 31 ~~Z{:fj - ADDEO III'RCNEUENTS ~ REC'ONSTRf..JC1'E) NTERSECT10N A/'tD ADDED TRAFRC SIGNAL ~ ~).. ~:'l: !Il~ ~~ Ie~ ~ ~ ~ t 103RD. STREET AND PENNSYL VANIA PKWY./ST. -' .... '" "" :ii N o I I <:> ~ o :i x <oJ ... N o ./ ... CLARIAN HEALTH NORTH HOSPITAL N o ~ o o N ./ N 4] ~ t i ~ lIj ::s 106TH STREET -L r - - - 35 MPH ,. .J 103RO. STREET J .. 30 MPH t .... ~ I!: lI) ~ ~ ~ ~ ~ II: t ~ lIj ::s -L .J l. ~ ~ r 106TH STREET J ~ ~ NO IUI'ROVBENTS I<ECESSARY I 103RD. STREET AND US 31 106TH STREET AND PENNSYL VANIA STREET t ~ t ~ t ~ ~ s '{ '{ ~ ~ -J -J g g I ~ PROPOSED WEST LEG 101ST. STREET PENNSYL VANIA PKWY. ) 20 MPH ~ I~I NO IMPROVBIENTS NECESSARY I r~~ - ADDED IUI'ROVBENTS I Il.' 1 ~ ~ ~ 103RD. STREET AND COLLEGE A VENUE PENNSYL VANIA PKWY. AND COLLEGE A VENUE 101ST. STREET AND COLLEGE A VENUE FIGURE 9 PROPOSED INTERSECTION I GEOMETRICS FOR SCENARIO 2 (EXISTING AND PROPOSED DEVELOPMENT ; TRAFFIC VOLUMES) ~ ~ l.l. J .. .J ~ ~ t ~ t .... t CIj ~ CIj :::> :::> ,. ll) ~ .J -L ~ tOOTH STREET s:! -L 103RD. ~ STREET - - - - ~ .- ~ l. .- ~ 106TH STREET J ~ J .- ----- - - - .. 35 MPH 30 MPH ~~ ~~~~j~:;: - ADDEO AIF'ROVEJENTS I I 106TH STREET AND US 31 !a~iJgi - ADDED AIF'ROVEJENTS ~ RECVNST1lUCTED NTERSECTIDN AND ArXJED TRAFRC SIGNAL ~ ~)... s:!~ !Il~ ~~ Ie~ ~ ~ g t 103RD. STREET AND PENNSYL VANIA PKWY/ST. -' r ~ i " ~ 1 I CLARIAN HEALTH NORTH HOSPITAL 42 dJ 35 MPH ] J ~;s7j . ADDED AIPRCWEMENTS l. ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~;,.J:.~ - ADDED M'ROVEJIENTS NO AIPRCWEMENTS /<ECESSARY I 106TH. STREET AND PENNSYL VANIA STREET 103RD. STREET AND US 31 t ~ t ~ t ~ II ~ :>: :>: ~ ~ ~ ~ ~ -J -J ~ is 0 PROPOSED WEST LEG , 101ST. STREET PENNSYL VANIA Al(WY ) 20 MPH NO AIPROtIEMENTS NECESSARY Il.l ~ ~ ~ ~ - AOOED NPRO>fUENTS I~I 103RD. STREET AND COLLEGE A VENUE PENNSYL VANIA PKWY. AND COLLEGE A VENUE 101ST. STREET AND COLLEGE A VENUE FIGURE 10 I I PROPOSED INTERSECTION I GEOMETRICS FOR SCENARIO 4 (VEAl R 2012 AND PROPOSED DEVELOPMENT I TRAFFIC VOLUMES) I i I ! D o !u ; 0 o o D o D D U o o o o o o D o TRAFFIC IMPACT ANALYSIS PROPOSED CLARIAN HEALTH HOSPITAL 1-465 & U.S. 31 ApPENDIX A CARMEL, INDIANA PREPARED FOR CLARIAN HEALTH NOVEMBER 2002 PREPARED By: A & F ENGINEERING CO., LLC CONSULTING ENGINEERS 8425 KEYSTONE CROSSING, SUITE 200 INDIANAPOLIS, IN 46240 PHONE 317-202-0864 FAX 317-202-0908 o o o o o o o o o o o o o o o o o o o CLAR.IAN HEALTH - NORTH HOSPITAL TRAFFICIMPACf ANALYSIS ApPENDIX A This document contains the traffic data that were used in the TRAFFIC IMPACT ANALYSIS for the proposed development. Included is the intersection turning movement traffic volume counts and the intersection capacity analyses for each of the study intersections for the AM peak hour and PM peak hour. o o o o D D o o o 10 D D D o D D D o o CLARlAN HEALTH - NORTH HOSPITAL TRAFFIC IMPACT ANALYSIS ApPENDIX A TABLE OF CONTENTS U.S. 31 & 106TH STREET ............................................................................ ..................................................................... 1 U.S. 31 & 1 03RD STREET.... ........................................................................................................................................... 17 PENNSYLVANIA STREET & 106TH STREET .................................................. ...................................................................37 PENNSYLVANIA STREET & 1 03RD STREET.....................................................................................................................49 COLLEGE AVENUE & 1 03RD STREET ........................................................................................................................... ] ] 5 COLLEGE AVENUE & PENNSYLVANIA P ARKW A Y ..................................... ................................................................. 127 COLLEGE AVENUE & 101 ST STREET ........................................................................................................................... 139 PENNSYLVANIA PARKWAY & ACCESS DRIVE 1 ......................................................................................................... 149 PENNSYLVANIA PARKWAY & ACCESS DRIVE 2 .........................................................................................................156 PENNSYLVANIA PARKWAY & ACCESS DRIVE 3 ......................................................................................................... 161 PENNSYLVANIA PARKWAY & ACCESS DRIVE 4 ......................................................................................................... 166 o o o D D D o o D D D D D D D D D D D CLARIAN HEALllI - NORllI HOSPITAL TRAFFIc IMPACf ANALYSIS u.s. 31 & 106TH STREET INTERSECTION DATA TRAFFIC VOLUME COUNTS AND CAPACITY ANALYSES 1 o 10 o o D D D D D D D D D D D D D o o A & F ENGINEERING CO., INC. TRAFFIC VOLUME SUMMARY CLIENT LOCATION DATE CLARIAN HEALTH U.S. 31 & 106TH STREET (06) :OCTOBER 16, 2002 NORTHBOUND EASTBOUND SOUTHBOUND WESTBOUND PEAK HOUR DATA AM PEAK OFF PEAK PM PEAK HR BEGIN 7:15 AM HR BEGIN 4:30 PM L T R TOT L T R TOT L T R TOT 177 2321 376 2874 139 2220 364 2723 131 155 146 432 111 256 175 542 30 2558 120 2708 48 2222 47 2317 233 221 31 485 351 202 35 588 HOUR SUMMARY HOUR NB SB NB+SB EB WB EB+WB TOTAL - AM - 6- 7 1402 1659 3061 172 196 368 3429 7- 8 2639 2554 5193 456 473 929 6122 8- 9 2468 2254 4722 435 436 871 5593 - PM - 3- 4 2092 1761 3853 449 369 818 4671 4- 5 2491 2187 4678 533 564 1097 5775 5- 6 2789 2058 4847 496 519 1015 5862 TOTAL 13881 12473 26354 2541 2557 5098 31452 44.1% 39.7% 83.8% 8.1% 8.1% 16.2% 100.0% - AM PEAK VOLUMES - 15-MIN 761 698 124 136 HOUR 2874 2708 456 487 PHF 0.94 0.97 0.92 0.90 - PM PEAK VOLUMES - 15-MIN 720 610 146 158 HOUR 2789 2317 556 588 PHF 0.97 0.95 0.95 0.93 2 D A & F ENGINEERING CO., INC. D TRAFFIC VOLUME SUMMARY D CLIENT CLARIAN HEALTH LOCATION U.S. 31 & 106TH STREET (06) 0 DATE :OCTOBER 16, 2002 DIRECTION OF TRAVEL NORTHBOUND HOUR LEFT THRU RIGHT TOTAL PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK AM 6- 7 71 1 72 1119 82 1201 125 4 129 1315 87 1402 7- 8 154 10 164 2041 92 2133 336 6 342 2531 108 263 8- 9 146 15 161 1883 135 2018 284 5 289 2313 155 246 PM 3- 4 112 5 117 1722 109 1831 141 3 144 1975 117 2092 4- 5 129 2 131 2016 69 2085 270 5 275 2415 76 249 5- 6 164 1 165 2171 62 2233 389 2 391 2724 65 278 PASSENGER 776 10952 1545 13273 0 95.8% 95.2% 98.4% 95.6% TRUCK 34 549 25 608 4.2% 4.8% 1. 6% 4.4% 0 BOTH 810 11501 1570 13881 5.8% 82.9% 11.3% 100.0% 0 DIRECTION OF TRAVEL : EASTBOUND HOUR LEFT THRU RIGHT TOTAL PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK AM 6- 7 34 2 36 42 1 43 91 2 93 167 5 7- 8 154 4 158 142 4 146 152 0 152 448 8 8- 9 95 7 102 151 15 166 164 3 167 410 25 PM 3- 4 84 5 89 172 9 181 170 9 179 426 23 4- 5 101 2 103 220 8 228 195 7 202 516 17 5- 6 115 0 115 242 3 245 133 3 136 490 6 PASSENGER 583 969 905 2457 D 96.7% 96.0% 97.4% 96.7% TRUCK 20 40 24 84 3.3% 4.0% 2.6% 3.3% 0 BOTH 603 1009 929 2541 23.7% 39.7% 36.6% 100.0% D --. -- . 0 3 - " D o !D D D D o o o D o D D o D D D D o A & F ENGINEERING CO., INC. TRAFFIC VOLUME SUMMARY CLIENT LOCATION DATE CLARIAN HEALTH U.S. 31 & 106TH STREET (06) :OCTOBER 16, 2002 DIRECTION OF TRAVEL : SOUTHBOUND HOUR LEFT THRU RIGHT TOTAL PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH AM 6- 7 6 1 7 1547 38 1585 65 2 67 1618 41 1659 7- 8 23 0 23 2352 71 2423 107 1 108 2482 72 2554 8- 9 47 3 50 1980 124 2104 96 4 100 2123 131 2254 PM 3- 4 30 1 31 1526 146 1672 57 1 58 1613 148 1761 4- 5 37 1 38 1984 122 2106 41 2 43 2062 125 2187 5- 6 47 0 47 1862 101 1963 48 0 48 1957 101 2058 PASSENGER 190 11251 414 11855 96.9% 94.9% 97.6% 95.0% TRUCK 6 602 10 618 3.1% 5.1% 2.4% 5.0% BOTH 196 11853 424 12473 1. 6% 95.0% 3.4% 100.0% DIRECTION OF TRAVEL WESTBOUND HOUR LEFT THRU RIGHT TOTAL PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH AM 6- 7 120 3 123 66 4 70 3 0 3 189 7 ,196 7- 8 242 2 244 201 5 206 23 0 23 466 7 473 8- 9 190 10 200 187 16 203 31 2 33 408 28 436 PM 3- 4 177 6 183 144 6 150 33 3 36 354 15 369 4- 5 345 0 345 179 4 183 36 0 36 560 4 564 5- 6 297 3 300 180 6 186 32 1 33 509 10 519 PASSENGER 1371 957 158 2486 98.3% 95.9% 96.3% 97.2% TRUCK 24 41 6 71 1. 7% 4.1% 3.7% 2.8% BOTH 1395 998 164 2557 54.6% 39.0% 6.4% 100.0% 4 SHORT REPORT General Information lSite Information fA.nalyst RMB Intersection US 31 & 106th Street !Agency or Co. A&F Engineering fA.rea Type All other areas Date Performed 11/1/02 ~urisdiction Carmel ime Period AM Peak fA.nalysis Year Existing Volume and Timing Input EB WB NB SB LT TH RT IT TH RT IT TH RT IT TH RT Num. of Lanes 1 2 1 1 1 1 2 3 1 2 2 1 Lane group L T R L T R L T R L T R Volume (vph) 131 155 146 233 221 31 177 2321 376 30 2558 120 % Heavy veh 5 5 5 5 5 5 5 5 5 5 5 5 PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Actuated (PIA) A A A A A A A A A A A A Startup lost time 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Ext. eft. qreen 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Arrival type 3 3 3 3 3 3 3 3 3 3 3 3 Unit Extension 30 30 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Ped/Bike/RTOR Volume 0 73 0 15 0 188 0 60 lane Width 120 12.0 12.0 12.0 120 10.0 12.0 120 12.0 12.0 12.0 12.0 Parking/Grade/Parking N 0 N N 0 N N 0 N N 0 N Parking/hr Bus stops/hr 0 0 0 O' 0 0 0 0 0 0 0 0 Unit Extension 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 30 30 3.0 Phasing Exel left EW Perm 03 04 Excl. left Thru & RT 07 08 Timing G = 7.0 G = 110 G= G= G= 7.0 G = 77.0 G= G= y= 3 Y = 5 y= y= y = 5 y= 5 y= y= Duration of Analysis (hrs) = 025 ~ycle Length C = 120.0 Lane Group Capacity, Control Delay, and LOS Determination EB WB NB SB Adj flow rate 146 172 81 259 246 18 197 2579 209 33 2842 67 lane group cap. 160 315 141 180 166 132 195 3170 987 195 2206 987 vIe ratio 091 055 057 1.44 1.48 0.14 1.01 0.81 021 0.17 1.29 0.07 Green ratio 0.17 0.09 0.09 0.17 0.09 0.09 0.06 0.64 0.64 0.06 0.64 0.64 Unif delay d1 46.9 521 52.3 50.8 54.5 50.1 56.5 16.1 8.9 53.7 21.5 8.1 Delay factor k 0.43 0.15 0.17 0.50 0.50 0.11 050 0.35 0.11 0.11 0.50 0.11 Increm. delay d2 46.5 2.0 5.6 2261 f2462 0.5 67.1 1.7 0.1 0.4 133.3 0.0 PF factor 1000 1000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1000 Control delay 93.4 541 57.9 f276.9 ~00.7 50.6 123.6 17.8 9.0 54.1 154.8 8.1 lane group LOS F 0 E F F 0 F B A 0 F A Appreh delay 692 280.3 242 150.3 Approach lOS E F C F Intersec delay 1006 Intersection LOS F .-:= D o D o o o D o o D o D o o o o o D o Short Report Page 1 of 1 iAMSi HCS;0001~1 C('pvJlghl <1;) 2000 Uni,'ersiTy of Florida. .All RIghts Resen'ed Version 4. Ie 5 fiJe:l/C:\Documents%20and%20Settings\tvandenbergDELL] S\LocaJ%20Settings\ T emp\s2... ] 1/7/2002 o o o o o o o o o o o o o D o o o o o Short Report Page I of I .1- P /v\ ':71- SHORT REPORT General Information lSite Information Analyst RMB Intersection US 31 & 106th Street A.gency or Co. A&F Engineering Area Type All other areas Date Performed 11/1/02 Jurisdiction Carmel ime Period PM Peak Analysis Year Existing Volume and Timinq Input EB WB NB SB LT TH RT LT TH RT LT TH RT LT TH RT Num. of Lanes 1 2 1 1 1 1 2 3 1 2 2 1 Lane group L T R L T R L T R L T R 1V0lume (vph) 111 256 175 351 202 35 139 2220 364 48 2222 47 % Heavy veh 5 5 5 5 5 5 5 5 5 5 5 5 PHF 0.90 0.90 0.90 0.90 090 0..90 0.90 0.90 0.90 0.90 0.90 0..90 Actuated (P/A) A A A A A A A A A A A A Startup lost time 2.0 2.0. 2.0 20 2.0 2.0 2.0 2.0 2.0 2.0 2.0. 2.0 Ext. eft. green 2.0. 2.0 2.0. 20 2.0 20. 2.0. 20. 2.0. 20. 2.0. 2.0. Arrival type 3 3 3 3 3 3 3 3 3 3 3 3 Unit Extension 30 3.0 3.0 30 3.0 30 3.0 30 30 3.0 3.0 3.0 Ped/Bike/RTOR Volume 0 87 0 17 0 182 0 23 Lane Width 12.0 120 12.0 12.0 120 10.0 120 120 120 12.0 12.0. 12.0 Par king/Grade/Parking N 0 N N a N N a N N a N Parking/hr Bus stops/hr a a a a 0 a a a a a a a Unit Extension 30. 30 30 3.0 30. 30. 30. 30 30. 30. 3.0. 3.0. Phasing Excl Left EW Perm 03 04 Excl Left Thru & RT 07 08 Timing G= 11.0. G= 11.0. G= G= G= 70. G= 730 G= G= . y = 3 y= 5 Y= y= y= 5 Y = 5 Y:: Y= Duration of Analysis (hrs) = 0.25 Cycle Length C = 120.0 Lane Group Capacity, Control Delay, and LOS Determination EB WB NB SB fA,dj flow rate 123 284 98 390. 224 20. 154 2467 20.2 53 2469 27 Lane group cap. 218 315 141 218 166 132 195 30.05 936 195 2091 936 '!v/e ratio 0.56 0.90. 0..70. 1.79 1.35 0..15 0..79 0.82 0.22 0..27 1.18 0..0.3 !' k;reen ratio 0.21 0..0.9 0..0.9 0.21 0.0.9 0..0.9 0..06 0.61 0.61 0..0.6 0..61 0..61 Unif. delay d1 40..9 54.0. 52.9 452 54.5 50.2 558 18.4 10.6 54.1 23.5 9.4 Delay factor k 0.16 0..42 0..26 0.50. 0..50. 0.11 0.34 0.36 0..11 0.11 0..50 0.11 Increm. delay d2 3.4 27.4 13.9 3729 1916 0.5 193 1.9 0.1 0..8 86.6 0..0. PF factor 1.0.0.0. 10.0.0. 1.0.0.0. 10.0.0. 1.00.0. 100.0. 100.0. 1. 0.00 1.000 1.000 1. 000 1000 :ontro! delay 44.3 81.3 66.7 418.1 246.1 50.7 751 20.3 10..7 548 110.1 9.4 Lane group LOS 0 F E F F 0 E C B 0 F A [Apprch delay 69.5 3457 226 1079 f\pproach LOS E F C F Intersec delay 91. 1 Intersection LOS F HCSlono1^1 Copy';ght 02000 Umvc",,, of Floflda. All Rights Re,erved Ver>lOn 4 Ie 6 fiJe://C :\Documents%20and%20Settings\tvandenberg.DELL 15\Local%20Settings\ T emp\s2k: 1 117/2002 HCS,'OOOl M Copyright C 7000 Unive"ltv of Flonda. All RIghts Re,erved Version 4 Ie o o D D o D D D o o o D o o o o o o o Short Report Page 1 of 1 :1A/I')1A SHORT REPORT General Information Site Information !Analyst RMB Intersection US 31 & la6th Street IAgency or Co. A&F Engineering Area Type All other areas Date Performed 11/110.2 Jurisdiction Carmel ime Period AM Peak Analysis Year Existing wi LOS Imprv. Volume and Timing Input EB WB NB SB LT TH RT LT TH RT LT TH RT LT TH RT Num. of Lanes 1 2 1 1 1 1 2 3 1 2 3 1 Lane group L T R L T R L T R L T R Volume (vph 131 155 146 233 221 31 177 2321 376 30. ?558 120. % Heavy veh 5 5 5 5 5 5 5 5 5 5 5 5 PHF 0..90. 0..90. 0..90. 0..90. 0..90. 0..90. 0..90. 0..90. 0..90. 0..90. 0..90. 0..90. Actuated (P/A) A A A A A A A A A A A A Startup lost time 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. Exl. eft. qreen 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. Arrival type 3 3 3 3 3 3 3 3 3 3 3 3 Unit Extension 3.0. 3.0. 3,0. 3.0. 3.0. 3.0. 3,0. 30. 3,0. 3D 3.0. 3.0. Ped/Bike/RTOR Volume 0. 73 0. 15 0. 188 0. 60. Lane Width 120. 12,0. 12.0. 120. 12,0. 100. 12,0. 12.0. 12,0. 12.0. 12,0. 12.0. Parking/Grade/Parking N a N N 0. N N 0. N N 0. N Parking/hr Bus stops/hr 0. a 0. 0. 0. a a a a a 0. a Unit Extension 3,0. 3,0. 3.0. 30. 3D 3,0. 3.0. 3,0. 30. 3,0. 3,0. 3.0. Phasing Excl. Left EW Perm 03 04 Excl. Left Thru & RT 07 08 Timing G= 70. G = 21.0. G= G= G= 70. G = 66.0. G= G= Y = 3 Y= 5 Y= Y= Y= 5 Y = 5 Y= Y= Duration of Analysis (hrs) = 0.25 Cycle Length C = 119.0. Lane Group Capacity, Control Delay, and LOS Determination EB WB NB 5B Adj flow rate 146 172 81 259 246 18 197 2579 20.9 33 2842 67 Lane group cap. 179 60.7 271 285 319 253 196 2740. i 853 196 2740. 853 v/c ratio 0..82 0..28 0.,30. 0.91 0.77 0.07 101 0,94 025 0.17 1.04 0.0.8 c Green ratio 026 0..18 0..18 0.26 0..18 018 0.06 0..55 0.55 0..06 055 0.55 Unit delay d1 423 42.5 42.6 44,8 467 40,9 56,0. 24.7 13.7 532 26.5 12.3 Delay factor k 0.,36 0..11 0..11 0.43 0,32 011 0.,50 0..45 D. 11 0..11 0..50 0..11 Increm. delay d2 24,5 0.3 0..6 30.8 110. 0.,1 65.6 7.5 0.2 0.4 27.8 0.0. PF factor 1. ODD 1. aDO 1.000. 1.0.0.0. 1,000. 1. 0.0.0 1,0.00. 1. DaD 1. 000. 1. DaD 1.0.0.0. 1. 00.0. Control delay 667 42.7 43.2 756 578 410. 1216 321 138 53.6 543 12.4 Lane group LOS E 0 0 E E 0 F C B 0 0 B Apprch delay 51.6 660 36,8 53.3 Approach LOS 0 E 0 0 Intersec delay 470 Intersection LOS 0 7 fi Ie:! Ie :\Documents%20and%20Set1ings\tvandenberg.DELL] S\Local%20Settings\ T emp\s2K 11/7/2002 D D o o D D 10 o D o D o o o o o o o o Short Report Page J of] l p.N\ 51-A SHORT REPORT General Information Site Information Analyst RMB Intersection US 31 & 106th Street Agency or Co. A&F Engineering ~rea Type All other areas Date Performed 1111102 Uurisdiction Carmel Time Period PM Peak Analysis Year Existing wi LOS fmprv. Volume and Timing Input EB WB NB SB LT TH RT LT TH RT LT TH RT LT TH RT Num of Lanes 1 2 1 1 1 1 2 3 1 2 3 1 Lane group L T R L T R L T R L T R Volume (vph) 111 256 175 351 202 35 139 2220 364 48 2222 47 % Heavy veh 5 5 5 5 5 5 5 5 5 5 5 5 PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 090 I\ctuated (PIA) A A A A A A A A A A A A Startup lost time 2.0 2.0 20 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Ext eff green 2.0 20 2.0 2.0 20 20 20 20 20 20 2.0 2.0 I\rrivaltype 3 3 3 3 3 3 3 3 3 3 3 3 Unit Extension 3.0 30 3.0 3,0 3.0 3.0 3.0 3.0 30 30 30 3.0 Ped/Blke/RTOR Volume 0 87 0 17 0 182 0 23 Lane Width 120 12.0 12.0 12.0 12.0 100 120 120 120 120 120 120 Parking/G rade/P arking N 0 N N 0 N N 0 N N 0 N Parking/hr Bus stops/hr 0 0 0 0 0 0 0 0 0 0 0 0 Unit Extension 3.0 3.0 30 30 3.0 3.0 30 3.0 3.0 30 30 30 PhasIng ExcL Left EW Perm 03 04 Excl Left Thru & RT 07 08 Iriming G= 12.0 G = 110 G= G= G= 7.0 G = 550 G= G= y = 3 Y = 5 Y= Y= Y = 5 Y = 5 Y= Y= Duration of Analysis (hrs) = 0.25 Cycle Length C = 103.0 Lane Group Capacity. Control Delay. and LOS Determination. EB WB NB SB Adj flow rate 123 284 98 390 224 20 154 2467 202 53 2469 27 Lane group cap. 270 367 164 270 193 153 227 2638 821 227 2638 821 vlc ratio 046 0.77 0.60 144 1.16 0.13 0.68 0.94 025 0.23 094 003 Green ratio 0.25 0.11 011 0.25 0.11 0.11 0.07 0.53 0.53 0.07 053 053 Unif delay d1 315 44.8 43.9 383 46.0 41.7 46.9 22.3 129 45.5 22.4 11.4 Delay factor k 0.11 032 019 0.50 050 0.11 0.25 0.45 0.11 0.11 0.45 0.11 Jncrem delay d2 1.2 99 59 219.7 114.7 04 79 71 02 05 72 00 PF factor 1.000 1.000 1.000 1000 1.000 1.000 1000 1000 1000 1.000 1000 1000 Control delay 32.7 54.7 498 258.0 160.7 42.1 548 29.5 130 460 295 114 lane group LOS C 0 0 F F 0 0 C B 0 C B Apprch delay 484 2168 29.7 297 Approach LOS 0 F C C Intersec. delay 494 Intersection LOS 0 JiCSlOOOB1 Copyright i!J 7000 Umw"ity of Florida, All Righls Reserved Ver~;on 4 Ie- 8 fiJe:l/C:\Documents%20and%20Settings\tvandenberg.DELL J 5\LocaJ%20Settings\ T emp\s2k: J 1/7/2002 lfCS20OV'M Copnlghl.~ 2000 Um'eJSltv of florida. All RIghts Reserved Page 1 of 1 0 j Aft"I 5). AD o o o o o o o o o D o D D o o o Vetslon 4 Ie o Short Report SHORT REPORT General Information Site Information fL\nalyst RMB Intersection US 31 & 106th Street Area Type All other areas iAgency or Co. A&F Engineering Jurisdiction Carmel Date Performed 1111/02 rrime Period AM Peak Analysis Year Existing +Prop wi LOS Imprv. Volume and Timin~ Input EB WB. NB SB LT TH RT LT TH RT LT TH RT LT TH RT Num. of Lanes 1 2 1 1 1 1 2 3 1 2 3 1 Lane group L T R L T R L T R L T R Volume (v ph) 131 155 146 233 221 57 177 2348 376 116 2645 120 % Heavy veh 5 5 5 5 5 5 5 5 5 5 5 5 PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Actuated (PIA) A A A A A A A A A A A A Startup lost time 2.0 2.0 2.0 2.0 2.0 20 2.0 2.0 2.0 2.0 2.0 2.0 Ext. eft. green 20 2.0 2.0 2.0 2.0 20 20 2.0 2.0 2.0 2.0 2.0 Arrival type 3 3 3 3 3 3 3 3 3 3 3 3 Unit Extension 3.0 3.0 30 3.0 30 30 3.0 3.0 3.0 3.0 3.0 3.0 Ped/Bike/RTOR Volume 0 73 0 28 0 188 0 60 Lane Width 12.0 12.0 120 120 120 10.0 12.0 12.0 12.0 12.0 12.0 12.0 Parking/Grade/Parking N 0 N N 0 N N 0 N N 0 N Parking/hr Bus stops/hr 0 0 0 0 0 0 0 0 0 0 0 0 Unit Extension 3.0 3.0 3.0 3.0 3.0 3.0 3.0 30 3.0 3.0 30 3.0 Phasing Excl. Left EW Perm 03 04 Exd Left Thru & RT 07 08 Timing G= 9.0 G = 18.0 G= G= G= 70 G = 68.0 G= G= Y= 3 Y = 5 y= y= Y= 5 y = 5 y= y= Duration of Analysis (hrs) = 0.25 Cycle Lenqth C = 120.0 Lane Group Capacity, Control Delay, and LOS Determination EB WB NB SB Adj. flow rate 146 172 81 . 259 246 32 197 2609 209 129 2939 67 Lane group cap. 189 516 231 280 272 215 195 2799 872 195 2799 872 vie ratio 0.77 033 035 0.93 0.90 015 1.01 093 024 0.66 1.05 0.08 ~, Green ratio 0.25 0.15 0.15 025 0.15 015 0.06 057 057 0.06 0.57 0.57 Unit delay d 1 38.1 45.6 45.8 458 502 443 56.5 23.9 13.0 55.3 26.0 11.8 Delay factor k 0.32 011 0.11 044 043 0.11 0.50 0.45 0.11 0.24 0.50 0.11 Inerem delay d2 17.8 0.4 0.9 34.6 31.0 03 67.1 6.5 0.1 8.1 32.0 0.0 PF factor 1. 000 1000 1. 000 1. 000 1. 000 1000 1. 000 1000 1.000 1.000 1000 1.000 Control delay 559 46.0 467 804 811 447 1236 30.4 13.2 63.4 58.0 11.8 Lane group LOS E D D F F 0 F C B E E B Apprch delay 49.8 786 35.3 57.2 . Approach LOS 0 E D E Intersee. delay 491 Intersection LOS D 9 file:/ Ie: \Documents%20and%20Settings\tvandenberg.DELL ] 5\Local%20Set1ings\ T emp\s2... 11/7/2002 o o o o o o o o o o o D o D o o o o o Short Report Page 1 of 1 1- P,N'\ 5} A SHORT REPORT General Information Site Information Analyst RMB Intersection US 31 & 106th Street Agency or Co A&F Engineering Area Type All other areas Date Performed 1111102 Jurisdiction Carmel Time Period PM Peak Analysis Year Existing + Prop wi LOS Imprv. Volume and Timing Input EB WB NB SB LT TH RT LT TH RT LT TH RT LT TH RT Num of Lanes 1 2 1 1 1 1 2 3 1 2 3 1 Lane group L T R L T R L T R L T R Volume (vph) 111 256 175 351 202 139 139 2324 364 84 2258 47 % Heavy veh 5 5 5 5 5 5 5 5 5 5 5 5 PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90. 0.90. 0.90. 0..90 Actuated (P/A) A A A A A A A A A A A A Startup lost time 2.0. 2.0. 2.0. 2.0 2.0 2.0 2.0 2.0. 2.0. 2.0. 2.0. 2.0. Ex!. eft. Qreen 2.0 2.0. 2.0. 2.0 2.0 2.0 2.0 2.0 2.0 2.0. 20. 2.0 IArrival type 3 3 3 3 3 3 3 3 3 3 3 3 Unit Extension 30 30 3.0. 3.0 3.0 3.0 30 30. 3.0 30 3.0. 30. Ped/Bike/RTOR Volume a 87 a 69 a 182 0 23 Lane Width 120. 12.0 12.0. 12.0 120. 100. 120. 12.0. 12.0. 120 120. 120. Parking/Grade/Parking N 0 N N 0 N N a N N 0 N Parking/hr Bus stops/hr a 0 0 0 0 0 0 a 0 0 0 0 Unit Extension 3.0 30 30. 3.0. 3.0 30 3.0 30. 30. 3.0 30. 30. Phasinq Exd Left EW Perm 03 04 Excl. Left Thru & RT 07 08 Timing G = 120 G= 10.0 G= G= G = 7.0 G = 57. 0 G= G= y= 3 Y = 5 Y= y= Y = 5 Y = 5 Y= Y= Duration of Analysis (hrs) = 0.25 Cycle Length C = 104.0 Lane Group Capacity, Control Delav, and LOS Determination EB WB NB SB iAdj flow rate 123 284 98 390. 224 78 154 2582 202 93 250.9 27 Lane group cap. 268 331 148 268 174 138 224 270.8 843 224 270.8 843 rv/c ratio 0.46 086 0.66 1.46 129 057 0.69 0..95 0.24 0.42 0.93 0.03 Green ratio 0.24 0.10 0.10 024 0.10 0.10 0.07 055 055 0.07 0.55 055 Unif delay d1 32.7 46.3 45.4 378 47.0 44.9 47.4 222 122 465 21.6 10.8 Delay factor k 0.11 0.39 0.24 0.50 0.50 0.16 0.26 0.46 O. 11 011 0.44 0.11 Increm delay d2 12 19.6 105 224.4 1655 53 8.5 89 0.1 1.2 62 0.0 PF factor 1. 00.0 10.0.0. 1. 0.0.0. 1. 0.00 1. GOO 1. 0.0.0. 1. 000 1. 000 1. 0.0.0 1. 000. 1.000 1.0.00. Control delay 340 659 55.9 ?622 212.5 50..2 56.0 31.1 12.4 47.8 27.8 108 Lane group LOS C E E F F D E C B D C B Apprch delay 562 2222 31.1 28.4 !Approach LOS E F C C Intersec delay 51.5 Intersection LOS D HCSZOOOH1 Copvnghl <&:. 2000 UniverSltv of Florida. All Rlghls Reserved Vef5.jon 4 Ie 10 fjle:!/C :\Documents%20and%20Settings\tvandenberg.DELL 15\Local%20Settings\ T emp\s2k: 1117/2002 HCS20001M Cop'flghl~' 2000 Umvrntv of Ffonda, All Righls Reser-'ed VC'rsion 4 Je o o o o o o o o o o o o o o o o o o o Short Report Page] of I :1Alv\S3A , SHORT REPORT General Information Site Information Analyst RMB Intersection US 31 & 10.6th Street Agency or Co, A&F Engineering Area Type All other areas Date Performed 111110.2 Jurisdiction Carmel Time Period AM Peak Analysis Year Yr, 20.12 wi LOS Imprv. Volume and Timing Input EB WB NB SB LT TH RT LT TH RT LT TH RT LT TH RT Num. of Lanes 1 2 1 1 1 1 2 3 1 2 3 1 Lane group L T R L T R L T R L T R Volume (vph) 164 194 183 291 276 39 221 2553 470. 38 2814 150 % Heavy veh 5 5 5 5 5 5 5 5 5 5 5 5 PHF 0.90 0.90 0.90 0..90 0..90. 0.90. 0.90. 0.90. 0..90. 0..90 0..90 0.90 ~ctuated (PIA) A A A A A A A A A A A A Startup lost time 2.0 2.0. 2.0 2.0. 2.0 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. Ext. eft. green 2.0. 2.0 2.0 2.0 2.0 2.0 2.0 2.0. 2.0 2.0. 2.0 2.0. ~rrival type 3 3 3 3 3 3 3 3 3 3 3 3 Unit Extension 30 3.0 3.0 3.0 3.0. 3.0. 3.0 3.0. 3.0. 30 30. 3.0. Ped/Bike/RTOR Volume a 91 a 19 a 235 0 75 Lane Width 120 120 120. 12.0. 120. 100 12.0. 120. 120 12.0. 120. 12.0 Parking/Grade/Parking N a N N a N N a N N a N Parking/hr Bus stops/hr a a a a a a 0. a a a a a Unit Extension 30. 3.0. 30 3.0. 3.0. 3.0. 30. 3.0. 30. 30. 30. 3.0. Phasing Excl. Left EW Perm 0.3 0.4 Exel Left Thru & RT 0.7 0.8 [riming G= 80. G = 14.0. G= G= G = 70. G = 73.0. G= G= Y = 3 Y = 5 Y= Y= Y= 5 Y = 5 Y= Y= Duration of Analysis (hrs) = 0. 25 Cycle Length C = 120.0. Lane Group Capacity, Control Delay, and LOS Determination EB WB NB S8 fA.dj. flow rate 182 216 102 323 30.7 22 246 2837 261 42 3127 83 Lane group cap. 175 40.1 179 20.7 211 168 195 30.0.5 936 195 30.0.5 936 ~/c ratio 1.0.4 0.54 0..57 1.56 1.45 0..13 126 0.94 0.28 022 10.4 0.0.9 k;reen ratio 0..21 0..12 0..12 0.21 0..12 0..12 0.0.6 0..61 0..61 0..0.6 0..61 0..61 Unit. delay d 1 45.2 50.0. 50.2 49.3 53.0. 47.5 565 21.6 111 53.9 23.5 97 Delay factor k 0..50. 0..14 0..16 0.50. 0..50. 0..11 0..50. 0..46 0.11 0. 11 0.50 0. 11 Increm delay d2 79.0. 1.5 4.3 274.4 '?29. 1 0.4 152.1 7.2 0.2 0.6 282 0..0. PF factor 1.0.0.0. 1.0.0.0. 10.0.0. 10.0.0. 1.0.0.0. 1.0.0.0. 10.0.0. 10.0.0. 1.0.0.0. 1.0.0.0. 10.0.0. 1.0.0.0. Control delay 1242 51.4 54.4 [323 8 282.1 47.9 20.86 28.8 112 54.4 517 9.8 Lane group LOS F 0 0 F F 0 F C B 0 0 A Apprch delay 785 2948 . 40.7 50.7 Approach LOS E F 0 0 Intersec delay 687 Intersection LOS E 11 fiIe:l/C:\Documents%20and%20Settings\tvandenberg.DELL 15\LocaI%20Senings\ T emp\s2k } 117/2002 o D o o o o D o o o D o D o o o D o D Short Report Page ] of] 1- p'A'\ S3A SHORT REPORT General Information Site Information Analyst RMB Intersection US 31 & 1D6th Street Agency or Co. A&F Engineering Area Type All other areas Date Performed 11/1/0.2 Jurisdiction Carmel Time Period PM Peak Analysis Year Yr. 20.12 wlLOS Imprv. Volume and Timing Input EB WB NB SB LT TH RT LT TH RT LT TH RT IT TH RT Num. of lanes 1 2 1 1 1 1 2 3 1 2 3 1 lane group L T R L T R L T R L T R Volume (vph) 139 320. 219 439 253 44 174 2442 455 60. 2444 59 % Heavy veh 5 5 5 5 5 5 5 5 5 5 5 5 PHF 0..90. 0..90. 0.90. 0..90. 0.90. 0..90. 0..90. 0..90. 0.90. 0.90. 0..90. 0..90. I\ctuated (PIA) A A A A A A A A A A A A Startup lost time 2.0. 2.0. 20. 2.0. 20. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. Ext. eft. green 2.0. 20. 20. 2.0. 2.0. 20. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. I\rrival type 3 3 3 3 3 3 3 3 3 3 3 3 Unit Extension 3D 3.0. 3D 3D 3D 3.0. 3D 3.0. 3D 3D 3.0. 3.0. Ped/Bike/RTOR Volume 0. 109 0. 22 0. 227 0. 29 lane Width 120. 120. 120. 120. 120. 10.0. 12.0. 120. 12.0. 120. 12.0. 12.0. Park i ng/Grade/Parking N 0. N N 0. N N 0. N N 0. N Parking/hr Bus stops/hr 0. 0. 0. a a a a 0. a a a 0. Unit Extension 3.0. 30. 30. 30. 3D 30. 3.0. 3D 3.0. 30. 3.0. 3.0. Phasing Exd Left EW Perm 03 04 Excl Left Thru & RT 07 08 rriming G = 120. G= 130. G= G= G= 70. G = 640. G= G= y= 3 Y = 5 y= y= y = 5 y= 5 y= y= Duration of Analysis (hrs) = 0.25 Cycle length C = 114.0. Lane Group Capacity, Control Delav, and LOS Determination EB WB NB SB Adj. flow rate 154 356 122 488 281 24 193 2713 253 67 2716 33 Lane group cap 244 392 175 244 20.6 164 20.5 2773 863 205 2773 863 vlc ratio 0..63 0.91 0..70. 20.0. 136 0.15 0..94 0.98 0..29 0.33 0..98 0.04 ,.' Green ratio 0..25 0. 11 0..11 0..25 0..11 011 0.0.6 0.56 0..56 0..06 0..56 0.56 Unif. delay d 1 363 499 48.6 40.2 50.5 455 53.3 24.3 13.1 51.2 24.4 11.2 Delay factor k 0.21 0.43 0.26 0..50. 050 0..11 045 048 0.11 0. 11 048 0. 11 Increm. delay d2 52 24.4 11.5 464.3 1918 04 464 124 0.2 0.9 12.6 0.0 PF factor 10.00 100.0 1000 100.0. 1.0.0.0. 1000 100.0. 1.0.0.0 10.00 1000 1000 1000 Control delay 415 744 60.1 5045 2423 459 997 36.8 13.3 52.2 37.0. 112 Lane group LOS 0 E E F F 0 F 0 B 0 0 B ~pprch. delay 636 3977 387 37.1 Approach LOS E F 0 0 Intersec delay 787 Intersection LOS E HCS70001M Copvnght <C 2000 lImw,,,,'. of tlondJ. ,\11 RIghts Rc,crv..d Version 4 Ie 12 fiIe://C:\Documents%20and%20Settings\tvandenberg.DELL I 5\Local%20Settings\ T emp\s2... 11/7/2002 HCS;OOOl~l Copynghl <C ]000 Uni\'eI~lty of f1011da~ All RIghts Reserved Vel~jon 4 Ie o o o o o D o o o o o D D o D o o D o Short Report Page I of I iA,N\53B SHORT REPORT General Information Site Information Analyst RMB Intersection US 31 & 106th Street Agency or Co. A&F Engineering Area Type All other areas Date Performed 111110.2 Jurisdiction Carmel Time Period AM Peak Analysis Year Yr. 20.12 wi Additonallmprv. Volume and Timing Input EB WB NB SB LT TH RT LT. TH RT LT TH RT LT TH RT Num. of Lanes 1 2 1 1 1 1 2 4 1 2 4 1 Lane group L T R L T R L T R L T R ~olume (vph) 164 194 183 291 276 39 221 2553 470. 38 2814 150. % Heavy veh 5 5 5 5 5 5 5 5 5 5 5 5 PHF 0..90. 0..90. 0..90. 0..90. 0..90. 0..90. 0..90. 0..90. 0..90. 0..90. 0..90. 0.90. ~etuated (PIA) A A A A A A A A A A A A Startup lost time 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. 20. 2.0. 2.0 Ext eft. qreen 2~D 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0 ~rrival type 3 3 3 3 3 3 3 3 3 3 3 3 Unit Extension 3D 3D 3.0 3D 3.0. 3D 3.0 3.0. 3.0. 3D 3.0 3.0. Ped/Bike/RTOR Volume 0 91 0. 19 0. 235 0. 75 Lane Width 12.0. 12~0 12.0. 12.0. 12.0. 10..0 120 120. 120. 12~D 12.0 12.0. Parking/Grade/Parking N 0. N N 0. N N 0. N N 0. N Parking/hr Bus stops/hr 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. Unit Extension 3D 30 30 3.0. 3D 3D 30 3.0. 3D 3D 3.0. 3.0. Phasinq Excl. Left EW Perm 03 04 Exel Left Thru & RT 07 08 Timing G::: 10..0. G::: 220. G::: G::: G::: 8.0. G::: 59.0. G::: G::: V::: 3 V::: 5 V::: V::: Y::: 5 Y::: 5 Y= V::: Duration of Analysis (hrs ::: 0..25 Cycle Lenqth C ::: 117.0. Lane Group Capacity, Control Delay, and LOS Determination EB WB NB SB Adj~ flow rate 182 216 10.2 323 30.7 22 246 2837 261 42 3127 83 Lane group cap. 209 646 289 324 340. 270. 228 3322 776 228 3322 776 ,,/e ratio 0.87 033 035 1.0.0 0.90. 0.0.8 1~08 0.85 0..34 0. 18 0..94 0..11 ,~ Green ratio 0..30. 0..19 0..19 0.30. 0.19 0..19 0.0.7 0..50. 0..50. 00.7 0..50 0..50. Unif delay d1 34.0. 412 41.3 43.8 465 39.2 54.5 25.3 17.3 514 27.4 15.2 Delay factor k 0.40 0..11 0..11 0..50 0..42 0..11 0.50. 039 011 011 0..45 0..11 Increm delay d2 30..4 0.3 0..7 49.1 261 0.1 82.2 2.4 0.3 0..4 6.4 0..1 PF factor 1. 0.0.0. 1.0.0.0. 1.0.0.0. 1.00.0. 1. 0.0.0. 1. 0.0.0. 1. 0.0.0. 10.0.0. 1.0.0.0. 1.0.0.0. 1. 0.00. 1.0.0.0. Control delay 64.5 41.5 421 929 726 393 136.7 27.6 176 51.8 33.7 15.3 Lane group LOS E 0 0 F E 0 F C B 0 C B ~pprch delay 50..0. 81.5 . 349 33.5 ~pproach LOS 0 F C C Intersec delay 392 Intersection LOS 0 13 fi 1e:l/C:\Documents%20and%20Settings\tvandenberg. DELL 15\Local%20Set1ings\ T emp\s2k: I] /7/2002 o o D D o o o o D o o D D D D D o o o Short Report Page ] of] ~ n N, <.:;: P, --.f-- r. ../... ..... SHORT REPORT General Information ~ite Information IAnalyst RMB Intersection US 31 & 1a6th Street Area Type All other areas fA,gency or Co. A&F Engineering Jurisdiction Carmel Date Performed 111110.2 ifime Period PM Peak Analysis Year Yr 20.12 wi Additional Imprv Volume and Timing Input EB WB NB SB LT TH RT LT TH RT LT TH RT LT TH RT Num. of Lanes 1 2 1 1 1 1 2 4 1 2 4 1 Lane group L T R L T R L T R L T R Volume (vph) 139 320. 219 439 253 44 174 2442 455 60. 12444 59 % Heavy veh 5 5 5 5 5 5 5 5 5 5 5 5 PHF 0..90. 0..90. 0.90. 0.90. 0..90. 0.90. 0..90. 0..90. 0..90. 0..90. 0..90. 0..90. Actuated (P/A) A A A A A A A A A A A A Startup lost time 2.0. 2.0. 2.0. 20. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. Ext. eft. Qreen 2.0. 20. 2.0. 2.0. 2.0. 2.0. 2.0. 20. 20. 2.0. 2.0. 2.0. Arrival type 3 3 3 3 3 3 3 3 3 3 3 3 Unit Extension 3.0. 3.0. 30. 3D 3D 3D 30. 3D 3.0. 30. 3.0. 3.0. Ped/Bike/RTOR Volume a 10.9 a 22 a 227 a 29 Lane Width 12.0. 12.0. 120. 120. 120. 10.0. 120. 12.0. 120. 120. 12.0. 12.0. Parking/Grade/Parking N a N N 0. N N 0. N N a N Parking/hr Bus stops/hr a a 0. a 0. 0. 0. 0. 0. a a a Unit Extension 30. 30. 3.0. 30. 30. 30. 3.0. 3.0. 3D 3.0. 3.0. 3.0. Phasinq Exel. left EW Perm 03 04 Excl left Thru & RT 07 08 Timing G = 142 G = 120. G= G= G= 70. G = 420. G= G= Y= 3 Y = 5 Y= y= Y = 5 Y = 5 y= Y= Duration of Analysis (hrs) = 0..25 Cycle Lenqth C = 932 Lane Group Capacity, Control Delay, and LOS Determination EB WB NB SB Adj. flow rate 154 356 122 488 281 24 193 2713 253 67 2716 33 lane group cap. 340. 443 198 340. 233 185 250. 2968 693 250. 2968 693 .- vIe ratio 0..45 0..80. 0.62 1.44 121 0.13 0.77 0.91 0.37 0.27 0..92 0.0.5 Green ratio 0.31 0.13 0..13 0.31 0.13 0..13 0..0.8 0.45 0..45 0..0.8 0..45 0..45 Unit. delay d 1 24.8 39.5 38.4 31.4 40.6 360. 42.3 239 168 40..7 23.9 14.4 Delay factor k 0..11 0.35 0.20. 0..50. 0.50. 0..11 0.32 0.43 0. 11 0.11 0..43 0..11 Inerem. delay d2 1.0. 10.3 5.7 212.0. 1260. 0.3 138 50. 0.3 0.6 50. 0..0. PF factor 10.0.0. 10.0.0. 1. 0.0.0. 10.0.0. 10.0.0. 10.0.0. 10.0.0. 1. 0.0.0. 1.0.0.0. 10.0.0. 1.0.0.0. 1.0.0.0. Control delay 25.8 49.8 441 243.5 166.6 363 562 289 172 41.3 28.9 14.4 Lane group LOS C 0 0 F F 0 E C B 0 C B Apprch delay 428 20.99 296 29.1 Approach LOS 0 F C C Intersee. delay 499 Intersection LOS 0 HCSl0001'l Cop)"nghl 02000 Um\'f?"'1)" of FI<'"d3. All RighI' Reserwd VersIOn 4lc 14 fiJe:l/C:\Documents%20and%20Sertings\tvandenberg.DELL] 5\Local%20Settings\ T emp\s21C ]] 17/2002 llCS;OOOlM Copyright 'C :?OOO UmvelSlfY or Florida. All RIghts R~St'rwd Page ] of] 0 1 AM SL.iAB o o o o o o o o D o o o o o o o o o Version 4 Ie Short Report SHORT REPORT General Information Site Information Analyst TSV Intersection US 31 & 106th Street Agency or Co. A&F Engineering V\rea Type All other areas Date Performed 111610.2 ~urisdiction Carmel :rime Period AM Peak fAnalysis Year Yr. 20.12 fPD wi Add. Imprv. Volume and Timing Input EB WB NB SB LT TH RT LT TH RT LT TH RT LT TH RT Num. of Lanes 1 2 1 1 1 1 2 4 1 2 4 1 Lane group L T R L T R L T R L T R Volume (vph) 164 194 183 291 276 65 221 2580. 470. 124 ~9a1 150. % Heavy veh 5 5 5 5 5 5 5 5 5 5 5 5 PHF 0..90. 0.90 0..90 0..90 0..90. 0.90. 0.90. 0.90 0.90 0..90 0.90 0..90 A.ctuated (PIA) A A A A A A A A A A A A Startup lost time 2.0 2.0 2.0 2.0. 2.0 2.0. 2.0. 2.0 2.0 2.0 2.0 2.0 Ext. eft. green 2.0 2.0. 2.0 2.0. 2.0. 2.0 2.0. 2.0. 2.0 2.0 2.0 2.0 A.rrival type 3 3 3 3 3 3 3 3 3 3 3 3 Unit Extension 3.0 3.0 3.0. 3.0. 3.0. 3.0. 30. 3.0. 3.0 3.0 3.0. 3.0 Ped/Bike/RTOR Volume 0 91 a 32 a 235 0 75 Lane Width 12.0 12.0 12.0. 120 12.0. 10.0. 12.0 120. 120. 12.0. 12.0. 12.0 Parking/Grade/Parking N 0 N N a N N a N N 0 N Parking/hr Bus stops/hr a a 0 a 0 0 0 0 a 0 0 a Unit Extension 3.0. 3.0 3.0 3.0. 3.0 3.0 30. 30. 30 30 3.0 30 Phasing Excl. Left EW Perm 03 04 Excl. Left Thru & RT 07 08 Timing G = 10..0 G = 19.0 G= G= G= 8.0 G = 58. a G= G= Y = 3 Y= 5 Y= Y= Y = 5 Y = 5 Y= Y= Duration of Analysis (hrs = 025 Cycle Length C = 1130 Lane Group Capacity, Control Delay, and LOS Determination EB WB NB SB Adj flow rate 182 216 102 323 307 37 246 2867 261 138 3223 83 Lane group cap. 216 578 259 30.7 304 241 236 3381 789 236 3381 789 v/c ratio 0.84 0.37 0.39 1.05 10.1 015 104 0.85 0.33 0.58 0.95 0..11 Green ratio 0.28 0.17 0.17 028 017 017 00.7 0.51 0.51 00.7 0..51 0.51 Unif delay d 1 34.1 41.7 41.9 43.1 47.0 40..1 52.5 23.7 16.1 50.9 26.2 14.1 Delay factor k 0.38 0.11 0.11 0..50 0.50 011 0.50. 0.38 O. 11 0.18 0.46 0.11 Increm delay d2 249 0.4 10 65.7 541 0.3 70..1 22 0.2 3.7 7.4 0..1 PF factor 1.0.00 1.000 10.0.0 1.0.00 1.000 1.000. 10.0.0 10.0.0 10.00. 10.00 1.0.0.0 1.00.0. Control delay 59.0 42.1 429 108.8 101.1 40..4 122.6 259 16.4 54.6 336 142 Lane group LOS E 0 0 F F 0 F C B 0 C B A.pprch delay 48.4 10.1.5 322 340 A.pproach LOS 0 F C C Intersec. delay 398 Intersection LOS 0 15 fiJe:l/C:\Documents%20and%20Settings\tvandenberg.DELL] 5\LocaJ%20Set1ings\Temp\s2k: ] ]1712002 o o o o D D D D D D D D D D D D D o D Short Report Page ] of] l ? Iv! S Li -4 B SHORT REPORT General Information Site Information ~nalyst TSV Intersection US 31 & 106th Street Area Type All other areas ~gency or Co. A&F Engineering Jurisdiction Carmel Date Performed 1116102 Time Period PM Peak Analysis Year Yr. 20121- PO wi Add. Imprv. Volume and TiminQ Input EB WB NB SB LT TH RT LT TH RT LT TH RT LT TH RT Num. of Lanes 1 2 1 1 1 1 2 4 1 2 4 1 Lane group L T R L T R L T R L T R Volume (vph) 139 320 219 439 253 148 174 7546 455 96 2480 59 % Heavy veh 5 5 5 5 5 5 5 5 5 5 5 5 PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 ~ctuated (P/A) A A A A A A A A A A A A Startup lost time 2.0 2.0 2.0 2.0 20 2.0 2.0 20 20 20 20 2.0 Ex!. eft. qreen 2.0 2.0 2.0 2.0 2.0. 20 2.0 2.0 20 2.0 2.0 2.0 Arrival tv pe 3 3 3 3 3 3 3 3 3 3 3 3 Unit Extension 3.0 3.0 30 3.0 3.0 30 30 30 30 30 3.0 3.0 Ped/Bike/RTOR Volume 0 109 0 74 0 227 a 29 Lane Width 12.0 120 120 120. 120 100. 120 120. 120 120. 120. 120. Parking/Grade/Parking N 0 N N 0 N N 0 N N a N Parking/hr Bus stops/hr a 0 a 0 0 0 0 a 0 0 0 a Unit Extension 3.0. 30 3.0. 30 3.0 30. 3.0 30 30 30 30. 30. PhasinQ Exel. Left EW Perm 03 04 Exel. Left Thru & RT 07 08 Timing G= 15.0 G = 12.0 G= G= G= 70 G = 43 a G= G= y= 3 Y = '5 y= y= y= 5 Y = 5 y= y= Duration of Analysis (hrs) = 0.25 Cycle LenQth C = 950 Lane Group Capacity, Control Delay, and LOS Determination EB WB NB SB Adj. now rate 154 356 122 488 281 82 193 2829 253 107 2756 33 Lane group cap. 347 434 194 347 229 181 246 2981 696 246 2981 696 v/c ratio 0..44 0.82 0.63 1.41 123 0..45 078 0.95 0.36 0.43 0..92 0.05 Green ratio 0..32 0.13 0..13 0.32 0.13 0..13 007 0.45 0.45 007 0.45 0.45 Unit. delay d 1 25.1 40.4 394 31.5 41.5 385 433 249 170 42.1 245 14.5 Delay factor k 0.11 0.36 0.21 050 0.50 0.11 0.33 0.46 0. 11 0.11 0.44 0.11 Increm delay d2 0.9 11.9 64 199.3 1345 18 153 77 03 12 56 GO PF factor 1.000 1.000 1.0.0.0. 1.0.00. 1000 1. 000 1. 00.0 1.000 1.000. 1. 000 1. 000 1000 Control delay 260. 523 458 230.8 1760 40.3 585 327 17.4 43.3 30.1 14.6 Lane group LOS C 0 0 F F 0 E C B 0 C B Apprch delay 447 1943 330 30.4 Approach LOS 0 F C C Intersec delay 50.9 Intersection LOS 0 JfCS20001~' Copyright C 2000 Umn/5ilV of Flond3. All RIf'h15 R.'.I'.d V(,"f~ion -t Ie 16 file:l/C:\Documents%20and%20Settings\tvandenberg.DELL] 5\Local%20Set1ings\Temp\s2... ]] /7/2002 o o o u o o D D o D o D D o D D D o D CLARlAN HEAL TIl - NORTIl HOSPITAL TRAFFlc IMPACT ANAL YSJS u.s. 31 & 103RD STREET INTERSECTION DATA TRAFFIC VOLUME COUNTS AND CAPACITY ANALYSES 17 o o o D o D D D D D o D D D o D D D o A & F ENGINEERING CO., INC. TRAFFIC VOLUME SUMMARY CLIENT LOCATION DATE CLARIAN HEALTH 103RD STREET & U.S. 31 (04) OCTOBER 21, 2002 PEAK HOUR DATA AM PEAK OFF PEAK PM PEAK HR BEGIN 7:15 AM HR BEGIN 4:30 PM L T R TOT L T R TOT L T R TOT 336 2707 394 3437 60 2579 269 2908 10 23 29 62 77 53 317 447 47 2802 44 2893 21 2647 15 2683 143 63 17 223 363 37 30 430 NORTHBOUND EASTBOUND SOUTHBOUND WESTBOUND HOUR SUMMARY HOUR NB SB NB+SB EB WB EB+WB TOTAL - AM - 6- 7 1512 1716 3228 12 70 82 3310 7- 8 3169 2828 5997 55 204 259 6256 8- 9 2835 2282 5117 62 206 268 5385 - PM - 3- 4 2142 1984 4126 158 240 398 4524 4- 5 2585 2385 4970 339 400 739 5709 5- 6 2989 2482 5471 402 342 744 6215 TOTAL 15232 13677 28909 1028 1462 2490 31399 48.5% 43.6% 92.1% 3.3% 4.7% 7.9% 100.0% - AM PEAK VOLUMES - 15-MIN 963 806 24 66 HOUR 3437 2893 80 249 PHF 0.89 0.90 0.83 0.94 - PM PEAK VOLUMES - 15-MIN 781 730 140 126 HOUR 3001 2683 447 430 PHF 0.96 0.92 0.80 0.85 18 0 A & F ENGINEERING CO., INC. D TRAFPI C VOLUME SUMMARY 0 CLIENT CLARIAN HEALTH LOCATION 103RD STREET & U.S. 31 (04) 0 DATE OCTOBER 21, 2002 DIRECTION OF TRAVEL NORTHBOUND HOUR LEFT THRU RIGHT TOTAL PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK AM 6- 7 104 2 106 1218 74 1292 III 3 114 1433 79 1512 7- 8 295 3 298 2390 129 2519 350 2 352 3035 134 316 8- 9 257 4 261 2071 166 2237 335 2 337 2663 172 283 PM 3- 4 49 2 51 1876 78 1954 137 0 137 2062 80 2142 4- 5 68 2 70 2232 88 2320 194 1 195 2494 91 258 5- 6 64 1 65 2587 58 2645 277 2 279 2928 61 298 PASSENGER 837 12374 1404 14615 D 98.4% 95.4% 99.3% 95.9% TRUCK 14 593 10 617 1. 6% 4.6% 0.7% 4.1% 0 BOTH 851 12967 1414 15232 5.6% 85.1% 9.3% 100.0% D DIRECTION OF TRAVEL : EASTBOUND HOUR LEFT THRU RIGHT TOTAL PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK AM 6- 7 3 0 3 0 0 0 9 0 9 12 0 7- 8 8 0 8 17 1 18 28 1 29 53 2 8- 9 13 1 14 17 2 19 29 0 29 59 3 PM 3- 4 17 1 18 22 1 23 114 3 117 153 5 4- 5 46 1 47 38 2 40 248 4 252 332 7 5- 6 77 1 78 52 0 52 270 2 272 399 3 PASSENGER 164 146 698 1008 D 97.6% 96.1% 98.6% 98.1% TRUCK 4 6 10 20 2.4% 3.9% 1.4% 1. 9% 0 BOTH 168 152 708 1028 16.3% 14.8% 68.9% 100.0% 0 -.-- .. 0 - 19 o o o o D D o D o D D o o D D D o D D A & F ENGINEERING CO., INC. TRAFFIC VOLUME SUMMARY CLIENT LOCATION DATE CLARIAN HEALTH 103RD STREET & U.S. 31 (04) OCTOBER 21, 2002 DIRECTION OF TRAVEL SOUTHBOUND HOUR LEFT THRU RIGHT TOTAL PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH AM 6- 7 13 0 13 1639 50 1689 14 0 14 1666 50 1716 7- 8 39 2 41 2681 72 2753 34 0 34 2754 74 2828 8- 9 42 0 42 2066 114 2180 59 1 60 2167 115 2282 PM 3- 4 16 0 16 1843 117 1960 8 0 8 1867 117 1984 4- 5 21 0 21 2221 119 2340 22 2 24 2264 121 2385 5- 6 25 0 25 2327 116 2443 14 0 14 2366 116 2482 PASSENGER 156 12777 151 13084 98.7% 95.6% 98.1% 95.7% TRUCK 2 588 3 593 1. 3% 4.4% 1. 9% 4.3% BOTH 158 13365 154 13677 1.2% 97.7% 1.1% 100.0% DIRECTION OF TRAVEL WESTBOUND HOUR LEFT , THRU RIGHT TOTAL PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH AM . 6- 7 52 1 53 14 0 14 3 0 3 69 1 70 7- 8 130 5 135 53 1 54 14 1 15 197 7 204 8- 9 125 1 126 60 1 61 18 1 19 203 3 206 PM 3- 4 197 0 197 20 0 20 21 2 23 238 2 240 4- 5 347 1 348 25 1 26 25 1 26 397 3 400 5- 6 276 1 277 34 0 34 31 0 31 341 1 342 PASSENGER 1127 206 112 1445 99.2% 98.6% 95.7% 98.8% TRUCK 9 3 5 17 0.8% 1.4% 4.3% 1. 2% BOTH 1136 209 117 1462 77.7% 14.3% 8.0% 100.0% 20 HCS;OOOH1 Copvright <<:;. 2000 Uniw",tv of FlolJda, ,\11 Righ" R"erwd V€'r~ion 4 Ie o o o o o o o o o o o o o o o o o o o Short Report Page 1 of] J..AM~1- SHORT REPORT General Information Site Information Analyst RMB Intersection US 31 & 103rd Street Agency or Co. A&F Engineering iArea Type All other areas Date Performed 11/4/02 ~urisdiction Carmel Time Period AM Peak ~nalysis Year Existing Volume and Timing Input EB WB NB SB LT TH RT LT TH RT LT TH RT LT TH RT Num. of Lanes 1 1 1 1 1 1 2 3 1 1 3 1 Lane group L T R L T R L T R L T R ~olume (vph) 10 23 29 143 63 17 336 2707 394 47 2802 44 % Heavy veh 5 5 5 5 5 5 5 5 5 5 5 5 PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 ~etuated (PIA) A A A A A A A A A A A A ~tartup lost time 20 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Ext. eft. green 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 IArrival type 3 3 3 3 3 3 3 3 3 3 3 3 Unit Extension 30 3.0 30 30 30 30 3.0 3.0 3.0 30 3.0 3.0 Ped/Bike/RTOR Volume 0 14 0 8 0 197 0 22 Lane Width 120 12.0 120 120 12.0 12.0 12.0 120 120 120 12.0 12.0 Parking/Grade/Parking N 0 N N 0 N N 0 N N 0 N Parking/hr Bus stops/hr 0 0 0 0 0 0 0 0 0 0 0 0 Unit Extension 30 30 3.0 30 30 30 3.0 3.0 3.0 3.0 30 3.0 Phasinq Exd Left EW Perm 03 04 Exel. Left Thru & RT 07 08 Timing G= 7.0 G = 7.0 G= G= G= 13.0 G = 70.0 G= G= Y = 3 Y = 5 Y= Y= Y = 5 Y = 5 Y= Y= Duration of Analysis (hrs) = 0.25 CYcle LenQth C = 115.0 Lane Group Capacity, Control Delay, and LOS Determination EB WB NB SB Adj flow rate 11 26 17 159 70 10 373 3008 219 52 3113 24 Lane group cap. 168 110 94 168 110 94 377 3007 936 194 3007 936 vIe ratio 007 024 018 095 0.64 011 099 1.00 0.23 027 1.04 003 Green ratio 015 006 0.06 0.15 0.06 006 0.11 0.61 061 0.11 0.61 0.61 Unif. delay d 1 42.1 51.5 513 48.4 528 51.0 50.9 22.5 10.3 466 22.5 8.9 Delay factor k O. 11 0.11 011 046 022 011 049 0.50 011 0.11 0.50 0.11 Inerem. delay d2 0.2 1.1 0.9 53.7 116 05 434 16.5 0.1 07 264 0.0 PF factor 1000 1000 1.000 1.000 1000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Control delay 423 526 522 102.1 643 51.5 94.3 390 104 47.4 48.9 90 Lane group LOS 0 0 0 F E 0 F 0 B 0 0 A Apprch delay 50.4 890 430 486 Approach LOS 0 F 0 0 Intersee delay 47.1 Intersection LOS 0 21 fiJe://C: \Documents%20and%20Set1ings\1vandenberg. DELL! 5\Local%20Settings\T emp\s2... ] J 17 /2002 o o o o o D o o !D o D D D D o D D D D Short Report Page 1 of] a.. P.M 51- SHORT REPORT General Information Site Information Analyst RMB Intersection US 31 & 103rd Street Agency or Co. A&F Engineering Area Type All other areas Date Performed 11/4/02 lJurisdiction Carmel trime Period PM Peak IAnalysis Year Existing Volume and Timing Input EB WB NB SB LT TH RT LT TH RT LT TH RT IT TH RT Num. of lanes 1 1 1 1 1 1 2 3 1 1 3 1 lane group L T R L T R L T R L T R VOlume (vph) 77 53 317 363 37 30 60 2579 269 21 2647 15 % Heavy veh 5 5 5 5 5 5 5 5 5 5 5 5 PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Actuated (PIA) A A A A A A A A A A A A startup lost time 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Exl. eft. green 2.0 2.0 2.0 2.0 20 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Arrival tYpe 3 3 3 3 3 3 3 3 3 3 3 3 Unit Extension 3.0 3.0 3.0 30 30 30 3.0 3.0 30 3.0 3.0 3.0 Ped/Bike/RTOR Volume 0 158 0 15 0 134 0 7 lane Width 12.0 12.0 120 12.0 120 120 120 120 12.0 120 120 12.0 Parking/Grade/Parking N 0 N N 0 N N 0 N N 0 N Parking/hr Bus stops/hr 0 0 0 0 0 0 0 0 0 0 0 0 Unit Extension 3.0 3.0 30 30 30 30 30 3.0 30 3.0 30 3.0 Phasinq Excl. left EW Perm 03 04 Excl left Thru & RT 07 08 triming G = 11.0 G= 11.0 G= G= G= 7.0 G = 730 G= G= Y= 3 y= 5 Y= Y= Y = 5 Y = 5 Y= y= Duration of Analysis (hrs) = 0.25 Cycle lenqth C = 120.0 Lane Group Capacity. Control Delay. and LOS Determination EB WB NB SB Adj flow rate 86 59 177 403 41 17 67 2866 150 23 2941 9 lane group cap. 257 166 141 256 166 141 195 300.5 936 10.0. 30.0.5 936 '.. y/e ratio 0.33 0..36 126 157 025 012 0.34 095 0.16 023 0.98 00.1 :. IGreen ratio 021 0.09 0.09 021 0.0.9 009 006 061 061 0.06 061 061 Unit delay d1 39.7 512 545 48.4 507 501 54.3 21.9 102 539 227 9.3 Delay factor k 011 011 050. 050 011 011 0.11 0.46 0. 11 0. 11 0.48 0.11 Increm. delay d2 0.8 13 160.0. 276.4 08 0.4 1 1 82 01 12 11.9 0.0 PF factor 1. 000 1000. 1000 1000 1000 1000 1000 1000 10.00 1000 1.000 1000 Control delay 40.5 525 2145 3248 514 50.4 554 301 103 55.1 34.6 9.3 lane group lOS 0 0 F F 0 0 E C B E C A IApprch delay 138.3 2903 29.7 34.7 Approach lOS F F C C Intersec. delay 546 Intersection lOS 0 HCS.'OOOTM Copynghl fid :?Ooo Um\.~"J'" of Flonda. All R.ghlS R050rwd Vo,-"ion 4Jc 22 fiJe:!/C: \Documents%20and%20Settings\tvandenberg.DELL 15\Local%20Settings\ T emp\s2k, 1117/2002 HCSl0001M Copnight 02000 Unl\er5;ty of Flood3. All RJghts Reserwd Ver:s.ion 4. Ie o o o o o o o o o o o o o o o o o o o Short Report Page 1 of 1 ~Aft'1s~ SHORT REPORT General Information Site Information Analyst RMB Intersection US 31 & 103rd Street Agency or Co. A&F Engineering Area Type All other areas Date Performed 11/4/02 Jurisdiction Carmel Time Period AM Peak Analysis Year Existing+Proposed Volume and Timing Input EB WB NB SB LT TH RT IT TH RT LT TH RT LT TH RT Num. of lanes 1 1 1 1 1 1 2 3 1 1 3 1 ane group L T R L T R L T R L T R Volume (vph) 10 23 29 256 63 44 336 2707 763 134 ')802 44 % Heavy veh 5 5 5 5 5 5 5 5 5 5 5 5 PHF 090 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Actuated (PIA) A A A A A A A A A A A A Startup lost time 2.0 2.0 2.0 2.0 2.0 2.0 20 2.0 20 2.0 2.0 2.0 Ext. eft. green 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 20 2.0 2.0 2.0 Arrival type 3 3 3 3 3 3 3 3 3 3 3 3 Unit Extension 3.0 3.0 3.0 30 3.0 3.0 30 30 30 3.0 3.0 3.0 Ped/Bike/RTOR Volume 0 14 0 22 0 381 0 22 lane Width 12.0 12.0 120 12.0 120 12.0 120 120 120 120 120 12.0 Parking/Grade/Parking N 0 N N 0 N N 0 N N 0 N Parking/hr Bus stops/hr 0 0 0 0 0 0 0 0 0 0 0 0 Unit Extension 3.0 30 30 3.0 30 3.0 3.0 30 3.0 3.0 30 3.0 PhasinQ Exel. Left EW Perm 03 04 Exd Left Thru & RT 07 08 Timing G = 8.0 G= 7.0 G= G= G= 10.0 G = 770 G= G= Y= 3 Y= 5 Y= y= Y = 5 Y = 5 Y= Y= Duration of Analysis (hrs) = 025 ~ycle LenQth C = 120.0 Lane Group Capacity, Control Delay, and LOS Determination EB WB NB 5B I\dj. flow rate 11 26 17 284 70 24 373 3008 424 149 3113 24 Lane group cap. 175 106 90 175 106 90 278 3170 987 143 3170 987 " v/c ratio 0.06 0.25 0.19 162 066 027 134 0.95 043 104 098 0.02 Green ratio 0.15 006 006 015 0.06 006 008 064 064 0.08 0.64 0.64 Unif. delay d 1 43.7 54.0 53.8 50.8 55.3 54.0 55.0 19.7 10.6 550 20.8 7.8 Delay factor k o. 11 0.11 0.11 0.50 0.24 0.11 0.50 046 0.11 0.50 0.49 0.11 Increm delay d2 02 12 1.0 304.9 142 16 176.0 7.4 0.3 86.8 121 00 PF factor 1.000 1.000 1.000 1000 1000 1000 1.000 1000 1.000 1.000 1.000 1.000 Control delay 439 55.2 548 3558 69.5 55.6 2310 270 109 1418 329 78 Lane group LOS 0 E 0 F E E F C B F C A I\pprch delay 52.8 2837 452 37. 7 I\pproach LOS 0 F 0 0 Intersec delay 54.0 Intersection LOS 0 23 file:1 Ie :\Documents%20and%20Settings\tvandenberg.DELL 1 S\LocaI%20Settings\ T emp\s2k 1 117/2002 o o o o D D o D o D D o D o o D D o o Short Report Page J of J :}.. P A-'\ Sd- SHORT REPORT General Information Site Information . Analyst RMB Intersection US 31 & 103rd Street IAgency or Co. A&F Engineering IArea Type All other areas Date Performed 11/4/0.2 lJurisdiction Carmel [Time Period PM Peak lA.nalysis Year Ex isting+ Proposed Volume and Timing Input EB WB NB SB IT TH RT IT TH RT LT TH RT LT TH RT Num. of lanes 1 1 1 1 1 1 2 3 1 1 3 1 lane group L T R L T R L T R L T R ~olume (vph) 77 53 317 80.7 37 134 60. 2579 423 57 2647 15 % Heavy veh 5 5 5 5 5 5 5 5 5 5 5 5 PHF . 0..90. 0..90. 0..90. 0..90 0..90. 0..90. 0..90. 0..90. 0.90. 0..90. 0..90 0.90 Actuated (PIA] A A A A A A A A A A A A Startup lost time 2.0 2.0 2.0 2.0 2.0. 20 20. 2.0. 2.0. 2.0. 2.0. 2.0. Ext. eft. green 2.0. 2.0 2.0 2.0. 2.0. 20 2.0. 2.0. 2.0 20 2.0. 2.0. Arrival type 3 3 3 3 3 3 3 3 3 3 3 3 Unit Extension 30. 3.0. 3.0. 3.0 3.0 30. 30. 30. 30. 30. 30. 3.0 Ped/Bike/RTOR Volume 0 158 0 67 a 211 a 7 Lane Width 120. 12.0 12.0 120 12.0. 120. 120. 12.0. 120. 120. 120. 12.0. Parking/Grade/Parking N 0 N N a N N 0 N N 0 N Parking/hr Bus stopslhr a 0 0 0 a 0 a 0 a a 0 a Unit Extension 3.0 3.0. 3.0 30. 30. 30 3.0. 3.0 30. 30. 30 3.0 Phasing Exct left EW Perm 03 04 Excl. Left Thru & RT 07 08 Timing G = 20.0 G= 7.0. G= G= G= 70. G = 65 a G== G= Y== 3 Y == 5 Y== Y== y == 5 Y== 5 y== y== Duration of Analysis (hrs) = 0. 25 Cycle length C == 1170. Lane Group Capacity, Control Delay, and LOS Determination EB WB NB SB Adj. flow rate 86 59 177 897 41 74 67 2866 236 63 2941 9 lane group cap. 356 108 92 356 108 92 20.0 2744 854 103 2744 854 vIe ratio 0..24 0.55 1.92 2.52 0..38 0.80. 0.34 1.0.4 0.28 0..61 107 0.0.1 preen ratio 0.26 0.0.6 00.6 0.26 0..0.6 0.0.6 0.0.6 0..56 0.56 0.06 056 0.56 Unif. delay d1 342 53.5 55.0. 429 529 54.3 528 260 13.7 53.7 260. 116 Delay factor k 0.11 0.15 0.50. 0..50 0..11 0.35 0. 11 0.50 0. 11 0.20. 0.50 0..11 Increm. delay d2 0..4 57 1453 1 692.1 2.2 388 10 30.2 0..2 10.2 40.2 0.0 PF factor 100.0. 10.0.0 1.0.00. 1.0.00 1.000. 10.00 10.0.0. 10.00 1.00.0 10.0.0 10.0.0. 1.0.00. Control delay 34.5 592 50.8.1 7350 551 931 538 562 13.8 639 662 116 Lane group LOS C E F F E F 0 IE B E E B Apprch delay 299.4 660.5 530. 66.0 Approach lOS F F 0 E Intersec delay 150.6 Intersection LOS F HCS70001M Copvrighl <<':' 2000 UOIv."itv ofFlonda, All RIghts Res.f'.d Ver:>ion 4. Jc 24 fiJe:lIC:\Documents%20and%20Settings\tv<.mdenberg.D.tLL] S\Local%20Set1ings\ T emp\s2k. ] 1/7/2002 HCSZOOOB1 CopVllghl 0 2000 Umw.s,1Y of Florida. 1"11 R.ghls Resened Vel~ion 4 Je o o o o o o o o o o o D o o o o o o o Short Report Page ] of] ). AJv\ sf-A SHORT REPORT General Information Site Information Analyst TSV Intersection US 31 & 1D3rd Street Agency or Co. A&F Engineering Area Type All other areas Date Performed 11/6/0.2 Jurisdiction Carmel ime Period AM Peak ~naJysis Year Ex isting + Proposed w/lmprov. Volume and Timing Input EB WB NB SB LT TH RT LT TH RT LT TH RT LT TH RT Num. of Lanes 1 1 1 1 1 1 2 4 1 1 4 1 Lane group L T R L T R L T R L T R Volume (vph) 10 23 29 256 63 44 336 270.7 763 134 280.2 44 % Heavy veh 5 5 5 5 5 5 5 5 5 5 5 5 PHF 0..90. 0..90. 0..90. 0..90. 0..90. 0..90. 0..90. 0..90. 0..90. 0..90. 0..90. 0..90. fA.ctuated (P/A) A A A A A A A A A A A A IStartup lost time 2.0. 2.0. 2.0. 20. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. Ext. eft. green 2.0. 20. 2.0. 2.0. 2.0. 2.0. 20. 2.0. 2.0. 2.0. 2.0. 2.0. fA.rrival type 3 3 3 3 3 3 3 3 3 3 3 3 Unit Extension 3.0. 3D 3.0. 3.0. 3.0. 3.0. 3.0. 3.0. 3.0. 3.0. 3.0. 3.0. Ped/Bike/RTOR Volume 0. 14 a 22 0. 381 0. 22 Lane Width 12.0. 12.0. 12.0. 12.0. 12.0. 120. 120. 12.0. 12.0. 120. 12.0. 12.0. Parking/Grade/Parking N a N N 0. N N a N N 0. N Parking/hr Bus stopslhr 0. 0. a a a a a a a a a a Unit Extension 3.0. 3D 3.0. 3.0. 3.0. 3D 30. 3.0. 3D 3.0. 3.0. 3.0. PhasinQ Exd Left EW Perm 03 04 Exd Left Thru & RT 07 08 Timing G= 8.0. G= 70. G= G= G = 10.0. G = 77.0. G= G= Y= 3 Y= 5 Y= Y= Y = 5 Y = 5 Y= Y= Duration of Analysis (hrs) = 0.25 Cycle LenQth C = 120. 0. Lane Group Capacity, Control Delay, and LOS Determination EB WB NB SB Adj flow rate 11 26 17 284 70. 24 373 30.0.8 424 149 3113 24 Lane group cap. 175 10.6 90. 175 106 90. 278 4227 987 143 4227 987 v/c ratio 0..0.6 0..25 0..19 1.62 0..66 0.27 1.34 0..71 0..43 10.4 0..74 0.0.2 Green ralio 0..15 0..0.6 0..0.6 0..15 0..0.6 0..0.6 0..0.8 0..64 0..64 0.0.8 0..64 0.64 Unit delay d1 43.7 54.0. 53.8 50.8 55.3 54.0. 55.0. 142 106 55.0. 14.6 78 Delay factor k 0..11 D. 11 0..11 0..50. 0..24 0..11 0..50 0.28 0..11 0..50. 0.29 0..11 Increm delay d2 0..2 1.2 1.0. 30.4.9 14.2 16 176.0. 0..6 0..3 86.8 0..7 0..0. PF factor 1.0.0.0. 1.0.0.0. 10.0.0. 1.000. 1.0.0.0. 10.0.0. 10.0.0. 1.0.0.0. 10.0.0. 1.0.0.0. 10.0.0. 10.0.0. Control delay 439 55.2 54.8 3558 695 55.6 2310. 14.8 10.9 1418 15.3 78 Lane group LOS 0 E 0 F E E F B B F B A Apprch delay 52.8 283.7 35.5 210. Approach LOS 0 F 0 C Intersec. delay 418 Intersection LOS 0 25 fiIe://C:\Documents%20and%20Settings\tvandenberg.DELL] 5\Local%20Settings\ T einp\s2... ]] /7/2002 o o o o o o o o o o o o o o o o D o o Short Report Page ] of] J. P.:v\ S ~ A SHORT REPORT General Information Site Information Analyst TSV Intersection US 31 & to3rd Street Agency or Co. A&F Engineering Area Type All other areas Date Performed 11/6/0.2 Jurisdiction Carmel ~ime Period PM Peak Analysis Year Existing+Proposed w/lmprov. Volume and Timing Input EB WB NB SB LT TH RT LT TH RT LT TH RT LT TH RT Num. of Lanes 1 1 1 1 1 1 2 4 1 1 4 1 Lane group L T R L T R L T R L T R Volume (vph) 77 53 317 80.7 37 134 60. 2579 423 57 2647 15 % Heavy veh 5 5 5 5 5 5 5 5 5 5 5 5 PHF 0..90. 0..90. 0.90. 0..90. 0..90. 0..90. 0.90. 0..90. 0.90. 0.90. 0..90. 0.90. Actuated (PIA) A A A A A A A A A A A A Startup lost time 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. Ext eft. green 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. 20. 20. 2.0. 2.0. ~rrival type 3 3 3 3 3 3 3 3 3 3 3 3 Unit Extension 3.0. 3.0. 3.0. 30. 3.0. 3D 3D 30. 30. 30. 3.0. 30. Ped/Bike/RTOR Volume a 158 0. 67 0. 211 a 7 Lane Width 12.0. 12.0. 12.0. 120. 120. 12.0. 12.0. 120. 120. 120 12.0. 120. Parking/Grade/Parking N 0. N N a N N 0. N N 0. N Parking/hr Bus stops/hr a 0. a 0 0 a a 0 0 0 0 0 Unit Extension 3.0 3.0. 30. 3.0. 3.0 30 30. 30. 30 3D 30. 30. Phasing Excl Left EW Perm 03 04 Exd Left Thru & RT 07 08 Timing G = 30. a G= to. a G= G= G= 7.0. G = 55 a G= G= Y = 3 y= 5 y= y= Y = 5 Y = 5 y= y= Duration of Analysis (hrs) = 0..25. Cycle Lenqth C = 120..0. Lane Group Capacity, Control Delay, and LOS Determination EB WB NB SB ~dj flow rate 86 59 177 897 41 74 67 2866 236 63 2941 9 Lane group cap. 518 151 128 517 151 128 195 3019 70.5 100 3019 70.5 ~/c ratio 0..17 039 1.38 174 027 058 0.34 095 0.33 0.63 0.97 0.0.1 Green ratio 0..36 0.08 0.08 036 0.08 0..08 0.0.6 046 046 006 0.46 0.46 Unit. delay d1 26.1 52.1 550 39.8 51.6 53.0 54.3 312 20.8 552 318 177 Delay factor k 0..11 a. 11 0.50. 0.50. 0.11 017 011 046 0..11 021 048 0..11 Increm delay d2 0.2 17 !;! 13.3 338.8 10 64 1.1 7.7 03 12.1 111 00 PF factor 1000. 1. 000. 1.000. 1. 0.00. 1000. 1. 0.0.0 1000. 10.00 100.0. 1. 000. 10.00. 1.000. Control delay 263 538 i?683 3786 526 593 554 38.9 211 673 429 17.7 Lane group LOS C 0 F F 0 E E 0 C E 0 B Apprch delay 1643 3421 379 433 Approach LOS F F 0 0 lntersec delay 864 Intersection LOS F IIC57000Bl Copynght iO 2000 UmvefSity of Flonda, /\11 RIghts Reser-'ed Vers;on 4 )e 26 file://C :\Documents%20and%20Settings\tvandenberg.DELL] 5\Local%20Settings\ T emp\s2__. ]] 17/2002 HCS10001M CopynghllJ 2000 Um'er~J1v of flOllda, All Right' Re,erved Ve,,,on 4 Ie 01 o o o o o o o o o o o o o o o D o o Short Report Page 1 of 1 J,4 lv' S J-B SHORT REPORT General Information Site Information Analyst RMB Intersection US 31 & 103rd Street Area Type All other areas Agency or Co, A&F Engineering Jurisdiction Carmel Date Performed 11/4102 Time Period AM Peak Analysis Year Existing+Proposed wi Improv, Volume and Timinq Input EB WB NB SB LT TH RT LT TH RT LT TH RT LT TH RT Num, of Lanes 1 1 1 2 1 1 2 4 1 1 4 1 Lane group L T R L T R L T R L T R Volume (vph) 10 23 29 256 63 44 336 2707 763 134 2802 44 % Heavy veh 5 5 ' 5 5 5 5 5 5 5 5 5 5 PHF 0,90 0.90 0,90 0,90 0.90 0.90 0.90 0.90 0,90 0,90 0.90 0,90 Actuated (P/A) A A A A A A A A A A A A Startup lost time 2,0 2.0 2,0 2,0 2,0 2.0 2,0 2,0 2,0 2,0 2,0 2.0 Ext eft, green 2,0 2,0 2,0 2.0 2.0 2,0 2,0 2,0 2.0 2.0 2,0 2.0 Arrival type 3 3 3 3 3 3 3 3 3 3 3 3 Unit Extension 3,0 3,0 30 3.0 3.0 30 30 30 3.0 3,0 3,0 30 Ped/Bike/RTOR Volume 0 14 0 22 0 381 0 22 Lane Width 120 120 120 12.0 120 12.0 12,0 12,0 12,0 12,0 12,0 12,0 Parking/Grade/Parking N 0 N N 0 N N 0 N N 0 N Parking/hr Bus stopslhr 0 0 0 0 0 0 0 0 0 0 0 0 Unit Extension 30 3,0 30 30 30 3,0 30 3,0 3,0 3,0 3,0 30 PhasinQ Excl. Left EW Perm 03 04 Excl. Left Thru & RT 07 08 Timing G= 140 G= 70 G= G= G= 14.0 G = 610 G= G= Y = 3 y= 5 y= y= Y = 5 y= 5 y= y= Duration of Analysis (hrs) = 025 Cvcle Lenqth C = 114,0 Lane Group Cas: acity, Control Delay, and LOS Determination EB WB NB SB Adj flow rate 11 26 17 284 70 24 373 3008 424 149 3113 24 Lane group cap 275 111 351 410 111 351 410 3525 1079 211 3525 1079 vie ratio 0,04 023 0,05 0,69 063 007 0.91 0.85 0,39 0.71 088 0.02 Green ratio 021 006 0.23 0,12 0.06 0,23 0,12 0,54 070 0.12 0,54 0.70 Unit. delay d1 359 509 34.3 47.9 522 34,5 49.4 22.7 70 480 23.4 52 Delay factor k 011 0,11 0.11 026 0,21 0,11 0.43 0.39 0.11 0,27 0.41 011 Increm delay d2 01 11 0.1 5.0 11,0 0,1 23.9 22 02 103 30 00 PF factor 1,000 1000 1000 1.000 1,000 1,000 1000 1000 1,000 1,000 1.000 1000 Control delay 35.9 520 34.4 52,9 632 346 733 24,9 72 58,3 263 52 Lane group LOS 0 0 C 0 E C E C A E C A Apprch delay 43,2 53.7 277 276 Approach lOS 0 0 C C Intersec, delay 29,1 Intersection LOS C 27 fiIe://C:\Documents%20and%20Settings\tvandenberg.DELL I S\Local%20Settings\ T ernp\s2k J 1/712002 D D o !D o o o D o D D D o o o o D o o Short Report Page J of J 1-.. y ,M S .}. '3 SHORT REPORT General Information Site Information Analyst RMB Intersection US 31 & 103rd Street Area Type All other areas A.gency or Co. A&F Engineering Jurisdiction Carmel Date Performed 111410.2 Time Period PM Peak A.nalysis Year Existing+Proposed wi Improv. Volume and Timing Input EB WB NB SB LT TH RT LT TH RT LT TH RT LT TH RT Num. of lanes 1 1 1 2 1 1 2 4 1 1 4 1 Lane group L T R L T R L T R L T R Volume (vph) 77 53 317 80.7 37 134 60. 2579 423 57 7647 15 % Heavy veh 5 5 5 5 5 5 5 5 5 5 5 5 PHF 0..90. 0..90. 0..90. 0.90. 0..90. 0.90 0..90. 0.90. 0..90. 0.90. 0..90. 0.90. A.ctuated (PIA) A A A A A A A A A A A A Startup lost time 20. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. 20. 2.0. Ex!. eft. green 2.0. 2.0. 2.0. 2.0 2.0. 2.0. 20. 2.0. 2.0. 2.0. 20. 2.0. V\rrivaltype 3 3 3 3 3 3 3 3 3 3 3 3 Unit Extension 30. 3.0. 3.0. 3.0. 3.0. 30. 3.0. 3.0. 30. 3.0. 3.0. 3.0. Ped/Bike/RTOR Volume a 158 a 67 a 211 a 7 Lane Width 120. 120. 12.0. 12.0. 12.0. 120. 120. 12.0. 12.0. 120. 120. 120. Park in g/Grade/Par king N a N N a N N a N N a N Parking/hr Bus slopslhr a a a a a a a a a a a a Unit Extension 3.0. 30. 3.0. 3.0. 3.0. 30. 3.0. 30. 30. 30. 30. 30. PhaSing Excl. Left EW Perm 03 04 Excl. Left Thru & RT 07 08 Timing G = 310. G = 70. G= G= G= 7.0. G = 530. G= G= y = 3 y= 5 y= y= Y = 5 Y = 5 y= y= Duration of Analysis (hrs) = 0.25 Cycle Length C = 1160. Lane Group Capacity, Control Delay, and LOS Determination EB WB NB SB AdJ flow rate 86 59 177 897 41 74 67 2866 236 63 2941 9 Lane group cap. 521 10.9 252 891 10.9 252 20.1 30.10 1180. 104 30.10. 1180. Iv/c ralio 0.17 0..54 0..10. 10.1 0.38 0.29 0.33 0..95 0.20. 0.61 0.98 0.0.1 I' Green ratio 0.35 0..0.6 0..16 0..27 0..0.6 0..16 0.0.6 0.46 0..17 0..0.6 0.46 0. 77 Unit delay d 1 256 529 458 425 52.4 42.6 52.3 30..3 3.1 53.2 30..9 32 Delay factor k 0.11 0..14 0.27 0..50. 0.11 0..11 0..11 0..46 0.11 0.19 0..48 0..11 Increm. delay d2 0.2 54 8.5 31.8 2.2 0..1 10. 80. 0..1 9.1 116 0.0. PF factor 1. aDo. 10.0.0. 10.0.0. 1.0.0.0. 1.0.00. 1.0.0.0. 1.0.0.0. 1.0.0.0. 1. 0.0.0. 10.00. 10.0.0 10.0.0. Control delay 258 58.3 54.3 743 54.6 43.3 53.2 383 3.8 629 425 32 Lane group LOS C E 0 E 0 0 0 0 A E 0 A Apprch delay 47.4 71.2 36.1 428 IApproach LOS 0 E 0 0 Intersec delay 44.0. Intersection LOS 0 Hc.<;}OOOlM Copvrlght i:' 2000 Universirv of florida. All RIghts Reserved Ve-Jsion 4 Jc 28 fiIe://C :\Documents%20and%20Set1ings\tvandenberg.DELL} S\Local%20Settings\ T emp\s2k' }} 17/2002 HCSloao1M Copyrighl <!;' :000 Univf,,'!1; of FJonda, All RIghtS Re5fT"fd VefSion ~ 1 ( o o o o o o o o o o o o o o o o o o o Short Report Page 1 of 1 ~ AA/\ s 3 SHORT REPORT General Information Site Information Analyst RMB Intersection US 31 & 103rd Street Agency or Co. A&F Engineering Area Type All other areas Date Performed 11/4/02 iJurisdiction Carmel tTime Period AM Peak V\nalysis Year Year 2012 Volume and TiminQ Input EB WB NB SB IT TH RT LT TH RT LT TH RT IT TH RT Num. of lanes 1 1 1 1 1 1 2 3 1 1 3 1 lane group L T R L T R L T R L T R Volume (vph 10 24 30 147 65 17 344 2978 404 48 3082 45 % Heavv veh 5 5 5 5 5 5 5 5 5 5 5 5 PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0,90 0.90 !Actuated (PIA) A A A A A A A A A A A A IStartup lost time 2.0. 20 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0. 2.0. 2.0 Ext. eft. qreen 20 2.0 2.0 2.0. 2.0 2.0 2.0 2.0 2.0 2.0. 2.0 2.0 I\rrival type 3 3 3 3 3 3 3 3 3 3 3 3 Unit Extension 30 30. 3.0 30. 3.0. 3.0. 30 3.0 3.0. 3.0 3.0. 3.0 Ped/Bike/RTOR Volume 0 15 a 8 a 20.2 a 22 lane Width 120 120. 120. 12.0 120 12.0 12.0 12.0 120. 12.0 12.0 12.0 Parking/Grade/Parking N 0 N N 0 N N 0 N N 0 N Parking/hr Bus stops/hr a 0 0. 0. 0. 0. 0. 0. 0. 0 0. 0. Unit Extension 3D 3D 3.0. 3.0. 30 3.0 3.0 3.0 3.0 3.0 3.0 30 Phasinq Excl. Left EW Perm 03 04 Excl. Left Thru & RT 07 0.8 Timing G= 7.0. G= 70. G= G= G = 7.0. G = 810 G= G= Y = 3 Y = 5 y= Y= Y = 5 y = 5 Y= Y= Duration of Analysis (hrs) = 0..25 Cycle Lenqth C = 120..0. Lane Group Capacity, Control Delay, and LOS Determination EB WB NB SB IAdj flow rate 11 27 17 163 72 10 382 330.9 224 53 3424 26 Lane group cap. 160 10.6 90. 160. 106 90. 195 3335 1038 100. 3335 10.38 ". \lIe ratio 0.07 0.25 0.19 1.0.2 0.68 0.11 196 0..99 0.22 0.53 1.03 0.0.3 Green ratio 0.14 0.06 0.06 0.14 0.06 0.06 0.0.6 0.68 0.68 0.06 068 068 Unit. delay d1 44.6 540. 53.8 51.4 55.4 53.6 56.5 19.2 74 54.9 19.5 6.4 Delay factor k 0.11 0.11 0.11 0..50. 0..25 0.11 0..50. 0..49 0.11 0.13 050 0.11 Increm. delay d2 02 1.3 1.0 76.2 16.2 0.5 4496 13.8 0.1 5.3 22.9 0..0. PF factor 1000. 100.0. 1000. 10.0.0. 1000 1.000 1000 1.00.0 1.00.0 1.000 1.000 1. ODD Control delay 448 553 548 1276 716 54.1 506.1 330 75 60.2 42.4 6.5 Lane group LOS 0 E 0 F E 0 F C A E 0 A Apprch delay 53.0 10.8.1 77.7 42.4 Approach LOS 0 F E 0 Intersec delay 625 Intersection LOS E 29 fiJe://C:\Documents%20and%20Settings\tvandenberg.DELL 15\LocaJ%20Settings\ T emp\s2k: 11/7 /2002 o o o o o o o o o o D D D D D o D o o Short Report Page J of J d.. \>.M73 SHORT REPORT General Information lSite Information Analyst RMB Intersection US 31 & 103rd Street Agency or Co. A&F Engineering IArea Type All other areas Date Performed 11/4/02 Wurisdiction Carmel Time Period PM Peak iAnalysis Year Year 2012 Volume and Timing Input EB WB NB SB LT TH RT LT TH RT IT TH RT LT TH RT Num. of Lanes 1 1 1 1 1 1 2 3 1 1 3 1 Lane group L T R L T R L T R L T R !Volume (vph) 79 54 325 372 38 31 62 2837 276 22 2912 15 % Heavy veh 5 5 5 5 5 5 5 5 5 5 5 5 PHF 0.90 0.90 0.90. 0.90. 0.90 0.90. 0..90 0..90. 0..90. 0..90 0.90. 0.90. Actuated (PIA) A A A A A A A A A A A A startup lost time 2.0. 2.0 2.0. 20. 20. 2.0 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. Ex\. eft. green 2.0. 2.0. 20. 20. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. Arrival type 3 3 3 3 3 3 3 3 3 3 3 3 Unit Extension 30. 3D 30. 3.0 30 3.0 3.0 3.0. 3.0. 3.0 3D 30 Ped/Bike/RTOR Volume 0 162 0 15 a 138 0 7 Lane Width 120 12.0 12.0. 120. 12.0 120. 12.0. 120. 12.0 120 120. 12.0. Parking/Grade/Parking N a N N 0 N N a N N 0 N Parking/hr Bus stops/hr 0 0 0 0 0 a 0 a 0 0 0 0 Unit Extension 30 30 30 30 30 30 3.0 3.0. 30. 30 30 3.0. PhasinQ Exel. Left EW Perm 03 04 Exel. Left Thru & RT 07 08 Timing G= 70 G= 110 G= G= G= 70 G = 770. G= G= Y = 3 Y = 5 Y= Y= Y = 5 Y = 5 Y= Y= Duration of Analysis (hrs) = 025 Cycle LenQth C = 120.0 Lane Group Capacity, Control Delay, and LOS Determination EB WB NB SB Adj flow rate 88 60 181 413 42 18 69 3152 153 24 3236 9 Lane group cap 199 166 141 197 166 141 195 3170 987 100 3170. 987 v/c ratio 0.44 036 128 2.10. 0..25 013 0..35 0.99 0..16 0.24 1.02 0.0.1 Green ratio 017 009 0.09 017 0.09 0.09 0.06 0.64 064 0.06 0.64 0.64 Unit delay d1 43.2 512 545 50.5 50.7 50.1 543 21.3 8.6 540. 21.5 7.7 Delay factor k 0.11 011 0.50 0.50 011 0.11 0.11 0.50 0..11 011 0.50 0.11 Increm delay d2 16 13 1708 510.3 0.8 04 1. 1 146 0..1 12 215 0.0 PF factor 1000 1000 1000 1.000 100.0 1000 1.000. 10.00. 1000 1000 1000 1000. K:;ontrol delay 447 525 2253 560.7 515 50.5 554 35.9 86 552 43.0 7.8 Lane group LOS 0 0 F F 0 0 E 0 A E 0 A Apprch delay 1455 4961 351 43.0 Approach LOS F F 0 0 Intersec delay 727 Intersection LOS E HCSl0001'-1 C"p\."ght <Q 2000 Um\e'''tv of F1onda. All RIghI> Re,ef\-ed VCT~JOn 4 Ie 30 fjJe:!/C:\Documents%20and%20Set1ings\tvandenberg.DELL J S\LocaJ%20Settings\ T emp\s2k' ]] /7/2002 Short Report Page 1 0 2A~v1("D ' .f '''''''' SHORT REPORT General Information Site Information Analyst RMB Intersection US 31 & 103rd Street 0 Agency or Co. A&F Engineering Area Type All other areas Date Performed 11/4102 Jurisdiction Carmel Time Period AM Peak Analysis Year Year 2012 wi LOS Improv. n Volume and Timjn~ Input - EB WB NB SB LT TH RT LT TH RT LT TH RT LT TH ~U Num. of Lanes 1 1 1 1 1 1 2 4 1 1 4 Lane group L T R L T R L T R L T ~ Volume (vph) 10 24 30 147 65 17 344 2978 404 48 3082 % Heavy veh 5 5 5 5 5 5 5 5 5 5 5 5 PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.9 Actuated (PIA) A A A A A A A A A A A A Startup lost time 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.( IlII Ext. eft. green 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Arrival type 3 3 3 3 3 3 3 3 3 3 3 ~1J Unit Extension 3.0 3.0 3.0 3.0 30 3.0 3.0 3.0 30 3.0 3.0 Ped/Bike/RTOR Volume 0 15 0 8 0 202 0 22 Lane Width 12.0 12.0 12.0 12.0 120 12.0 12.0 12.0 120 12.0 12.0 1~U Parking/Grade/Parking N 0 N N 0 N N 0 N N 0 Parking/hr eft Bus stops/hr 0 0 0 0 0 0 0 0 0 0 0 Unit Extension 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0' Phasing Exel. left EW Perm 03 04 Excl. Left Thru & RT 07 08 i1 iming G= 7.0 G = 14.0 G= G= G = 14.0 G = 67.0 G= G= Y= 3 Y = 5 Y= Y= Y = 5 Y = 5 Y= Y= - Duration of Analysis (hrs) = 0.25 Cycle Lenqth C = 120.0 11 Lane Group Capacity, Control Delav, and LOS Determination EB WB NB SB Adj. flow rate 11 27 17 163 72 10 382 3309 224 53 3424 2 Lane group cap. 228 211 179 234 211 179 389 3678 859 201 3678 85 . v/c ratio 0.05 0.13 0.09 0.70 0.34 0.06 0.98 0.90 0.26 0.26 0.93 o.u- Green ratio 0.20 0.12 0.12 0.20 0.12 0.12 0.12 0.56 0.56 0.12 0.56 0.5 Unit. delay dl 38.8 47.5 47.3 45.2 48.8 47.1 52.9 23.5 13.7 48.3 24.4 11.9 Delay factor k 0.11 0.11 0.11 0.26 0.11 0.11 0.49 0.42 0.11 0.11 0.45 0.1J- Increm. delay d2 0.1 0.3 0.2 8.7 1.0 0.1 40.7 3.4 0.2 0.7 5.1 0.1 PF factor 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1000 1.000 1.000 1.0';}l I- Control delay 38.8 47.8 47.6 53.9 49.7 47.3 93.6 27.0 13.9 49.0 29.4 11.. lane group LOS 0 0 0 0 0 0 F C B 0 C B IApprch. delay 45.9 52.4 32.7 29.6 I IApproach LOS 0 C - 0 C Intersec. delay 32.0 Intersection LOS C 7(/ Bl Co ",i III <Q 2000 University of Florida. All Riehls Reserved VeTS' He S. 00 P) g fiJe://C:\ WINDOWS\TEMP\s2kC] 98.TMP 31 ] l/Q(] o o o o o o o o o o o o o o o o o o o Short Report Page 1 of 1 d- ?;\I\ 5 3 /'\. SHORT REPORT General Information Isite Information Analyst RMB Intersection US 31 & 103rd Street Agency or Co. A&F Eng;neering Area Type All other areas Date Performed 1114102 Jurisdiction Carmel Time Period PM Peak Analysis Year Year 2012 wi LOS Improv Volume and Timing Input EB WB NB SB LT TH RT LT TH RT LT TH RT LT TH RT Num. of Lanes 1 1 1 1 1 1 2 4 1 1 4 1 Lane group L T R L T R L T R L T R Volume (vph) 79 54 325 372 38 31 62 2837 276 22 2912 15 % Heavy veh 5 5 5 5 5 5 5 5 5 5 5 5 PHF 0..90. 0..90 090. 0.90 0.90. 0.90. 0.90 0.90. 0.90 0.90. 0..90. 0..90. IActuated (P/A) A A A A A A A A A A A A Startup lost time 2.0. 2.0. 20. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. Ext. eft. Qreen 2.0. 20 20 2.0. 20. 2.0. 2.0. 2.0 20 2.0. 2.0. 2.0. Arrival type 3 3 3 3 3 3 3 3 3 3 3 3 Unit Extension 30 30 30. 3.0 30 30. 30. 30 30 3.0 3.0. 3.0 Ped/Bike/RTOR Volume 0 162 0 15 a 138 a 7 Lane Width 12.0. 120 120 120 120 120 12.0 12.0. 120 120 12.0 12.0 Parking/Grade/Parking N 0 N N 0 N N 0 N N a N Parking/hr Bus stops/hr 0 0 0 0 0 0 0 0 0 0 0 0 Unit Extension 30 3.0 3.0 30 30 30 3.0 3.0 30 30 3.0 3.0 PhasinQ Exel Left EW Perm 03 04 Exel Left Thru & RT 07 08 triming G= 130 G= 150. G= G= G= 7.0 G = 67. 0 G= G= Y= 3 Y = 5 y= y= y = 5 Y = 5 y= Y= Duration of Analysis (hrs) = 0.25 Cycle Lenqth C = 1200 Lane Group Capacity, Control Delay, and LOS Determination EB WB NB SB Adj. flow rate 88 60 181 413 42 18 69 3152 153 24 3236 9 Lane group cap. 329 226 192 327 226 192 195 3678 859 100 3678 859 vie ratio 0.27 027 094 126 019 0.09 0.35 086 0.18 024 0.88 0.01 ":, Green ratio 026 0.13 013 0.26 013 013 0.06 0.56 0.56 0.06 0.56 056 Unif delay d 1 349 475 521 458 470 465 543 224 130 54.0 23.0 118 Delay factor k 0. 11 0. 11 046 0.50 0.11 0. 11 0.11 0.39 0.11 a. 11 0.41 0.11 Increm. delay d2 04 0.6 48.7 1406 0.4 02 1.1 22 01 1.2 2.8 0.0 PF factor 1.000 1.000 1000 1000 1000 1000 1.000 1000 1000 1000 1000. 10.00. Control delay 353 48.1 100.7 1864 474 46.7 554 246 131 552 25.8 11.8 Lane group LOS 0 0 F F 0 0 E C B E C B Apprch delay 73.6 1687 248 260 IApproach LOS E F C C lntersec. delay 366 Intersection LOS 0 HCS::OOO™ Cc>pynghl <0 2000 UmYeT"lJ of florIda. All RIghts Reserved Version 4_ lc 32 - - fiJe:l/C:\Documents%20and%20Settings\tvandenberg.DELL 15\Local%20Settings\T emp\s2k' 1] /7/2002 HCS;0001M Copyright C 7000 UniversITY of Florida, All Rlghls Resened VersIon 4 Ie o o o o o o o o o o o o o o o o o o o Short Report Page ] of I 1 AM Sl-\A B SHORT REPORT General Information Site Information Analyst TSV Intersection US 31 & 103rd Street Agency or Co, A&F Engineering Area Type All other areas Date Performed 1116102 Jurisdiction Carmel ~ime Period AM Peak Analysis Year Yr 2011 -+ PO wi Improv, Volume and Timing Input EB WB NB SB LT TH RT LT TH RT LT TH RT LT TH RT Num of Lanes 1 1 1 2 1 1 2 4 1 1 4 1 Lane group L T R L T R L T R L T R Volume (vph) 10 24 30 260 65 44 344 2978 773 135 3082 45 % Heavv veh 5 5 5 5 5 5 5 5 5 5 5 5 PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0,90 0.90 0.90 0.90 0.90 Actuated (P/A) A A A A A A A A A A A A Startup lost time 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2,0 2.0 2.0 2.0 2.0 Ext. eft. Qreen 2.0 2.0 2.0 2.0 2.0 2,0 2.0 2.0 20 20 2.0 2,0 Arrival type 3 3 3 3 3 3 3 3 3 3 3 3 Unit Extension 3.0 3.0 3.0 30 30 30 30 3.0 30 30 3.0 3.0 Ped/Bike/RTOR Volume 0 15 0 22 0 386 0 22 Lane Width 12.0 12.0 12.0 12.0 12.0 12.0 120 120 12.0 120 12.0 12.0 Parking/Grade/Parking N 0 N N 0 N N 0 N N 0 N Parking/hr Bus stops/hr 0 0 0 0 0 0 0 0 0 0 0 0 Unit Extension 3.0 3.0 3.0 3.0 3.0 30 30 30 30 30 30 3.0 Phasinq Exel. Left EW Perm 03 04 Exel. Left Thru & RT 07 08 Timing G::: 12.0 G = 7.0 G= G= G = 17.0 G = 68 0 G= G= Y = 3 Y= 5 Y= y= y= 5 y= 5 y= y::: Duration of Analysis (hrs) = 0.25 Cycle Length C ::: 1220 Lane Group Capacity, Control Delay, and LOS Determination EB WB NB 5B Adj flow rate 11 27 17 289 72 24 382 3309 430 150 3424 26 Lane group cap. 228 104 366 328 104 366 465 3671 1072 240 3671 1072 'rile ratio 0.05 0.26 0.05 0.88 0.69 007 082 0.90 0.40 063 0.93 0.02 :' Green ratio 0.18 0.06 0.24 0.10 0.06 024 014 0.56 070 014 0.56 0.70 Unit. delay d1 41.4 550 35.8 54.3 56.4 360 51.0 240 7.8 495 24.9 57 Delay factor k 0.11 0.11 0.11 0.41 0.26 011 036 0.42 0.11 021 0.45 0.11 Increm delay d2 0.1 13 01 23.1 17.9 . 0.1 113 3.5 02 50 52 0.0 PF factor 1.000 1.000 1.000 1.000 1.000 1.000 1000 1.000 1000 1.000 1.000 1.000 Icontrol delay 41.4 56.4 359 77.4 74.4 361 62.3 27.5 80 545 30.1 57 Lane group LOS 0 E 0 E E 0 E C A 0 C A iApprch. delay 47.0 743 287 309 iApproach LOS 0 E C C Intersec. delay 320 Intersection LOS C - fiJe:l/C :\Documen1s%20and%20SettingS\1vandenb~Yg.DELL 15\Local%20Settings\ T emp\s2k' J 117/2002 o o 10 o o D o o o o o o o o o o D o o Short Report Page J of] ~ VM S4A13 SHORT REPORT General Information Isite Information IAnalyst TSV Intersection US 31 & 103rd Street IAgency or Co. A&F Engineering Area Type All other areas Date Performed 1116102 Jurisdiction Carmel [rime Period PM Peak Analysis Year Yr 2012 + f'D wi Improv. Volume and Timing Input EB WB NB SB LT TH RT LT TH RT LT TH RT LT TH RT Num. of Lanes 1 1 1 2 1 1 2 4 1 1 4 1 lane group L T R L T R L T R L T R Volume (vph) 79 54 325 816 38 135 62 /837 430 58 2912 15 % Heavy veh . 5 5 5 5 5 5 5 5 5 5 5 5 PHF 0..90. 0..90. 0.90. 0.90. 0..90 0..90. 090 0.90 0..90 090 0.90 0.90 Actuated (PIA) A A A A A A A A A A A A Startup lost time 2.0 2.0. 2.0 2.0 2.0. 20. 20 20 20 2.0. 2.0. 2.0 Ext. eft. green 2.0 2.0. 2.0 2.0 2.0 2.0 20 20 20 20. 2.0. 2.0. Arrival type 3 3 3 3 3 3 3 3 3 3 3 3 Unit Extension 3.0 3.0. 30 30 3.0 3D 3.0 30 30 30 3D 3.0 Ped/Bike/RTOR Volume 0 162 0. 67 0 215 0 7 lane Width 120 12.0 12.0 12.0. 12.0 120 120 120. 120 120 12.0. 12.0 Parking/Grade/Parking N 0. N N 0. N N 0 N N 0 N Parking/hr Bus stops/hr 0 0. 0 0 0. 0. 0 0. 0 0 0 0 Unit Extension 3.0 3.0. 3D 3.0 30 3D 30 30 3D 3D 3D 3.0. Phasing Excl. Left EW Perm 03 04 Excl. left Thru & RT 07 08 Timing G = 29.0 G= 70 G= G= G= 70 G = 570 G= G= Y= 3 Y= 5 Y= Y= Y = 5 Y = 5 Y= Y= Duration of Analysis (hrs) = 0.25 Cycle lenqth C = 1180 lane Group Capacity, Control Delay, and LOS Determination EB WB NB SB Adj flow rate 88 60 181 90.7 42 76 69 3152 239 64 3236 9 Lane group cap. 483 107 248 820. 107 248 198 3182 1186 102 3182 1/86 vIe ratio 0.18 0.56 0.73 1.1/ 0.39 0.31 0.35 0.99 0.20 0.63 1.02 00.1 Green ratio 0.33 0.06 0.16 0.25 0.06 0.16 0.06 0.48 077 0.06 0.48 077 Unit. delay d 1 28.0 54.0. 47.1 445 53.5 437 533 30.2 37 542 305 3.1 Delay factor k 011 016 0.29 0.50 0. 11 0. 11 0. 11 0.49 0. 11 021 050. 0.11 Increm delay d2 0.2 65 10.4 64.6 2.4 0.7 1.1 138 01 11.6 20.4 0.0. PF factor 1.000 1. 0.00 1. 000. 1. 000 100.0. 1. 000 1.000 1. 000. 1. 000. 1. 000. 1. 000 1.00.0 Control delay 282 605 575 109.1 558 44.4 544 440 37 659 50.9 3.1 Lane group LOS C E E F E 0 0 0 A E 0 A IApprch delay 502 102.2 41.4 51.0 Approach lOS 0 F 0 0 Intersec. delay 53.4 Intersection LOS 0 HC5Z0001M Copyright \D 2000 Um\"ersir,- of florrda. All RIghT> R~'ef\"ed Version 4.lc 34 - . fiJe://C:\Documents%20and%20Settings\tvandenberg.DELL 15\Local%20Settings\ T eIllP\s2k' ) ) 17/2002 lICS}OOOl\1 Copyright <<) 2000 Uniw"i~ of florida, All Rights Re~erwJ VeJ~lon 4 ) ( o o o o o o o o o o o o o o o o o o o Short Report Page 1 of 1 .J. ANI S4AL SHORT REPORT General Information Site Information Analyst TSV Intersection US 31 & 103rd Street Agency or Co. A&F Engineering Area Type All other areas Date Performed 11/6/02 ~urisdiction Carmel Irime Period AM Peak IAnalysis Year Yr 2012 + p{) wi Improv Volume and TiminQ Input EB WB NB SB LT TH RT LT TH RT LT TH RT LT TH RT Num. of Lanes 1 1 1 3 1 1 2 4 1 1 4 1 Lane group L T R L T R L T R L T R Volume (vph) 10 24 30 260 65 44 344 2978 773 135 3082 45 % Heavy veh 5 5 5 5 5 5 5 5 5 5 5 5 PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 ~ctuated (PIA) A A A A A A A A A A A A Startup lost time 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0. 2.0 Ext eft. green 2.0. 2.0 2.0 2.0 2.0. 2.0 2.0. 2.0 2.0 2.0 2.0 20 ~rrivaltYpe 3 3 3 3 3 3 3 3 3 3 3 3 Unit Extension 3.0 3.0 3.0. 3.0 3.0. 3D 3.0. 3.0 3.0. 3.0 3D 30 Ped/Bike/RTOR Volume 0 15 0 22 0 386 0. 22 Lane Width 12.0. 12.0 12.0 120 12.0. 120. 12.0 12.0 120 120 120 120 Park ing/Grad e/Parking N 0 N N 0. N N 0. N N 0. N Parking/hr Bus stops/hr 0. 0. 0. 0. 0. 0 0. 0. 0 0 0. 0. Unit Extension 3.0. 3.0 3.0. 3.0. 3.0 3D 3.0 30 3D 30 30 3D Phasinq Exel. left EW Perm 03 04 Exel. Left Thru & RT 07 08 Timing G = 10.0 G = 7.0. G= G= G = 17.0 G = 68 0 G= G= Y= 3 Y= 5 Y= Y= Y = 5 Y = 5 Y= Y= Duration of Analysis (hrs) = 0..25 Cycle lenoth C = 120.0 Lane Group Capacity, Control Delay, and LOS Determination EB WB NB SB ~dj flow rate 11 27 17 289 72 24 382 330.9 430. 150 3424 26 Lane group cap. 203 106 372 391 106 372 472 3733 1064 244 3733 1064 vie ratio 0..0.5 0.25 0.05 0..74 0.68 0.0.6 0..81 0.89 0..40 0.61 092 0.0.2 - k Green ratio 0..17 0.06 0..24 0.08 0..06 0.24 0.14 0.57 0..69 0..14 0.57 0.69 Unif. delay d1 42.0. 54.0 34.9 53.7 55.4 35.1 49.9 22.6 7.9 48.4 23.5 5.8 Delay factor k 0.11 0.11 0..11 0.30 0..25 0..11 0.35 0.41 0..11 0.20 0.44 0.11 Increm delay d2 0.1 1.3 0..1 7.3 16.2 0.1 10.2 29 0.3 4.6 42 0.0 PF factor 1.000 1.00.0 1.0.00 1.00.0. 1000 1.0.00 1.0.00 10.00 1000. 1000 10.0.0 1. 000 Control delay 42.2 553 349 61.0 71.6 35.1 60..1 256 8.2 530 276 58 lane group LOS D E C E E D E C A 0 C A A..pprch delay 46.4 61.4 27.0 285 A..pproach LOS 0 E C C Intersec delay 29.4 Intersection LOS C . 35 . - fjle:l/C :\Documents%20and%20Set1mgs\tvandenberg.DELL 15\Local%20Settmgs\ T emp\s2k< 11!7 /2002 o o o o o o o o o D o o o D o o o o o Short Report Page ] of 1 d-- \f}V\ 5 11 A ( SHORT REPORT General Information Site Information Analyst TSV Intersection US 31 & 1a3rd Street Agency or Co. A&F Engineering Area Type All other areas Date Performed 111610.2 Jurisdiction Carmel Irime Period PM Peak Analysis Year Yr 20.12 + pv wi Improv. Volume and Timinq Input . EB WB NB SB LT TH RT LT TH RT LT TH RT LT TH RT Num. of lanes 1 1 1 3 1 1 2 4 1 1 4 1 Lane group L T R L T R L T R L T R Volume (vph) 79 54 325 816 38 135 62 2837 430. 58 2912 15 % Heavy veh 5 5 5 5 5 5 5 5 5 5 5 5 PHF 0..90. 0..90. 0..90. 0..90. 0..90. 0..90. 0..90. 0..90. 0..90. 0..90. 0..90. 0..90. Actuated (PIA) A A A A A A A A A A A A Startup lost time 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. 20. 20. Ext. eft. Qreen 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. 2.0. 20. 2.0. 2.0. Arrival type 3 3 3 3 3 3 3 3 3 3 3 3 Unit Extension 3.0. 3.0. 3.0. 3.0. 30. 3.0. 3D 3D 30. 30. 30. 30. Ped/Bike/RTOR Volume a 162 a 67 a 215 a 7 Lane Width 12.0. 12.0. 12.0. 12.0. 12.0. 12.0. 120. 12.0. 120. 120. 120. 120. Parking/Grade/Parking N a N N a N N a N N a N Parking/hr Bus stops/hr a a a a a a a a a a a a Unit Extension 30. 3.0. 3.0. 30. 3.0. 30. 30. 30. 30. 30. 30. 3D Phasinq Exd Left EW Perm 03 04 Exd Left Thru & RT 07 08 Iriming G = 22. a G = 7.0. G= G= G= 70. G = 570. G= G= Y= 3 Y= 5 Y= Y= Y = 5 Y = 5 Y= Y= Duration of Analvsis (hrs) = 0.25 Cvcle Lenqth C = 1110. Lane Group Capacity, Control Delav, and LOS Determination EB WB J NB SB IAdj flow rate 88 60. 181 90.7 42 76 69 3152 239 64 3236 9 Lane group cap. 40.6 114 263 930. 114 263 210. 3383 1164 10.8 3383 1164 Iv/c ratio 0.22 0.53 0.69 0..98 0..37 0.29 0.33 0.93 0..21 0.59 0.96 0.0.1 " Green ratio 0.29 0..0.6 0..17 0..20. 0.0.6 0.17 0..0.6 0.51 0..76 0..0.6 0.51 0.76 Unif delay d1 29.7 50.4 432 442 499 40..1 49.8 252 39 50.6 25.8 3.3 Delay factor k 0..11 0.13 0..26 0..48 0.11 0..11 0..11 0..45 0..11 018 0.47 0.11 Increm. delay d2 0.3 45 7.4 23.5 20. 0..6 09 5.5 0.1 84 7.8 0.0 PF factor 1.0.00 1. 0.0.0 1. 00.0 1.0.00. 10.00 10.0.0 1.00.0. 1. 00.0. 1. 00.0. 1.00.0. 1. 0.00. 1. 000. Control delay 30.0. 54.9 50.6 67.8 51.9 40..7 50..7 30..7 40 591 336 33 lane group LOS C 0 0 E 0 0 0 C A E C A Apprch. delay 45.9 65.1 292 340 Approach LOS 0 E C C Intersec delay 364 Intersection LOS 0 J/CS1000 1 M Copvnghl iE' 2000 UmHr,llV of Flonda, All Right~ R"eTved Ver~ion 4 Ie 36 fi le:!/C :\Documents%20and%20Settings\tvandenberg.DELL 15\Local%20Settings\ T emp\s2k. 1117/2002 o o o o o D o D o o o D o o o o D o o CLARlAN HEALm - NORm HOSPITAL TRAFFIc IMPACT ANALYSIS PENNSYLVANIA STREET & 106TH STREET INTERSECTION DATA TRAFFIC VOLUME COUNTS AND CAPACITY ANALYSES 37 l o o o o o o D o o o o D o D D D D D o A & F ENGINEERING CO., INC. TRAFFIC VOLUME SUMMARY CLIENT LOCATION DATE CLARIAN HEALTH 106TH STREET & PENNSYLVANIA STREET (05) OCTOBER 17, 2002 NORTHBOUND EASTBOUND SOUTHBOUND WESTBOUND PEAK HOUR DATA AM PEAK OFF PEAK PM PEAK HR BEGIN 7:30 AM HR BEGIN 4:45 PM L T R TOT L T R TOT L T R TOT 6 207 8 221 22 231 52 305 352 146 37 535 313 433 9 755 28 173 135 336 94 161 281 536 69 381 76 526 13 247 33 293 HOUR SUMMARY HOUR NB SB NB+SB EB WB EB+WB TOTAL - AM - 6- 7 37 61 98 166 209 375 473 7- 8 185 275 460 477 484 961 1421 8- 9 166 278 444 429 451 880 1324 - PM - 3- 4 118 307 425 335 269 604 1029 4- 5 190 571 761 525 253 778 1539 5- 6 295 459 754 722 293 1015 1769 TOTAL 991 1951 2942 2654 1959 4613 7555 13.1% 25.8% 38.9% 35.1% 25.9% 61.1% 100.0% - AM PEAK VOLUMES - 15-MIN 75 104 149 152 HOUR 221 336 535 526 PHF 0.74 0.81 0.90 0.87 - PM PEAK VOLUMES - 15-MIN 88 164 203 81 HOUR 305 604 755 293 PHF 0.87 0.92 0.93 0.90 38 D A & F ENGINEERING CO., INC. D TRAFFIC VOLUME SUMMARY 0 CLIENT CLARIAN HEALTH LOCATION 106TH STREET & PENNSYLVANIA STREET (OS) 0 DATE OCTOBER 1 7 , 2002 DIRECTION OF TRAVEL NORTHBOUND HOUR LEFT THRU RIGHT TOTAL PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK AM 6- 7 4 0 4 27 1 28 5 0 5 36 1 7- 8 2 0 2 174 2 176 5 2 7 181 4 8- 9 9 1 10 148 0 148 8 0 8 165 1 PM 3- 4 23 1 24 66 3 69 25 0 25 114 4 11 4- 5 18 0 18 141 1 142 28 2 30 187 3 19 5- 6 17 0 17 230 2 232 46 0 46 293 2 29 PASSENGER 73 786 117 976 D 97.3% 98.9% 96.7% 98.5% TRUCK 2 9 4 15 0 2.7% 1.1% 3.3% 1. 5% BOTH 75 795 121 991 7.6% 80.2% 12.2% 100.0% 0 DIRECTION OF TRAVEL : EASTBOUND HOUR LEFT THRU RIGHT TOTAL PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK AM 6- 7 100 0 100 56 1 57 8 1 9 164 2 7- 8 302 2 304 146 3 149 24 0 24 472 5 8- 9 246 1 247 142 11 153 29 0 29 417 12 PM 3- 4 79 3 82 233 10 243 9 1 10 321 14 4- 5 161 3 164 348 6 354 7 0 7 516 9 5- 6 291 1 292 414 5 419 10 1 11 715 7 PASSENGER 1179 1339 87 2605 0 99.2% 97.4% 96.7% 98.2% TRUCK 10 36 3 49 0 0.8% 2.6% 3.3% 1. 8% BOTH 1189 1375 90 2654 44.8% 51.8% 3.4% 100.0% 0 ---- - 0 39 - --.----- -~-~-~--~- D o D o o o o o o o o D o D D o o o o A & F ENGINEERING CO., INC. TRAFFIC VOLUME SUMMARY CLIENT LOCATION DATE CLARIAN HEALTH 106TH STREET & PENNSYLVANIA STREET (05) OCTOBER 17, 2002 DIRECTION OF TRAVEL SOUTHBOUND HOUR LEFT THRU RIGHT TOTAL PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH AM 6- 7 8 0 8 23 0 23 29 1 30 60 1 61 7- 8 25 0 25 133 0 133 117 0 117 275 0 275 8- 9 30 1 31 125 0 125 118 4 122 273 5 278 PM 3- 4 65 0 65 90 1 91 150 1 151 305 2 307 4- 5 73 1 74 194 0 194 301 2 303 568 3 571 5- 6 84 0 84 133 0 133 242 0 242 459 0 459 PASSENGER 285 698 957 1940 99.3% 99.9% 99.2% 99.4% TRUCK 2 1 8 11 0.7% 0.1% 0.8% 0.6% BOTH 287 699 965 1951 14.7% 35.8% 49.5% 100.0% DIRECTION OF TRAVEL WESTBOUND HOUR LEFT THRU RIGHT TOTAL PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH AM 6- 7 9 0 9 166 9 175 25 0 25 200 9 '209 7- 8 45 0 45 363 12 375 63 1 64 471 13 484 8- 9 52 0 52 324 16 340 59 0 59 435 16 451 PM 3- 4 7 0 7 217 13 230 31 1 32 255 14 269 4- 5 15 0 15 206 4 210 28 0 28 249 4 253 5- 6 9 0 9 254 1 255 28 1 29 291 2 293 PASSENGER 137 1530 234 1901 100.0% 96.5% 98.7% 97.0% TRUCK 0 55 3 58 0.0% 3.5% 1. 3% 3.0% BOTH 137 1585 237 1959 7.0% 80.9% 12.1% 100.0% 40 Short Report Page 1 0 3fiM~/ SHORT REPORT General Information Site Information Analyst RMB Intersection 106th Street & Penn. U Agency or Co. A&F Engineering Parkway Area Type A/f other areas Date Performed 11/1/02 Jurisdiction Carmel 0 Time Period AM Peak Analysis Year Existing Volume and Timing Input EB WB NB SB Rfl LT TH RT LT TH RT LT TH RT LT TH Num. of Lanes 1 1 0 1 1 0 0 1 0 1 1 1- ILane group L TR L TR LTR L T 1~ lVolume (v ph) 352 146 37 69 381 76 6 207 8 28 173 % Heavy veh 5 5 5 5 5 5 5 5 5 5 5 5 PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 o~-o I\ctuated (PIA) A A A A A A A A A A A :,tartup lost time 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Ext. eft. green 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.( 1 I\rrival type 3 3 3 3 3 3 3 3 Unit Extension 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3. r Ped/Bike/RTOR Volume 0 9 0 19 0 2 0 6h Lane Width 11.0 11.0 11.0 12.0 110 11.0 12.0 12. Parking/Grade/Parking N 0 N N 0 N N 0 N N 0 N Parking/hr iJ Bus stops/hr 0 0 0 0 0 0 0 Unit Extension 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Phasing Excl. Left EW Perm 03 04 SB Only NS Perm 07 08 U liming G = 14.0 G = 40.0 G= G= G = 7.0 G = 17.0 G= G= Y= 3 Y = 5 y= Y= Y= 3 Y = 5 y= Y= Duration of Analysis (hrs) = 0.25 Cycle Length C = 94.0 {} Lane Group Capacity, Control Delay, and LOS Determination EB WB NB SB Adj. flow rate 391 193 77 486 244 31 192 76 l Lane group cap. 457 726 680 755 312 210 520 < 44'- vIe ratio 0.86 0.27 0.11 0.64 0.78 0.15 0.37 a.1D Green ratio 0.61 0.43 0.61 0.43 0.18 0.29 0.29 0.2 Unif. delay d1 13.4 17.5 7.9 21.4 36.7 25.7 26.7 25.1 Delay factor k 0.39 0.11 0.11 0.22 0.33 0.11 0.11 0.1 r Increm. delay d2 14.7 0.2 0.1 1.9 12.2 0.3 0.4 0.2- PF factor 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.0 Control delay 28.2 17. 7 8.0 23.3 48.9 260 27.2 25. Lane group LOS C B A C 0 C C Cn Apprch. delay 24.7 21.2 48.9 26.6 Approach LOS C C 0 C lntersec. delay 27.3 Intersection LOS C versio-U 1~1 y s. , HCSJOOO (oP) nghl rQ 2000 Um er . 't: of Flonda. All Rlghls Rescn ed 41 o lInlO fiJe://C:\WJNDOWS\TEMP\s2k3l F7.TMP [j o o o o D o o o o D D D D D D D o U Short Report Page 1 of 3Pn~/ SHORT REPORT General Information Isite Information Analyst RMB Intersection 106th Street & Penn. Parkway Agency or Co. A&F Engineering ~rea Type All other areas Date Performed 11/1/02 ~urisdiction Carmel ~ime Period PM Peak fAnalysis Year Existing Volume and Timing Input EB WB NB SB LT TH RT IT TH RT LT TH RT LT TH RT Num. of Lanes 1 1 0 1 1 0 0 1 0 1 1 1 ane group L TR L TR LTR L T R Volume (vph) 313 433 9 13 247 33 22 231 52 94 161 281 % Heavy veh 5 5 5 5 5 5 5 5 5 5 5 5 IPHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 fActuated (PIA A A A A A A A A A A A A Istartup lost time 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Ext. eft. green 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Arrival type 3 3 3 3 3 3 3 3 Unit Extension 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Ped/Bike/RTOR Volume 0 2 0 8 0 13 0 140 Lane Width 11.0 11.0 11.0 12.0 11.0 11.0 120 12.0 IParking/Grade/Parking N 0 N N 0 N N 0 N N 0 N Parkinglhr Bus stops/hr 0 0 0 0 0 0 0 0 Unit Extension 3.0 3.0 3.0 30 30 3.0 30 3.0 Phasing Exel. Left EW Perm 03 04 SB Only NS Perm 07 08 Timing G = 7.0 G = 35.0 G= G= G = 7.0 G = 23.0 G= G= Y= 3 Y= 5 Y= Y= Y = 3 Y= 5 Y= Y= Duration of Analysis (hrs) = 0.25 Cycle Length C = 88.0 Lane Group Capacity, Control Delay, and LOS Determination EB WB NB SB Adj. flow rate 348 489 14 302 324 104 179 157 ane group cap. 445 694 308 710 435 281 679 577 Iv/c ratio 0.78 0.70 0.05 0.43 0.74 0.37 0.26 0.27 Green ratio 0.51 0.40 0.51 0.40 0.26 0.38 0.38 0.38 Unif. delay d1 21.2 22.2 12.9 19.2 29.8 20.2 19.1 19.1 Delay factor k 0.33 0.27 0.11 0.11 0.30 0.11 0.11 0.11 Increm. delay d2 8.8 3.3 0.1 0.4 6.9 0.8 0.2 0.3 PF factor 1.000 1.000 1.000 1000 1000 1.000 1.000 1.000 ~ontrol delay 30.0 25.4 12.9 19.6 36.7 21.0 19.3 19.4 lane group LOS C C B B 0 C B B Apprch. delay 27.3 19.3 36.7 19.7 Approach LOS C B 0 B Intersec. delay 25.8 Intersection LOS C HCS:OOO™ Copyright <i) :WOO Uniwrsitv of Florida. .-\11 Rights Reserwd Version 4. J r file://C:\WJNDOWS\TEMP\s2kFl71.TMP 42 11/7/02 Short Report Page 1 LJ 3 11M 5 b SHORT REPORT General Information Site Information IAnalyst RMB Intersection 106th Street & Penn. U I\gency or Co. A&F Engineering Area Type Parkway Date Performed 11/1/02 All other areas ime Period AM Peak Jurisdiction Carmel n Analysis Year Existing+Proposed Volume and Timinq Input EB WB NB SB Ril LT TH RT LT TH RT LT TH RT LT TH Num. of Lanes 1 1 0 1 1 0 0 1 0 1 1 1- Lane group L TR L TR LTR L T 1~-D Volume (vph) 352 146 123 69 381 76 32 207 8 28 173 % Heavy veh 5 5 5 5 5 5 5 5 5 5 5 5 PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 O:-D Actuated (PIA) A A A A A A A A A A A Startup lost time 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Exl. eft. green 2.0 2.0 2.0 2.0 2.0 2.0 2.0 . 230ft Arrival type 3 3 3 3 3 3 3 Unit Extension 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0- Ped/Bike/RTOR Volume 0 30 0 19 0 2 0 67n Lane Width 11.0 11.0 11.0 12.0 11.0 11.0 12.0 12.q Parking/Grade/Parking N 0 N N 0 N N 0 N N 0 N- Parkinglhr oD Bus stops/hr 0 0 0 0 0 0 0 Unit Extension 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Phasing Excl. Left EW Perm 03 04 SB Only NS Perm 07 08 U ITiming G = 14.0 G = 39.0 G= G= G = 7.0 G = 19.0 G= G= Y= 3 Y= 5 Y= Y= Y = 3 Y= 5 Y= Y= Duration of Analysis (hrs) = 0.25 Cycle LenQth C = 95.0 D Lane Group Capacity, Control Delay, and LOS Determination EB WB NB SB Adj. flow rate 391 265 77 486 273 31 192 76U Lane group cap. 436 676 600 728 325 230 553 .. 469 ',Jlc ratio 0.90 0.39 0.13 0.67 0.84 0.13 0.35 b.1~D Green ratio 0.59 0.41 0.59 0.41 0.20 0.31 0.31 0.31 Unit. delay d1 14.6 19.7 8.9 22.7 36.5 25.0 25.6 24.1 Delay factor k 0.42 0.11 0.11 0.24 0.38 0.11 0.11 0.111 Increm. delay d2 20.8 0.4 0.1 2.4 17.5 0.3 0.4 0.2 PF factor 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.0;D Control delay 35.4 20.0+ 9.0 25.1 54.1 25.3 26.0 24.3 Lane group LOS D C A C D C C C n' Apprch delay 29.2 22.9 54.1 25.5 U Approach LOS C C D C Intersec. delay 30.4 Intersection LOS C I > Hi Co .Ii .hl e, 7000 Universilv of Florida. All Ruthts Resernd VeJsion--wc HCS, 000 p) g 43 o 1117/02 fiJe://C:\ W1NDOWS\TEMP\s2k3399. TMP o o o o o o o o o D o D D o D D o D D Short Report Page] of SPJ'tS7- SHORT REPORT General Information Site Information A.nalyst RMB Intersection 106th Street & Penn. Parkway !Agency or Co. A&F Engineering fl\rea Type All other areas Date Performed 1//1/02 Jurisdiction Carmel Irime Period PM Peak fl\nalysis Year Ex ist;ng+ Proposed Volume and TiminQ Input EB WB NB SB LT TH RT LT TH RT LT TH RT LT TH RT Num. of lanes 1 1 0 1 1 0 0 1 0 1 1 1 ane group L TR L TR LTR L T R Volume (vph) 313 433 45 13 247 33 126 231 52 94 161 281 % Heavy veh 5 5 5 5 5 5 5 5 5 5 5 5 PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 A.ctuated (PIA) A A A A A A A A A A A A Startup lost time 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Ext. eft. green 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Arrival type 3 3 3 3 3 3 3 3 Unit Extension 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Ped/Bike/RTOR Volume 0 2 0 8 0 13 0 140 Lane Width 1/.0 11.0 1/.0 12.0 11.0 11.0 12.0 12.0 Parking/Grade/Parking N 0 N N 0 N N 0 N N 0 N Parking/hr Bus stops/hr 0 0 0 0 0 0 0 0 Unit Extension 3.0 3.0 3.0 3.0 30 I 13.0 3.0 3.0 Phasing Exel. Left EW Perm 03 04 SB Only NS Perm 07 08 irning G =: 7.0 G = 35.0 G= G= G= 7.0 G = 34.0 G= G= Y= 3 Y = 5 y= Y= y == 3 y= 5 y= y= Duration of Analysis (hrs) = 0.25 Cycle Length C = 99.0 Lane Group Capacity, Control Delay, and LOS Determination EB WB NB SB A.dj. flow rale 348 529 14 302 440 104 179 157 lane group cap. 373 610 212 631 490 381 804 684 v/c ratio - 0.93 0.87 0.07 0.48 0.90 0.27 0.22 0.23 Green ratio 0.45 0.35 0.45 0.35 0.34 0..44 0..44 0..44 Unit. delay d1 30.6 29.8 18.5 24.9 30..9 18.7 17.0. 17.0. Delay factor k 0.45 OAG 0..11 0..11 0.42 0..11 0.11 0.11 Increm delay d2 30..1 12.6 0.1 0..6 19.2 0..4 0..1 0.2 PF factor 1.000. 1.000 1.000 1.0.00 1.0.0.0 1.000 1.000 1.000 Control delay 60.7 42.4 18.6 25.5 50..0. 19.1 17.1 17.2 Lane group LOS E 0 B C 0 B B B Apprch. delay 49.7 25.2 50.0. 17.6 . Approach LOS 0 C 0 B i Inlersec delay 39.2 Intersection LOS 0 I -7 HCS70001M Copyright <!') 2000 Unl\TJsity of Florida, All RighlS Reserved Version 4_ J{ file://C:\ W1NDOWS\TEMP\s2k027C. TMP 44 ]] 17/02 Short Report Page] lJ SHORT REPORT 3/1~5~ General Information Site Information Intersection 106th Street & Penn. 0 ~nalyst RMB Parkway lAgency or Co. A&F Engineering Area Type All other areas Date Performed 1111/02 Jurisdiction Carmel 0 trime Period AM Peak Analysis Year Year 2012 wi Planned Improv. Volume and Timing Input EB WB NB SB RiJ LT TH RT LT TH RT LT TH RT LT TH Num. of Lanes 1 1 0 1 1 0 1 2 0 1 2 0 ane group L TR L TR L TR L TR I [ Volume (vph) 440 183 46 86 476 95 8 212 10 35 177 16~ % Heavy veh 5 5 5 5 5 5 5 5 5 5 5 5 PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 o;U Actuated (PIA) A A A A A A A A A A A Startup lost time 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Ext. eft. qreen 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 U Arrival type 3 3 3 3 3 3 3 3 Unit Extension 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Ped/Bike/RTOR Volume 0 11 0 23 0 2 0 42U lane Width 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 Parking/Grade/Parking N 0 N N 0 N N 0 N N 0 N Parking/hr JJ Bus stops/hr 0 0 0 0 0 0 0 0 Unit Extension 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 11 Phasing Excl. Left EW Perm 03 04 Excl. Left NS Perm 07 08 Timing G = 25.0 G = 36.0 G= G= G = 7.0 G = 13.0 G= G= - Y= 3 Y = 5 Y= y= Y = 3 Y = 5 Y= y= Duration of Analysis (hrs) = 025 Cycle Length C = 97.0 JJ Lane Group Capacity, Control Delay, and LOS Determination EB WB NB SB D Adj. flow rate 489 242 96 609 9 245 39 338 lane group cap. 518 655 778 658 199 458 231 432 __ vlc ratio 0.94 0.37 0.12 0.93 0.05 0.53 0.17 0.78 U Green ratio 0.66 0.37 0.66 0.37 0.24 0.13 0.24 0.13 Unit. delay d1 27.8 22.2 6.5 29.2 28.8 39.2 29.1 40.6 D Delay factor k 0.46 0.11 0.11 0.44 0.11 0.14 O. 11 0.33 Increm. delay d2 26.2 0.4 0.1 19.1 0.1 1.2 0.3 9.1 PF factor 1.000 1.000 1.000 1. 000 1.000 1.000 1.000 1.000 I r Control delay 22.6 6.5 48.3 29.5 49.7 - 54.0 28.9 40.4 ane group lOS 0 C A 0 C 0 C 0 Apprch. delay 43.6 42.7 40.0 47.6 Approach LOS 0 0 0 0 D Inter sec. delay 43.6 Intersection LOS 0 HCS?OnoH1 Copyright <tJ 2000 tlniwrsiry e>f florida. All Rights Reserved Version 4.1, 45 o 1117/0L file:/IC:\WINDOWS\TEMP\s2k4] 47 .TMP o Short Report o o D D D o o o D o o D o D D o D D Page 1 of] r#J5::S SHORT REPORT General Information Isite Information Intersection 106th Street & Penn. Analyst RMB Parkway Agency or Co. A&F Engineering ~rea Type All other areas Date Performed 11/1/02 Wurisdiction Carmel Time Period PM Peak ~nalysis Year Year 2012 wi Planned Improv. Volume and Timing Input EB WB NB SB LT TH RT IT TH RT IT TH RT LT TH RT Num. of lanes 1 1 0 1 1 0 1 2 0 1 2 0 lane group L TR L TR L TR L TR Volume (vph) 391 541 11 16 309 41 28 237 65 118 165 351 % Heavy veh 5 5 5 5 5 5 5 5 5 5 5 5 PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Actuat~d (PIA) A A A A A A A A A A A A Startup lost time 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Ext. eft. green 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Arrival type 3 3 3 3 3 3 3 3 Unit Extension 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Ped/Bike/RTOR Volume 0 2 0 10 a 16 a 87 Lane Width 12.0 12.0 12.0 120 12.0 12.0 12.0 12.0 Park jng/Grade/Par king N a N N 0 N N 0 N N a N Parking/hr Bus stops/hr 0 a 0 0 0 0 0 a Unit Extension 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Phasing Excl. Left EW Perm 03 04 Excl. left NS Perm 07 08 Timing G= 80 G = 41.0 G= G= G= 7.0 G = 16.0 G= G= y= 3 y= 5 Y= y= y= 3 y = 5 y= Y= Duration of Analysis (hrs) = 0.25 Cycle Length C ::: 88.0 Lane Group Capacity, Control Delay, and LOS Determination EB WB NB SB ~dj. flow rate 434 611 18 377 31 317 131 476 Lane group cap. 505 841 333 832 219 609 271 567 ... ~/c ratio 0.86 0.73 0.05 0.45 0.14 0.52 0.48 0.84 Green ratio 0.59 0.47 0.59 0.47 0.30 0.18 0.30 0.18 Unit. delay d1 19.9 19.0 10.8 15.9 23.0 32.5 24.0 34.8 Delay factor k 0.39 0.29 0.11 0.11 0.11 0.13 0.11 0.37 Increm. delay d2 139 3.2 0.1 0.4 0.3 0.8 1.4 10.8 PF factor 1. 000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Control delay 339 22.2 10.9 16.3 23.3 33.3 25.4 45.6 Lane group LOS C C B B C C C D Apprch. delay 27.0 16.1 32.4 41.2 Approach LOS C B C D Intersec. delay 29.6 Intersection LOS C 3 HCS)OOOBl C(OPYTlghl ~ 2000 Uniwrsiry (Of Florida. All Righls Resened VeJsion 4_ J 46 file://C:\W1NDOWS\TEMP\s2k] 059.TMP ] ] 17 /0: Short Report Page I 0. 3/1,l45 if: SHORT REPORT General Information Site Information Intersection 106th Street & Penn. U I\nalyst TSV Parkway I\gency or Co. A&F Engineering I\rea Type All other areas Date Performed 1116102 Jurisdiction Carmel 0 Time Period AM Peak I\nalysis Year Yr 2012 + PD wi Plan. Improv. Volume and Timing Input EB WB NB SB RU LT TH RT IT TH RT IT TH RT LT TH Num. of Lanes 1 1 0 1 1 0 1 2 0 1 2 0 Lane group L TR L TR L TR L TR r Volume (v ph) 440 183 132 86 476 95 34 212 10 35 177 16 r % Heavy veh 5 5 5 5 5 5 5 5 5 5 5 5 PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 o.n Actuated (P/A) A A A A A A A A A A A A- Startup lost time 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Ext. eft. green 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 U Arrival type 3 3 3 3 3 3 3 3 Unit Extension 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 'Ped/Bike/RTOR Volume 0 33 0 23 0 2 0 4U Lane Width 12.0 120 12.0 12.0 12.0 12.0 12.0 12.0 Parking/Grade/Parking N 0 N N 0 N N 0 N N 0 N Parking/hr J Bus stops/hr 0 0 0 0 0 0 0 0 Unit Extension 30 3.0 3.0 3.0 3.0 3.0 3.0 3.0 n Phasing Exel. left EW Perm 03 04 Exel. left NS Perm 07 08 G = 29.0 G = 40.0 G= G= G = 7.0 G = 15.0 G= G= - !riming y= 3 Y = 5 y= y= y= 3 Y = 5 y= y= J Duration of Analysis (hrs) = 0.25 Cycle length C = 107.0 Lane Group Capacity, Control Delay, and LOS Determination . WB NB SB EB W- Adj. flow rate 489 313 96 609 38 245 39 338 . lane group cap. 534 641 744 663 185 479 223 452 v/c ratio 0.92 0.49 0.13 0.92 0.21 0.51 0.17 0.75 l Green ratio 0.67 0.37 0.67 037 0.23 0.14 0.23 0.14 - Unif. delay d 1 30.4 25.7 7.1 31.9 32.6 42.6 32.4 44.2 {} Delay factor k 0.43 0.11 0.11 0.44 0.11 0.12 0.11 0.30 Increm. delay d2 20.6 0.6 0.1 17.9 0.6 0.9 0.4 6.8 PF factor 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 11 Control delay 51.0 26.2 7.2 49.9 33.2 435 328 50.9 lane group LOS 0 C A 0 C 0 C 0 Apprch. delay 41.4 44.1 42.1 49.1 Approach lOS 0 0 0 0 -0- Intersec. delay 43.7 Intersection LOS 0 HC5JOOOB1 Cop'righl <j) 2000 Univnsity of f1orida. All Righls Resened Version 4. 47 o 1117/0 fi Ie://C:\ WINDOWS\ TEMP\s2k4 28ATMP o o D o o o o o o o o o o o o o o o o Short Report Page 1 of .5P.MS YA SHORT REPORT General Information Site Information Intersection 106th Street & Penn. Analyst TSV Parkway Agency or Co. A&F Engineering Area Type All other areas Date Performed 1116102 Jurisdiction Carmel Time Period PM Peak Analysis Year Yr 2012 + PD wi Plan. Improv. Volume and TiminQ Input EB WB NB SB LT TH RT LT TH RT LT TH RT LT TH RT Num. of Lanes 1 1 0 1 1 0 1 2 0 1 2 0 Lane group L TR L TR L TR L TR Volume (vph) 391 541 47 16 309 41 132 237 65 118 165 351 % Heavy veh 5 5 5 5 5 5 5 5 5 5 5 5 PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Actuated (P/A A A A A A A A A A A A A Startup lost time 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Ext. eft. qreen 2.0 20 2.0 2.0 2.0 2.0 2.0 2.0 Arrival type 3 3 3 3 3 3 3 3 Unit Extension 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Ped/Bike/RTOR Volume 0 11 0 10 0 16 0 87 Lane Width 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 Parking/Grade/Parking N 0 N N 0 N N 0 N N 0 N Parking/hr Bus stops/hr 0 0 0 0 0 0 0 0 Unit Extension 3.0 30 3.0 3.0 3.0 3.0 3.0 3.0 Phasing Excl. Left EW Perm 03 04 Excl. Left NS Perm 07 08 Timing G= 10.0 G = 37.0 G= G= G = 7.0 G = 19.0 G= G= Y = 3 Y = 5 Y= y= Y = 3 Y= 5 Y= y= Duration of Analysis (hrs) = 0.25 Cycle Lenqth C = 89.0 Lane Group Capacity, Control Delay, and LOS Determination EB WB NB SB I\dj. flow rate 434 641 18 377 147 317 131 476 Lane group cap. 480 745 289 742 239 715 304 666 : 'r-;/c ratio 0.90 0.86 0.06 0.51 0.62 0.44 0.43 0.71 ~reen ratio 0.56 0.12 056 0.42 0.33 0.21 0.33 0.21 Unif. delay d1 22.5 23.7 13.4 19.3 23.0 30.1 22.2 32.5 Delay factor k 0.13 0.39 0.11 0.12 0.20 0.11 0.11 0.28 Increm. delay d2 20.1 10.0 0.1 0.6 4.7 0.4 1.0 3.7 PF factor 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Control delay 42.9 33.7 135 19.8 27. 7 30.8 23.2 36.1 Lane group LOS 0 C 8 8 C C C 0 Apprch. delay 37.4 196 29.8 33.3 Approach LOS 0 8 C C Intersec. delay 323 Intersection LOS C HCS;OOOlM topYTighl <<:~ 2000 UnJ\osiIV of Florida. All Rights Reser.ed Velsion 4 J 48 file://C:\ WINDOWS\TEMP\s2k ] nc. TMP lJ /7/0~ o o o o o o o o o o o o o D D o o o o CLARlAN JlEALl1l - NORTIJ HOSPITAL TRAFFIc IMPACT ANAL YSlS PENNSYLVANIA STREET & 103RD STREET INTERSECTION DATA TRAFFIC VOLUME COUNTS AND CAPACITY ANALYSES 49 o o o o D o o o o D D D o D D o D D D A & F ENGINEERING CO., INC. TRAFFIC VOLUME SUMMARY CLIENT LOCATION DATE CLARIAN HEALTH 103RD STREET & PENNSYLVANIA STREET (07) OCTOBER 22, 2002 NORTHBOUND EASTBOUND SOUTIlBOUND WESTBOUND PEAK HOUR DATA AM PEAK OFF PEAK PM PEAK HR BEGIN 7:30 AM HR BEGIN 4:30 PM L T R TOT L T R TOT L T R TOT 93 68 2 163 103 69 5 177 168 79 194 441 119 135 69 323 6 110 66 182 23 98 208 329 7 88 26 121 3 44 14 61 HOUR SUMMARY HOUR NB SB NB+SB EB WB EB+WB TOTAL - AM - 6- 7 44 31 75 144 53 197 272 7- 8 124 156 280 350 108 458 738 8- 9 145 121 266 379 77 456 722 - PM - 3- 4 156 132 288 166 25 191 479 4- 5 199 295 494 228 52 280 774 5- 6 172 250 422 333 55 388 810 TOTAL 840 985 1825 1600 370 1970 3795 22.1% 26.0% 48.1% 42.2% 9.7% 51.9% 100.0% - AM PEAK VOLUMES - 15-MIN 50 66 131 40 HOUR 163 182 441 121 PHF 0.82 0.69 0.84 0.76 - PM PEAK VOLUMES - 15-MIN 66 110 101 27 HOUR 207 330 348 64 PHF 0.78 0.75 0.86 0.59 50 TRAFFIC VOLUME SUMMARY o o o o A & F ENGINEERING CO., INC. CLIENT LOCATION DATE CLARIAN HEALTH 103RD STREET & PENNSYLVANIA STREET (07) OCTOBER 22, 2002 DIRECTION OF TRAVEL NORTHBOUND HOUR LEFT THRU RIGHT TOTAL PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTr AM 6- 7 31 1 32 12 0 12 0 0 0 43 1 7- 8 71 1 72 49 1 50 2 0 2 122 2 8- 9 82 1 83 55 1 56 5 1 6 142 3 PM 3- 4 III 2 113 35 4 39 4 0 4 150 6 4- 5 133 2 135 56 2 58 6 0 6 195 4 5- 6 100 0 100 68 0 68 4 0 4 172 0 PASSENGER 528 275 21 824 98.7% 97.2% 95.5% 98.1% TRUCK 7 8 1 16 1. 3% 2.8% 4.5% 1. 9% BOTH 535 283 22 840 63.7% 33.7% 2.6% 100.0% DIRECTION OF TRAVEL EASTBOUND 44 ~1J m -- - HOUR LEFT THRU RIGHT TOTAL PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOt AM 6- 7 47 1 48 11 0 11 83 2 85 141 3 ;:.144 7- 8 150 1 151 45 0 45 153 1 154 348 2 ~D 8- 9 131 2 133 71 1 72 172 2 174 374 5 PM 3- 4 53 2 55 47 1 48 63 0 63 163 3 ~D 4- 5 69 0 69 89 1 90 68 1 69 226 2 5- 6 130 1 131 129 0 129 73 0 73 332 1 o o o o PASSENGER 580 392 612 1584 0 98.8% 99.2% 99.0% 99.0% TRUCK 7 3 6 16 0 1. 2% 0.8% 1. 0% 1. 0% BOTH 587 395 618 1600 36_7% 24.7% 38.6% 100.0% 0 -. ..~ . D 51 o o o o o D D o o o 10 o D o D o o o D A & F ENGINEERING CO., INC. TRAFFIC VOLUME SUMMARY CLIENT LOCATION DATE CLARIAN HEALTH 103RD STREET & PENNSYLVANIA STREET (07) OCTOBER 22, 2002 DIRECTION OF TRAVEL SOUTHBOUND HOUR LEFT THRU RIGHT TOTAL PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH AM 6- 7 0 0 0 18 0 18 12 1 13 30 1 31 7- 8 3 0 3 97 0 97 56 0 56 156 0 156 8- 9 7 0 7 66 1 67 46 1 47 119 2 121 PM 3- 4 7 1 8 36 4 40 82 2 84 125 7 132 4- 5 10 1 11 70 0 70 211 3 214 291 4 295 5- 6 20 0 20 93 0 93 136 1 137 249 1 250 PASSENGER 47 380 543 970 95.9% 98.7% 98.5% 98.5% TRUCK 2 5 8 15 4.1% 1.3% 1.5% 1.5% BOTH 49 385 551 985 5.0% 39.1% 55.9% 100.0% DIRECTION OF TRAVEL WESTBOUND HOUR LEFT THRU RIGHT TOTAL PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH AM . 6- 7 2 0 2 46 0 46 5 0 5 53 0 53 7- 8 3 0 3 84 0 84 19 2 21 106 2 108 8- 9 13 0 13 44 0 44 20 0 20 77 0 77 PM 3- 4 5 0 5 13 2 15 5 0 5 23 2 25 4- 5 4 0 4 38 0 38 10 0 10 52 0 52 5- 6 2 0 2 40 1 41 12 0 12 54 1 55 PASSENGER 29 265 71 365 100.0% 98.9% 97.3% 98.6% TRUCK 0 3 2 5 0.0% 1.1% 2.7% 1.4% BOTH 29 268 73 370 7.8% 72.4% 19.7% 100.0% 52 All-Way Stop Control Page] g ~/!M51 0 ALL-WAY STOP CONTROL ANALYSIS General Information ite Information U I\nalvst RMB ntersection 103rd Slreet & Penn. Pkwy. I\Qencv/Co. A&F Enqineerina urisdiction Carmel Date Performed 11/1/02 nalvsis Year IExistinq il Analvsis Time Period AM Peak Proiect ID Clarian Heaf/h EastlWest Street: 103rd SImer lNorth/South Street: Penn. Parkway il Volume Adiustments and Site Characteristics I\pproach Eastbound Westbound -- Movement l T R l T R u'olume 168 79 194 7 88 26 D YoThrus left lane 50 50 Il,pproach Northbound Southbound Movement l T R l T R il ~oJume 93 68 2 6 110 66 Yo Thrus left lane 50 50 .. Eastbound Westbound Northbound Southbound D 11 l2 11 L2 11 l2 11 l2 ~onfiguration L TR LTR LT R LTR PHF 0.90 0.90 0.90 0.90 0.90 0.90 il low Rate 186 302 132 178 2 201 Yo Heavy Vehicles 5 5 5 5 5 5 -..- No. lanes 2 1 2 1 Geometry Group 5 4b 5 4b U Duration, T 0.25 Saturation Headway Ad'ustment Worksheet Prop. left-Turns 1.0 0.0 0.1 0.6 0.0 0.0 U Prop. Right-Turns 0.0 0.7 0.2 0.0 1.0 0.4 Prop. Heavy Vehicle 0.0 0.0 0.0 0.0 0.0 0.0 hLT .adj 0.5 0.5 0.2 0.2 0.5 0.5 0.2 0.2 U hRT.adj -0.7 -0.7 -0.6 -0.6 -0.7 -0.7 -0.6 -0.6 "HV.adj 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 "adj, computed 6.61 6.61 6.61 6.61 6.61 6.61 l [ Departure Headway and Service Time .. . ,",d, initial value 3.20 3.20 3.20 3.20 3.20 . 3.20 , initial 0.17 0.27 0.12 0.16 0.00 0.18 U hd, final value 6.61 6.61 6.61 661 6.61 6.61 x, frnal value 0.34 0.47 0.24 0.35 0.00 0.36 Move.up time, m 2.3 2.3 2.3 2.3 3.3 D ~ervice Time . 4.3 . 3.3 . 4.3 I 3.3 4.3 I 3.3 4.3 ICapacity and level of Service . D Eastbound Westbound Northbound Southbound 11 l2 11 l2 11 l2 11 l2 !capacity 436 552 382 428 252 451 Delay 12.70 13.17 11.27 13.33 8.70 12.69 U os 8 8 8 8 A 8 !APproach: Delay 12.99 11.27 13.28 12.69 11 lOS 8 8 8 8 Intersection Delay 12.75 - Intersection LOS 8 53 o file:! /C:\ W1NDOWS\ TEMP\u2kEOB5. TMP 11/7/0' o AIl- Way Stop Control Page J of o ALL-WAY STOP CONTROL ANAL YSIS General Information Site Information i\i1alvst IRMa Intersection 103Td Street & Penn. Pkwy. Aoency/Co. IA&F Engineering lJurisdiction Carmel Date Performed 11/1/02 v-matvsis Year IExisting Analvsis Time Period !PM Peak Proiect ID Clarian Health EasllWest Street: 103Td StTeet !North/South Street: Penn. Parkway IVolume Adjustments and Site Characteristics lAPProach Eastbound Westbound Movement l T R l T R Volume 119 135 69 3 44 14 Yo Thrus left lane 50 50 Approach Northbound Southbound Movement l T R l T R Volume 103 69 5 -23 98 208 Yo Thrus left lane 50 50 Eastbound Westbound Northbound Southbound 11 l2 11 l2 11 l2 11 l2 !Configuration L TR LTR LT R LTR PHF 0.90 0.90 0.90 0.90 0.90 0.90 Flow Rate 132 226 66 190 5 364 Yo Heavy Vehicles 5 5 5 5 5 5 No. lanes 2 1 2 1 Geometry Group 5 4b 5 4b Duration. T 025 Isaturation Headwav Ad.ustment Worksheet Prop. left-Turns 1.0 0.0 00 06 00 0.1 Prop. Right-Turns 0.0 03 0.2 0.0 1.0 06 Prop. Heavy Vehicle 0.0 0.0 0.0 0.0 00 0.0 hLT.adj 0.5 05 02 02 05 0.5 0.2 0.2 hRT -adj -OJ -0.7 -0.6 -06 -0.7 -0.7 -06 -0.6 hHV-adj 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 jhadj. computed 6.93 6.93 6.93 I 6.93 I 693 I 6.93 I i/P~5 / o o D D D o o o o D D repartu,e Headway an~ Se",'ce Ti+ 3.20 3.20 3.20 3.20 3.20 - d. inilial value 3.20 .., Ix. inilial 0.12 0.20 0.06 0.17 0.00 0.32 "'d. final value 6.93 693 6.93 6.93 6.93 6.93 ix. fInal value 0.25 0.39 0.13 0.36 0.01 0.59 Move.up lime. m 2.3 2.3 2.3 2.3 Service Time 4.6 I 39 4.6 I 3.9 I 4.6 r 3.9 I 4.6 I 3.9 o D ~apacity and level of sf",'ce o Eastbound Weslbound Northbound Southbound 11 l2 11 l2 11 12 l1 12 !capacity 382 476 316 440 255 596 Delay 11.97 12.76 10.61 13.21 8.51 16.75 lOS B B B B A C Approach: Delay 12.47 1061 13.09 16.75 LOS B B B C Intersection Delay 14.05 Intersection LOS B o o o fi Je:/!C: \ WJNDOWS\ TEMP\u2kF091 . TMP 54 1117/02 All-Way Stop Control Page I Q ~4/4s2 n ALL-WAY STOP CONTROL ANALYSIS General Information Site Information U Analyst RMB Intersection 103rd Street & Penn. PkWy. AQency/Co. A&F EngineerinQ lJurisdiction Carmel Date Performed 11/1/02 ~alysis Year 'XistinQ-t Proposed 11 Analysis Time Period AM Peak IProiectlD Ctarian Health Ir-- asVWest Street: 103rd Street lNorth/South Street: Penn. Parkway 'olume Adjustments and Site Characteristics I r \pproach Eastbound Westbound - vtovement l T R l T R Volume 168 79 736 7 88 26 D YoThrus left lane 50 50 Approach Northbound Southbound Movement l T R l T R f,tolume 259 68 2 6 110 66 U Yo Thrus left lane 50 50 Eastbound Westbound Northbound Southbound il 11 L2 11 l2 11 l2 11 l2 K:;onfiguration L TR LTR LT R LTR .. DHF 0.90 0.90 0.90 0.90 0.90 0.90 11 low Rate 186 904 132 362 2 201 Yo Heavy Vehicles 5 5 5 5 5 5 IIIlI - No. lanes 2 1 2 1 Geometry Group 5 4b 5 4b U Duration, T 0.25 Saturation Headwav Ad'ustment Worksheet Drop. left. Turns 1.0 0.0 0.1 0.8 0.0 0.0 U Prop. Right-Turns 0.0 0.9 0.2 0.0 1.0 0.4 Prop. Heavy Vehicle 0.0 0.0 0.0 0.0 0.0 0.0 hLT.adj 0.5 0.5 0.2 0.2 0.5 0.5 0.2 0.2 U hRT.adj -0.7 -0.7 -0.6 -0.6 -0.7 -0.7 -0.6 -0.6 IhHV.adj 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 ~adj, computed 7.75 7.75 7.75 7.75 7.75 7.75 U Departure Headwav and Service Time ~d. initial value 3.20 320 3.20 3.20 3.20 3.20 ,,' , initial 0.17 0.80 0.12 0.32 0.00 0.18 U ihd. f.nal value 7.75 7.75 7.75 7.75 7.75 7.75 . final value 0.40 1.66 0.31 0.82 0.00 0.45 !Move-up time. m 2.3 2.3 2.3 2.3 4.3D Iservice Time 5.5 4.3 5.5 I 4.3 5.5 4.3 5.5 Capacity and level of Service Eastbound Westbound Northbound Southbound D 11 l2 11 l2 11 l2 11 L2 apacity 436 904 382 439 252 432 Delay 15.54 320.66 14.70 38.43 9.75 17.07 U LOS C F B E A C Approach: Delay 268.59 14.70 3828 17.07 LOS F 8 E C \ t Intersection Delay 174.63 - Inte.section LOS F D -. ~ - . 55 Ji Je:/ /C:\ WINDOW S\TEMP\u2kE225 .TMP 11 nm o All-Way Stop Control Page I of: o All-WAY STOP CONTROL ANALYSIS General Information ite Information V\nalyst 'f?M8 ntersection 103rd Street & Penn Pkwy. Agency/Co. f4&F Engineering urisdiction Carmel Date Performed 11/1102 . lVlalysis Year lE;tisting + Proposed Analysis Time Period !PM Peak Project ID Clarian Health E asVWest Street 103rd Street INorth/South Street: Penn Parkway olume Adjustments and Site Characteristics .pproach Eastbound Westbound ovemenl l T R l T R Volume 119 135 295 3 44 14 10Thrus Left Lane 50 50 Approach Northbound Southbound Movement l T R l T R IVolume 755 69 5 23 98 208 X,Thrus Left lane 50 50 Eastbound Westbound Northbound Southbound L1 L2 L1 L2 L1 l2 L1 L2 "onfiguration L TR LTR LT R LTR PHF 0.90 0.90 0.90 0.90 0.90. 0.90 F low Rate 132 477 66 914 5 364 10 Heavy Vehicles 5. 5 5 5 5 5 No. Lanes 2 1 2 1 !Geometry Group 5 4b 5 4b Duration, T 025 Saturation Headway Ad.ustment Worksheet Prop. Left.Turns 1.0 0.0 0.0 0.9 0.0 0.1 Prop. Right-Turns 0.0 0.7 02 0.0 1.0 0.6 Prop Heavy Vehicle 0.0 0.0 0.0 0.0 0.0 00 hL T.adj 0.5 05 02 02 05 0.5 02 0.2 hRT.adJ -0.7 -0.7 -06 -0.6 -0.7 -0.7 -06 -0.6 IhHV-adj 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 lhadj, computed 8.38 8.38 8.38 I 8.38 I 8.38 I 8.38 I // P /11..5 J-. o D D ~ D o o D o D o Fepartu,e Headway and Serv;ce T;+ d. initial value I 3.20 3.20 3.20 3.20 3.20 3.20 ...,. . inilial 0.12 0.42 0.06 0.81 0.00 0.32 hd, final value 8.38 8.38 8-38 8.38 8.38 8.38 ;t. final value 0.31 0.98 0.18 2.13 0.01 0.79 Move.up time, m 2.3 2.3 2.3 2.3 I i ~ervice Time 6.1 I 5.1 6.1 5.1 6.1 I 5.1 6.1 I 5.1 , I I I o o Icapacity and level of Service D I Eastbound Westbound Northbound Southbound L1 L2 11 12 L1 12 11 12 apacity 382 488 316 914 255 459 Delay 14.74 6191 14.43 533.01 9.96 33.56 LOS B F B F A 0 Approach: Delay 51.69 14.43 530. 16 33.56 LOS F B F 0 Intersection Delay 27164 Intersection LOS F o D D 56 file:! IC: \ WINDOWS\ TEMP\u2kF230. TMP ] ]/7/02 Short Report Page I Q 9' A f.,( 5 2Jl SHORT REPORT General Information Site Information I\nalyst RMB Intersection Penn. Pkwy & 103rd Street ~gency or Co. A&F Engineering Area Type All other areas pate Performed 11/6/02 Uurisdiction Carmel 0 :rime Period AM Peak Analysis Year Existing+Proposed - Volume and TiminQ Input EB WB NB SB RiJ LT TH RT LT TH RT IT TH RT LT TH Num. of Lanes 1 1 1 1 1 0 2 1 0 1 1 1 ane group L T R L TR L TR L T R r volume (v ph) 168 79 650 7 88 26 233 94 2 6 196 66- % Heavv veh 5 5 5 5 5 5 5 5 5 5 5 5 PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 01D Actuated (P/A A A A A A A A A A A A Startup lost time 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Ext. eft. qreen 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2~ !Arrival type 3 3 3 3 3 3 3 3 3 Unit Extension 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Ped/Bike/RTOR Volume 0 325 0 6 0 0 0 3D Lane Width 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12. Parking/Grade/Parking N 0 N N 0 N N 0 N N 0 N Parking/hr oU Bus stops/hr 0 0 0 0 0 0 0 0 0 Unit Extension 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Phasinq Excl. Left EW Perm 03 04 NB Only NS Perm 07 08 t Timing G = 7.0 G = 38.0 G= G= G = 10.0 G = 14.0 G= G= - Y = 3 Y= 5 Y= Y= Y= 3 Y = 5 Y= Y= Duration of Analysis (hrs) = 0.25 Cvcle lenqth C = 85.0 U Lane Group Capacity, Control Delay, and LOS Determination EB WB NB SB -37U Adj. flow rate 187 88 361 8 120 259 106 7 218 ane group cap. 663 809 688 678 787 392 573 205 298 - .253 vIe ratio 0.28 0.11 0.52 0.01 0.15 0.66 0.18 0.03 0.73 o. ~{J- Green ratio 0.56 0.45 0.45 0.56 0.45 0.12 0.32 0.16 0.16 0.1 Unif. delay d1 9.2 13.7 17.0 8.2 13.9 35.9 21.0 29.8 33.7 30.1J Delay factor k 0.11 0.11 0.13 0.11 0.11 0.24 0.11 0.11 0.29 0.1-~ Inerem. delay d2 0.2 0.1 0.7 0.0 0.1 4.1 0.2 0.1 8.9 0.3 PF factor 1.000 1.000 1.000 1.000 1000 1.000 1.000 1.000 1.000 1.oq r Icontrol delay 9.4 13.7 17.7 8.2 140 40.0 21.2 29.9 42.6 30.7 Lane group LOS A B B A B D C C D C IApprch. delay 14.7 13.7 34.5 40.6 Approach LOS B B C D U lntersec. delay 24.7 Intersection LOS C HCS;OOOlM ("op~,ight <E> 2000 Uniw"ity of f1orida. All Rights Resened Version 4_ J 57 o 1J)e://C:\ WINDOWS\ TEMP\s2k624 7. TMP 111710: o o o o o o o o o o 10 o o D D o o o o Short Report Page ] of q'P/!-15Z <- SHORT REPORT General Information Isite Information Analyst RMB Intersection Penn. Pkwy & 103rd Street ~gency or Co. A&F Engineering Area Type All other areas Date Performed 11/6/02 Jurisdiction Carmel Irime Period PM Peak Analysis Year Existing+Proposed Volume and TiminQ Input EB WB NB 5B LT TH RT LT TH RT LT TH RT LT TH RT Num. of Lanes 1 1 1 1 1 0 2 1 0 1 1 1 Lane group L T R L TR L TR L T R !Volume (vph) 119 135 259 3 44 14 651 173 5 23 134 208 % Heavy veh 5 5 5 5 5 5 5 5 5 5 5 5 PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Actuated (PIA) A A A A A A A A A A A A Startup lost time 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Ext. eft. Qreen 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Arrival type 3 3 3 3 3 3 3 3 3 3 Unit Extension 3.0 3.0 3.0 3.0 3.0 3.0 3.0 30 3.0 3.0 Ped/Bike/RTOR Volume 0 129 0 3 0 1 0 104 Lane Width 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 Parking/Grade/Parking N 0 N N 0 N N 0 N N 0 N Parkingfhr Bus stops/hr 0 0 0 0 0 0 0 0 0 0 Unit Extension 3.0 3.0 3.0 30 3.0 3.0 3.0 30 3.0 3.0 PhasinQ Excl. Left EW Perm 03 04 NB Only NS Perm 07 08 Timing G= 7.0 G = 9.0 G= G= G = 200 G = 8.0 G= G= y= 3 Y = 5 y= Y= y = 3 Y = 5 y= y= Duration of Analysis (hrs) = 0.25 Cycle lenqth C = 60.0 Lane Group Capacity, Control Delay, and LOS Determination EB WB NB SB Adj. flow rate 132 150 144 3 61 723 196 26 149 116 Lane group cap. 352 272 231 341 263 1112 932 153 241 .205 vie ratio 0.38 0.55 0.62 0.01 0.23 0.65 0.21 0.17 0.62 '0.57 Green ratio 032 0.15 0.15 0.32 0.15 0.33 0.52 0.13 0.13 0.13 Unit. delay d1 15.4 23.6 23.9 14.2 22.5 17.0 7.9 23.1 24.6 24.4 Delay factor k 0.11 0.15 021 0.11 0.11 0.23 0.11 0.11 0.20 0.16 Inerem. delay d2 OJ 2.4 5.2 0.0 0.5 1.4 0.1 0.5 4.8 3.6 PF factor 1.000 1.000 1.000 1.000 1.000 1.000 1000 1.000 1.000 1.000 Control delay 16.1 260 29.1 14.3 22.9 18.4 8.0 23.6 29.3 28.0 Lane group LOS B C C B C B A C C C Apprch. delay 24.0 22.5 16.2 28.3 !Approach LOS C C B C Intersec. delay 20.4 Intersection LOS C HC5l0001M COP\'lIghl 'D 2000 Universlfy of Florida. All Righls Reserwd Version 4_1< 58 fiJe://C:\ WJNDOWS\ TEMP\s2k72E8. TMP ] ]/7/02 Akcelik & Associates pty Ltd - aaSIDRA 2.0.0.205 --------------------------------------------------- A&F Engineering A&F Engineering Registered User No. A0654 Licence Type: Professional, Single Computer Time and Date of Analysis 10:10 AM, Nov 6,2002 Filename: Z:\2002\02114-clarion\Capacity\Ch4ams2r.OUT Clarian Health 103rd & Penn (Scenario 2, AM PEAK) Intersection ID: 1 aaTraffic SIDRA US Highway Capacity Manual (2000) Version RUN INFORMATION * Basic Parameters: Intersection Type: Roundabout Driving on the right-hand side of the road Input data specified in US units Default Values File No. 11 Peak flow period (for performance): 15 minutes Unit time (for volumes): 60 minutes (Total Flow Period) Delay definition: Control delay Geometric delay included HCM Delay and Queue Models option selected Level of Service based on: Delay (HCM method) Queue definition: Back of queue, 95th Percentile Clarian Health 103rd & Penn (Scenario 2, AM PEAK) Intersection ID: 1 DEFAULT PARAMETERS Default values for some of the important general parameters: (Default Values File: DEFll.SDF) I. Basic saturation flow: 1900 tcu/h This value applies mainly to signalised intersections. For roundabouts and sign-controlled intersections, it is used for determining capacity of priority and continuous movements. 2. Through car equivalents for L EFT LV HV Normal 1.053 2.000 Restricted 1.303 2.500 signalised intersections THROUGH RIG H T LV HV LV HV 1.000 2.000 1.176 2.000 1.426 2.500 3. Opposed turn parameters (Roundabout) Crit. Fol.up Min. Gap Hdway Deps V V 2.5 V V 2.5 V V 2.5 % Exit Flow Opposing o o o Left turns : Through Right turns: 4. Cruise speed= 40 mi/h, Approach Distance= 1800 ft 5. Queue space per vehicle In Light vehicles: 25.0 feet Heavy vehicles: 45.0 59 A full list of input data defaults and ranges IS given In the o L-\ AM SJ. R o o o o o o o o o o o o o o o o o o o Input Guide part of aaSIDRA User Guide. O Clarian Heal th 103rd & Penn (Scenario Intersection ID: 1 Roundabout 2, AM PEAK) o Table S.O - TRAFFIC FLOW DATA D Flow Scale ------------------------------------------------------------------------ Mov No. Left Through Right o LV HV LV HV LV HV Peak Flow Factor ------------------------------------------------------------------------ VEHICLES Demand flows in veh/hour as used by the program West: West Approach 12 177 9 0 0 0 0 1.00 0.90 11 0 0 83 4 0 0 1.00 0.90 13 0 0 0 0 686 36 1.00 0.90 D ------------------------------------------------------------------------ o South: South 32 31 33 Approach 246 o o 13 o o o 99 o o 5 o o o 2 o o 1 1.00 1.00 1. 00 East: East 22 21 23 Approach o 93 o o o 27 1. 00 1. 00 1. 00 [] ------------------------------------------------------------------------ 0.90 0.90 0.90 North: North 42 41 43 Approach 6 o o 1 o o o 207 o o 11 o o o 70 o o 4 1.00 1.00 1. 00 o 0.90 0.90 0.90 0.90 0.90 0.90 ------------------~-~----------------------------------------------~---- Based on unit time = 60 minutes. D Flow Scale and Peak Hour Factor effects included in flow values. Clarian Health D 103rd & Penn (Scenario 2, AM PEAK) Intersection ID: 1 Roundabout D Table R.O - ROUNDABOUT BASIC PARAMETERS D ----------------------------------------------------------------~------------ Circulating/Exiting Stream Cent Circ Insc No.of No.of Av.Ent ---------------------------------- Island Width Diam. Circ. Entry Lane Flow %HV Adjust. %Exit Cap. Diam Lanes Lanes Width (vehl Flow Incl_ Constr. ( ft) ( ft) (ft ) (ft) h) (pcu/h) Effect West Approach 30 160 [J ----------------------------------------------------------------------------- West: 100 2 2 12.00 232 5.0 232 South: 100 South Approach 30 160 12.00 281 5.0 281 ---~--~-~---------------~---------------------------------------------------- N O East: 100 East Approach 30 160 2 2 12.00 550 5.0 550 ~-------------------------------------~--------~----------------------------- o N o N D North: North Approach 100 30 160 2 2 12.00 364 5.0 364 0 N -------~----------------------~---------------------------------------------- O Clarian Heal th 103rd & Penn (Scenario 2, AM PEAK) 60 Intersection ID: 1 Roundabout o Turn Table R.1 - ROUNDABOUT GAP ACCEPTANCE PARAMETERS D Lane No. --------------------------------------------------------------------- Lane Type Circ/ Exit Flow (pcu/h) Intra- Bunch Headway (s) Prop. Bunched Vehicles Critical Gap (s) o Follow Up Headway (s) o --------------------------------------------------------------------- West: Left Thru Right West Approach 1 Subdominant 1 Subdominant 2 Dominant 232 232 232 1.38 1. 38 1. 38 0.200 0.200 0.200 5.04 5.04 3.32 2.88 2.88 1. 90 o --------------------------------------------------------------------- South: Left Thru Right South Approach 1 Dominant 2 Subdominant 2 Subdominant 281 281 281 2.00 2.00 2.00 0.323 0.323 0.323 3.95 5.17 5.17 2.28 2.99 2.99 o --------------------------------------------------------------------- o East: East Approach Left 1 Subdominant 550 1.63 0.464 4.12 2.51 Thru 1 Subdominant 550 1. 63 0.464 4.12 2.51 2 Dominant 550 1. 63 0.464 3.83 2.32 Right 2 Dominant 550 1. 63 0.464 3.83 2.32 --------------------------------------------------------------------- D North: North Approach Left 1 Subdominant 364 1.80 0.366 4.28 2.51 Thru 1 Subdominant 364 1. 80 0.366 4.28 2.51 2 Dominant 364 1. 80 0.366 4.00 2.35 Right 2 Dominant 364 1. 80 0.366 4.00 2.35 o ----------------~----~----------------------------------------------- o Clarian Health 103rd & Penn (Scenario 2, AM PEAK) Intersection ID: 1 Roundabout o Table R.5 - ROUNDABOUT CAPACITY & LEVEL OF SERVICE - aaSIDRA & HCM MODELS o aaSIDRA HCM 2000 Lower HCM 2000 Upper Mov Dem -------------------- -------------~------ ---------~--~------- No. Flow Cap. Deg. Av. Cap. Deg. Av. Cap. Deg. Av. (veh (veh Satn Delay LOS (veh Satn Delay LOS (veh Satn Delay LOS /h) /h) x (see) /h) x (see) /h) x (see) o ----------------------------------------~-------------~---~------------------ o West: 12 L lIT 13R West Approach 186 660 0.282 87 309 0.282 722 15770.458 12.3 3.8 5.5 B A A - NA - NA - - NA - - - NA - NA - - NA - o 2546 0.458 -------------------------------~------------------------------- 6.6 A - - - - NA - - - - - - - - NA - - - - ---------------------------------------~------------------------------------- South: 32 L 31 T 33 R South 259 104 3 Approach 1221 0.212 851 0.122 25 0.120 12.1 B 4.1 A 6.3 A o - NA - - NA - NA - - NA - - NA - - NA - o 2097 0.212 -------------~----------------------------------------~-------- 9.8 A - - - - NA ~ - - - - - - - NA - - - - --------------~-----------~---------------------~---~--~--------------~------ East: 22 L 21 T 23 R East Approach 8 113 0.071 98 1384 0.071 28 395 0.071 13 .2 4.6 6_7 B A A - NA - - NA - - NA - - - NA - - NA - - NA - o 1892 0.071 --------------------~~------------~-~~~-~--------------~------- 5.5 A - - - - N~1- - - - - NA - - -c_ - -~ D o North: North Approach 42 L 7 50 0.140 12.6 B - NA - - - NA - - 41 T 218 1565 0.139 4.0 A - NA - - - - - NA - 43 R 74 531 0.139 6.1 A - NA - - - NA o 2146 0.140 4.7 A ------------------~-------------------------------------------- - - - - NA - - - - o - - - - NA - - - - -------------------~----------~---------------------------------------------- ALL VEHICLES: 8681 0.458 6.9 A ----~------------------------------------------------------------------------ D - - - - NA - - - - - - - - NA - - - - NA Values for this roundabout capacity model have not been calculated because the model was not applicable for the given roundabout conditions. Note that the HCM models are only applicable to single-lane roundabouts with circulating flows less than 1200 veh/h. Also note that results are not calculated for any of the models for slip lane or continuous movements. See aaSIDRA Output Guide Appendix Section A3.8 for roundabout limits. D o o Clarian Health 103rd & Penn (Scenario 2, AM PEAK) Intersection ID: 1 Roundabout D Table R.6 - ROUNDABOUT ALTERNATIVE CAPACITY MODELS ----------------------------------------------------------------- o aaSIDRA NAASRA 1986 Ger. Linear Ger. GapAcc Mov Dem ----------- ----------- ----------- ---------~- No. Flow Cap. Deg. Cap. % Diff Cap. % Diff Cap. % Diff (veh {veh Satn {veh from (veh from (veh from /h) /h) x /h} aaSIDRA /h) aaSIDRA Ih) aaSIDRA -----------------------------------~----------------------------- D West: West Approach 12 L 186 660 0.282 1010 53.0 431 -34.7 713 8.0 11 T 87 309 0.282 472 52.8 201 -35.0 334 8.1 13 R 722 1577 0.458 1482 - 6.0 632 -59.9 1047 -33.6 0 ----------------------------~---------------------- 2546 0.458 2964 16.4 1264 -50.4 2094 -17.8 -----------------------------~--~---------~---------------~------ D South: 32 L 31 T 33 R 1422 1372 40 South 259 104 3 Approach 1221 0.212 8510.122 25 0.120 D 16.5 61.2 60.0 620 598 17 -49.2 -29.7 -32.0 1007 971 28 -17.5 14.1 12.0 2097 0.212 2834 ------~-------------------------------------------- -4.3 35.1 1235 -41.1 2006 ----------------------------------------------------------------- D East: 22 L 21 T 23 R 135 1650 471 East Approach 8 113 98 1384 28 395 0.071 0.071 0.071 19.5 19.2 19.2 66 804 230 -41.6 -41.9 -41.8 96 1173 335 -15.0 -15.2 -15.2 1892 2256 --------------------------------------------------- -15.2 D North: 42 L 41 T 43 R 0.071 19.2 1100 -41.9 1604 --------~---------------------------~------------- North 7 218 74 Approach 50 0.140 1565 0.139 531 0.139 62 1927 654 o 24.0 23.1 23.2 28 870 295 -44.0 -44.4 -44.4 44 1368 464 -12.0 -12.6 -12.6 D ALL VEHICLES: 2146 0.140 2643 --------------------------------------------------- 23.2 1193 -44.4 1876 -12.6 8681 0.458 10697 ----------------------------------------------- 4792 23.2 $ -44.8 7580 -12.7 ---------------------~-------------~-------------------- D Clarian Health 103rd & Penn (Scenario 2, AM PEAK) O Intersection ID: 1 Roundabout 62 -------------------------------------------------------------------- Mov Dem Total %HV Adjust. Total Prac. Prac. Lane Deg. No. Flow Opng Opng Cap. Deg. Spare Util Satn (veh Flow Flow (veh Satn Cap. /h) (veh/h) (pcu/h) /h) xp (% ) ( %) x -------------------------------------------------------------------- West: West Approach 12 L 186 232 5.0 232 660 0.85 202 62 0.282 11 T 87 232 5.0 232 309 0.85 202 62 0.282 13 R 722 232 5.0 232 1577 0.85 86 100 0.458* -------------------------------------------------------------------- South: South Approach 32 L 259 281 5.0 281 1221 0.85 301 100 0.212 31 T 104 281 5.0 281 851 0.85 596 58 0.122 33 R 3 281 5.0 281 25 0.85 608 58 0.120 -------------------------------------------------------------------- East: East Approach 22 L 8 550 5.0 550 113 0.85 1101 100 0.071 21 T 98 550 5.0 550 1384 0.85 1100 100 0.071 23 R 28 550 5.0 550 395 0.85 1099 100 0.071 -------------------------------------------------------------------- North: 42 L 41 T 43 R North Approach 7 364 218 364 74 364 364 364 364 50 1565 531 0.85 0.85 0.85 507 510 510 100 100 100 0.140 0.139 0.139 5.0 5.0 5.0 -------------------------------------------------------------------- D o o o o o o D Clarian Health 103rd & Penn (Scenario 2, AM PEAK) Intersection ID: 1 Roundabout Table S.3 - INTERSECTION PARAMETERS D ---~-------------------------------------~------~-----------------~------- D Intersection Level of Service Worst movement Level of Service Average intersection delay (s) Largest average movement delay (s) Largest back of queue, 95% (ft) Performance Index Degree of saturation (highest) Practical Spare Capacity (lowest) Total vehicle capacity, all lanes (veh/h) Total vehicle flow (veh/h) Total person flow (pers/h) Total vehicle delay (veh~h/h) Total person delay (pers~h/h) Total effective vehicle stops (veh/h) Total effective person stops (pers/h) Total vehicle travel (veh-mi/h) Total cost (S/h) Total fuel (ga/h) Total C02 (kg/h) A B 6.9 13.2 83 37.77 0.458 86 % 8682 1794 2691 3.42 5.13 1896 2844 730.9 524.69 26.8 254.26 o o o o o C1arian Health 103rd & Penn (Scenario 2, AM PEAK) Intersection ID: 1 Roundabout .. Table S.5 - MOVEMENT PERFORMANCE o o Aver. Speed (mph) o Mov No. Total Total Aver. Prop. Delay Delay Delay Queued (veh-h/h) (pers-h/h) (sec) Eff. Longest Queue Stop 95% Back Rate (vehs) (ft) Perf. Index ----------------------------~--------------------------------------------- West: West Approach 63 o 12 L 0.64 0.96 12.3 0.39 1.39 1.7 43 4.71 43.6 11 T 0.09 0.14 3.8 0.39 0.78 1.7 43 1. 64 50.0 13 R 1.10 1. 65 5.5 0.36 1. 00 3.2 83 14.38 48.2 -------------------------------------------------------------------------- South: South Approach 32 L 0.87 1. 31 12.1 0.39 1. 35 1.3 34 6.41 43.6 31 T 0.12 0.18 4.1 0.41 0.84 0.7 18 2.01 49.8. 33 R 0.01 0.01 6.3 0.41 1. 07 0.7 18 0.06 48.0 o o o -------------------------------------------------------------------------- ------------~------------------------------------------------------------- o East: 22 21 23 O North: 42 L 41 T 43 R East L T R Approach 0.03 0.12 0.05 0.04 0.19 0.08 13 .2 4.6 6.7 0.49 0.49 0.48 1. 43 0.94 1.15 0.4 0.4 0.4 10 10 10 0.21 1.95 0.60 43.2 49.2 47.5 North Approach 0.02 0.04 0.24 0.36 0.13 0.19 12.6 4.0 6.1 0.43 0.42 0.42 1.39 0.82 1. 08 0.8 0.8 0.8 0.18 4.10 1.53 43.5 49.7 47.9 O Clarian Health 103rd & Penn (Scenario Intersection ID: 1 Roundabout [J Table S.G - INTERSECTION PERFORMANCE 2, AM PEAK) o ---------------------------~---~----------------------------------------- Total Flow (veh/h) Deg. Satn x Total Total Aver. Prop. Delay Delay Delay Queued (veh-h/h) (pers-h/h) (see) Eff. Longest Perf. Stop Queue Index Rate (ft) Aver. Speed (mph) O West: 995 ---------~--------------------------------------------------------------- 83 West Approach 0.458 1.83 2.74 6.6 0.375 1. 06 20.72 29.4 ------------------------------------------------------------------------- South: o 366 South Approach 0.212 0.99 1. 49 9.8 0.397 1.20 34 8.48 28.1 East: 134 -~----------------------------------~-~-----~---------------------------- 1. 02 East Approach o . 071 0 . 21 0.31 10 o --------------------------------------------------------------- North: 299 5.5 0.492 2.75 30.1 North Approach 0.140 0.39 30.5 0.58 4.7 0.428 0.89 21 5.82 o ------------------------------------------------------------------------- INTERSECTION (persons): 2691 0.458 5.13 6.9 0.397 1. 06 37.77 47.2 --------------------------------,----------------~-------~---------------- D Queue values in this table are 95% back of queue (feet). Clarian Health D103rd & P:nn (Scenario Intersect~on ID: 1 Roundabout 2, AM PEAK) D Table S. 7 - LANE PERFORMANCE ---------------------------------------------------------------- D-~:~~~--~:~~-~~~~~~~~------------------------------------------- 1 LT 12, 273 969 0.282 9.6 0.60 1.7 43 11 O 2 R 11, 722 1577 0.458 13 ----------------~----------------------------- o Lane No. Dem Q u e u e Flow Cap Deg. Aver. Eft. 95% Back Short Mov (veh (veh Satn Delay Stop ----------- Lane No. /h) /h) x (see) Rate (vehs) (ft) (ft ) 5.5 0.50 3.2 83 64 South: South Approach 1 L 32, 259 1221 0.212 12.1 0.68 1.3 34 31 2 TR 31, 107 875 0.122 4.2 0.42 0.7 18 33 o o ---------------------------------------------------------------- East: East Approach 1 LT 22, 63 895 0.071 5.8 0.51 0.4 10 21 2 TR 21, 71 998 0.071 5.3 0.50 0.4 10 23 D ---------------------------------------------------------------- o North: North Approach 1 LT 42, 143 1026 0.139 4.4 0.43 0.8 21 41 2 TR 41, 156 1121 0.139 4.9 0.46 0.8 21 43 D ---------------------------------------------------------------- o Clarian Health 103rd & Penn (Scenario 2, AM PEAK) Intersection ID: 1 Roundabout D Table S.8 - LANE FLOW AND CAPACITY INFORMATION D Min Tot Lan Mov Dem Flow (veh/h) Cap Cap Oeg. Lane No. No. -----------~------- (veh (veh Satn Util Lef Thru Rig Tot /h) ih) x % o West: West Approach 1 LT 12, 186 87 0 273 150 969 0.282 62P 11 2 R 11, 0 0 722 722 150 1577 0.458 100 13 D D South: 1 L South Approach 32, 259 0 0 259 150 1221 0.212 100 31 31, 0 104 3 107 107 875 0.122 58P 33 D 2 TR East: 1 LT East Approach 22, 8 55 0 63 63 895 0.071 100 21 21, 0 43 28 71 71 998 0.071 100 23 o 2 TR o North: North Approach 1 LT 42, 7 136 0 143 143 1026 0.139 100 41 2 TR 41, 0 82 74 156 150 1121 0.139 100 43 o P Lane under-utilisation found by the 'Program" D For roundabouts, the capacity value for continuous movements is obtained as the basic saturation flow without any adjustments. Saturation flow scale applies if specified. D Clarian Health 103rd & Penn (Scenario 2, AM PEAK) Intersection 10: 1 Roundabout o 65 D Table S.10 - MOVEMENT CAPACITY ANO PERFORMANCE SUMMARY [J ------------------------------------------------ o Mov No. Dem Flow (veh /h) Mov Typ Total Cap. (veh /h) Lane Util Deg. Satn Aver. Delay x (see) Eft. Stop Rate 95% Back of Queue (veh) Perf. Index (% ) ------------------------------------------------------------------ [J West: West Approach 12 L 186 660 62 0.282 12.3 1.39 1.7 4.71 11 T 87 309 62 0.282 3.8 0.78 1.7 1.64 13 R 722 1577 100 0.458* 5.5 1.00 3.2 14.38 D ------------------------------------------------------------------ South: South Approach 32 L 259 1221 100 0.212 12.1 1.35 1.3 6.41 31 T 104 851 58 0.122 4.1 0.84 0.7 2.01 0 33 R 3 25 58 0.120 6.3 1.07 0.7 0.06 ------------------------------------------------------------------ East: East Approach 0 22 L 8 113 100 0.071 13.2 1.43 0.4 0.21 21 T 98 1384 100 0.071 4.6 0.94 0.4 1.95 23 R 28 395 100 0.071 6.7 1.15 0.4 0.60 ------------------------------------------------------------------ O North: 42 L 41 T 43 R North Approach 7 50 218 1565 74 531 100 100 100 0.140 0.139 0.139 12.6 4.0 6.1 1.39 0.82 1.08 0.8 0.8 0.8 0.18 4.10 1.53 D --:--------------------------------------------------------------- Maximum degree of saturation [] Clarian Health 103rd & Penn (Scenario Intersection ID: 1 Roundabout D 2, AM PEAK) Table S.12A - FUEL CONSUMPTION, EMISSIONS AND COST - TOTAL D -------------------------------------------------------------- Mov Fuel Cost HC CO NOX CO2 No. Total Total Total Total Total Total gal/h $/h kg/h kg/h kg/h kg/h -------------------------~------------ ---~-------~------------ West: West Approach 12 L 3.1 62.89 0.043 1.43 0.052 29.1 11 T 1.2 23.39 0.016 0.47 0.020 11.6 13 R 10.5 203.30 0.142 4.58 0.179 99.9 o o 14.8 --------------------------------------~-------- 140.6 289.58 0.201 6.49 0.250 o South: 32 L 31 T 33 R Approach 4.3 1.5 0.0 [J -------------------------------------------------------------- South 87.57 27.96 0.84 0.060 0.019 0.001 2.00 0.57 0.02 0.072 0.024 0.001 40.6 13.9 0.4 5.8 ------------~--------------~------------------- 54.9 116.37 0.080 2.59 0.097 --------------------~---------~---------~--------------------~ D East: East 22 L 21 T 23 R D Approach 0.1 1.4 0.4 2.71 26.34 7_89 0.002 0.018 0.006 0.06 0.57 0.18 0.002 0.023 0.007 1.3 13 .2 3.9 1.9 ----------------------------------------------- 18.3 36.94 0.026 0.820.033 ---~---------------------------~-----------------------~----~- North: North O 42 L 41 T 43 R Approach 0.1 3.1 1.1 2.37 58.60 20.84 0.002 0.040 0.015 0.05 1. 21 0.48 0_002 0.051 0.019 1.1 29.1 10.3 4.3 o --------uu_____u_____u_____u__u_____~~~: 66 n~~~~________ 40.5 ----------------------------------------------- 81.81 0.056 INTERSECTION: 26.8 -------------------------------------------------------------- 254.3 D 524.69 0.363 PARAMETERS USED IN COST CALCULATIONS 11.64 Pump price of fuel (S/US gal) Fuel resource cost factor Ratio of running cost to fuel cost Average income (S/h) Time value factor Average occupancy (persons/veh) Light vehicle mass (1000 lb) Heavy vehicle mass (1000 lb) Light vehicle idle fuel rate (US gal/h) Heavy vehicle idle fuel rate (US gal/h) 0.451 0.850 0.50 3.0 23.00 0.60 1.5 1.4 11.0 0.360 0.530 o D o D The idle fuel and vehicle mass parameters given above are the default values (data given in RIDES may override some of these parameters) . D Clarian Health 103rd & Penn (Scenario 2, AM PEAK) Intersection ID: 1 Roundabout o D Table S.12B - FUEL CONSUMPTION, EMISSIONS AND COST - RATE o -------------------------------------------------------------- Mov Fuel Cost HC CO NOX CO2 No. Eft. Rate Rate Rate Rate Rate mpg $/mi g/Jun g/km g/Jun g/km ------------------------------~------------------~------------ West: West Approach 12 L 259.6 0.49 0.338 11.16 0.402 227.0 11 T 286.3 0.42 0.282 8.44 0.357 205.8 13 R 273.5 0.44 0.306 9.88 0.385 215.4 271.7 0.45 0.311 10.01 0.386 D o 216.9 ------------------~------~------------------------------------ o South: 32 L 31 T 33 R South Approach 259.6 28S.7 273.0 266.3 0.49 0.42 0.44 0.47 0.338 0.283 0.308 0.323 11.16 8.S3 10.01 10.44 0.401 0.359 0.388 0.390 226.9 206.2 218.3 o -------------------------------------------------------------- 221.3 East: 22 21 23 East L T R Approach 258.8 283.1 271.3 278.9 0.49 0.42 0.44 0.43 0.340 0.288 0.311 0.296 11.32 8.98 10.29 9.40 0.40S 0.368 0.394 0.376 228.3 208.2 217 .1 o -------------------------------------------------------------- 211.3 o North: North 42 L 41 T 43 R Approach 2S9.4 285.1 272.5 281.2 0.49 0.42 0.44 0.42 0.338 0.285 0.309 0.292 11.22 8.63 10.07 9.05 0.403 0.361 0.389 0.369 228.0 206.7 216.3 o 209.6 o --------------~----------------------------------------------- 216.2 INTERSECTION: 272.6 0.45 0.309 9.90 0.383 -------------------------~------------------------------------ o Clarian Health l03rd & Penn (Scenario 2, AM PEAK) Intersection ID: I Roundabout 67 o o Lane No. o Table S .14 - SUMMARY OF INPUT AND OUTPUT DATA -------------------------------------~---------------- Demand Flow (veh/h) %HV Adj. Eff Grn Basic (secs) Satf. 1st 2nd Deg Sat Aver. Longest Shrt Delay Queue Lane (sec) ( f t) (ft) o ----------~----~----~------------------------------~---------------------- West: 1 LT D 2 R West Approach 186 87 Tot 722 273 . 722 5 5 0.282 0.458 9.6 5.5 43 83 186 87 ------------------------------------------------------------------ 83 722 995 5 0.458 6.6 -------------------------------------------------------------------------- D South: 1 L 2 TR South Approach 259 104 3 259 107 5 6 0.212 0.122 12.1 4.2 ------------------------------------------------------------------ 34 18 D 259 104 3 366 5 0.212 9.8 34 -------------------------------------------------------------------------- East: D 1 LT 2 TR North: 1 LT 2 TR D East Approach 8 55 43 28 63 71 6 4 0.071 0.071 5.8 5.3 10 10 8 98 ------------------------------------------------------------------ 10 North Approach 7 136 82 28 134 5 0.071 5.5 0.139 0.139 4.4 4.9 o ALL VEHICLES 7 218 ------------------------------------------------------------------ 21 74 143 156 5 0.139 4.7 --------------------------------------~--------------~----~----------~---- -------------~-----~~----------------~------------~---------------------~~- 74 299 t1ax Queue 83 -------------------------------------------------------------------------- -------------------------------------------~---------~-------------------- Mov Typ Total Flow (veh Ih) Total Flow 1794 % HV 5 Total flow period = 60 minutes. o Max X 0.458 Aver. Delay 6.9 Peak flow period = 15 minutes. Queue values in this table are 95% back of queue (feet). O Note: Basic Saturation Flows are not adjusted at roundabouts or sign~ controlled intersections and apply only to continuous lanes. O Clarian Health . 103rd & Penn (Scenario Intersection ID: 1 Roundabout [J Table S.15 - CAPACITY AND LEVEL OF SERVICE 2, AM PEAK) [J Mov No. ---~--------~----------------~----------------~--- LOS Total Cap. (veh Ih) Deg. of Satn (v Ic) Aver. Delay (sec) [J -------------------------------------------------- [J West: 12 L 11 T 13 R West Approach 186 87 722 660 309 1577 2546 0.282 0.282 0.458* 12.3 3.8 5.5 B A A -------------------------------------------------- A n South: ~ 32 L 31 T 33 R o 995 South Approach 259 104 3 366 1221 851 25 2097 0.458 6.6 0.212 0.122 0.120 12.1 4.1 6.3 0.212 9.8 B A A 6~ East: East 22 L 21 T 23 R Approach 8 98 28 134 North: 42 L 41 T 43 R North Approach 7 218 74 299 ALL VEHICLES: 1794 113 1384 395 1892 50 1565 531 2146 8682 0.071 0.071 0.071 0.071 0.140 0.139 0.139 0.140 0.458 13 .2 4.6 6.7 5.5 12.6 4.0 6.1 4.7 6.9 o B A A D A D B A A D A D A Level of Service calculations are based on average control delay including geometric delay (HCM criteria), independent of the current delay definition used. For the criteria, refer to the "Level of ServiceM topic in the aaSIDRA Output Guide or the Output section of the on-line help. * Maximum vie ratio, or critical green periods D D Clarian Health 103rd & Penn (Scenario 2, AM PEAK) Intersection ID: 1 Roundabout Table D.O - GEOMETRIC DELAY DATA From Approach To Approach West: West Approach South East North South: South Approach West East North East: East Approach West South North North: North Approach West South East Negn Negn Radius Speed (ft) (mph) 117.2 190.4 62.0 62.0 117.2 190.4 190.4 62.0 117 .2 117.2 190.4 62.0 22.0 28.1 16.0 16.0 22.0 28.1 28.1 16.0 22.0 22.0 28.1 16.0 Negn Dist. (ft ) 61. 9 151.5 243.5 243.5 61. 9 151.5 151.5 243.5 61. 9 61.9 151.5 243.5 D D Appr. Dist. (ft) o Downstream Distance (ft ) 1800 1800 1800 D 311 323 469 o 1800 1800 1800 469 311 323 o 1800 1800 1800 o 323 469 311 1800 1800 1800 o 311 323 469 o Downstream distance is distance travelled from the stopline until exit cruise speed is reached (includes negotiation distance) _ Acceleration distance is weighted for light and heavy vehicles. The same distance applies for both stopped and unstopped vehicles. D Clarian Health 103rd & Penn (Scenario 2, AM PEAK) Intersection ID: 1 Roundabout Table D.l - LANE DELAYS D 69 o o --------------------------------------------------------------------------- D Lane No. Mov No. Deg. Satn x Stop-line Delay 1st 2nd Total d1 d2 dSL Delay Acc. Dec. dn (seconds/veh) ---------~------ Queuing Stopd Total MvUp (Idle) Geom Control dq dqrn di dig dic ---------------------------------------------------------------~----------- o West: West Approach 1 LT 12, 0.282 1.4 0.0 1.4 2.2 0.0 0.0 0.0 10.9 9.6 11 2.4 2 R 11, 0.458 0.8 0.0 0.8 2.3 0.0 0.0 0.0 0.0 5.5 13 4.7 o --------------------------------------------------------------------------- o South: South Approach 1 L 32, 0.212 1.2 0.0 1.2 1.9 0.0 0.0 0.0 10.9 12.1 31 0.0 2 TR 31, 0.122 1.7 0.0 1.7 3.0 0.0 0.0 0.0 2.4 4.2 33 4.7 o --------------------------------------------------------------------------- East: East Approach 1 LT 22, 0.071 2.3 0.0 2.3 3.5 0.0 0.0 0.0 10.9 5.8 21 2.4 2 TR 21, 0.071 2.0 0.0 2.0 3.3 0.0 0.0 0.0 2.4 5.3 23 4.7 o --------------------------------------------------------------------------- North: North Approach 0 1 LT 42, 0.139 1.6 0.0 1.6 3.1 0.0 0.0 0.0 10.9 4.4 41 2.4 2 TR 41, 0.139 1.4 0.0 1.4 2.9 0.0 0.0 0.0 2.4 4.9 43 4.7 o -----------~------------~--------------------------------~----------~------ dn is average stop-start delay for all vehicles queued and unqueued O Clarian Heal th 103rd & Penn (Scenario 2, AM PEAK) Intersection ID: 1 Roundabout D Table D.2 - LANE STOPS D -------~-----------~----------------------------------- Lane No. Deg. Satn -- Effective Stop Rate -- Geom. Overall hig h hel he2 Prop. Queued pq Queue Move-up Rate hqrn D ------------------------------------------------------- West: 1 LT 2 R West Approach 0.282 0.27 0.00 0.458 0.23 0.00 0.33 0.27 0.60 0.50 0.395 0.367 0.00 0.00 D ------------------------------------------------------- South: South Approach 1 L 0.212 0.26 0.00 2 TR 0.122 0.28 0.00 0.42 0.15 0.68 0.42 0.391 0.411 0.00 0.00 D ------------------------------------------------------- East: 1 LT 2 TR East Approach 0.071 0.36 0.00 0.071 0.34 0.00 0.15 0.16 0.51 0.50 0.497 0.487 0.00 0.00 lJ ------------------------------------------------------- North: North Approach 1 LT 0.139 0.28 0.00 2 TR 0.139 0.27 0.00 0.15 0.19 0.43 0.46 0.433 0.423 0.00 0.00 o hg is the average value for all movements in a shared lane hqrn is average queue move-up rate for all vehicles queued and unqueued Clarian Health O 103rd & Penn (Scenario 2, AM PEAK) Intersection ID: 1 70 Roundabout Table D.3 - LANE QUEUES Lane No. West: 1 LT 2 R Deg. Satn x Ovrfl. Average (veh) Queue ----------------- No Nb1 Nb2 Nb West Approach 0.282 0.0 0.458 0.0 0.5 1.0 South: South Approach 1 L 0.212 0.0 0.4 2 TR 0.122 0.0 0.2 East: 1 LT 2 TR East Approach 0.071 0.0 0.1 0.071 0.0 0.1 North: North Approach 1 LT 0.139 0.0 0.3 2 TR 0.139 0.0 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.5 1.0 0.4 0.2 0.1 0.1 0.3 0.3 70% 1.0 1.9 0.8 0.4 0.2 0.2 Percentile (veh) 0.5 0.5 85% 1.2 2.3 0.9 0.5 90% 1.3 2.6 1.1 0.6 0.3 0.3 0.3 0.3 95% 1.7 3.2 1.3 0.7 0.4 0.4 0.8 0.8 Values printed in this table are back of queue (vehicles). 0.6 0.6 0.7 0.7 98% 1.9 3.7 o D Queue Stor. Ratio o 0.02 0.05 o 1.5 0.8 o 0.02 0.01 0.5 0.5 o 0.01 0.01 0.9 0.9 D 0.01 0.01 D Clarian Health 103rd & Penn (Scenario 2, AM PEAK) Intersection ID: 1 Roundabout Table D.4 - MOVEMENT SPEEDS (mph) App. Speeds Mov ------------ No. Cruise Negn Queue Move-up Exit Speeds ------------- Av. Section Spd West: 12 11 13 South: 32 31 33 East: 22 21 23 North: 42 41 43 Negn Cruise West Approach 35.0 16.0 35.0 28.1 35.0 22.0 16.0 28.1 22.0 35.0 35.0 35.0 35.0 35.0 35.0 35.0 35.0 35.0 35.0 35.0 35.0 1st Grn 2nd Grn Running Overall 27.1 31. 0 30.0 27.1 31. 0 29.8 26.9 30.6 29.5 27 .0 30.9 29.8 27.1 31. 0 30.0 27.1 31. 0 29.8 26.9 30.6 29.5 27.0 30.9 29.8 "Running Speed" is the average speed excluding stopped periods. South 35.0 35.0 35.0 Approach 16.0 16.0 28.1 28.1 22.0 22.0 East Approach 35.0 16.0 35.0 28.1 35.0 22.0 16.0 28.1 22.0 North 35.0 35.0 35.0 Approach 16.0 16.0 28.1 28.1 22.0 22.0 --- End of aaSIDRA Outpllt --- 71 o o o o o o o o o o D o Akcelik & Associates Pty Ltd - aaSIDRA 2.0.0.205 o -----------------~-------------~------------------- !\&F Engineering A&F Engineering Registered User No. A0654 Licence Type: Professional, Single Computer o Time and Date of Analysis 1:14 PM, Nov 6,2002 D Filename: Z:\2002\02114-clarion\Capacity\Ch4pms2r.OUT Clarian Health 103rd & Penn (Scenario 2, PM PEAK) Intersection ID: 1 D aaTraffic SIDRA US Highway Capacity Manual (2000) Version o RUN INFORMATION o * Basic Parameters: Intersection Type: Roundabout Driving on the right-hand side of the road Input data specified in US units Default Values File No. 11 Peak flow period (for performance): 15 minutes Unit time (for volumes): 60 minutes (Total Flow Period) Delay definition: Control delay Geometric delay included HCM Delay and Queue Models option selected Level of Service based on: Delay (HCM method) Queue definition: Back of queue, 95th Percentile o o y p)l\ SJ.. {\ D D Clarian Health 103rd & Penn (Scenario 2, PM PEAK) Intersection ID: 1 D DEFAULT PARAMETERS D Default values for some of the important general parameters: (Default Values File: DEFl1.SDF) 1. Basic saturation flow: 1900 tcu/h D This value applies mainly to signalised intersections. For roundabouts and sign-controlled intersections, it is used for determining Capacity of priority and continuous movements. D 2. Through car equivalents for L EFT LV HV Normal 1.053 2.000 Restricted 1.303 2.500 signalised intersections THROUGH RIG H T LV HV LV HV 1.000 2.000 1.176 2.000 1.426 2.500 D 3. Opposed turn parameters (Roundabout) Crit. Fol.up Min. Gap Hdway Deps V V 2.5 V V 2.5 V V 2.5 % Exit Flow Opposing o o o D Left turns : Through Right turns: D 4. Cruise speed= 40 mi/h, Approach Distance= 1800 ft o 5. Queue space per vehicle ln Light vehicles: 25.0 feet Heavy vehicles: d5.0 72 A full list of input data defaults and ranges ~S given ln the Input Guide part of aaSIDRA User Guide. Clarian Health 103rd & Penn (Scenario 2, PM PEAK) Intersection ID: 1 Roundabout Table S.O - TRAFFIC FLOW DATA Mov No. LV HV Left Through LV HV Right LV HV Flow Scale D o o Peak Flow Factor o o ------------------------------------------------------------------------ VEHICLES Demand flows in veh/hour as used by the program West: West Approach 12 126 7 0 0 0 0 1. 00 0.90 11 0 0 143 7 0 0 1.00 0.90 13 0 0 0 0 273 14 1. 00 0.90 South: South 32 31 33 Approach 687 o o East: East Approach 22 21 23 North: North 42 41 43 Approach 24 o o 36 o o 3 o o o 183 o 1 o o o 46 o o 10 o o o 5 o o 1 1. 00 1.00 1. 00 1 o o o 141 o o 2 o o o 15 o o 1 1. 00 1. 00 1.00 o 7 o o o 220 o o 12 1. 00 1. 00 1. 00 Based on unit time = 60 minutes. Flow Scale and Peak Hour Factor effects included in flow values. Clarian Health 103rd & Penn (Scenario 2, PM PEAK) Intersection ID: 1 Roundabout Table R.O - ROUNDABOUT BASIC PARAMETERS o 0.90 0.90 0.90 D 0.90 0.90 0.90 D D 0.90 0.90 0.90 o o o D D Circulating/Exiting Stream Cent Circ Insc No.of No.of Av.Ent --------------------~------------- Island Width Diam. Circ. Entry Lane Flow %HV Adjust. %Exit Cap. Diam Lanes Lanes Width (veh/ Flow Incl. Constr. (ft ) (ft ) (ft ) (ft ) h) (pcu/h) Effect West: 100 South: 100 East: 100 North: 100 West Approach 30 160 South Approach 30 160 2 East Approach 30 160 North Approach 30 160 2 2 2 2 12.00 2 12.00 2 12.00 2 12.00 Clarian Health 103rd & PenD (Scenario 2, PM PEAK) 178 308 1048 776 73 5.0 5.0 5.0 5.0 178 308 1048 776 o o N D o N o o N o D N o o Intersection ID: 1 Roundabout o Table R.1 - ROUNDABOUT GAP ACCEPTANCE PARAMETERS --------------------------------------------------------------------- 0 Turn Lane Lane Circ! Intra- Prop. Critical Follow No. Type Exit Bunch Bunched Gap Up Flow Headway Vehicles ( s) Headway (pcu!h) (s) (s) D --------------------------------------------------------------------- West: West Approach Left 1 Subdominant 178 2.00 0.219 4.29 2.43 Thru 1 Subdominant 178 2.00 0.219 4.29 2.43 0 2 Dominant 178 2.00 0.219 3.77 2.14 Right 2 Dominant 178 2.00 0.219 3.77 2.14 --------------------------------------------------------------------- South: South Approach D Left 1 Dominant 308 1. 74 0.311 3.52 2.04 Thru 2 Subdominant 308 1. 74 0.311 5.71 3.31 Right 2 Subdominant 308 1. 74 0.311 5.71 3.31 o --------------------------------------------------------------------- East: Left Thru o Right --------------------------------------------~---------------------- o North: Left Thru Right East Approach 1 Subdominant 1048 1. 59 0.685 3.61 2.42 1 Subdominant 1048 1. 59 0.685 3.61 2.42 2 Dominant 1048 1. 59 0.685 3.19 2.14 2 Dominant 1048 1. 59 0.685 3.19 2.14 North Approach 1 Subdominant 1 Subdominant 2 Dominant 776 776 776 1.95 1.95 1.95 0.651 0.651 0.651 3.97 3.97 3.52 2.52 2.52 2.24 --------------------------------------------------------------------- D o Clarian Health 103rd & Penn (Scenario 2, PM PEAK) Intersection ID: 1 Roundabout D Table R.5 - ROUNDABOUT CAPACITY & LEVEL OF SERVICE - aaSIDRA & HCM MODELS --------------~--~------------~~--~----------------------~------------------- o Mov No. aaSIDRA HCM 2000 Lower HCM 2000 Upper Dem Flow (veh /h) -------~--~--------- -------~------------ -------------------- Cap. (veh /h) Deg. Av. Cap. Satn Delay LOS (veh x (see) /h) Deg. Av. Cap. Satn Delay LOS (veh x (see) /h) Deg. Av. Satn Delay LOS x (see) ----------------------------------------------------------------------------- O West: 12 L 11 T 13 R o West Approach 133 611 0.218 150 689 0.218 287 13190.218 11.7 B 3.2 A 5.3 A - NA - NA - NA - NA - NA - - - NA --------------------------------------------------------------- 2619 0.218 6.2 A - - - - NA - - - - - - - - NA - - - - -------------------------------------------~--------------------------------- O SO~~h ~ 31 T 33 R D South Approach 723 1384 0.522 12.4 B - - - NA - NA - 193 737 0.262 4.9 A - - - - NA - - NA - 6 23 0.261 7.1 A - NA - NA - --------------------------------------------------------------- 2144 0.522 10.8 B - - - - NA - - - - - - - - NA - - - - --~-------------------------------------------------------------------------- o East: 22 L 21 T 23 R East Approach 4 76 0.053 48 908 0.053 16 303 0.053 16.1 7.2 9.1 B A A - NA - - NA - - NA - NA - NA - - NA -------~---~--------------------------------------------------- [J ---------------------------------~ 1287 0.053 8.2 - - - - NA . ____________ 74 - - - - NA -_ . .c:. - ..,. - . -------~------------------- North: 42 L 41 T 43 R North 25 148 232 Approach 95 0.263 563 0.263 772 0.301 1430 0.301 ALL VEHICLES: 7480 0.522 16.3 7.7 9.4 9.2 A 9.1 A D B A A - NA - NA - - NA - - NA - - NA - NA - - o - - - - NA - - - - - - - - NA - - - - - - - - NA - - - - - - - - NA - - - - o NA Values for this roundabout capacity model have not been calculated because the model was not applicable for the given roundabout conditions. Note that the HCM models are only applicable to single-lane roundabouts with circulating flows less than 1200 veh/h. Also note that results are not calculated for any of the models for slip lane or continuous movements. See aaSIDRA Output Guide Appendix Section A3.8 for roundabout limits. Clarian Health 103rd & Penn (Scenario 2, PM PEAK) Intersection ID: 1 Roundabout o o o o Table R.6 - ROUNDABOUT ALTERNATIVE CAPACITY MODELS Q aaSIDRA NAASRA 1986 Ger. Linear Ger. GapAcc Mov Dem ----------- ----------- ----------- ----------- No. Flow Cap. Deg. Cap. % Diff Cap. % Diff Cap. % Diff (veh (veh Satn (veh from (veh from (veh from /h) /h) x Ih) aaSIDRA /h) aaSIDRA /h) aaSIDRA West: 12 L 11 T 13R West Approach 133 611 150 689 287 1319 0.218 0.218 0.218 728 821 1552 2619 0.218 3101 South: 32 L 31 T 33 R South 723 193 6 Approach 1384 0.522 737 0.262 23 0.261 1391 1342 42 2144 0.522 2775 East: 22 L 21 T 23 R East Approach 4 76 48 908 16 303 0.053 0.053 0.053 86 1031 344 1287 0.053 1461 D 19.1 19.2 17.7 303 342 645 D -50.4 - 50.4 -51.1 513 578 1092 -16.0 -16.1 -17.2 o 18.4 1290 -50.7 2183 -16.6 0.5 82.1 82.6 613 591 18 o -55.7 -19.8 -21.7 986 951 30 -28.8 29.0 30.4 29.4 1222 -43.0 1967 o -c8.3 13 .2 13.5 13.5 -30.3 -30.2 -30.4 D 59 708 236 -22.4 -22.0 -22.1 53 634 211 13.5 898 -30.2 1003 -22.1 o North: North Approach 42 L 25 95 0.263 135 42.1 76 -20.0 95 0.0 41 T 148 563 0.263 801 42.3 448 -20.4 565 0.4 43 R 232 772 0.301 934 21. 0 523 -32.3 659 -14.6 ~~-----------------------------------~------------- 1430 0.301 1870 30.8 1047 -.26.8 1319 -7.8 ALL VEHICLES: 7480 0.522 9207 D 23.1 4457 -40.4 6472 -13.5 o D Clarian Health 103rd & Penn (Scenario 2, PM PEAK) Intersection ID: 1 Roundabout o 75 o %HV -------------------------------------------------------------------- Deg. Satn D Mov No. Total Cap. (veh /h) Dem Flow (veh /h) Total Opng Flow (veh/h) Adjust. Opng Flow (pcu/h) Prac. Deg. Satn xp Prac. Spare Cap. (%) Lane Util (% ) x ------------------------------------~------------------------------- D West: West Approach 12 L 133 178 5.0 178 611 0.85 290 100 0.218 11 T 150 178 5.0 178 689 0.85 290 100 0.218 13 R 287 178 5.0 178 1319 0.85 291 100 0.218 0 ------------------------------------------------------- ------------- South: South Approach 32 L 723 308 5.0 308 1384 0.85 63 100 0.522* 31 T 193 308 5.0 308 737 0.85 225 50 0.262 0 33 R 6 308 5.0 308 23 0.85 226 50 0.261 -------------------------------------------------------------------- East: East Approach 22 L 4 1048 5.0 1048 76 0.85 1515 100 0.053 0 21 T 48 1048 5.0 1048 908 0.85 1508 100 0.053 23 R 16 1048 5.0 1048 303 0.85 1510 100 0.053 -------------------------------------------------------------------- 0 North: North Approach 42 L 25 776 5.0 776 95 0.85 223 87 0.263 41 T 148 776 5.0 776 563 0.85 223 87 0.263 43 R 232 776 5.0 776 772 0.85 183 100 0.301 o --------------------------------------------------------------- o Clarian Health 103rd & Penn (Scenario 2, PM PEAK) Intersection ID: 1 Roundabout [J Table S.3 - INTERSECTION PARAMETERS ------------------~-------------------------~----~---~-----------~-------- o Intersection Level of Service Worst movement Level of Service Average intersection delay (s) Largest average movement delay (s) Largest back of queue, 95% (ft) Performance Index Degree of saturation (highest) Practical Spare Capacity (lowest) Total vehicle capacity, all lanes (veh/h) Total vehicle flow (veh/h) Total person flow (pers/h) Total vehicle delay (veh-h/h) Total person delay (pers-h/h) Total effective vehicle stops (veh/h) Total effective person stops (pers/h) Total vehicle travel (veh-mi/h) Total cost (S/h) Total fuel (ga/h) Total C02 (kg/h) D o o o A B 9.1 16.3 106 45.62 0.522 63 % 7479 1965 2948 4.94 7.41 2431 3646 811. 9 598.02 30.3 287.18 o Clarian Health 103rd & Penn (Scenario Intersection ID: 1 Roundabout 2, PM PEAK) D Table 5.5 - MOVEMENT PERFORMANCE Mov No. Total Total Aver. Prop. Delay Delay Delay Queued (veh-h/h) (pers-h/h) (sec) (J -------------------------------------------------------------------------- Aver. Speed (mph) Eff. Longest Queue Stop 95% Back Rate (vehs) (ft) [J ------------------------------------------------ West: West Approach Perf. Index 76 12 L 0.43 0.65 11.7 0.31 1.31 1.3 34 3.24 43.9 11 T 0.13 0.20 3.2 0.31 0.65 1.3 34 2.62 50.6 13 R 0.42 0.63 5.3 0.29 0.93 1.3 34 5.56 48.7 -------------------------------------------------------------------------- South: South Approach 32 L 2.49 3.74 12.4 0.48 1. 40 4.1 106 18.31 43.3 31 T 0.26 0.39 4.9 0.47 1. 00 1.5 40 4.02 49.3 33 R 0.01 0.02 7.1 0.47 1.21 1.5 40 0.14 47.6 o o o East: 22 21 23 East L T R Approach 0.02 0.10 0.04 0.03 0.14 0.06 16.1 7.2 9.1 0.65 0.65 0.65 1. 57 1.24 1. 34 0.3 0.3 0.3 7 8 8 0.11 1.11 0.38 41.3 47.8 46.2 o North: 42 L 41 T 43 R North Approach 0.11 0.17 0.32 0.48 0.61 0.91 16.3 7.7 9.4 0.67 0.67 0.68 1. 67 1. 39 1.47 1.7 1.7 2.0 43 43 53 0.73 3.61 5.80 41.2 47.5 45.9 o o Clarian Health 103rd & Penn (Scenario 2, PM PEAK) Intersection ID: 1 Roundabout o Table S.6 - INTERSECTION PERFORMANCE o Total Flow (veh/h) Deg. Total Total Aver. Prop. Satn Delay Delay Delay Queued x (veh-h/h) (pers-h/h) (see) Eff. Longest Perf. Stop Queue Index Rate (ft) Aver. Speed (mph) D West: West Approach 570 0.218 0.99 1. 48 6.2 0.304 0.95 34 11.43 29.8 D South: South Approach 922 0.522 2.76 4.14 10.8 0.481 1.32 106 22.46 27.6 o East: East Approach 68 0.053 0.15 0.23 8.2 0.654 1.29 8 1. 60 29.2 o North: North Approach 405 0.301 1.04 1. 56 9.2 0.682 1.46 53 10.13 28.6 INTERSECTION (persons): 2948 0.522 7.41 9.1 0.477 1.24 45.62 45.8 D Queue values in this table are 95% back of queue (feet). D Clarian Health 103rd & Penn (Scenario 2, PM PEAK) Intersection ID: 1 Roundabout o Table S.7 - LANE PERFORMANCE o Dem Q u e u e Flow Cap Deg. Aver. Eff. 95% Back Short Lane Mov (veh (veh Satn Delay Stop ----------- Lane No. No. /h) /h) x (see) Rate (vehs) (ft ) (ft) o West: West Approach 1 LT 12, 264 1213 0.218 7.5 0.49 11 2 TR II, 306 1407 0.218 5.1 0.46 13 ______________________________________________ 77 1.3 34 o 1.3 34 o 0 South: South Approach 1 L 32, 723 1384 0.522 12.4 0.70 4.1 106 0 31 2 TR 31, 199 760 0.262 4.9 0.50 1.5 40 33 ------------------------------------------------------------- o East: East Approach 1 LT 22, 31 580 0.053 8.7 0.65 0.3 7 21 2 TR 21, 37 705 0.053 7.8 0.64 0.3 8 23 o ---------------------------------------------------------------- o North: North Approach 1 LT 42, 173 658 0.263 9.0 0.72 1.7 43 41 2 R 41, 232 772 0.301 9.4 0.74 2.0 53 43 o ---------------------------------------------------------------- o Clarian Health 103rd & Penn (Scenario 2, PM PEAK) Intersection ID: 1 Roundabout o Table S.8 - LANE FLOW AND CAPACITY INFORMATION ------------------------------------------------------- Min Tot 0 Lan Mov Dem Flow (veh/h) Cap Cap Deg. Lane No. No. ------------------- {veh (veh Satn Util Lef Thru Rig Tot Ih) Ih) x % -----------------~----------------------------------- D West: West Approach 1 LT 12, 133 131' 0 264 150 1213 0.218 100 11 2 TR 11, 0 19 287 306 150 1407 0.218 100 0 13 ------------------------------------------------------- South: South Approach 0 1 L 32, 723 0 0 723 150 1384 0.522 100 31 2 TR 31, 0 193 6 199 150 760 0.262 SOP 33 D ------------------------------------------------------- East: East Approach 1 LT 22, 4 27 0 31 31 580 0.053 100 21 2 TR 21, 0 21 16 37 37 705 0.053 100 23 (J _______________________________________________________ North: North Approach 0 1 LT 42, 25 148 0 173 150 658 0.263 87P 41 2 R 41, 0 0 232 232 150 772 0.301 100 43 o --~---------------------------------------------------- Lane under-utilisation found by the "Program" o For roundabouts, the capacity value for continuous movements is obtained as the basic saturation flow without any adjustments. Saturation flow scale applies if specified. O Clarian Heal th 103rd & Penn (Scenario Intersection ID: 1 Roundabout 2, PM PEAK) o 78 Table S.10 - MOVEMENT CAPACITY AND PERFORMANCE SUMMARY o Mov Mov Dem Total Lane Deg. Aver. EfL 95% Perf. No. Typ Flow Cap. Util Satn Delay Stop Back of Index (veh (veh Rate Queue /h) /h) (%) x (see) (veh) ------------------------------------------------------------------ West: West Approach 12 L 133 611 100 0.218 11.7 1.31 1.3 3.24 11 T 150 689 100 0.218 3.2 0.65 1.3 2.62 13 R 287 1319 100 0.218 5.3 0.93 1.3 5.56 South: 32 L 31 T 33 R South Approach 723 1384 193 737 6 23 100 50 50 0.522* 0.262 0.261 12.4 4.9 7.1 1.40 1.00 1.21 o o 4.1 1.5 1.5 D 18.31 4.02 0.14 D East: East Approach 22 L 4 76 100 0.053 16.1 1.57 0.3 0.11 21 T 48 908 100 0.053 7.2 1.24 0.3 1.11 23 R 16 303 100 0.053 9.1 1.34 0.3 0.38 ------------------------------------------------------------------ North: North Approach 42 L 25 95 87 0.263 16.3 1.67 1.7 0.73 41 T 148 563 87 0.263 7.7 1.39 1.7 3.61 43 R 232 772 100 0.301 9.4 1. 47 2.0 5.80 * Maximum degree of saturation Clarian Health 103rd & Penn (Scenario 2, PM PEAK) Intersection ID: 1 Roundabout o D o o o Table S.12A - FUEL CONSUMPTION, EMISSIONS AND COST - TOTAL o Mov Fuel Cost HC CO NOX CO2 No. Total Total Total Total Total Total gal/h $/h kgjh kg/h kg/h kg/h ------------------------~------------------------------------- West: West Approach 12 L 2.2 44.96 0.031 1.01 0.037 20.8 11 T 2.1 40.32 0.027 0.77 0.034 19.8 13 R 4.2 80.80 0.056 1.78 0.070 39.5 8.4 South: South 32 L 31 T 33 R Approach 12.0 2.7 0.1 14.8 East: 22 21 23 East L T R Approach 0.1 0.7 0.2 1.0 North: North 42 L 41 T 43 R Approach 0.4 2.1 3.5 166.08 244.50 51.88 1. 69 298.07 1. 40 12.97 4.54 18.91 8.75 40.13 66.09 0.114 0.169 0.036 0.001 0.206 0.001 0.009 0.003 0.014 0.006 0.029 0.048 3.56 0.140 o o 80.0 113.6 25.9 0.8 o 5.64 1.11 0.04 0.202 0.046 0.002 140.4 o 6.79 0.249 0.6 6.6 2.3 o 0.03 0.31 0.11 0.001 0.012 0.004 9.5 o 0.45 .0.017 0.20 0.96 1. 63 0.007 0.037 0.061 4.0 20.4 32.9 o 6.0 114.97 0.083 2.79 0.105 57.3 ______________________________________________ 79 ____________ o D INTERSECTION: 30.3 ----~--------------------------------------------------------- 287.2 598.02 0.416 o PARAMETERS USED IN COST CALCULATIONS Pump price of fuel (S/US gal) Fuel resource cost factor Ratio of running cost to fuel cost Average income (S/h) Time value factor Average occupancy (persons/veh) Light vehicle mass (1000 lb) Heavy vehicle mass (1000 lb) Light vehicle idle fuel rate (US gal/h) Heavy vehicle idle fuel rate (US gal/h) o o D D 13.60 0.512 0.850 0.50 3.0 23.00 0.60 1.5 1.4 11. 0 0.360 0.530 The idle fuel and vehicle mass parameters given above are the default values (data given in RIDES may override some of these parameters) . O Clarian Health 103rd & Penn (Scenario Intersection ID: 1 Roundabout o 2, PM PEAK) Table S.12B - FUEL CONSUMPTION, EMISSIONS AND COST - RATE [J -------------------------------------------------------------- Mov Fuel Cost HC CO NOX CO2 No. Eft. Rate Rate Rate Rate Rate mpg $/mi g/km g/km g/km g/km ~-------~---~----------------~-------------------------------- Vvest: West Approach 12 L 260.3 0.49 0.336 11.04 0.399 226.4 11 T 289.0 0.42 0.277 7.97 0.347 203.9 13 R 274.9 0.44 0.304 9.64 0.380 214.3 D o 274.6 ----------------------------------------~------ 214.6 0.45 0.305 9.55 0.376 -----------------------~-------------------------------------- D South: 32 L 31 T 33 R South Approach 258.9 283.6 271.6 o 0.49 0.42 0.44 0.339 0.288 0.311 11.30 8.90 10.25 0.405 0.366 0.393 227.6 207.8 218.0 263.5 ----------------------------------------------- 223.6 0.47 0.329 10.82 0.397 -------------------------------------------------------------- O East: East 22 L 21 T 23 R Approach 254.6 277.6 267.6 o 0.51 0.42 0.44 0.349 0.299 0.319 11.61 9.89 10.85 0.412 0.387 0.407 233.3 212.2 220.3 273.6 ----------------------------------------------- 215.4 0.43 0.307 10.22 0.394 --------~----------------------------------------------------- o North: 42 L 41 T 43 R North Approach 254.2 276.4 266.7 0.51 0.42 0.44 0.349 0.301 0_320 11.66 10.04 10.96 0.413 0_391 0.409 231.7 213 .1 221.0 269.3 ----------------------------------------------- 218.8 [J -------------------------------------------------------------- INTERSECTION: 268.1 0.44 0.46 0.315 0.319 10.67 10.41 0.403 0.392 ~------------------------------------------------------------- 219.8 D Clarian Health O 103rd & Penn (Scenario Intersection ID: 1 Roundabout 2, PM PEAK) 80 Table S.14 - SUMMARY OF INPUT AND OUTPUT DATA Lane No. West: 1 LT 2 TR South: 1 L 2 TR East: 1 LT 2 TR North: 1 LT 2 R Demand Flow (veh/h) L T R Tot Adj. Eff Grn %HV Basic (sees) Satf. 1st 2nd Deg Sat x 264 306 570 723 199 6 922 5 5 5 5 6 5 7 5 68 6 0.218 0.218 0.218 0.522 0.262 0.522 0.053 0.053 0.053 0.263 0.301 0.301 o o Aver. Longest Shrt Delay Queue Lane (see) (ft) (ft) 7.5 5.1 6.2 12.4 4.9 10.8 8.7 7.8 8.2 9.0 9.4 9.2 o 34 34 o West Approach 133 131 19 287 133 150 287 South Approach 723 193 6 723 193 East Approach 4 27 21 16 4 48 31 37 16 North Approach 25 148 173 232 232 5 5 5 34 106 40 o ALL VEHICLES 25 148 232 405 106 o 7 8 o 8 43 53 o -----~-------------------------------------------------------------------- -------~------------------------------------------------------------------ 53 o Total Flow 1965 % HV 5 Max X 0.522 Aver. Delay 9.1 Max Queue 106 o Total flow period = 60 minutes. Peak flow period = 15 minutes. Queue values in this table are 95% back of queue (feet). o Note: Basic Saturation Flows are not adjusted at roundabouts or sign- controlled intersections and apply only to continuous lanes. Clarian Health 103rd & Penn (Scenario 2, PM PEAK) Intersection ID: 1 Roundabout Table S.15 - CAPACITY AND LEVEL OF SERVICE Mov No. West: West 12 L 11 T 13 R South: 32 L 31 T 33 R Mov Typ Total Flow (veh Ih) Approach 133 150 287 570 South Approach 723 193 6 922 Total Cap. (veh Ih) 611 689 1319 2619 1384 737 23 2144 Deg. of Satn (vie) 0.218 0.218 0.218 0.218 0.522* 0.262 0.261 0.522 Aver. Delay (see) 11.7 3.2 5.3 6.2 12.4 4.9 7.1 10.8 LOS B A A A B A A 81 o o o o o o o o o -------------------------------------------------- Level of Service calculations are based on average control delay including geometric delay (HCM criteria), independent of the current delay definition used. For the criteria, refer to the "Level of Service" topic in the aaSIDRA Output Guide or the Output section of the on-line help. Maximum vie ratio, or critical green periods o East: East 22 L 21 T 23 R Approach 4 48 16 o North: 42 L 41 T 43 R North Approach 25 148 232 D D 405 ALL VEHICLES: 1965 D o ,. 76 908 303 68 1287 0.053 0.053 0.053 0.053 0.263 0.263 0.301 0.301 0.522 D Clarian Health 103rd & Penn (Scenario 2, PM PEAK) Intersection ID: 1 Roundabout o 95 563 772 1430 7479 Table D.O - GEOMETRIC DELAY DATA 16.1 7.2 9.1 8.2 16.3 7.7 9.4 9.2 9.1 B A A A B A A A A o ---------------------------------~-------------~--------------- From Approach To Approach --------------------------------------------------------------- o West: West Approach South East North D Negn Negn Radius Speed ( f t ) (mph) 117.2 190.4 62.0 22.0 28.1 16.0 Negn Dist. (ft ) 61.9 151.5 243.5 Appr. Dist. ( ft) 1800 1800 1800 South: ------------------------------------------------- South Approach West East North D 62.0 117.2 190.4 16.0 22.0 28.1 243.5 61.9 151.5 1800 1800 1800 Downstream Distance (ft) 311 323 469 469 311 323 East: --------------------------------------------------------------- o East Approach West South North 190.4 62.0 117.2 28.1 16.0 22.0 151.5 243.5 61.9 1800 1800 1800 323 469 311 North --------------------------------------------------------------- D North: Approach West South East 117.2 190.4 62.0 22.0 28.1 16.0 61.9 151.5 243.5 1800 1800 1800 D --------------------------------------------------------------- 311 323 469 D Downstream distance is distance travelled from the stopline until exit cruise speed is reached (includes negotiation distance). Acceleration distance is weighted for light and heavy vehicles. The same distance applies for both stopped and unstopped vehicles. O Clarian Health 103rd & Penn (Scenario Intersection ID: 1 Roundabout o Table D.1 - LANE DELAYS 2, PM PEAK) 82 o Lane No. Mov No. Deg. Satn x Stop-line Delay 1st 2nd Total d1 d2 dSL Delay Acc. pec. dn (seconds/veh) ---------------- Queuing Stopd Total MvUp (Idle) Geom Control dq dqrn di dig dic o West: West Approach 1 LT 12, 0.218 0.8 0.0 0.8 1.9 0.0 0.0 0.0 10.9 7.5 11 2.4 2 TR 11, 0.218 0.6 0.0 0.6 1.8 0.0 0.0 0.0 2.4 5.1 13 4.7 D o South: South Approach 1 L 32, 0.522 1.5 0.0 1.5 2.4 0.0 0.0 0.0 10.9 12.4 31 0.0 2 TR 31, 0.262 2.4 0.0 2.4 3.4 0.0 0.0 0.0 2.4 4.9 33 4.7 o East: East Approach 1 LT 22, 0.053 5.1 0.0 5.1 4.6 0.6 0.0 0.6 10.9 8.7 21 2.4 2 TR 21, 0.053 4.4 0.0 4.4 4.4 0.2 0.0 0.2 2.4 7.8 23 4.7 D o North: North Approach 1 LT 42, 0.263 5.3 0.0 5.3 4.7 0.6 0.0 0.6 10.9 9.0 41 2.4 2 R 41, 0.301 4.8 0.0 4.8 4.2 0.5 0.0 0.5 0.0 9.4 43 4.7 o dn is average stop-start delay for all vehicles queued and unqueued o Clarian Health 103rd & Penn (Scenario 2, PM PEAK) Intersection ID: 1 Roundabout o o Table D.2 - LANE STOPS Queue Deg. -- Effective Stop Rate - - Prop. Move-up Lane Satn Geom. Overall Queued Rate No. x hel he2 hig h pq hqrn o West: 1 LT 2 TR West Approach 0.218 0.17 0.00 0.218 0.16 0.00 o 0.32 0.29 0.49 0.46 0.315 0.295 0.00 0.00 o South: South Approach 1 L 0.522 0.35 0.00 2 TR 0.262 0.37 0.00 0.36 0.13 0.70 0.50 0.482 0.477 0.00 0.00 o East: 1 LT 2 TR East Approach 0.053 0.55 0.00 0.053 0.52 0.00 0.10 0.11 0.65 0.64 0.656 0.653 0.00 0.00 D North: North Approach 1 LT 0.263 0.62 0.00 2 R 0.301 0.60 0.00 0.10 0.13 0.72 0.74 0.679 0.683 0.00 0.00 D hg is the average value for all movements in a shared lane hqrn is average queue move-up rate for all vehicles queued and unqueued o Clarian Health 103rd & Penn (Scenario 2, PM PEAK) Intersection ID: 1 83 o o o Roundabout Table D.3 - LANE QUEUES --------------------------------------------------------------------------- D Lane No. --------------------------------------------------------------------------- 98% Queue Stor. Ratio D West: 1 LT 2 TR Deg. Satn x Ovrfl. Average (veh) Queue ----------------- No Nb1 Nb2 Nb 70% 85% Percentile (veh) 95% West Approach 0.218 0.0 0.4 0.218 0.0 0.4 ----------------------------- 0.0 0.0 0.4 0.4 0.8 0.8 0.9 0.9 1.0 1.1 90% 1.3 1.3 1.5 1.5 0.02 0.02 --------------------------------------------------------------------------- D South: South Approach 1 L 0.522 0.0 1.3 2 TR 0.262 0.0 0.5 0.0 0.0 1.3 0.5 2.4 0.9 2.9 1.1 3.3 1.2 4.1 1.5 4.7 1.8 --------------------------------------------------------------------------- 0.06 0.02 u East: 1 LT 2 TR East Approach 0.053 0.0 0.1 0.053 0.0 0.1 0.0 0.0 0.1 0.1 0.2 0.2 0.2 0.2 0.2 0.2 0.3 0.3 0.3 0.3 --------------------------------------------------------------------------- 0.00 0.00 D North: North Approach 1 LT 0.263 0.0 0.5 2 R 0.301 0.0 0.6 0.0 0.0 0.5 0.6 1.0 1.2 1.2 1.4 1.3 1.6 1.7 2.0 1.9 2.4 --------------------------------------------------------------------------- 0.02 0.03 [J Values printed in this table are back of queue (vehicles). D Clarian Heal th 103rd & Penn (Scenario Intersection ID: 1 Roundabout D Table D.4 . MOVEMENT SPEEDS Croph) 2, PM PEAK) o ----------------------------------------------------------------- Mov No. App.' Speeds Queue Move-up Cruise Negn Exit Speeds 2nd Grn Av. Section Spd Negn Cruise 1st Grn Running Overall (J ----------------------------------------------------------------- West: 12 11 13 West Approach 35.0 16.0 35.0 28.1 35.0 22.0 16.0 28.1 22.0 35.0 35.0 35.0 27.3 31. 5 30.3 ~ ----------------------------------------------------------------- 27.3 31. 5 30.3 D South: 32 31 33 South 35.0 35.0 35.0 Approach 16.0 16.0 28.1 28.1 22.0 22.0 35.0 35.0 35.0 26.9 30.7 29.6 26.9 30.7 29.6 ----------------------------------------------------------------- o East: 22 21 23 East Approach 35.0 16.0 35.0 28.1 35.0 22.0 16.0 28.1 22.0 35.0 35.0 35.0 26.5 29.8 28.9 25.7 29.7 28.7 o ----------------------------------------------------------------- North: 42 41 43 North 35.0 35.0 35.0 Approach 16.0 16.0 28.1 28.1 22.0 22.0 35.0 35.0 35.0 26.5 29.7 28.8 o ----------------------------------------------------------------- 25.6 29.5 28.5 o "Running Speed" is the average speed excluding stopped periods. [J --- End of aaSIDRA Output --- 84 All-Way Stop Control Page] J:J: f/ M15 ALL-WAY STOP CONTROL ANAL YSIS General Information Site Information n Inalyst ~MB Intersection 1031d Street & Penn. Pkwy. \oeocy/Co. D,&F Engineering urisdiction Carmet ate Performed 11/1/02 f-\fIalysis Year Yeal 2012 Inalvsis Time Period D,M Peak U Proiect 10 Clarian Heallh East/West Street: 103rd Street lNorth/South Street: Penn. Parkway Volume Adjustments and Site Characteristics U ~pproach Eastbound Westbound Movement l T R l T R ~olume 172 81 199 7 90. 27 f1 1'. Thrus left lane 50. 50 !Approach Northbound Southbound - Movement l T R l T R volume 95 70. 2 6 113 68 I'.Thrus left lane 50 50. . Eastbound Westbound Northbound Southbound 11 l2 11 l2 11 l2 11 l2 onfiguration L TR LTR LT R LTR ... PHF 0..90. 0..90. 0..90. 0..90. 0..90. 0..90. Flow Rate 191 311 137 182 2 20.6 U 1'. Heavy Vehicles 5 5 5 5 5 5 No. lanes 2 1 2 1 Geometry Group 5 4b 5 4b -0 Duration, T 0.25 Saturation Headway Ad'ustment Worksheet Prop. left-Turns 1.0. 0..0. 0..1 0..6 0..0. 0..0. D Prop. Right-Turns 0..0. 0..7 0.2 0..0. 1.0. 0.:4 Prop. Heavy Vehicle 0..0. 0..0. 0..0. 00 0.0. 0..0. hLT-adj 0..5 0..5 0.2 0..2 0..5 0..5 0..2 0..2 D hRT -adj -0..7 -0..7 -0.6 -0..6 -0..7 -0..7 -0..6 -0._6 hHV-adj 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 hadj, computed 6.67 6.67 6.67 667 667 6.67 D Departure Headway and Service Time hd, initial value 3.20. 3.20. 3.20. 3.20. 3.20. 3.20. '- , initial 0..17 0..28 0..12 0.16 0.0.0. 0..18 D hd, final value 6.67 6.67 6.67 6.67 6.67 6.67 , final value 0..35 0..49 0.25 0..36 0..0.0. 0..37 Move-up time, m 2.3 2.3 2.3 2.3 f1 Service Time 4.4 3.4 4.4 3.4 4.4 I 3.4 4.4 3.4 Capacity and level of Service - Eastbound Westbound Northbound Southbound D 11 l2 11 l2 11 l2 11 l2 apacily '441 561 387 432 252 456 Delay 12.98 13.66 1150. 13.64 8.78 13.0.1 D LOS B B B B A B !Approach: Delay 13.40. 11.50. 13.59 13.0.1 LOS B B B B U Intersection Delay 13.10. Intersection LOS B 85 o file:l/C:\ WINDOWS\TEMP\u2kE3 74. TMP J1 /7 /O~ o All- Way Stop Control Page I of: o Rt15 3 ALL-WAY STOP CONTROL ANALYSIS General Information ~ite Information nalvsl RMB nlerseclion 103rd Street & Penn. Pkwv. \oencv/Co. A&F Enoineerino urisdiclion Carmel ate Performed 11/1/02 Vlalvsis Year Year 2012 Inalvsis Time Period PM Peak Proiect ID Clarian Heaffh EasVWest Street: 103rd Street lNorth/South Street: Penn. Parkway Volume Adiustments and Site Characteristics I\oDroach Eastbound Westbound Movement l T R l T R lJolume 122 138 71 3 45 14 Y.Thrus left lane 50 50 lAooroach Northbound Southbound Movement l T R l T R Ivolume 106 71 5 24 100 213 Yo Thrus Left lane 50 50 Eastbound Westbound Northbound Southbound 11 l2 11 l2 11 l2 11 l2 !configuration L TR LTR LT R LTR PHF 0.90 0.90 0.90 0.90 0.90 0.90 low Rate 135 231 68 195 5 373 Yo Heavy Vehicles 5 5 5 5 5 5 No. lanes 2 1 2 1 Geometry Group 5 4b 5 4b Duration, T 0.25 Saturation Headway Ad"ustment Worksheet Prop. left.Turns 1.0 0.0 00 0.6 00 0.1 Prop. Right. Turns 00 03 0.2 0.0 1.0 0.6 Drop. Heavy Vehicle 0.0 0.0 0.0 0.0 0.0 0.0 l T.adj 05 05 0.2 02 0.5 0.5 0.2 0.2 hRT .adj -07 -0.7 -0.6 -0.6 -0.7 -07 -0.6 -0.6 IhHV.adj 17 17 17 17 1.7 1.7 1.7 1.7 Ihadj, compuled 7.00 700 7.00 7.00 7.00 7.00 . . ~ o o o o o o o D o o o IOeparture Headway and Service Time hd, initial value 3.20 3.20 3.20 3.20 3.20 3.20 . , initial 0.12 0.21 0.06 0.17 0.00 0.33 .;; hd, fInal value 7.00 7.00 7.00 7.00 7.00 7.00 , fInal value 0.26 0.40 0.13 0.37 0.01 0.61 Move-up time, m 2.3 2.3 2.3 2.3 Service Time 4.7 I 4.0 4.7 4.0 4.7 I 4.0 4.7 I 4.0 . . o o !capacity and level of Service Eastbound Westbound Northbound Southbound l1 l2 II l2 11 l2 11 lZ !capacity 385 481 318 445 255 590 Delay 12.16 13.07 10.77 1353 8.58 17.57 LOS B B B B A C Approach: Delay 12.74 10.77 13.41 17.57 LOS B B B C Intersection Delay 14.53 Intersection lOS B D o D o fiJc:lIC:I WIN DOW SITEM Plu2kF 3 I 2.TMP 86 } }/7/0~ SHORT REPORT ~enerallnformation Site Information !Analyst RMB Intersection Penn. Pkwy & 103rd Street IAgency or Co. A&F Engineering Area Type All other areas Date Performed 11/6/02 Jurisdiction Carmel ime Period AM Peak Analysis Year Existing+Proposed Volume and TiminQ Input EB WB NB SB LT TH RT LT TH RT LT TH RT LT TH RT Num. of Lanes 1 1 1 1 1 0 2 1 0 1 1. 1 lane group L T R L TR L TR L T R Volume (vph) 168 79 650 7 88 26 233 94 2 6 196 66 % Heavy veh 5 5 5 5 5 5 5 5 5 5 5 5 PHF 0.90. 0.90. 0.90 0.90. 0.90. 0..90 0.90 0.90 0..90 0..90. 0..90 0.90. Actuated (P/A) A A A A A A A A A A A A Startup lost time 2.0 2.0 2.0. 2.0 2.0 2.0. 2.0. 2.0. 2.0 2.0. Ext. eft. green 2.0 2.0 2.0 2.0 2.0 2.0. 2.0. 2.0 20. 2.0 Arrival type 3 3 3 3 3 3 3 3 3 3 Unit Extension 3.0 3.0. 3.0. 3.0 3.0. 3.0 3.0 30 3.0. 3.0. Ped/Bike/RTOR Volume 0 325 0. 6 0. 0 0 33 Lane Width 12.0. 12.0 12.0. 12.0 120. 12.0 12.0 12.0. 12.0. 120 Parking/Grade/Parking N 0. N N 0 N N 0 N N 0. N Parking/hr Bus stops/hr 0 0. 0 0 0. 0 0 0 0. 0. Unit Extension 3D 3.0 30 3.0 3.0. 3.0 3.0. 3.0 3.0. 3.0. Phasing Exel. left EW Perm 03 04 NB Only NS Perm 07 08 :riming G= 7.0 G = 38.0 G= G= G == 100 G == 14.0. G== G= Y== 3 Y== 5 Y== Y== Y == 3 Y == 5 Y== Y= Duration of Analysis (hrs = 0.25 Cycle Length C == 85.0. Lane Group Capacity, Control Dela'J , and LOS Determination EB WB NB SB !Adj. flow rate 187 88 361 8 120. 259 10$ 7 218 37 Lane group cap. 663 80.9 959 678 787 392 573 205 298 253 ~/c ratio 0..28 0..11 0.38 0..01 0.15 0.66 0.18 0..03 0..73 0..15 ~reen ratio 0..56 0..45 0.62 0..56 0..45 0.12 0.32 0.16 0..16 0..16 Unif. delay d1 9.2 13.7 79 8.2 13.9 35.9 210 29.8 33.7 30.4 Delay factor k 0.11 0..11 0..11 0..11 0..11 0.24 O. 11 0.11 0..29 0.11 Increm. delay d2 0..2 0.1 0.2 0.0. 0.1 4. 1 0.2 0.1 8.9 0.3 PF factor 1. 00.0 1.0.00 1.000 1.000 1.000 1000 1. 000 1.000 1000 1.000 ~ontrol delay 9.4 13.7 8.1 82 14.0 40.0 212 299 42.6 30.7 Lane group LOS A B A A B 0 C C 0 C !Apprch. delay 9.3 13.7 345 406 !Approach lOS A B C 0 Intersec. delay 222 Intersection LOS C Page ] of] 0 41\,"-'5:j 4] Short Report HCS10001M Cop)oghl C>?OOO UnivelSllV of FIOIida. All Rights Reserved Ver~jon 4. Ie o o o o o o o o o o o o o o o o o 87 file://C:\Documents%20and%20Set1ings\tvandenberg.DELL] 5\LocaJ%20Settings\Temp\s2... ]] /8/2002 D o o D D D o o D D o D D D o D o o D Short Report Page I of] Y rAI\ 5Y-45 SHORT REPORT General Information Site Information . Analyst RMB Intersection Penn. Pkwy & 103rd Street fA,gency or Co. A&F Engineering Area Type All other areas Date Performed 11/6/02 Jurisdiction Carmel Irime Period PM Peak Analysis Year Ex isting + Proposed Volume and Timing Input EB WB NB SB LT TH RT LT TH RT LT TH RT LT TH RT Num. of Lanes 1 1 1 1 1 0 2 1 0 1 1 1 Lane group L T R L TR L TR L T R Volume (vph) 119 135 259 3 44 14 651 173 5 23 134 208 % Heavy veh 5 5 5 5 5 5 5 5 5 5 5 5 PHF 0.90 0..90 0..90. 0..90. 0..90. 0.90 0..90. 0.90 0.90. 0.90 0..90 0.90. lActuated (PIA) A A A A A A A A A A A A Startup lost time 2.0. 2.0 2.0 2.0 2.0. 20 2.0 2.0 2.0. 2.0. Ext. eft. !]reen 2.0. 2.0. 2.0. 2.0 2.0. 2.0 2.0 2.0. 2.0. 2.0 ~rrival type 3 3 3 3 3 3 3 3 3 3 Unit Extension 3.0. 3.0. 3.0 30. 30 3.0. 3.0 3.0. 30. 3.0. Ped/Bike/RTOR Volume 0 129 0 3 a 1 a 104 Lane Width 12.0. 120. 120 120 120. 120 12.0 120 12.0 12.0 Parking/Grade/Parking N a N N 0 N N 0 N N 0 N Parking/hr Bus stops/hr a a a 0 0 0 0 0 0 a Unit Extension 3.0. 30 3.0 30. 30. 30 3.0 3.0. 3.0 3.0. Phasin!] Excl. Left EW Perm 03 04 NB Only NS Perm 07 08 Timing G= 7.0 G = 9.0 G= G= G = 20 a G= 8.0 G= G= Y= 3 Y = 5 Y= Y= Y = 3 Y = 5 Y= Y= Duration of Analysis (hrs) = 0.25 Cycle LenQth C = 600 lane Group Capacity, Control Dela~, and lOS Determination EB WB NB SB lAdj. flow rate 132 150 144 3 61 723 196 26 149 116 Lane group cap. 352 272 872 341 263 1112 932 153 241 205 ~/c ratio 0.38 0..55 0.17 0.01 0.23 065 0.21 0. 17 0.62 0.57 Green ratio 0.32 0.15 0..57 032 0.15 033 052 0.13 0.13 0.13 Unit. delay d1 15.4 23.6 62 14.2 22.5 170 79 23.1 24.6 24.4 Delay factor k 0.11 0.15 0.11 011 0.11 0.23 0. 11 0.11 0.20 0.16 Increm. delay d2 0.7 2.4 01 0.0 0.5 1.4 0.1 0.5 48 3.6 PF factor 1.0.0.0 10.00 1000. 1000 1. 000 1. 00.0 1000 1000 1. 000 1.000 !control delay 16.1 260. 6.3 143 229 18.4 80 23.6 293 28.0 Lane group LOS B C A B C B A C C C Apprch. delay 163 225 162 283 Approach LOS B C B C Intersec. delay 185 Intersection LOS B HC57000™ Copyright <07000 Univer,,'Y of F londa. All RIghts Reserved Version 4. Ie 88 fiJe://C:\Documents%20and%20Settings\tvandenberg.DELL I S\Local%20Settings\ T einp\s2... I 1/8/2002 Akcelik & Associates pty Ltd - aaSIDRA 2.0.0.205 A&F Engineering A&F Engineering Registered User No. A0654 Licence Type: Professional, Single Computer Time and Date of Analysis 7:35 AM, Nov 7,2002 Filename: Z:\2002\02114-clarion\Capacity\Ch4ams4ar.OUT Clarian Health 103rd & Penn (Scenario 4A, AM PEAK) Intersection ID: 1 aaTraffic SIDRA US Highway Capacity Manual (2000) Version RUN INFORMATION * Basic Parameters: Intersection Type: Roundabout Driving on the right-hand side of the road Input data specified in US units Default Values File No. 11 Peak flow period (for performance): 15 minutes Unit time (for volumes): 60 minutes (Total Flow Period) Delay definition: Control delay Geometric delay included HCM Delay and Queue Models option selected Level of Service based on: Delay (HCM method) Queue definition: Back of queue, 95th Percentile Clarian Health 103rd & Penn (Scenario 4A, AM PEAK) Intersection ID: 1 DEFAULT PARAMETERS Default values for some of the important general parameters: (Default Values File: DEF11.SDF) 1. Basic saturation flow: 1900 tcu/h This value applies mainly to signalised intersections. For roundabouts and sign-controlled intersections, it is used for determining capacity of priority and continuous movements. 2. Through car equivalents for L EFT LV HV Normal 1.053 2.000 Restricted 1.303 2.500 signalised intersections THROUGH RIG H T LV HV LV HV 1.000 2.000 1.176 2.000 1.426 2.500 3. Opposed turn parameters (Roundabout) Crit. Fol.up Min. Gap Hdway Deps V V 2.5 V V 2.5 V V 2.5 % Exit Flow Opposing o o o Left turns : Through Right turns: 4. Cruise speed= 40 mi/h, Approach Distance= 1800 ft 5. Queue space per vehicle in feet Light vehicles: 25.0 Heavy vehicles: 4S.0 89 A full list of input data defaults and ranges IS given in the D ~AM ~L\;\\\ D o o o o D D o o o o o o o D o o o o Input Guide part of aaSIDRA User Guide. O Clarian Heal th 103rd & Penn (Scenario Intersection ID: 1 Roundabout 4A, AM PEAK) o Table S.O - TRAFFIC FLOW DATA D Flow Scale ---------------------------------------~-------------------------------- Mov No. Left Through Right LV HV LV HV LV HV D Peak Flow Factor ------------------------------------------------------------------------ VEHICLES Demand flows in veh/hour as used by the program West: West Approach 12 182 10 0 0 0 0 1.00 0.90 11 0 0 86 4 0 0 1.00 0.90 13 0 0 0 0 691 36 1.00 0.90 D ------------------------------------------------------------------------ o South: South 32 31 33 Approach 248 o o 13 o o o 101 o o 5 o o o 2 o o 1 1.00 1.00 1.00 East: East 22 21 23 Approach o 95 o o o 29 1.00 1.00 J .00 [J ---------------------------------------------------------------------- 0.90 0.90 0.90 North: North 42 41 43 Approach 6 o o 1 o o o 2JO o o 11 o o o 72 o o 4 J.OO J .00 J .00 D 0.90 0.90 0.90 0.90 0.90 0.90 ----~------~------------------------------------------------~----------- Based on unit time = 60 minutes. D Flow Scale and Peak Hour Factor effects included in flow values. Clarian Health D 103rd & Penn (Scenario Intersection ID: 1 Roundabout 4A, AM PEAK) D Table R.O - ROUNDABOUT BASIC PARAMETERS ------------------~-------------~------~----------~---~---------------------- Circulating/Exiting ':'- Stream Cent Circ Insc No.of No.of Av.Ent ---------------------------------- Island Width Diam. Circ. Entry Lane Flow %HV Adjust. %Exit Cap. Diam Lanes Lanes Width (veh/ Flow Incl. Constr. (ft ) (ft) ( ft) ( f t) h) (pcu/h) Effect D D ----------------------------------------------------------------------------- West: West Approach 100 30 160 2 2 12.00 236 5.0 236 0 N (J ;~:~~~--~~:~~-~~~~~~~~------------------------------------------------------- 100 30 160 2 2 12.00 288 5.0 288 0 N D East: 100 559 ----------------------~-------------------------------~---------------------- N East Approach 30 160 2 2 12.00 559 5.0 c o ------------------------------------~------------~--------------------------- North: North Approach O 100 30 160 2 2 12.00 369 5.0 369 0 N ---------------------------------------------------------------------------~- O Clarian Heal th 103rd & Penn (Scenario 4A, AM PEAK) 90 Intersection ID: 1 Roundabout o Turn Table R.l - ROUNDABOUT GAP ACCEPTANCE PARAMETERS o West: Left Thru Right. South: Left Thru Right Lane No. Lane Type Circ/ Exit Flow (pcu/h) 236 236 236 288 288 288 Intra- Bunch Headway (s) Critical Gap (s) o West Approach 1 Subdominant 1 Subdominant 2 Dominant South Approach 1 Dominant 2 Subdominant 2 Subdominant Follow Up Headway (s) Prop. Bunched Vehicles 1. 38 1. 38 1.38 0.203 0.203 0.203 D 4.99 4.99 3.32 2.86 2.86 1.90 o 2.00 2.00 2.00 3.95 5.15 5.15 o 2.28 2.98 2.98 0.329 0.329 0.329 East: East Approach Left 1 Subdominant 559 1. 63 0.469 4.11 2.50 Thru 1 Subdominant 559 1. 63 0.469 4.11 2.50 2 Dominant 559 1. 63 0.4 69 3.81 2.32 Right 2 Dominant 559 1. 63 0.469 3.81 2.32 o D North: North Approach Left 1 Subdominant 369 1. 80 0.370 4.28 2.51 Thru 1 Subdominant 369 1. 80 0.370 4.28 2.51 2 Dominant 369 1. 80 0.370 3.99 2.34 Right 2 Dominant 369 1. 80 0.370 3.99 2.34 o o Clarian Health 103rd & Penn (Scenario 4A, AM PEAK) Intersection ID: 1 Roundabout o Table R.5 - ROUNDABOUT CAPACITY & LEVEL OF SERVICE - aaSIDRA & HCM MODELS D aaSIDRA HCM 2000 Lower HCM 2000 Upper Mov Dem -------------------- -------------------- -------------------- No. Flow Cap. Deg. Av. Cap. Deg. Av. Cap. Deg. Av. (veh (veh Satn Delay LOS (veh Satn Delay LOS (veh Satn Delay LOS /h) /h) x (see) /h) x (see) /h) x (see) West: 12 L 11 T 13R South: 32 L 31 T 33 R East: 22 L 21 T 23 R West Approach 192 663 0.290 90 311 0.289 727 1571 0.463 2545 0.463 South 261 106 3 Approach 1214 0.215 850 0.125 24 0.125 12.3 3.8 5.5 6.6 A 12.2 4.1 6.4 9.8 A 13.3 4.6 6.7 D B A A o 2088 0.215 East Approach 8 109 0.073 100 1365 0.073 30 410 0.073 NA - - - - - NA - NA - - - - NA - - - NA - - - - NA o - - - - NA - - - - - - - - NA - - - - B A A o NA - - NA - - - - - - NA - - NA - - - - NA - NA - - - - - NA ~ - - - D - - - - NA - - - - B A A - NA - - - NA - NA o - NA - - - NA -NA-- 1884 0.073 5.6 A - - - - NA - ----------------------------------------------~1 - - - - NA ~. m-' . - '- '. ' D o North: 42 L o ~; ~ o North 7 221 76 Approach 49 0.143 1557 0.142 535 0.142 ALL VEHICLES: 8658 0.463 2141 0.143 o 12.6 B 4.0 A 6.1 A 4.7 A 6.9 A - NA NA - NA - - - - NA - - - - - - - - NA - - - - - NA - NA - NA - - - - NA - - - - - - - - NA - - - - NA Values for this roundabout capacity model have not been calculated because the model was not applicable for the given roundabout conditions. Note that the HCM models are only applicable to single-lane roundabouts with circulating flows less than 1200 veh/h. Also note that results are not calculated for any of the models for slip lane or continuous movements. See aaSIDRA Output Guide Appendix Section A3.8 for roundabout limits. D D Clarian Health 103rd & Penn (Scenario 4A, AM PEAK) Intersection ID: 1 Roundabout o o Table R.6 - ROUNDABOUT ALTERNATIVE CAPACITY MODELS o Mov No. aaSIDRA NAASRA 1986 Ger. Linear Ger. GapAcc Dem ----------- ----------- ----------- ----------~ Flow Cap. Deg. Cap. % Diff Cap. % Diff Cap. % Diff (veh (veh Satn (veh from (veh from (veh from /h) Ih) x Ih) aaSIDRA /h) aaSIDRA Ih) aaSIDRA 0 West: West Approach 12 L 192 663 0.290 1005 51. 6 429 -35.3 710 7.1 11 T 90 311 0.289 471 51. 4 201 -35.4 333 7.1 13 R 727 1571 0.463 1478 -5.9 631 -59.8 1044 -33.5 D ---------~----------------------------------------- 2545 0.463 2954 16.1 1261 -50.5 2087 -18.0 --~-------------------~------------------------------------------ D South: 32 L 31 T 33 R South 261 106 3 Approach 1214 0.215 850 0.125 24 0.125 1415 1365 39 16.6 60.6 62.5 618 596 17 -49.1 -29.9 -29.2 1001 966 27 -17.5 13.6 12.5 D -----------------------__________________________________________ o East: 22 L 21 T 23 R 2088 0.215 2819 130 1624 487 35.0 19.3 19.0 18.8 1231 -41.0 64 794 238 -41.3 -41.8 -42.0 1994 92 1155 346 -4.5 -15.6 -15.4 -15.6 D ------------------------------------------------------------ D North: 42 L 41 T 43 R East Approach 8 109 100 1365 30 410 0.073 0.073 0.073 2241 61 1916 659 ALL VEHICLES: 8658 2141 0.143 2636 18.9 24.5 23.1 23.2 1096 27 867 298 -41.8 -44.9 -44.3 -44.3 1593 43 1360 468 -15.4 -12.2 -12.7 -12.5 23.0 23.1 1192 -44.3 1871 -12.6 -12.9 [] --------------------------------------------------------- 1884 0.073 0.463 10650 4780 -44.8 7545 -------------------------------~--------------------------------- North 7 221 76 Approach 49 0.143 1557 0.142 535 0.142 D Clarian Health 103rd & Penn (Scenario 4A, AM PEAK) [] Intersection ID: 1 Roundabout 92 o Mov Dem Total %HV Adjust. Total Prac. Prac. Lane Deg. No. Flow Opng Opng Cap. Deg. Spare util Satn (veh Flow Flow (veh Satn Cap. /h) (veh/h) (pcu/h) /h) xp (%) (%) x -------------------------------------------------------------------- West: West Approach 12 L 192 236 5.0 236 663 0.85 194 63 0.290 11 T 90 236 5.0 236 311 0.85 194 63 0.289 13 R 727 236 5.0 236 1571 0.85 84 100 0.463* South: 32 L 31 T 33 R East: 22 L 21T 23 R North: 42 L 41 T 43 R South Approach 261 288 106 288 3 288 288 288 288 1214 850 24 D D 0.85 0.85 0.85 o 5.0 5.0 5.0 295 582 580 100 58 58 0.215 0.125 0.125 D East Approach 8 559 100 559 30 559 5.0 5.0 5.0 559 559 559 109 1365 410 0.85 0.85 0.85 1058 1060 1062 100 100 100 0.073 0.073 0.073 o North Approach 7 369 221 369 76 369 369 369 369 49 1557 535 0.85 0.85 0.85 495 499 498 o 5.0 5.0 5.0 100 100 100 0.143 0.142 0.142 D Clarian Health 103rd & Penn (Scenario 4A, AM PEAK) Intersection ID: 1 Roundabout Table S.3 - INTERSECTION PARAMETERS Intersection Level of Service Worst movement Level of Service Average intersection delay (s) Largest average movement delay (s) Largest back of queue, 95% (ft) Performance Index Degree of saturation (highest) Practical Spare Capacity (lowest) Total vehicle capacity, all lanes (veh/h) Total vehicle flow (veh/h) Total person flow (pers/h) Total vehicle delay (veh-h/h) Total person delay (pers-h/h) Total effective vehicle stops (veh/h) Total effective person stops (pers/h) Total vehicle travel (veh-mi/h) Total cost (S/h) Total fuel (ga/h) Total C02 (kg/h) D o A B 6.9 13.3 84 38.42 0.463 84 % 8658 1821 2732 3.48 5.22 1933 2899 741.9 532.62 27.2 258.17 o o o o o Clarian Health 103rd & Penn (Scenario 4A, AM PEAK) Intersection ID: 1 Roundabout Tabl e S. 5 - MOVEMENT PERFORMANCE Mov No. o o Perf. Index D Total Total Aver. Prop. Delay Delay Delay Queued (veh-h/h) (pers-hih) (see) Eff. Longest Queue Stop 95% Baek Rate (vehs) (ft) Aver. Speed (mph) D West: West Approach 93 o 12 L 11 T DR D 0.66 0.10 1.11 0.99 0.14 1. 66 12.3 3.8 5.5 0.39 0.39 0.37 1.40 0.79 1. 01 1.7 1.7 3.2 44 44 84 4.87 1. 69 14.50 43;6 49.9 48.2 ----------------------------------~--------------------------------------- South: 32 L 31 T 33 R D South Approach 0.88 1.32 0.12 0.18 0.01 0.01 12.2 4.1 6.4 0.39 0.41 0.41 1.36 0.85 1.07 1.3 0.7 0.7 35 18 18 6.47 2.05 0.06 43.6 49.8 47.9 -------------------------------------------------------------------------- D East: 22 21 23 o East L T R Approach 0.03 0.13 0.06 0.04 0.19 0.08 13 .3 4.6 6.7 0.50 0.49 0.49 1.44 0.95 1.15 0.4 0.4 0.4 11 11 11 0.21 1.99 0.64 43.2 49.2 47.5 -------------------------------------------------------------------------- North: 42 L 41 T 43 R o North Approach 0.02 0.04 0.24 0.37 0.13 0.19 12.6 4.0 6.1 0.43 0.43 0.42 1.40 0.82 1. 08 0.8 0.8 0.8 22 22 22 0.18 4.17 1.58 43.5 49.7 47.9 -------------------------------------------------------------------------- D C1arian Health 103rd & Penn (Scenario 4A, AM PEAK) Intersection ID: 1 Roundabout o Table S.6 - INTERSECTION PERFORMANCE o ------------------------------------------------------------------------- Total Flow (veh/h) Deg. Satn x Total Total Aver. Prop. Delay Delay Delay Queued (veh-h/h) (pers-h/h) (see) Eff. Longest Perf. Stop Queue Index Rate (ft) Aver. Speed (mph) D W~~~~ ----------~~-----~~---------------------------------~--------------~----- 29.4 West Approach 0.463 1-86 2.79 6.6 0.379 1-06 84 21_06 D South: 370 -~-----~-------~-------~------------------------------------------------- 28.1 South Approach 0.215 1.01 1. 51 9.8 0.403 1.21 35 8.59 -------------------~----------------------------------------------------- East: 138 o North: 304 East Approach 0_073 0_21 0.32 5.6 0.496 1. 03 11 2.84 30_1 ------------~------------------------------------------------------------ 30.5 North Approach 0.143 0.40 0.60 4.7 0.431 0.90 22 5.93 [J ------------------------------------------------------------------------- INTERSECTION (persons): 2732 0.463 5.22 6.9 0.401 1. 06 38.42 -------------------------------------------------------------~----------- 47.2 (j Queue values in this table are 95% back of queue (feet). Clarian Health n 103rd & Penn (Scenario 4A, AM PEAK) ~ Intersection ID: 1 Roundabout D Table S.7 - LANE PERFORMANCE ---------------------------------------------------------------- o Lane No. Mov No. Dem Flow (veh /h) Cap (veh Ih) Deg. Satn x Aver. Delay (see) Eft. Stop Rate [j ---------------------------------------------- West: i'vest Approach 1 LT 12, 282 974 0.290 9.6 0.60 11 2 R 11, 727 1571 0_463 5.5 0.50 13 u __ __ 94 Que u e 95% Back (vehs) (ft) 1.7 44 3.2 84 Short Lane (ft) South: South Approach 1 L 32, 261 1214 0.215 12.2 0.68 1.3 35 31 2 TR 31, 109 874 0.125 4.2 0.43 0.7 18 33 o D East: East Approach 1 LT 22, 65 890 0.073 5.8 0.52 0.4 11 21 2 TR 21, 73 993 0.073 5.4 0.51 0.4 11 23 D o North: North Approach 1 LT 42, 145 1023 0.142 4.5 0.43 0.8 22 41 2 TR 41, 159 1118 0.142 5.0 0.47 0.8 22 43 o D Clarian Health 103rd & Penn (Scenario 4A, AM PEAK) Intersection ID: 1 Roundabout D Table S.8 - LANE FLOW AND CAPACITY INFORMATION D Min Tot Lan Mov Dem Flow (veh/h) Cap Cap Deg. Lane No. No. --------------~---- (veh (veh Satn Util Lef Thru Rig Tot /h) /h) x % D West: West Approach 1 LT 12, 192 90 0 282 150 974 0.290 63P 11 2 R 11, 0 0 727 727 150 1571 0.463 100 13 D o South: South Approach 1 L 32, 261 0 0 261 150 1214 0.215 100 31 2 TR 31, 0 106 3 109 109 874 0.125 58P 33 o East: East Approach 1 LT 22, 8 57 0 65 65 890 0.073 100 21 2 TR 21, 0 43 30 73 73 993 0.073 100 23 o o North: North Approach 1 LT 42, 7 138 0 145 145 1023 0.142 100 41 2 TR 41, 0 83 76 159 150 1118 0.142 100 43 o P Lane under-utilisation found by the "Program" o For roundabouts, the capacity value for continuous movements is obtained as the basic saturation flow without any adjustments. Saturation flow scale applies if specified. o Clarian Health 103rd & Penn (Scenario 4A, AM PEAK) Intersection ID: 1 Roundabout D 95 Table S.10 - MOVEMENT CAPACITY AND PERFORMANCE SUMMARY D D Mov Typ ------------------~----------------------------------------------- Perf. Index D Mov No. Dem Flow (veh /h) Total Cap. (veh /h) Lane Util Deg. Satn Aver. Delay x (see) Eft. Stop Rate 95% Back of Queue (veh) ------------------------------------------------------------------ (% ) 0 West: West Approach 12 L 192 663 63 0.290 12.3 1.40 1.7 4.87 11 T 90 311 63 0.289 3.8 0.79 1.7 1.69 13 R 727 1571 100 0.463* 5.5 1.01 3.2 14.50 0 ------------------------------------------------------------ ------ South: South Approach 32 L 261 1214 100 0.215 12.2 1.36 1.3 6.47 31 T 106 850 58 0.125 4.1 0.85 0.7 2.05 0 33 R 3 24 58 0.125 6.4 1.07 0.7 0.06 ------------------------------------------------------------------ East: East Approach D 22 L 8 109 100 0.073 13 .3 1.44 0.4 0.21 21 T 100 1365 100 0.073 4.6 0.95 0.4 1.99 23 R 30 410 100 0.073 6.7 1.15 0.4 0.64 ------------------------------------------------------------------ O North: 42 L 41 T 43 R North Approach 7 49 221 1557 76 535 100 100 100 0.143 0.142 0.142 12.6 4.0 6.1 1.40 0.82 1.08 0.8 0.8 0.8 0.18 4.17 1.58 o --:--------------------------------------------------------------- Maximum degree of saturation D Clarian Health 103rd & Penn (Scenario Intersection ID: 1 Roundabout D 4A, A11 PEAK) Table S.12A - FUEL CONSUMPTION, EMISSIONS AND COST - TOTAL D -------------------------------------------------------------- Mov Fuel Cost HC CO NOX CO2 No. Total Total Total Total Total Total gal/h $/h kg/h kg/h kg/h kg/h ------------------------------------~------------------------- West: West Approach 12 L 3.2 64.92 0.045 1. 48 0.053 30.1 11 T 1.3 24.19 0.016 0.49 0.021 12.0 13 R 10.6 204.71 0.143 4.62 0.180 100.6 D o 15.0 -----~~---------------------------------------- 142.7 293.82 0.204 6.59 0.254 D South: 32 L 31 T 33 R Approach 4.3 1.5 0.0 D -------------------------------------------------------------- South 88.25 28.49 0.84 0.061 0.019 0.001 2.01 0.59 0.02 0.072 0.025 0.001 40.9 14.1 0.4 5.8 ---------------------------------------~------- 55.4 117.58 0.081 2.62 0.098 ------------------~------------~------------------------------ 0 East: East 22 L 21 T 23 R 0 Approach 0.1 1.4 0.4 2.71 26.88 8.45 0.002 0.019 0.006 0.06 0.58 0.20 0.002 0.024 0.008 1.3 13.5 4.2 2.0 ----------------------------------------------- 18.9 38.04 0.027 0.84 0.034 -------------------------------------------------------------- o North: 42 L 41 T 43 R Approach 0.1 3.1 1 .1 North 2.37 59.41 21.40 0.002 0.041 0.015 0.05 1. 23 0.49 0.002 0.052 0.019 1.1 29.5 10.6 ----------------------------------------------- O 4.3 83.18 0.057 1.78 0.073 41.2 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - _ _ _ _ _ _ _ _ _ _ _ _ _ .96 ". _ _ _ _ _ _ _ _ _ _ _ _ INTERSECTION: 27.2 ------------------------------------------------- 0.458 532.62 0.369 PARAMETERS USED IN COST CALCULATIONS 11.83 Pump price of fuel ($/US gal) Fuel resource cost factor Ratio of running cost to fuel cost Average income ($/h) Time value factor Average occupancy (persons/veh) Light vehicle mass (1000 lb) Heavy vehicle mass (1000 lb) Light vehicle idle fuel rate (US gal/h) Heavy vehicle idle fuel rate (US gal/h) 0.850 0.50 3.0 23.00 0.60 1.5 1.4 11.0 0.360 0.530 258.2 D D o o o The idle fuel and vehicle mass parameters given above are the default values (data given in RIDES may override some of these parameters) . o Clarian Health 103rd & Penn (Scenario 4A, AM PEAK) Intersection ID: 1 Roundabout o o Table S.12B - FUEL CONSUMPTION, EMISSIONS AND COST - RATE -------------------------------------------------------------- D Mov Fuel Cost HC CO NOX CO2 No. Eft. Rate Rate Rate Rate Rate mpg $/mi g/krn g/krn g/krn g/krn -------------------------------------------------------------- West: West Approach 12 L 259.6 0.49 0.338 11.17 0.402 227.0 11 T 286.2 0.42 0.283 8.45 0.357 205.9 13 R 273.5 0.44 0.307 9.89 0.386 215.5 271.6 South: 32 L 31 T 33 R South Approach 259.6 285.6 272.9 266.3 East: 22 21 23 East L T R Approach 258.8 282.9 271.2 278.7 0.45 0.49 0.42 0.44 0.47 0.49 0.42 0.44 0.43 0.311 0.338 0.284 0.308 0.323 0.340 0.289 0.311 0.297 10.02 11.17 8.55 10.03 10.44 11.33 9.01 10.30 9.43 0.386 0.402 0.359 0.389 0.390 0.405 0.369 0.395 0.377 o 216.9 o 227.0 206.3 218.3 o 221.3 o 228.4 208.2 217.1 o -------------------------------------------------------------- 211. 4 D North: North 42 L 41 T 43 R Approach 259.3 285.0 272.4 281.1 INTERSECTION: 272.5 0.49 0.42 0.44 0.42 0.45 0.338 0.285 0.309 0.292 0.309 11.23 8.65 10.08 9.07 9.91 0.403 0.361 0.390 0.369 0.384 228.0 206.7 216.3 D 209.6 o 216.2 o Clarian Health 103rd & Penn (Scenario 4A, AM PEAK) Intersection ID: 1 Roundabout 97 o o Lane No. Table S.14 - SUMMARY OF INPUT AND OUTPUT DATA o Adj. Eff Grn Basic (sees) Satf. 1st 2nd x -------------------------------------------------------------------------- o L T Demand Flow (veh/h) Tot R %HV Deg Sat Aver. Longest Shrt Delay Queue Lane ( see) ( f t ) ( ft ) -------------------------------------------------------------------------- West: 1 LT 2 R D West Approach 192 90 727 282 727 5 5 0.290 0.463 9.6 5.5 44 84 192 90 ------------------------------------------------------------------ 84 727 1009 5 0.463 6.6 -------------------------------------------------------------------------- D South: 1 L 2 TR D South Approach 261 106 3 261 109 5 6 0.215 0.125 12.2 4.2 35 18 ------------------------------------------------------------------ 35 261 106 3 370 5 0.215 9.8 -------------------------------------------------------------------------- D East: 1 LT 2 TR North: 1 LT 2 TR East Approach 8 57 43 30 65 73 6 4 0.073 0.073 5.8 5.4 11 11 8 100 ------------------------------------------------------------------ 11 North Approach 7 138 83 30 138 5 0.073 5.6 4.5 5.0 22 22 [J ==========:========::===================================================== 76 145 159 0.142 0.142 ALL VEHICLES 221 ------------------------------------------------------------------ D 304 Total Flow 1821 0.142 % HV 5 Max X 0.463 4.7 Aver. Delay 6.9 22 Max Queue 84 -----------------------------~----------~-------~----~--------~----------- ---------------------------------~~---~~---------------------------------- Total flow period = 60 minutes. Peak flow period = 15 minutes. [J Queue values in this table are 95% back of queue (feet). D Note: Basic Saturation Flows are not adjusted at roundabouts or sign- controlled intersections and apply only to continuous lanes. Clarian Health D 103rd & Penn (Scenario 4A, AM PEAK) Intersection ID: 1 Roundabout (J Table S.15 - CAPACITY AND LEVEL OF SERVICE D Mov No. ---------------------~------------------~--------- o West: 12 L 11 T l3R Mov Typ Total Flow (veh /h) Total Cap. (veh Ih) 663 311 1571 2545 Deg. Aver. LOS of Delay Satn (vie) (see) 0.290 0.289 0.463* 12.3 3.8 5.5 West Approach 192 90 727 0.463 6.6 A 1009 -----------------------------~---------~---------- D South: South Approach 32 L 261 1214 0.215 12.2 B 31 T 106 850 0.125 4.1 A 33 R 3 24 0.125 6.4 A [J ------------------~----------------- 370 2088 0.215 9.8 98 Level of Service calculations are based on average control delay including geometric delay (HCM criteria), independent of the current delay definition used. For the criteria, refer to the "Level of Service" topic in the aaSIDRA Output Guide or the Output section of the on-line help. Maximum vie ratio, or critical green periods East: East 22 L 21 T 23 R Approach 8 100 30 138 North: 42 L 41 T 43 R North Approach 7 221 76 304 ALL VEHICLES: 1821 * 109 1365 410 1884 49 1557 535 2141 8658 0.073 0.073 0.073 0.073 0.143 0.142 0.142 0.143 0.463 13.3 4.6 6.7 5.6 12.6 4.0 6.1 4.7 6.9 D B A A D A o B A A o A A o D D Clarian Health 103rd & Penn (Scenario 4A, AM PEAK) Intersection ID: 1 Roundabout Table D.O - GEOMETRIC DELAY DATA From Approach To Approach West: West Approach South East North South: South Approach West East North East: East Approach West South North North: North Approach West South East Negn Negn Radius Speed (ft) (mph) 117.2 190.4 62.0 62.0 117.2 190.4 190.4 62.0 117.2 117.2 190.4 62.0 22.0 28.1 16.0 16.0 22.0 28.1 28.1 16.0 22.0 22.0 28.1 16.0 Negn Dist. (ft) 61. 9 151.5 243.5 243.5 61. 9 151.5 151.5 243.5 61. 9 61. 9 151.5 243.5 D D Appr. Dist. (ft) Downstream Distance (ft) o 1800 1800 1800 o 311 323 469 o 1800 1800 1800 469 311 323 o 1800 1800 1800 323 469 311 o 1800 1800 1800 o 311 323 469 o Downstream distance is distance travelled from the stopline until exit cruise speed is reached (includes negotiation distance). Acceleration distance is weighted for light and heavy vehicles. The same distance applies for both stopped and unstopped vehicles. o Clarian Health 103rd & Penn (Scenario 4A, AM PEAK) Intersection ID: 1 Roundabout Table D.l - LANE DELAYS o 99 o [J _____________________________ o Lane No. ---------------------------------------------- Mov No. Deg. Satn x Stop-line Delay 1st 2nd Total d1 d2 dSL Delay Acc. Dec. dn (seconds/veh) ---------------_ Queuing Stopd Total MvUp (Idle) Geom Control dq dqm di dig dic o West: 1 LT -----------------------------------------------------~-~-----------~------- West Approach 12, 0.290 1.4 0.0 1.4 2.3 0.0 0.0 0.0 10.9 9.6 11 2.4 11, 0.463 0.8 0.0 0.8 2.3 0.0 0.0 0.0 0.0 5.5 13 4.7 2 R (J --------------------------------------------------------------------------- South: South Approach D 1 L 32, 0.215 1.2 0.0 1.2 2.0 0.0 0.0 0.0 10.9 12.2 31 0.0 2 TR 31, 0.125 1.7 0.0 1.7 3.0 0.0 0.0 0.0 2.4 4.2 33 4.7 East: 1 LT [J --------------------------------------------------------------------------- o 2 TR East Approach 22, 0.073 2.3 0.0 2.3 3.5 0.0 0.0 0.0 10.9 5.8 21 2.4 21, 0.073 2.1 0.0 2.1 3.3 0.0 0.0 0.0 2.4 5.4 23 4.7 --------------------------------------------------------------------------- North: North Approach 0 1 LT 42, 0.142 1.6 0.0 1.6 3.1 0.0 0.0 0.0 10.9 4.5 41 2.4 2 TR 41, 0.142 1.5 0.0 1.5 2.9 0.0 0.0 0.0 2.4 5.0 43 4.7 (J --------------------------------------------------------------------------- dn is average stop-start delay for all vehicles queued and unqueued O Clarian Heal th 103rd & Penn (Scenario Intersection ID: 1 Roundabout D 4A, AM PEAK) Table D.2 - LANE STOPS (J ------------------------------------------------------- Queue Deg. -- Effective Stop Rate -- Prop. Move-up Lane Satn Geom. Overall Queued Rate No. x hel he2 hig h pq hqm West: 1 LT 2 R D ------------------------------------------------------- (J ------------------------------------------------------- West Approach 0.290 0.27 0.00 0.463 0.24 0.00 0.33 0.27 0.60 0.50 0.398 0.371 0.00 0.00 South: South Approach 1 L 0.215 0.26 0.00 2 TR 0.125 0.28 0.00 ~ ------------------------------------------------------- East: 1 LT 2 TR 0.41 0.15 0.68 0.43 0.397 0.416 0.00 0.00 East Approach 0.073 0.37 0.00 0.073 0.35 0.00 0.15 0.16 0.52 0.51 0.501 0.492 0.00 0.00 [J ------------------------------------------------------- North: North Approach 1 LT 0.142 0.28 0.00 2 TR 0.142 0.28 0.00 [J ---------------------------------------________________ 0.15 0.19 0.43 0.47 0.436 0.426 0.00 0.00 o hg is the average value for all movements in a shared lane hqm is average queue move-up rate for all vehicles queued and unqueued O Clarian Health 103rd & Penn (Scenario 4A, AM PEAK) Intersection 1D: 1 100 Roundabout Table D.3 - LANE QUEUES o --------------------------------------------------------------------------- D Lane No. Deg. Satn x Ovrfl. Average (veh) Queue ----------------- No Nb1 Nb2 Nb 70% Percentile (veh) 85% 90% 95% 98% Queue Stor. Ratio -0 --------------------------------------------------------------------------- West: 1 LT 2 R West Approach 0.290 0.0 0.463 0.0 0.5 1.0 0.0 0.0 0.5 1.0 1.0 1.9 1.2 2.3 1.4 2.6 1.7 3.2 2.0 3.7 0.02 0.05 D --------------------------------------------------------------------------- South: South Approach 1 L 0.215 0.0 0.4 2 TR 0.125 0.0 0.2 0.0 0.0 0.4 0.2 0.8 0.4 1.0 0.5 1.1 0.6 1.3 0.7 1.6 0.8 o 0.02 0.01 --------------------------------------------------------------------------- East: 1 LT 2 TR East Approach 0.073 0.0 0.073 0.0 0.1 0.1 North: North Approach 1 LT 0.142 0.0 0.3 2 TR 0.142 0.0 0.3 0.0 0.0 0.1 0.1 0.2 0.2 0.5 0.5 0.3 0.3 0.3 0.3 0.6 0.6 0.7 0.7 0.4 0.4 0.8 0.8 Values printed in this table are back of queue (vehicles). 0.0 0.0 0.3 0.3 Clarian Health 103rd & Penn (Scenario 4A, AM PEAK) Intersection ID: 1 Roundabout Table D.4 - MOVEMENT SPEEDS (mph) App. Speeds Mov ------------ No. Cruise Negn Queue Move-up Exit Speeds ------------- Av. Section Spd West: 12 11 13 South: 32 31 33 East: 22 21 23 North: 42 41 43 Negn Cruise West Approach 35.0 16.0 35.0 28.1 35.0 22.0 16.0 28.1 22.0 35.0 35.0 35.0 35.0 35.0 35.0 35.0 35.0 35.0 35.0 35.0 35.0 1st Grn 2nd Grn Running Overall 27.1 31. 0 30.0 27.1 30.9 29.8 26.9 30.6 29.5 27.0 30.9 29.7 27.1 31. 0 30.0 27.1 30.9 29.8 26.9 30.6 29.5 27.0 30.9 29.7 "Running Speed" is the average speed excluding stopped periods. South 35.0 35.0 35.0 Approach 16.0 16.0 28.1 28.1 22.0 22.0 East Approach 35.0 16.0 35.0 28.1 35.0 22.0 16.0 28.1 22.0 North 35.0 3S.0 35.0 Approach 16.0 16.0 28.1 28.1 22.0 22.0 --- End of aaSIDRA Output --- 101 0.5 0.5 0.01 0.01 o 1.0 1.0 D 0.01 0.01 o D o o o o o D o o o D o Akcelik & Associates Pty Ltd - aaSIDRA 2.0.0.205 o --------------------------------------------------- A&F Engineering A&F Engineering Registered User No. A0654 Licence Type: Professional, Single Computer o Time and Date of Analysis 7:55 AM, Nov 8,2002 Filename: Z:\2002\02114-clarion\Capacity\CH4pMS4AR.OUT o Clarian Health 103rd & Penn (Scenario 4A, PM PEAK) Intersection ID: 1 o aaTraffic SIDRA US Highway Capacity Manual (2000) Version D RUN INFORMATION o ~ Basic Parameters: Intersection Type: Roundabout Driving on the right-hand side of the road Input data specified in US units Default Values File No. 11 Peak flow period (for performance): 15 minutes Unit time (for volumes): 60 minutes (Total Flow Period) Delay definition: Control delay Geometric delay included HCM Delay and Queue Models option selected Level of Service based on: Delay (HeM method) Queue definition: Back of queue, 95th Percentile o o D Clarian Health 103rd & Penn (Scenario 4A, PM PEAK) Intersection 1D: 1 o D DEFAULT PARAMETERS o Default values for some of the important general parameters: (Default Values File: DEFll.SDF) 1. Basic saturation flow: 1900 tcu/h D This value applies mainly to signalised intersections. For roundabouts and sign-controlled intersections, it is used for determining capacity of priority and continuous movements. D 2. Through car equivalents for L EFT LV HV Normal 1.053 2.000 Restricted ].303 2.500 signalised intersections THROUGH RIG H T LV HV LV HV 1.000 2.000 1.]76 2.000 1.426 2.500 o 3. Opposed turn parameters Crit. Gap V V V (Roundabout) Fol.up Min. Hdway Deps V 2.5 V 2.5 V 2.5 % Exit Flow Opposing o o o o Left turns : Through Right turns: o 4. Cruise speed= 40 milh, Approach Distance= 1800 ft o s. Queue space per vehicle in feet Light vehicles: 25.0 Heavy vehicles: 45.0 102 A full list of input data defaults and rangeJ 1S given in the l-~ P;\l1 S '-\ A F\ Input Guide part of aaSIDRA User Guide. Clarian Health 103rd & Penn (Scenario 4A, PM PEAK) Intersection 10: 1 Roundabout Table S.O - TRAFFIC FLOW DATA Mov No. LV HV Left Through LV HV Right LV HV Flow Scale o D o Peak Flow Factor D o ------------------------------------------------------------------------ VEHICLES Demand flows in veh/hour as used by the program West: West Approach 12 129 7 0 0 0 0 1.00 0.90 11 0 0 146 8 0 0 1.00 0.90 13 0 0 0 0 276 14 1.00 0.90 South: South 32 31 33 Approach 690 o o East: East Approach 22 21 23 North: North 42 41 43 Approach 2S o o 36 o o 3 o o o 18S o o 10 o o o 5 o 2 o o o IS o o 1 1.00 1. 00 1.00 1 o o o 48 o o 8 o o o 22S o o 1 1.00 1. 00 1. 00 1 o o o 144 o o o 12 1. 00 1. 00 1.00 Based on unit time = 60 minutes. Flow Scale and Peak Hour Factor effects included in flow values. Clarian Health 103rd & Penn (Scenario 4A, PM PEAK) Intersection ID: 1 Roundabout Table R.O - ROUNDABOUT BASIC PARAMETERS o 0.90 0.90 0.90 D 0.90 0.90 0.90 o o 0.90 0.90 0.90 o D o o Circulating/Exiting Stream Cent Circ Insc No.of No.of AV.Ent ---------------------------------- Island Width Diam. Circ. Entry Lane Flow %HV Adjust. %Exit Cap. Diam Lanes Lanes Width (veh/ Flow Incl. Constr. (ft ) (ft ) (ft) (ft) h) (pcu/h) Effect West: 100 South: 100 East: 100 North: 100 West Approach 30160 South Approach 30 160 2 East Approach 30 160 North Approach 30 160 2 2 2 2 12.00 2 12.00 2 12.00 2 12.00 Clarian Health l03rd & Penn (Scenario 4A, PM PEAK) 181 316 1057 780 103 S.O S.O S.O S.O 181 316 10S7 780 o o o N o D N o o N o o N D o Intersection 10: 1 Roundabout [j Table R.l - ROUNDABOUT GAP ACCEPTANCE PARAMETERS --------------------------------------------------------------------- 0 Turn Lane Lane Circl Intra- Prop. Critical Follow No. Type Exit Bunch Bunched Gap Up Flow Headway Vehicles (s) Headway (pcu/h) (s) (s) D --------------------------------------------------------------------- West: West Approach Left 1 Subdominant 181 2.00 0.222 4.29 2.43 Thru 1 Subdominant 181 2.00 0.222 4.29 2.43 0 2 Dominant 181 2.00 0.222 3.77 2.14 Right 2 Dominant 181 2.00 0.222 3.77 2.14 --------------------------------------------------------------------- D South: Left Thru Right South Approach 1 Dominant 2 Subdominant 2 Subdominant 316 316 316 1. 73 1.73 1.73 0.316 0.316 0.316 3.53 5.69 5.69 2.05 3.31 3.31 --------------------------------------------------------------------- o East: East Approach Left 1 Subdominant 1057 1. 59 0.688 3.60 2.42 Thru 1 Subdominant 1057 1. 59 0.688 3.60 2.42 2 Dominant 1057 1.59 0.688 3.18 2.14 Right 2 Dominant 1057 1. 59 0.688 3.18 2.14 o _____________________________________________________________________ North: OLe f t Thru Right North Approach 1 Subdominant 1 Subdominant 2 Dominant 780 780 780 1. 95 1. 95 1. 95 0.653 0.653 0.653 3.96 3.96 3.52 2.52 2.52 2.24 --------------------------------------------------------------------~ D Clarian Health ]03rd & Penn (Scenario O Intersection 10: 1 Roundabout 4A, PJ'.1 PEAK) o Table R.5 - ROUNDABOUT CAPACITY & LEVEL OF SERVICE - aaSIDRA & HCM MODELS ---~------------~--------------------------------~--------------------------- aaSIDRA HCM 2000 Lower HCM 2000 Upper 0 f'1ov Dem -------------------- -------------------- -------------------- No. FloH Cap. Deg. Av. Cap. Deg. Av. Cap. Deg. Av. (veh (veh Satn Delay LOS (veh Satn Delay LOS (veh Satn Delay LOS /h) /h) x (see) /h) x (see) /h) x (see) D West: 12 L 11 T 13 R West Approach 136 612 0.222 154 693 0.222 290 1305 0.222 11.7 3.2 5.3 - NA - - NA - - NA - - - NA - - NA - - NA - 26]0 0.222 --------------------------------------------------------------- - - - - NA - - - - South 726 195 6 Approach 1369 0.530 734 0.266 23 0.261 6.3 A - - - - NA - - - - --~--~---------~------------------------------------------------- D South: 32 L 3] T 33 R o 12.5 4.9 7.2 B A A - NA - - NA - - NA - - NA - - NA - - - NA - --~----------------~------------------------------------------- East Approach 4 73 0.055 SO 910 0.055 ]6 291 0.055 16.2 7.3 9.1 2126 0.530 10.8 B - - - - NA 7 - - - - - - - NA - - - - --------------------~------------------------------~------------------------- B A A - NA - - NA - - NA - - NA - NA NA East: O 22 L 2] T 23 R o ---------------=~~~-~~~==---~~~--~---=-=-=-=-~~04 ________=_=_=_=_~~_~~:~=_=_- North: 42 L 41 T 43 R North 26 152 237 Approach 95 0.274 557 0.273 767 0.309 16.3 B 7.8 A 9.5 A o - NA - - NA - NA - - NA - NA - NA D 1419 0.309 --------------------------------------------------------------- - - - - NA - - - - - - - - NA - - - - 9.3 A ----------------------------------------------------------------------------- - - - - NA - - - - - - - - NA - - - - o ALL VEHICLES: 7429 0.530 9.1 A ----------------------------------------------------------------------------- o NA Values for this roundabout capacity model have not been calculated because the model was not applicable for the given roundabout conditions. Note that the HCM models are only applicable to single-lane roundabouts with circulating flows less than 1200 veh/h. Also note that results are not calculated for any of the models for slip lane or continuous movements. See aaSIDRA Output Guide Appendix Section A3.8 for roundabout limits. o o Clarian Health 103rd & Penn (Scenario 4A, PM PEAK) Intersection ID: 1 Roundabout o Table R.6 - ROUNDABOUT ALTERNATIVE CAPACITY MODELS Q ----------------------------------------------------------------- aaSIDRA NAASRA 1986 Ger. Linear Ger. GapAcc Mov Dem --------~-- ----------- ----------- ----------- No. Flow Cap. Deg. Cap. % Diff Cap. 0 Diff Cap. % Diff -0 (veh (veh Satn (veh from (veh from (veh from /h) /h} x /h) aaSIDRA /h} aaSIDRA /h} aaSIDRA D ----------------------------------~-----~-----------~------------ West: 12 L 11 T 13 R West Approach 136 612 154 693 290 1305 0.222 0.222 0.222 725 821 1546 2610 0.222 3092 South: 32 L 31 T 33 R South 726 195 6 Approach 1369 0.530 734 0.266 23 0.261 1382 1334 41 2126 0.530 2757 East: 22 L 21 T 23 R East Approach 4 73 50 910 16 291 0.055 0.055 0.055 83 1036 332 1274 0.055 1451 18.S ]8.5 ]8.5 302 342 644 -50.7 -50.6 -50.7 510 578 1088 -16.7 -16.6 -16.6 o 18.5 1288 -50.7 2176 -16.6 o 0.9 81.7 78.3 611 590 18 979 946 29 -28.5 28.9 26.1 o o -55.4 -19.6 -21.7 29.7 1219 -42.7 1954 -8.1 13.7 13.8 14. 1 51 640 205 -30.1 -29.7 -29.6 -21.9 -21.9 -22.0 o 57 711 227 13.9 896 -29.7 995 -21.9 o North: North Approach 42 L 26 95 0.274 136 43.2 76 -20.0 96 1.1 41 T 152 557 0.273 794 42.5 446 -19.9 561 0.7 43 R 237 767 0.309 932 21.5 523 -31.8 657 -}4.3 --------------------------------------------------- 1419 0.309 1862 31.2 1045 -26.4 1314 -7.4 ALL VEHICLES: 7429 0.530 9162 D 23.3 4448 ~40.1 6439 -13.3 o o Clarian Health 103rd & Penn (Scenario 4A, PM PEAK) Intersection ID: 1 Roundabout o 105 o ---------------------------------------------------------------- Mov Dem Total %HV Adjust. Total Prac. Prac. Lane Deg. 0 No. Flow Opng Opng Cap. Deg. Spare Util Satn (veh Flow Flow (veh Satn Cap. /h) (veh/h) (pcu/h) /h) xp (%) (% ) x -------------------------------------------------------------------- 0 West: West Approach 12 L 136 181 5.0 181 612 0.85 283 100 0.222 11 T 154 181 5.0 181 693 0.85 283 100 0.222 0 13 R 290 181 5.0 181 1305 0.85 283 100 0.222 ------------------------------------------------------------------ South: South Approach 32 L 726 316 5.0 316 1369 0.85 60 100 0.530* 0 31 T 195 316 5.0 316 734 0.85 220 50 0.266 33 R 6 316 5.0 316 23 0.85 226 50 0.261 -------------------------------------------------------------------- D East: East 22 L 21 T 23 R 73 910 291 Approach 4 1057 50 1057 16 1057 1057 1057 1057 5.0 5.0 5.0 O North: 42 L 41 T 43 R North Approach 26 780 152 780 237 780 5.0 5.0 5.0 780 780 780 95 557 767 o 0.85 0.85 0.85 1451 1447 1446 100 100 100 0.055 0.055 0.055 0.85 0.85 0.85 211 211 175 88 88 100 0.274 0.273 0.309 o C1arian Health 103rd & Penn (Scenario 4A, PM PEAK) Intersection ID: 1 Roundabout o Table S.3 - INTERSECTION PARAMETERS ---~------~-~----------------~-----~~-~----------------------------------- Intersection Level of Service Worst movement Level of Service Average intersection delay (s) Largest average movement delay (s) Largest back of queue, 95% (ft) Performance Index Degree of saturation (highest) Practical Spare Capacity (lowest) Total vehicle capacity, all lanes (veh/h) Total vehicle flow (veh/h) Total person flow (pers/h) Total vehicle delay (veh-h/h) Total person delay (pers-h/h) Total effective vehicle stops (veh/h) Total effective person stops (pers/h) Total vehicle travel (veh-mi/h) Total cost ($/h) Total fuel (ga/h) Total C02 (kg/h) o Clarian Heal th 103rd & Penn (Scenario 4A, PM PEAK) O Intersection ID: 1 Roundabout o D o o D o Table S. 5 - MOVEf-:JENT PERFORMANCE A B 9.1 16.3 108 46.39 0.530 60 % 7429 1992 2988 5.03 7.55 2478 3717 822.9 606.03 30.7 291.14 Mov No. ---------~--------------~-----------~------------------------------------- Perf. Index Total Total Aver. Prop. Delay Delay Delay Queued (veh-h/h) (pers-h/h) (see) Eff. Longest Queue Stop 95% Back Rate (vehs) (ft) Aver. Speed (mph) [J ----------------------------------------------- West: West Approach 106 12 L 0.44 0.67 11. 7 0.31 1. 31 1.3 34 3.31 43.9 11 T 0.14 0.21 3.2 0.31 0.66 1.3 35 2.70 50.6 13 R 0.43 0.64 5.3 0.29 0.93 1.3 35 5.63 48.7 ----------------------------------- ~----------------------------- --------- South: South Approach 32 L 2.51 3.77 12.5 0.49 1. 41 4.2 108 18.45 43.3 31 T 0.27 0.40 4.9 0.48 1. 01 1.6 41 4.08 49.3 33 R 0.01 0.02 7.2 0.48 1.22 1.6 41 0.14 47.5 o D -------------------------------------------------------------------------- o East: 22 21 23 East L T R Approach 0.02 0.10 0.04 16.2 7.3 9.1 0.65 0.65 0.65 1. 57 1. 25 1. 35 0.3 0.3 0.3 8 8 8 0.11 1.16 0.38 0.03 0.15 0.06 41. 2 47.8 46.1 o -------------------------------------------------------------------------- North: 42 L 41 T 43 R North Approach 0.12 0.18 0.33 0.49 0.62 0.94 16.3 7.8 9.5 0.68 0.68 0.68 1. 68 1. 40 1. 48 1.7 1.7 2.1 45 45 54 0.76 3.72 5.94 Clarian Health 103rd & Penn (Scenario 4A, PM PEAK) Intersection ID: 1 Roundabout Table S.6 - INTERSECTION PERFORMANCE Total Flow (veh/h) Deg. Total Total Aver. Prop. Satn Delay Delay Delay Queued x (veh-h/h) (pers-h/h) (see) Eff. Longest Perf. Stop Queue Index Rate (ft) West: West Approach 580 0.222 1.01 35 11.65 1. 51 6.3 0.308 0.95 South: South Approach 927 0.530 2.79 10.8 0.490 1.33 108 22.67 4.19 East: East Approach 70 0.055 0.16 8 1. 65 0.24 8.2 0.657 1.29 North: North Approach 415 0.309 1.07 9.3 0.685 1.46 54 10.42 1. 61 INTERSECTION (persons): 2988 0.530 7.55 9.1 0.484 1.24 46.39 Queue values in this table are 95% back of queue (feet). Clarian Health 103rd & Penn (Scenario 4A, PM PEAK) Intersection ID: 1 Roundabout Table S.7 - LANE PERFORMANCE Lane No. Dem Flow (veh Ih) Que u e 95% Back Short Lane (ft ) Eft. Stop Rate Cap Deg. (veh Satn Ih) x Aver. Delay (see) Mov No. (vehs) (ft) West: West Approach 1 LT 12, 269 1209 0.222 7.5 0.50 1.3 34 1J 2 TR 1J, 311 1401 0.222 5.1 0.46 1.3 35 13 107 41.1 47.4 45.8 o o o o Aver. Speed (mph) o 29.7 o 27.6 o 29.2 o o 28.6 45.7 o D o o D o 0 South: South Approach 1 L 32, 726 1369 0.530 12.5 0.71 4.2 108 0 31 2 TR 31, 201 757 0.266 5.0 0.51 1.6 41 33 o East: 1 LT East Approach 22, 32 575 0.055 8.7 0.66 0.3 8 21 21, 38 699 0.055 7.8 0.64 0.3 8 23 2 TR [J ---------------------------------------------------------------- North: North Approach 1 LT 42, 178 653 0.273 9.0 0.72 1.7 45 D 41 2 R 41, 237 767 0.309 9.5 0.74 2.1 54 43 D ---------------------------------------------------------------- Clarian Health O 103rd & Penn (Scenario Intersection 10: 1 Roundabout 4A, PM PEAK) [J Table S.8 - LANE FLOW AND CAPACITY INFORMATION Min Tot 0 Lan Mov Oem Flow (veh/h) Cap Cap Deg. Lane No. No. --------------~---- ( veh (veh Satn Util Lef Thru Rig Tot /h) Ih) x 0 -0 [J West: 1 LT 2 TR West Approach 12, 136 133 0 269 150 1209 0.222 100 11 11, 0 21 290 311 150 1401 0.222 100 13 o ------------------------------------------------------- South: South Approach D 1 L 32, 726 0 0 726 150 1369 0.530 100 31 2 TR 31, 0 195 6 201 150 757 0.266 50P 33 East: 1 LT D ------------------------------------------------------- o 2 TR East Approach 22, 4 28 0 32 32 575 0.055 100 21 .. 21, 0 22 16 38 38 699 0.055 100 23 North: North Approach 0 1 LT 42, 26 152 0 178 150 653 0.273 88P 41 2 R 41, 0 0 237 237 150 767 0.309 100 43 [J --~---------------------------------------------------- Lane under-utilisation found by the "Program" o For roundabouts, the capacity value for continuous movements is obtained as the basic saturation flow without any adjustments. Saturation flow scale applies if specified. O Clarian Heal th 103rd & Penn (Scenario Intersection 10: 1 Roundabout D 4A, PM PEAK) Table S.10 - MOVEMENT CAPACITY AND PERFORr~NCE SUMMARY 108 o -------- ---------------------------------------------------------- Mov Mov Dem Total Lane Deg. Aver. Eft. 95% Perf. No. Typ Flow Cap. Util Satn Delay Stop Back of Index (veh (veh Rate Queue Ih) Ih) (% ) x (see) (veh) West: 12 L 11 T 13R West Approach 136 154 290 612 693 1305 100 100 100 0.222 0.222 0.222 11. 7 3.2 5.3 1. 31 0.66 0.93 o 1.3 1.3 1.3 o 3.31 2.70 5.63 4.2 1.6 1.6 o ------------------------------------------------------------------ South: 32 L 31 T 33 R South Approach 726 1369 195 734 6 23 100 50 50 0.530* 0.266 0.261 12.5 4.9 7.2 1. 41 1. 01 1.22 18.45 4.08 0.14 o East: East Approach 22 L 4 73 100 0.055 16.2 1.57 0.3 0.11 21 T 50 910 100 0.055 7.3 1. 25 0.3 1. 16 23 R 16 291 100 0.055 9.1 1.35 0.3 0.38 ------------------------------------------------------------------ North: North Approach 42 L 26 95 88 0.274 16.3 1. 68 1.7 0.76 41 T 152 557 88 0.273 7.8 1. 40 1.7 3.72 43 R 237 767 100 0.309 9.5 1. 48 2.1 5.94 * Maximum degree of saturation o o o Clarian Health 103rd & Penn (Scenario 4A, PM PEAK) Intersection 10: 1 Roundabout o o Table S.12A - FUEL CONSUMPTION, EMISSIONS AND COST - TOTAL o Mov Fuel Cost HC CO NOX CO2 No. Total Total Total Total Total Total gal/h $/h kg/h kg/h kg/h kg/h -------------------------------------------------------------- West: West Approach 12 L 2.2 45.98 0.032 1. 04 0.037 21.3 11 T 2.1 41.39 0.028 0.80 0.035 20.3 13 R 4.2 81.65 0.057 1. 80 0.071 39.9 8.6 Sout h : Sout h 32 L 31 T 33 R Approach 12.0 2.8 0.1 14.9 East: 22 21 23 Approach 0.1 0.7 0.2 East L T R 1.0 North: North 42 L 41 T 43 R Approach 0.4 2.2 3.5 6.2 169.02 245.52 52.42 1. 69 299.63 1. 40 13.51 4.55 19.46 9.11 41.25 67.57 117.92 0.116 0.170 0.036 0.001 0.208 0.001 0.010 0.003 0.014 0.006 0.030 0.049 0.085 3.63 5.67 1.12 0.04 6.84 0.03 0.32 0.11 0.46 0.21 0.99 1. 67 0.143 0.203 0.046 0.002 0.251 0.001 0.013 0.004 0.018 0.007 0.038 0.062 2.871090.108 o D 81. 5 114.1 26.2 0.8 D 141.1 o 0.6 6.9 2.3 D 9.8 o 4.2 20.9 33.6 D 58.8 o o INTERSECTION: 30.7 -------------------------------------------------------------- 291.1 606.03 0.422 [J PARAMETERS USED IN COST CALCULATIONS Pump price of fuel ($/US gal) Fuel resource cost factor Ratio of running cost to fuel cost Average income ($/h) Time value factor Average occupancy (persons/veh) Light vehicle mass (1000 lb) Heavy vehicle mass (1000 lb) Light vehicle idle fuel rate (US gal/h) Heavy vehicle idle fuel rate (US gal/h) o D o o 13.80 0.520 0.850 0.50 3.0 23.00 0.60 1.5 1.4 11.0 0.360 0.530 The idle fuel and vehicle mass parameters given above are the default values (data given in RIDES may override some of these parameters) . O Clarian Health 103rd & Penn (Scenario Intersection ID: 1 Roundabout o 4A, PM PEAK) Table S.12B - FUEL CONSUMPTION, EMISSIONS AND COST - RATE [J -------------------------------------------------------------- Mov Fuel Cost HC CO NOX CO2 No. Eff. Rate Rate Rate Rate Rate mpg $/mi g/km g/km g/km g/km ----------------------~---~----------------------------------- West: West Approach ]2 L 260.2 0.49 0.336 1].04 0.399 226.4 Jl T 288.9 0.42 0.278 7.99 0.347 204.0 13 R 274.8 0.44 0.304 9.65 0.380 214.4 o D 274.5 0.45 0.305 9.56 0.376 --------------------------------------------------------- 214.6 D South: 32 L 31 T 33 R South Approach 258.8 283.4 271.5 o 263.4 D Eas~~ 21 23 East L T R Approach 254.5 277.4 267.4 D 273.6 -------------------------------------------------------------- 215.4 D North: North 42 L 41 T 43 R Approach 254. ] 276.3 266.5 o ---------------- 269.1 INTERSECTION: 268.0 0.49 0.42 0.44 0.47 0.5] 0.42 0.44 0.43 0.5] 0.42 0.44 0.44 0.46 0.340 0.288 0.311 0.329 0.349 0.299 0.3]9 0.307 0.350 0.302 0.321 0.3]6 0.319 ]1.32 8.93 ]0.26 ]0.83 1] .62 9.9] 10.86 10.23 11.67 ]0.06 ] 0.97 10.69 ] 0.42 0.405 0.367 0.394 0.397 0.412 0.388 0.407 0.394 0.414 0.391 0.410 0.403 0.392 227.7 207.9 218.0 223.7 233.4 212.3 220.5 231.8 213.3 221. ] 218.9 -------------------------------------------------------------- 219.8 [J Clarian Health O 103rd & Penn (Scenario Intersection ID: 1 Roundabout 4A, Pf1 PEAK) 110 Table 5.14 - SUMMARY OF INPUT AND OUTPUT DATA Lane No. Demand Flow (veh/h) L T R Tot Adj. Eff Grn %HV Basic (sees) Sat f. 1 st 2nd Deg Sat x o D Aver. Longest Shrt Delay Queue Lane (see) (ft) (ft). D -------------------------------------------------------------------------- West: 1 LT 2 TR West Approach 136 133 21 290 136 154 290 269 311 580 5 5 5 0.222 0.222 0.222 7.5 5.1 6.3 34 35 D -------------------------------------------------------------------------- 35 South: 1 L 2 TR South Approach 726 195 6 726 195 726 201 6 927 5 5 5 0.530 0.266 0.530 12.5 5.0 10.8 108 41 o -------------------------------------------------------------------------- 108 D East: 1 LT 2 TR East Approach 4 28 22 16 4 50 32 38 16 70 7 5 6 0.055 0.055 0.055 8.7 7.8 8.2 8 8 D 8 45 54 D -------------------------------------------------------------------------- North: 1 LT 2 R North Approach 26 152 237 ALL VEHICLES 26 152 237 178 237 415 5 5 5 0.273 0.309 0.309 9.0 9.5 9.3 -------------------------------------------------------------------------- -----~-------------------------------------------------------------------- 54 D Max Queue 108 o Total Flow 1992 o " HV 5 Max X 0.530 Aver. Delay 9.1 -------------------------------------------------------------------------- -----~~------------------------------------------------------------------- Total flow period = 60 minutes. Peak flow period = 15 minutes. Queue values in this table are 95% back of queue (feet). o Note: Basic Saturation Flows are not adjusted at roundabouts or sign- controlled intersections and apply only to continuous lanes. o Clarian Health 103rd & Penn (Scenario 4A, PM PEAK) Intersection ID: 1 Roundabout Table 5.15 - CAPACITY AND LEVEL OF SERVICE Mov No. West: West 12 L 11 T 13 R South: 32 L 31 T 33 R Mov Typ Total Flow (veh Ih) Approach 136 154 290 580 South Approach 726 195 6 Total Cap. (veh /h) 612 693 1305 2610 1369 734 23 927 2126 Deg. of Satn (vie) 0.222 0.222 0.222 0.222 0.530~ 0.266 0.261 0.530 Aver. Delay (see) 11.7 3.2 5.3 6.3 12.5 4.9 7.2 10.8 LOS B A A A B A .A 111 o o o o o o D [J ------------------------------____________________ o East: 22L 21 T 23 R Approach 4 50 16 East 73 910 291 0.055 0.055 0.055 16.2 7.3 9.1 B A A North [j ------------------------------------------------~- o North: 42 L 41 T 43 R Approach 26 152 237 415 70 1274 0.055 0.274 0.273 0.309 0.309 8.2 16.3 7.8 9.5 9.3 B A A [J ------------------------------------------------;- A Level of Service calculations are based on average control delay including geometric delay (HCM criteria), independent of the current delay definition used. For the criteria, refer to the "Level of Servicew topic in the aaSIDRA Output Guide or the Output section of the on-line help. Maximum vlc ratio, or critical green periods ALL VEHICLES: 1992 D o * 95 557 767 1419 7429 0.530 u.... Clarian Health 103rd & Penn (Scenario 4A, PM PEAK) Intersection ID: 1 Roundabout u Table D.O - GEOMETRIC DELAY DATA 9.1 u ---~----------------------------------------------------------- From Approach To Approach ---------~----------------------------------------------------- D West: West Approach South East North Negn Negn Radius Speed (ft) (mph) 117.2 190.4 62.0 22.0 28.1 16.0 Negn Dist. (ft) 61. 9 151.5 243.5 Appr. Dist. (f t ) ]800 ]800 ]800 Downstream Distance (ft ) South lJ --------------------------------------------------------------- 311 323 469 South: Approach West East North [j ------------------------------------------- 243.5 61. 9 151.5 East: East Approach West South North D 62.0 117.2 190.4 190.4 62.0 117.2 16.0 22.0 28.1 28.1 16.0 22.0 151.5 243.5 61. 9 1800 ]800 ]800 1800 1800 1800 469 311 323 323 469 311 --------------------------------------------------------------- D North: North Approach West South (J ------------------:~~~----~~~~---=~~~--=~=~=---:~~~------~~~--- 117.2 190.4 22.0 28.1 61. 9 151.5 1800 ]800 311 323 D Downstream distance is distance travelled from the stopline until exit cruise speed is reached (includes negotiation distance). Acceleration distance is weighted for light and heavy vehicles. The same distance applies for both stopped and unstopped vehicles. D Clarian Health 103rd & Penn (Scenario Intersection 10: 1 Roundabout o Table 0.1 - LANE DELAYS 4A, PM PEAK) 112 --------------------------------------------------------------------------- o Lane No. Mov No. Deg. Satn x Stop-line Delay 1st 2nd Total dl d2 dSL Delay Acc. Dec. dn (seconds/veh) ---------------- Queuing Stopd Total MvUp (Idle) Geom Control dq dqm di dig dic o --------------------------------------------------------------------------- West: West Approach 1 LT 12, 0.222 0.8 0.0 0.8 1.9 0.0 0.0 0.0 10.9 7.5 11 2.4 2 TR 11, 0.222 0.6 0.0 0.6 1.9 0.0 0.0 0.0 2.4 5.1 13 4.7 o South: South Approach 1 L 32, 0.530 1.5 0.0 1.5 2.4 0.0 0.0 0.0 10.9 12.5 31 0.0 2 TR 31, 0.266 2.5 0.0 2.5 3.5 0.0 0.0 0.0 2.4 5.0 33 4.7 o ------------~-------------------------------------------------------------- o --------------------------------------------------------------------------- East: East Approach 1 LT 22, 0.055 5.2 0.0 5.2 4.6 0.6 0.0 0.6 10.9 8.7 21 2.4 2 TR 21, 0.055 4.5 0.0 4.5 4.5 0.2 0.0 0.2 2.4 7.8 23 4.7 o o North: North Approach 1 LT 42, 0.273 5.4 0.0 5.4 4.7 0.7 0.0 0.7 10.9 9.0 41 2.4 2 R 41, 0.309 4.8 0.0 4.8 4.2 0.6 0.0 0.6 0.0 9.5 43 4.7 D dn is average stop-start delay for all vehicles queued and unqueued o --------------------------------------------------------------------------- Clarian Health 103rd & Penn (Scenario 4A, PM PEAK) Intersection 10: 1 Roundabout o o Table 0.2 - LANE STOPS Lane No. Deg. Satn x -- Effective Stop Rate -- Geom. Overall hel he2 hig h Prop. Queued pg Queue r1ove-up Rate hqm o West: 1 LT 2 TR West Approach 0.222 0.18 0.00 0.222 0.17 0.00 D 0.32 0.29 0.50 0.46 0.319 0.299 0.00 0.00 o South: South Approach 1 L 0.530 0.36 0.00 2 TR 0.266 0.38 0.00 0.35 0.13 0.71 0.51 0.492 0.482 0.00 0.00 D East: I LT 2 TR East Approach 0.055 0.55 0.00 0.055 0.53 0.00 0.10 0.11 0.66 0.64 0.659 0.656 0.00 0.00 o North: North Approach 1 LT 0.273 0.62 0.00 2 R 0.309 0.61 0.00 0.10 0.13 0.72 0.74 0.683 0.687 0.00 0.00 o hg is the average value for all movements in a shared lane hgm is average queue move-up rate for all vehicles queued and unqueued o Clarian Health 103rd & Penn (Scenario 4A, PM PEAK) Intersection ID: 1 113 o D Roundabout o Tabl e D. 3 - LANE QUEUES Lane No. Deg. Satn Ovrfl. Average (veh) Queue ----------------- No Nbl Nb2 Nb 70% Percentile (veh) o ----------~---------------------------------------------------------------- 98% Queue StOT. Ratio West: 1 LT 2 TR West Approach 0.222 0.0 0.222 0.0 0.4 0.4 0.0 0.0 0.4 0.4 0.8 0.8 85% 90% 95% 1.3 1.3 [J ___________________________________________________________________________ 1.5 1.6 0.02 0.02 D South: South Approach 1 L 0.530 0.0 1.3 2 TR 0.266 0.0 0.5 D East: 1 LT 2 TR East Approach 0.055 0.0 0.1 0.055 0.0 0.1 o North: North Approach 1 LT 0.273 0.0 0.5 2 R 0.309 0.0 0.7 0.0 0.0 0.0 0.0 0.0 0.0 1.3 0.5 2.4 0.9 0.9 1.0 1.1 1.1 4.2 1.6 0.3 0.3 1.7 2.1 [J Values printed in this table are back of queue (vehicles). 0.1 0.1 0.2 0.2 3.0 1.1 3.4 1.3 4.8 1.8 0.06 0.02 0.5 0.7 1.0 1.2 0.2 0.2 0.2 0.3 0.3 0.4 0.00 0.00 1.2 1.5 1.4 1.7 2.0 2.4 0.02 0.03 D Clarian Health 103rd & Penn (Scenario Intersection 1D: ] Roundabout o Tabl e D. 4 - MOVEMENT SPEEDS (mph) D Mov No. App. Speeds 4A, PM PEAK} Cruise Negn Exit Speeds Negn Cruise Queue Move-up 1 st 2nd Grn Grn Av. Section Spd Running Overall D ----------------------------------------------------------------- West: 12 11 13 West Approach 35.016.0 35.0 28.1 35.0 22.0 16.0 28.1 22 .0 35.0 35.0 35.0 27.3 31. 4 30.2 D ----------------------------------------------------------------- 27 .3 31.4 30.2 D South: 32 31 33 D East: 22 21 23 South 35.0 35.0 35.0 Approach 16.0 16.0 28.] 28.1 22.0 22.0 35.0 35.0 35.0 35.0 35.0 35.0 26.9 30.6 29.5 26.5 29.8 28.9 26.9 30.6 29.5 25.6 29.7 28.7 North: 42 41 43 D ----------------------------------------------------------------- East Approach 35.0 16.0 35.0 28.1 35.0 22.0 ]6.0 28.1 22.0 35.0 35.0 35.0 26.4 29.7 28.8 D ----------------------------------------------------------------- 25.6 29.5 28.5 North 35.0 35.0 35.0 Approach 16.0 16.0 28.1 28.1 22.0 22.0 o "Running Speed" is the average speed excluding stopped periods. o --- End of aaS1DRA Output --- 114 o D D o o o o o o o D o D o o o o o o CLARIAN IlEALTH - NORTH HOSPITAL TRAme IMPACT ANALYSIS COLLEGE AVENUE & 103RD STREET INTERSECTION DATA TRAFFIC VOLUME COUNTS AND CAPACITY ANALYSES 115 D D D D D D D iD D D D D D D D D D ! D D A & F ENGINEERING CO., INC. TRAFFIC VOLUME SUMMARY CLIENT LOCATION DATE CLARIAN HEALTH 103RD STREET & COLLEGE AVENUE (02) OCTOBER 16, 2002 NORTHBOUND EASTBOUND SOUTHBOUND WESTBOUND PEAK HOUR DATA I I AM PEAK OFF PEAK PM PEAK I HR BEGIN 7:30 AM HR BEGIN 4 :45 PM I L T R TOT L T R TOT L T R TOT I I 25 357 3 385 19 578 11 608 I 34 9 21 64 80 34 23 137 I 7 499 49 555 26 394 52 472 I 31 16 11 58 15 12 11 38 I HOUR SUMMARY HOUR NB SB NB+SB EB WB EB+WB TOTAL - AM - 6- 7 100 157 257 21 37 58 315 7- 8 339 488 827 71 61 132 959 8- 9 292 436 728 48 34 82 810 - PM - 3- 4 338 291 629 82 21 103 732 4- 5 458 412 870 92 31 123 993 5- 6 582 429 1011 120 31 151 1162 TOTAL 2109 2213 4322 434 215 649 4971 42.4% 44.5% 86.9% 8.7% 4.3% 13.1% 100.0% - AM PEAK VOLUMES - 15-MIN 153 163 24 23 HOUR 385 555 74 61 PHF 0.63 0.85 0.77 0.66 - PM PEAK VOLUMES - 15-MIN 175 138 40 10 HOUR 608 472 137 38 PHF 0.87 0.86 0.86 0.95 116 TRAFFIC VOLUME SUMMARY o D D D A & F ENGINEERING CO., INC. CLIENT LOCATION DATE CLARIAN HEALTH 103RD STREET & COLLEGE AVENUE (02) OCTOBER 16, 2002 DIRECTION OF TRAVEL NORTHBOUND HOUR LEFT THRU RIGHT TOTAL PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOT AM 6- 7 5 0 5 94 0 94 1 0 1 100 0 100 7- 8 13 0 13 318 3 321 2 3 5 333 6 33C 8- 9 23 0 23 265 3 268 1 0 1 289 3 29 PM 3- 4 14 2 16 304 9 313 8 1 9 326 12 33 4- 5 22 0 22 423 4 427 9 0 9 454 4 45 5- 6 17 0 17 553 2 555 10 0 10 580 2 58 PASSENGER 94 1957 31 2082 D 97.9% 98.9% 88.6% 98.7% TRUCK 2 21 4 27 D 2.1% 1.1% 11.4% 1.3% BOTH 96 1978 35 2109 4.6% 93.8% 1. 7% 100.0% D DIRECTION OF TRAVEL : EASTBOUND I HOUR LEFT THRU RIGHT TOTAL .. PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTfl AM ~ . 6- 7 9 0 9 1 0 1 11 0 11 21 0 21 7- 8 39 2 41 11 0 11 19 0 19 69 2 ~D 8- 9 26 1 27 3 0 3 17 1 18 46 2 PM 3- 4 43 6 49 21 1 22 10 1 11 74 8 :0 4- 5 57 1 58 17 1 18 16 0 16 90 2 5- 6 63 0 63 33 0 33 24 0 24 120 0 12 PASSENGER 237 86 97 420 0 96.0% 97.7% 98.0% 96.8% TRUCK 10 2 2 14 0 4.0% 2.3% 2.0% 3.2% BOTH 247 88 99 434 56.9% 20.3% 22.8% 100.0% D 117 D ,---- D D D D D o o o o o D D o D D D o o D A & F ENGINEERING CO., INC. TRAFFIC VOLUME SUMMARY CLIENT LOCATION DATE CLARIAN HEALTH 103RD STREET & COLLEGE AVENUE (02) OCTOBER 16, 2002 DIRECTION OF TRAVEL SOUTHBOUND HOUR LEFT THRU RIGHT TOTAL PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH AM 6- 7 5 0 5 141 0 141 11 0 11 157 0 157 7- 8 10 2 12 434 9 443 31 2 33 475 13 488 8- 9 8 0 8 381 9 390 38 0 38 427 9 436 PM 3- 4 15 1 16 250 5 255 18 2 20 283 8 291 4- 5 20 1 21 325 2 327 64 0 64 409 3 412 5- 6 22 0 22 360 0 360 47 0 47 429 0 429 PASSENGER 80 1891 209 2180 95.2% 98.7% 98.1% 98.5% TRUCK 4 25 4 33 4.8% 1. 3% 1. 9% 1. 5% BOTH 84 1916 213 2213 3.8% 86.6% 9.6% 100.0% DIRECTION OF TRAVEL WESTBOUND HOUR LEFT THRU RIGHT TOTAL PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH AM 6- 7 .. 11 0 11 16 0 16 10 0 10 37 0 37 7- 8 22 1 23 21 1 22 16 0 16 59 2 61 8- 9 18 0 18 9 0 9 7 0 7 34 0 34 PM 3- 4 6 1 7 4 0 4 10 0 10 20 1 21 4- 5 10 1 11 10 1 11 9 0 9 29 2 31 5- 6 13 0 13 10 0 10 8 0 8 31 0 31 PASSENGER 80 70 60 210 96.4% 97.2% 100.0% 97.7% TRUCK 3 2 0 5 3.6% 2.8% 0.0% 2.3% BOTH 83 72 60 215 38.6% 33.5% 27.9% 100.0% _.4_ . 118 - Short Report Page 1 J:) SAM SI SHORT REPORT General Information Site Information V\nalyst RMB Intersection College Ave. & 103rd Street U V\gency or Co. A&F Engineering Area Type All other areas Date Performed 11/1/02 Jurisdiction Carmel 0 Irime Period AM Peak V\nalysis Year Existing Volume and Timing Input EB WB NB SB RTD IT TH RT LT TH RT LT TH RT LT TH Num. of Lanes 0 1 0 0 1 0 1 1 0 1 1 0 Lane group It-TR LTR L TR L TR 49D Volume (vph) 34 9 21 80 34 23 25 357 3 7 499 % Heavy veh 5 5 5 5 5 5 5 5 5 5 5 5 PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 O:U Actuated (PIA) A A A A A A A A A A A Startup lost time 2.0 2.0 2.0 2.0 2.0 2.0 Ext. eff. green 2.0 2.0 2.0 2.0 2.0 2.0 D Arrival type 3 3 3 3 3 3 Unit Extension 3.0 3.0 3.0 3.0 3.0 3.0 Ped/Bike/RTOR Volume 0 5 0 5 0 0 0 12-0- Lane Width 12.0 12.0 10.0 12.0 10.0 12.0 Parking/Grade/Parking N 0 N N 0 N N 0 N N 0 N Parking/hr D Bus stops/hr 0 0 0 0 0 0 Unit Extension 3.0 3.0 3.0 3.0 3.0 3.0 Phasing EW Perm 02 03 04 NS Perm 06 07 08 U Timing G = 15.0 G= G= G= G = 35.0 G= G= G= Y= 5 Y= Y= Y= Y = 5 Y= Y= Y= Duration of Analysis (hrs) = 0.25 Cycle Length C = 60.0 0 Lane Group Capacity, Control Delay, and LOS Determination EB WB NB SB Adj. flow rate 66 147 28 400 8 595 I [ Lane group cap. 345 345 342 1054 487 1045 - v/c ratio 0.19 0.43 0.08 0.38 0.02 0.57 ~.. Green ratio 0.25 0.25 0.58 0.58 0.58 0.58 Unif. delay d1 17.7 18.9 5.5 6.7 5.3 7.8 IT Delay factor k 0.11 0.11 0.11 0.11 0.11 0.16 Increm. delay d2 0.3 0.8 0.1 0.2 0.0 0.7 , PF factor 1.000 1.000 1.000 1.000 1.000 1.000 D Control delay 18.0 19.7 5.6 6.9 5.3 8.5 Lane group LOS B B A A A A D Apprch. delay 18.0 19.7 6.8 8.5 Approach LOS B B A A Intersec. delay 9.8 Intersection LOS A I l <;' Bl Co ni hI ~ 2000 lIni'eJsi "r F1mida. All Ri hIs Reserved Version ,,( He. 000 P. g ry g 119 o 11/7/02 fiJe:l/C:\ WfNDOWS\ TEMP\s2k73 37 TMP D o o o D o D o o D o o o D o o D D o Short Report Page 1 of. ~PM<;I SHORT REPORT General Information Site Information Analyst RMB Intersection College Ave. & 103rd Street Agency or Co. A&F Engineering Area Type All other areas Date Performed 11/1/02 Jurisdiction Carmel Time Period PM Peak Analysis Year Existing Volume and Timing Input EB WB NB SB LT TH RT LT TH RT LT TH RT LT TH RT Num. of Lanes 0 1 0 0 1 0 1 1 0 1 1 0 Lane group TR LTR L TR L TR Volume (vph) 80 34 23 15 12 11 19 578 11 26 394 52 % Heavy veh 5 5 5 5 5 5 5 5 5 5 5 5 PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Actuated (PIA) A A A A A A A A A A A A Startup lost time 2.0 2.0 2.0 2.0 2.0 2.0 Ext. eft. green 2.0 2.0 2.0 2.0 2.0 2.0 Arrival type 3 3 3 3 3 3 Unit Extension 3.0 3.0 3.0 3.0 3.0 3.0 Ped/Bike/RTOR Volume 0 5 0 2 0 2 0 13 Lane Width 12.0 12.0 10.0 12.0 10.0 12.0 Parking/Grade/Parking N 0 N N 0 N N 0 N N 0 N Parkinglhr Bus stops/hr 0 0 0 0 0 0 Unit Extension 3.0 3.0 3.0 3.0 3.0 3.0 Phasing EW Perm 02 03 04 NS Perm 06 07 08 triming G = 15.0 G= G= G= G = 35.0 G= G= G= Y = 5 Y= Y= Y= Y = 5 Y= Y= y= Duration of Analysis (hrs) = 0.25 Cycle Length C = 60.0 Lane Group Capacity, Control Delay, and LOS Determination EB WB NB SB Adj. flow rate 147 40 21 652 29 481 Lane group cap. 352 378 425 1053 303 1041 . vlc ratio 0.42 0.11 0.05 0.62 0.10 0.46 Green ratio 0.25 0.25 0.58 0.58 0.58 0.58 Unif. delay d1 18.8 17.3 5.4 8.2 5.5 7.1 Delay factor k 0.11 0.11 0.11 0.20 0.11 0.11 Increm. delay d2 0.8 0.1 0.0 1.1 0.1 0.3 PF factor 1.000 1. 000 1.000 1.000 1.000 1. 000 Control delay 19.6 17.5 5.4 93 5.7 7.5 Lane group LOS B B A A A A IApprch. delay 19.6 17.5 9.2 7.4 ~pproach LOS B B A A Intersec. delay 9.9 Intersection LOS A }JCSl0001M C0P}T1ghl 'i) 2000 University of Florida. All RighlS R=rwd Vers.jem4.J( 120 fiJe:I/C:\WJNDOWS\TEMP\s2kC3] 2.TMP ] ]/7/02 Short Report Page 1 00 514/t,1S& n SHORT REPORT - General Information Site Information D I\nalyst RMB Intersection Coffege Ave. & 103rd Street I\gency or Co. A&F Engineering IArea Type All other areas Date Performed 11/1/02 ~urisdiction Carmel 0 ime Period AM Peak IAnalysis Year Existing+ Proposed Volume and Timinq Input EB WB NB SB RT-D LT TH RT IT TH RT IT TH RT IT TH Num. of Lanes 0 1 0 0 1 0 1 1 0 1 1 0 ane group ....TR LTR L TR L TR 49D Volume (vph) 34 9 21 80 34 23 25 361 3 7 510 % Heavy veh 5 5 5 5 5 5 5 5 5 5 5 5 PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 01U Actuated (PIA) A A A A A A A A A A A Startup lost time 2.0 2.0 2.0 2.0 2.0 2.0 Ext. eft. qreen 2.0 2.0 2.0 2.0 2.0 2.0 -{] fL\rrival type 3 3 3 3 3 3 Unit Extension 3.0 3.0 3.0 3.0 3.0 3.0 Ped/Bike/RTOR Volume 0 5 0 5 0 0 0 12-0 Lane Width 12.0 12.0 10.0 12.0 10.0 12.0 Parking/Grade/Parking N 0 N N 0 N N 0 N N 0 N iParking/hr -D Bus stops/hr 0 0 0 0 0 0 Unit Extension 3.0 3.0 3.0 3.0 3.0 3.0 PhasinQ EW Perm 02 03 04 NS Perm 06 07 08 U Iriming G = 15.0 G= G= G= G = 35.0 G= G= G= Y = 5 Y= Y= Y= Y = 5 Y= Y= Y= Duration of Analysis (hrs) = 0.25 . Cycle Length C = 60.0 =D Lane Group Capacity, Control Delay, and LOS Determination EB WB NB SB Adj. flow rate 66 147 28 404 8 608 I r 484 1045 - Lane group cap. 345 345 333 1055 v/c ratio 0.19 0.43 0.08 0.38 0.02 0.58 Green ratio 0.25 0.25 0.58 0.58 0.58 0.58 Unit. delay d 1 17.7 18.9 5.5 6.7 5.3 7.9 D Delay factor k 0.11 0.11 0.11 0.11 0.11 0.17 Increm delay d2 0.3 0.8 0.1 0.2 0.0 0.8 PF factor 1.000 1.000 1.000 1.000 1.000 1.000 -0- Control delay 18.0 19.7 5.6 6.9 5.3 8.7 Lane group LOS B B A A A A -0- Apprch. delay 18.0 19.7 6.9 8.7 Approach LOS B B A A Intersec. delay 9.8 Intersection LOS A I r - HC5.'OOOlM Cop"righl (Q 2000 Uni""Js,ty of Florida. .1\11 Righls Resened Version 4.1 121 D file:! Ie: \ WJNDOWS\ TEMP\s2k 80D9. TJ\:1P lJ 17/0: D D o D o D D o D 10 D D D D D o D Short Report Page 1 of 1 S-P#l -5 Z- SHORT REPORT General Information Site Information [Analyst RMB Intersection College Ave. & 103rd Street lAgency or Co. A&F Engineering Area Type All other areas Date Performed 11/1/02 Jurisdiction Carmel rrime Period PM Peak Analysis Year Existing + Proposed Volume and Timinq Input EB WB NB SB LT TH RT LT TH RT LT TH RT LT TH RT Num. of Lanes 0 1 0 0 1 0 1 1 0 1 1 0 Lane group ILTR LTR L TR L TR lVolume (vph) 80 34 23 15 12 11 19 592 11 26 399 52 % Heavy veh 5 5 5 5 5 5 5 5 5 5 5 5 PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Actuated (P/A) A A A A A A A A A A A A Startup lost time 2.0 2.0 2.0 2.0 2.0 2.0 Ex!. eft. Qreen 2.0 2.0 2.0 2.0 2.0 2.0 i !Arrival type 3 3 3 3 3 3 Unit Extension 3.0 3.0 3.0 3.0 3.0 3.0 Ped/Bike/RTOR Volume 0 5 0 2 0 2 0 13 Lane Width 12.0 12.0 10.0 120 10.0 12.0 Parking/Grade/Parking N 0 N N 0 N N 0 N N 0 N Parking/hr Bus stops/hr 0 0 0 0 0 0 Unit Extension 3.0 3.0 3.0 3.0 3.0 3.0 PhasinQ EW Perm 02 03 04 NS Perm 06 07 08 Timing G = 15.0 G= G= G= G = 35.0 G= G= G= Y = 5 Y= Y= Y= Y= 5 Y= Y= Y= Duration ot Analysis (hrs) = 0.25 Cycle LenQth C = 60.0 Lane Group Capacity, Control Delay, and LOS Determination EB WB NB SB !Adj. flow rate 147 40 21 668 29 486 Lane group cap. 352 378 421 1053 292 1042 v/c ratio 0.42 0.11 0.05 063 0.10 0.47 o. Green ratio 0.25 0.25 0.58 0.58 0.58 0.58 Unit. delay d1 18.8 17.3 5.4 8.3 5.5 7.2 Delay factor k 0.11 0.11 0.11 0.21 0.11 0.11 Increm. delay d2 0.8 0.1 0.0 1.3 0.1 0.3 PF factor 1.000 1. 000 1.000 1.000 1.000 1.000 Control delay 19.6 17.5 5.4 95 5.7 7.5 Lane group LOS B B A A A A lApprch. delay 19.6 17.5 9.4 7.4 IApproach LOS B B A A Intersec. delay 10.0- Intersection LOS A o HCS70001M Copyright <<'J 200(1 Uniwrsity of Florida. All Rights Reserwd \'{,J~jon 4_ Je o 122 file:l/C:\WINDOWS\TEMP\s2kD10ATMP 11/7/02 Short Report Page] D ~1i/v153 SHORT REPORT General Information Site Information ~nalyst RMB Intersection College Ave. & 103rd Street U ~gencyor Co. A&F Engineering A.rea Type All other areas Date Performed 11/1/02 Jurisdiction Carmel D !Time Period AM Peak A.nalysis Year Year 2012 Volume and Timing Input EB WB NB SB RTil LT TH RT LT TH RT LT TH RT LT TH Num. of Lanes 0 1 0 0 1 0 1 1 0 1 1 0- Lane group TR LTR L TR L TR 50D Volume (vph) 35 9 22 82 35 24 26 446 3 7 624 % Heavy veh 5 5 5 5 5 5 5 5 5 5 5 5 PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 o:-U Actuated (PIA) A A A A A A A A A A A Startup lost time 2.0 2.0 2.0 2.0 2.0 2.0 Exl. eft. green 2.0 2.0 2.0 2.0 2.0 2.0 il Arrival type 3 3 3 3 3 3 Unit Extension 3.0 3.0 3.0 3.0 3.0 3.0 - Ped/Bike/RTOR Volume 0 5 0 6 0 0 0 12[1 Lane Width 12.0 12.0 10.0 12.0 10.0 12.0 Parking/Grade/Parking N 0 N N 0 N N 0 N N 0 N .. Parkinglhr {J Bus stops/hr 0 0 0 0 0 0 Unit Extension 3.0 3.0 3.0 3.0 3.0 3.0 . Phasing EW Perm 02 03 04 NS Perm 06 07 08 U Timing 'G = 15.0 G= G= G= G = 35.0 G= G= G= Y= 5 Y= Y= Y= Y= 5 Y= Y= Y= Duration of Analysis (hrs) = 0.25 Cycle Length C = 60.0 0 Lane Group Capacity, Control Delay, and LOS Determination EB WB NB SB Adj. flow rate 68 150 29 499 8 735 I l Lane group cap. 343 344 247 1055 411 1046 - vIe ratio 0.20 0.44 0.12 0.47 0.02 0.70 D Green ratio 0.25 0.25 0.58 0.58 0.58 0.58 Unif. delay d1 17.8 18.9 5.6 7.2 5.3 8.8 Delay factor k 0.11 0.11 0.11 0.11 0.11 0.27 [} lncrem. delay d2 0.3 0.9 0.2 0.3 0.0 2.1 - PF factor 1.000 1.000 1.000 1.000 1.000 1.000 Control delay 18.0 19.8 5.8 7.5 5.3 11.0 Lane group LOS B B A A A B -0- ~pprch. delay 18.0 19.8. 7.4 10.9 ~pproach LOS B B A B lntersec. delay 10.9 Intersection LOS B I l 7 1"" ('" ni hI t;. 2000 lIniYelsirv of FlOJida, All Ri hIS Reserved Vt'lsjon~' Hes.OOO r g g 123 o 1 J 17 /O~ file:! IC: \ W1NDOWS\ TEMP\s2k 82 87. TMP o Short Report Page] of ) o D D D D o D D D D D D D D D o D J-fCSZIJOOH1 D 5 PM'7~ SHORT REPORT General Information Site Information ~nalyst RMB Intersection College Ave. & 103rd Street ~gency or Co. A&F Engineering Area Type All other areas Date Performed 11/1/02 Jurisdiction Carmel !rime Period PM Peak Analysis Year Year 2012 Volume and Timinq Input EB WB NB SB LT TH RT IT TH RT LT TH RT LT TH RT Num. of Lanes 0. 1 0. 0 1 0 1 1 0 1 1 0. ILane group TR LTR L TR L TR 1V0lume (vph) 82 35 24 15 12 11 19 723 11 27 493 53 % Heavy veh 5 5 5 5 5 5 5 5 5 5 5 5 PHF 0.90 0.90. 0.90 0.90 0.90. 0..90 0.90. 0.90 0.90 0.90 0.90 0.90. IActuated (P/A) A A A A A A A A A A A A Istartup lost time 2.0 2.0. 2.0. 2.0. 2.0. 2.0 Ext. eft. oreen 2.0 2.0 2.0. 2.0 2.0 2.0 lAfrival tvpe 3 3 3 3 3 3 Unit Extension 3.0. 3.0. 3.0 3.0 3.0 3.0 Ped/Bike/RTOR Volume 0. 6 0 2 0 2 0 13 Lane Width 12.0 12.0 10.0 12.0 10.0 12.0 Parking/Grade/Parking N 0 N N a N N 0 N N 0 N Parkinglhr Bus stops/hr 0 0 0 a 0 0 Unit Extension 3.0. 3.0 3.0 3.0 3.0 3.0 Phasinq EW Perm 02 03 04 NS Perm 06 07 08 !riming G = 15.0 G= G= G= G = 35.0 G= G= G= y = 5 y= y= Y= Y = 5 Y= y= y= Duration of Analysis (hrs) = 0.25 Cycle Length C = 60.0 Lane Group Capacity, Control Delay, and LOS Determination EB WB NB SB Adj. flow rate 150 40 21 813 30 592 Lane group cap. 352 378 344 1053 196 1044 v/c ratio 0.43 0.11 0.06 0.77 0..15 0..57 :, Green ratio 025 0..25 0.58 0.58 0.58 0..58 Unif. delay d 1 18.9 17.3 5.4 9.5 5.7 7.8 Delay factor k 0..11 0.11 0..11 0..32 0..11 0..16 !ncrem. delay d2 0.8 0.1 0.1 3.6 0.4 0.7 PF factor 1.000. 1.0.00 1.00.0. 1. 000. 1000 1.000 Control delay 19.7 17.5 5.5 13.1 6.1 8.5 Lane group LOS 8 8 A 8 A A Apprch. delay 19.7 17.5 12.9 8.4 Approach LOS 8 8 8 A Intersec. delay 11.9 Intersection LOS 8 Copyright rt;. 7000 Uni\eTsiry of F1onda. All Righls Reser>ed Version 4.1< 124 fiJe:l/C: \ WINDOWS\ TEMP\s2kD23 9. TMP 1117/02 Short Report Page ] (] MStfA D SHORT REPORT General Information Site Information ~nalyst TSV Intersection College Ave. & 103rd Street D ~gency or Co. A&F Engineering Area Type All other areas Date Performed 11/6/02 Jurisdiction Carmel [Time Period AM Peak Analysis Year Yr 2012 + .Po 11 Volume and Timing Input - EB WB NB 5B Rf1 LT TH RT LT TH RT LT TH RT LT TH Num. of Lanes 0 1 0 0 1 0 1 1 0 1 1 o. Lane group LTR LTR L TR L TR soD Volume (vph) 35 9 22 82 35 24 26 450 3 7 635 % Heavy veh 5 5 5 5 5 5 5 5 5 5 5 5 PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.9l It Actuated (PIA) A A A A A A A A A A A A Startup lost time 2.0 2.0 2.0 2.0 2.0 2.0 - Ext. eft. green 2.0 2.0 2.0 2.0 2.0 2.0 Arrival type 3 3 3 3 3 3 U Unit Extension 3.0 3.0 3.0 3.0 3.0 3.0 Ped/Bike/RTOR Volume 0 5 0 6 0 0 0 12 lane Width 12.0 12.0 10.0 12.0 10.0 12.0 [ Parking/Grade/Parking N 0 N N 0 N N 0 N N 0 N- Parking/hr D Bus stops/hr 0 0 0 0 0 0 Unit Extension 3.0 3.0 3.0 3.0 3.0 3.0 Phasing EW Perm 02 03 04 NS Perm 06 07 08 {} Timing G = 15.0 G= G= G= G = 35.0 G= G= G= Y= 5 Y= Y= Y= Y= 5 y= y= y= Duration of Analysis (hrs) = 025 Cycle length C = 60.0 11 Lane Group Capacity, Control Delay, and LOS Determination EB WB NB SB Adj. flow rate 68 150 29 503 8 748 G lane group cap. 343 344 239 1055 408 1046 . - v/c ratio 0.20 044 0.12 0.48 0.02 0.72. . D Green ratio 0.25 0.25 0.58 0.58 0.58 0.58 Unif. delay d1 17.8 18.9 5.6 7.2 5.3 8.9 Delay factor k 0.11 0.11 0.11 0.11 0.11 0.28 U Increm. delay d2 0.3 0.9 0.2 0.3 0.0 2.4 PF factor 1.000 1.000 1.000 1.000 1.000 1.000 {} Control delay 18.0 19.8 5.8 7.6 5.3 11.3 lane group lOS B B A A A B Apprch. delay 18.0 19.8 7.5 11.2 1 Approach lOS - B B A B Intersec. delay 11.1 Intersection lOS B HCS;OOOlM cop~";gh' <D 2000 Un;'.eTSJlY of Florida. All Righrs Rescned Verslo .i SA 125 o ]] 17/0 file:l/C:\ WINDOWS\ TEM P\s2k904 7. TMP o Short Report Page] of. o D o D o D o o o o D D D D o D o HCSZ0001M o S-P/IISLfJ! SHORT REPORT General Information Site Information Analyst TSV Intersection College Ave. & to3rd Street Agency or Co. A&F Engineering Area Type All other areas Date Performed 11/6/02 Jurisdiction Carmel Time Period PM Peak Analysis Year Yr 2012 -t pO Volume and TiminQ Input EB WB NB SB LT TH RT LT TH RT LT TH RT LT TH RT Num. of Lanes 0 1 0 0 1 0 1 1 0 1 1 0 Lane group ...TR LTR L TR L TR ~olume (vph) 82 35 24 15 12 11 19 737 11 27 498 53 % Heavy veh 5 5 5 5 5 5 5 5 5 5 5 5 PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Actuated (PIA) A A A A A A A A A A A A ~tartup lost time 2.0 2.0 2.0 2.0 2.0 2.0 Ext. eft. green 2.0 2.0 2.0 2.0 2.0 2.0 ~rrival type 3 3 3 3 3 3 Unit Extension 3.0 3.0 3.0 3.0 3.0 3.0 Ped/Bike/RTOR Volume 0 6 0 2 0 2 0 13 Lane Width 12.0 120 10.0 12.0 to. 0 12.0 Par king/Gr ade/Par king N 0 N N 0 N N 0 N N 0 N Parking/hr Bus stops/hr , 0 0 0 0 0 0 Unit Extension 30 3.0 3.0 3.0 3.0 3.0 Phasing EW Perm 02 03 04 NS Perm 06 07 08 lTiming G= 15.0 G= G= G= G = 35.0 G= G= G= Y = 5 y= y= y= y= 5 y= Y= y= Duration of Analysis (hrs) = 025 K:ycle Length C = 60.0 Lane Group Capacity, Control Delay, and LOS Determination EB WB NB SB Adj. flow rate 150 40 21 829 30 597 Lane group cap. 352 378 341 1053 185 1044 vlc ratio 0.43 0.11 0.06 0.79 0.16 0.57 '. '" Green ratio 0.25 0.25 0.58 0.58 0.58 0.58 Unit. delay d1 18.9 17.3 5.4 9.6 5.8 7.8 Delay factor k 0.11 0.11 0.11 0.33 0.11 0.17 Increm delay d2 08 0.1 0.1 4.1 0.4 0.8 PF factor 1.000 1. 000 1.000 1.000 1.000 1.000 Control delay 19.7 17.5 5.5 13.7 6.2 86 Lane group LOS B B A B A A Apprch. delay 19.7 17.5 13.5 8.5 Approach LOS B B B A Intersec. delay 123 Intersection LOS B C"pyrighl {; 2000 Uni,,'rs;!)' of Florida. ."'11 RighlS Reserved Velsion 4. I, 126 file:/ le:\ WINDOWS\ TEMP\s2kD368. TMP lJ /7 /0= D D o D o o D D o o o o o o D o o o o CLARlANHEALTII -NORTII HOSPITAL TRAme IMPACT ANALYSIS COLLEGE AVENUE & PENNSYLVANIA PARKWAY INTERSECTION DATA TRAFFIC VOLUME COUNTS AND CAPACITY ANALYSES 127 D D D D D D D D D D D D D o o D D D D A & F ENGINEERING CO., INC. TRAFFIC VOLUME SUMMARY CLIENT LOCATION DATE CLARIAN HEALTH COLLEGE AVENUE & PENNSYLVANIA PKWY (03) OCTOBER 23, 2002 PEAK HOUR DATA AM PEAK HR BEGIN 7:30 AM L T R TOT OFF PEAK PM PEAK HR BEGIN 4:30 PM L T R TOT L T R TOT NORTHBOUND EASTBOUND SOUTHBOUND 129 277 406 4 140 144 415 14 429 67 594 661 19 197 216 400 3 403 HOUR SUMMARY HOUR NB SB NB+SB EB TOTAL - AM - 6- 7 120 156 276 12 288 7- 8 355 381 736 116 852 8- 9 370 338 708 68 776 - PM - 3- 4 366 253 619 94 713 4- 5 514 342 856 164 1020 5- 6 617 379 996 175 1171 TOTAL 2342 1849 4191 629 4820 48.6% 38.4% 87.0% 13.0% 100.0% - AM PEAK VOLUMES - 15-MIN 108 121 54 HOUR 406 429 144 PHF 0.94 0.89 0.67 - PM PEAK VOLUMES - 15-MIN 193 III 64 HOUR 672 403 216 PHF 0.87 0.91 0.84 128 TRAFFIC VOLUME SUMMARY o o D o A & F ENGINEERING CO., INC. CLIENT LOCATION DATE CLARIAN HEALTH COLLEGE AVENUE & PENNSYLVANIA PKWY (03) OCTOBER 23, 2002 DIRECTION OF TRAVEL NORTHBOUND HOUR LEFT THRU RIGHT TOTAL PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTHi AM 6- 7 32 0 32 88 0 88 120 0 7- 8 105 1 106 246 3 249 351 4 8- 9 104 0 104 262 4 266 366 4 PM 3- 4 41 2 43 314 9 323 355 11 4- 5 54 1 55 447 12 459 501 13 ':>1 5- 6 57 0 57 553 7 560 610 7 61 PASSENGER 393 1910 2303 0 99.0% 98.2% 98.3% TRUCK 4 35 39 D 1. 0% 1. 8% 1. 7% BOTH 397 1945 2342 17.0% 83.0% 100.0% 0 DIRECTION OF TRAVEL : n HOUR LEFT THRU RIGHT TOTAL ~ PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOT~1 AM U c 6- 7 0 0 0 11 1 12 11 1 12 .- 7- 8 1 1 2 114 0 114 115 1 l~O 8- 9 3 0 3 63 2 65 66 2 PM 3- 4 13 0 13 78 3 81 91 3 9Q 4- 5 19 0 19 143 2 145 162 2 16 5- 6 14 0 14 161 0 161 175 0 17 · EASTBOUND PASSENGER 50 570 620 D 98.0% 98.6% 98.6% TRUCK 1 8 9 0 2.0% 1. 4% 1.4% BOTH 51 578 629 8.1% 91.9% 100.0% 0 129 0 o D o o o D o o o D D o D D D o D D o A & F ENGINEERING CO., INC. TRAFFIC VOLUME SUMMARY CLIENT LOCATION DATE CLARIAN HEALTH COLLEGE AVENUE & PENNSYLVANIA PKWY (03) OCTOBER 23, 2002 DIRECTION OF TRAVEL SOUTHBOUND HOUR LEFT THRU RIGHT TOTAL PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH AM 6- 7 142 1 143 13 0 13 155 1 156 7- 8 362 5 367 14 0 14 376 5 381 8- 9 318 8 326 11 1 12 329 9 338 PM 3- 4 240 10 250 3 0 3 243 10 253 4- 5 335 4 339 3 0 3 338 4 342 5- 6 372 4 376 3 0 3 375 4 379 PASSENGER 1769 47 1816 98.2% 97.9% 98.2% TRUCK 32 1 33 1.8% 2.1% 1-8% BOTH 1801 48 1849 97.4% 2.6% 100.0% 130 Two-Way Stop Control Page 1 ~. t/tN5/ D TWO-WAY STOP CONTROL SUMMARY General Information Site Information Coflege Ave. & Penn. parkw-D fA.nalyst RMB Intersection Agency/Co. A&F Engineering Jurisdiction Carmel Date Performed 11/1/02 Analysis Year Existing n !Analysis Time Period AM Peak Project Description Clarian Health - East/West Street: Penn. Parkway ]North/South Street: Cofleae A venue Intersection Orientation: North-South IStudy Period (hr5t 0.25 ~ehicle Volumes and Adjustments - Major Street Northbound Southbound 11 Movement 1 2 3 4 5 6 L T R L T R - ~olume 129 277 0 0 415 14 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 U Hourly Flow Rate, HFR 143 307 0 0 461 15 Percent Heavy Vehicles 5 - -- 0 -- -- Median Type Undivided U RT Channelized 0 0 Lanes 1 1 0 0 1 1 Configuration L T T R Upstream Siqnal 0 0 . Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 D L T R L T R Volume 0 0 0 4 0 140 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 D Hourly Flow Rate, HFR 0 0 0 4 0 155 Percent Heavy Vehicles 0 0 0 5 0 5 Percent Grade (%) 0 0 D Flared Approach N N Storage 0 0 RT Channelized 0 0 UI Lanes 0 0 0 1 0 1 !Configuration L R. Delay, Queue length, and level of Service UI IApproach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 1hl Lane Configuration L L RI Iv (vph) 143 4 155- !C (m) (vph) 1071 214 59~1 Iv/c 0.13 0.02 0.2 195% queue length 0.46 0.06 1.04 !Control Delay 89 22.1 1~{}1 LOS A C IApproach Delay n - 13.4 IApproach LOS -- -- B UI > CopYTighl ro 7000 Vniwrsiry of Florida. All Righls Reser.ed Verslon 4. 131 o 11 17/0 fi Je://C: \ WINDOWS\TEMP\u2k2005. TMP o Two-Way Stop Control o o D D D o o TWO-WAY STOP CONTROL SUMMARY General Information Isite Information I\nalyst RMB Intersection College Ave. & Penn Parkway I\gency/Co. A&F Engineering ~urisdiction Carmel Date Performed 11/1/02 ~nalysis Year Existing !Analysis Time Period PM Peak Project Description C/arian Health EasUWest Street: Penn Parkway lNorth/South Street: Colleqe A venue Intersection Orientation: North-South Istudy Period hrs): 0.25 Vehicle Volumes and Adjustments Major Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R Volume 67 594 0 0 400 3 Peak-Hour Factor, PHF 0..90 0..90 0.90 0..90. 0..90. 0..90 Hourly Flow Rate, HFR 74 660 a a 444 3 Percent Heavy Vehicles 5 -- -- 0 n - Median Type Undivided RT Channelized a a Lanes 1 1 0 0 1 1 K;onfiguration L T T R Upstream Signal 0 a Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R Volume 0 0 a 19 a 197 Peak-Hour Factor, PHF 0..90. 0..90. 0..90. 0.90. 0.90. 0.90. Hourly Flow Rate, HFR 0 0 a 21 a 218 : Percent Heavy Vehicles 0 0 0 5 0 5 i Percent Grade (%) 0 a Flared Approach N N I Storage 0 0 I RT Channelized a 0 Lanes 0 0 0 1 0 1 Configuration L R ~: Delay, Queue lenqth, and level of Service Approach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration L L R ~ (vph) 74 21 218 C (m) (vph) 10.98 175 608 'vie 0..0.7 0.12 0.36 95% queue length 0.22 0.40 1.62 Control Delay 8.5 28.4 14.2 LOS A 0 B Approach Delay -- -- 15.4 V\pproach LOS -- .- C Page 1 of: &(//45/ o D Q o D o D D D 0> o fi le:/ /C:\ WINDOWS\ TEMP\u2k3 3 5 2. TMP C0pvflgh. ~ 2000 Uni\TTSllY of Florida. All Rights Resened VeTsi0n 4]( 132 11/7/02 Two- Way Stop Control Page 1 Q. (o,4)15Z n - TWO-WAY STOP CONTROL SUMMARY General Information Site Information College Ave. & Penn. parkwV I\nalyst RMB Intersection I\gency/Co. A&F Engineering Jurisdiction Carmel Date Performed 11/1/02 Analysis Year Existing+Proposed n I\nalysis Time Period AM Peak Project Description Clarian Health - EasVWest Street: Penn. Parkway North/South Street: Colleqe A venue f1 Intersection Orientation: North-South Istudy Period (hrs): 0.25 Vehicle Volumes and Adjustments - Major Street Northbound Southbound n Movement 1 2 3 4 5 6 L T R L T R - . Volume 152 277 0 0 415 25 JJ Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 168 307 0 0 461 27 Percent Heavy Vehicles 5 -- -- 0 -- -- Median Type Undivided U RT Channelized 0 0 Lanes 1 1 0 0 1 1 Configuration L T T R -U- Upstream Signal 0 0 Minor Street Westbound Eastbound Movement 7 8. 9 10 11 12 -U- L T R L T R Volume 0 0 0 8 0 147 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 U Hourly Flow Rate, HFR 0 0 0 8 0 163 Percent Heavy Vehicles 0 0 0 5 0 5 Percent Grade (%) 0 0 -0- Flared Approach N N !Storage 0 0 RT Channelized 0 0 1 L Lanes 0 0 0 1 0 1 - Configuration L R. Delay, Queue lenQth, and level of Service I t iApproach NB SB Westbound Eastbound ... Movement 1 4 7 8 9 10 11 12fl Lane Configuration L L Rl ~ (vph) 168 8 163 C (m) (vph) 1060 194 5940 Iv/c 0.16 0.04 0.27 95% queue length 0.56 0.13 1.11 Control Delay 9.0 24.4 '~3D LOS A C iApproach Delay -- -- 13.9 Approach LOS n -- B I l I11III > C"PYTighl 'f"J 7000 Unl'TTSllV of Florida. All Rights Resened 133 vmiooO fi]e:IIC: \WINDOWS\TEMP\u2k2260. TMP J ]1710: o Two-Way Stop Control o o Page 1 of: o o o ~ PI15 Z TWO-WAY STOP CONTROL SUMMARY General Information Site Information Analyst RMB Intersection College Ave. & Penn. Parkway ~gency/Co. A&F Engineering lJurisdiction Carmel Date Performed 11/1/02 Analysis Year Ex;st;ng + Proposed Analysis Time Period PM Peak Project Description Clar;an Health EasVWest Street: Penn. Parkway North/South Street: College A venue Intersection Orientation: North-South Jstudy Period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R Volume 77 594 0 0 400 8 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 85 660 0 0 444 8 Percent Heavy Vehicles 5 -- -- 0 -- -- Median Type Undivided RT Channelized 0 0 Lanes 1 1 0 0 1 1 Configuration L T T R Upstream Signal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R Volume 0 0 0 33 0 225 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 0 0 0 36 0 250 Percent Heavy Vehicles 0 0 0 5 0 5 . Percent Grade (%) 0 0 , Flared Approach N N . Storage 0 0 ! RT Channelized 0 0 Lanes 0 0 0 1 0 1 Configuration L R/ Delay, Queue length, and level of Service Approach NB S8 Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration L L R v (vph) 85 36 250 C (m) (vph) 1093 168 608 vlc 0.08 0.21 0.41 95% queue length 0.25 0.78 2~01 Control Delay 8.6 32.2 15.0- LOS A 0 B Approach Delay -- -- 17.2 Approach LOS -- -- C o o o o o o o o o o o o > o CC'pynghl <02000 Univer,ilY of Florida. All RighlS Resened VeTs;C'n 4 J( 134 file:I/C: \ WTNDOWS\ TEMP\u2k4065. TMP 1 ] 17102 Two-Way Stop Control Page I ~: t.; /I fi151 n - TWO-WAY STOP CONTROL SUMMARY General Information Site Information College Ave. & Penn. parkwi,J- I\nalyst RMB Intersection I\gency/Co. A&F Engineering Jurisdiction Carmel Date Performed 11/1/02 Analysis Year Year 2012 n Analysis Time Period AM Peak Project Description Clarian Health - EasVWest Street Penn. Parkway North/South Street: College A venue n Intersection Orientation: North-South IStudy Period (hrs): 0.25 lVehicle Volumes and Adjustments - Major Street Northbound Southbound fl- Movement 1 2 3 4 5 6 L T R L T R - Volume 132 346 0 0 519 14 f1 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 146 384 0 0 576 15 .. Percent Heavy Vehicles 5 -- -- 0 -- -- Median Type Undivided I RT Channelized 0 0 .. Lanes 1 1 0 0 1 1 Configuration L T T R U Upstream Signal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 U' L T R L T R N'olume 0 0 0 4 0 144 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 090 0.90 U Hourly Flow Rate, HFR 0 0 0 4 0 160 Percent Heavy Vehicles 0 0 0 5 0 5 Percent Grade (%) 0 0 D Flared Approach N N Storage 0 0 RT Channelized 0 0 I [ Lanes 0 0 0 1 0 1 - . Configuration L R/ Delay, Queue Length, and Level of Service I r Approach NB SB Westbound Eastbound - Movement 1 4 7 8 9 10 11 12D Lane Configuration L L R L v (vph) 146 4 160 C (m) (vph) 970 160 511 -0 vlc 0.15 0.03 0.31 . 95% queue length' 0.53 0.08 1.33 Control Delay 9.4 28.1 1~2-lJ LOS A 0 Approach Delay - -- 15.5 Approach LOS -- -- C I [ - > 135 VeJ5ion 0' Copyright re. 2000 Univn,iry of F!"rida. ">'11 Right> Reserwd fiJe:l/C :\WINDOWS\ TEMP\u2k23 85. TMP ]] 1710= Page 1 of2 o 'ft15 '5 TWO-WAY STOP CONTROL SUMMARY General Information Site Information Analyst RMB Intersection College Ave. & Penn. Parkway Agency/Co. A&F Engineering Jurisdiction Carmel Date Performed 11/1/02 Analysis Year Year 2012 Analysis Time Period PM Peak Project Description Clarian Health East/West Street: Penn. Parkway lNorth/South Street: Colleqe A venue Intersection Orientation: North-South IStudy Period (hrs): 025 Vehicle Volumes and Adjustments Major Street. Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R Volume 69 743 0 0 500 3 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 76 825 0 0 555 3 Percent Heavy Vehicles 5 -- -- 0 - - Median Type Undivided RT Channelized 0 0 Lanes 1 1 0 0 1 1 Configuration L T T R Upstream Signal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R Volume 0 0 0 19 0 202 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 0 0 0 21 0 224 Percent Heavy Vehicles 0 0 0 5 0 5 Percent Grade (%) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 1 0 1 . Configuration L R.': Delay, Queue Length, and level of Service iApproach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration L L R ~ (vph) 76 21 224 I C (m) (vph) 998 116 526 i ':-J/c 0.08 0.18 0.43 : 95% queue length 025 0.63 2.11 Control Delay 8.9 42.8 16.8 . LOS A E C Approach Delay - - 19.0 Approach LOS -- -- C bP. Q o o o o o o o o o 0> o C0pvnghl ,~ 2000 Uni\osirv 0f Florida, ."-I1 Righrs Reserwd Vers100 4.1 t 136 fiJe://C:\WINDOWS\TEMP\u2k4] 43,TMP ] ]!7!O~ Two-Way Stop Control Page 1 ~: (#/1-4154/1 n - TWO-WAY STOP CONTROL SUMMARY General Information Site Information . ;ij !Analyst TSV Intersection College Ave. & Penn. Parkw ~gency/Co. A&F Engineering lJurisdiction Carmel bate Performed 11/6/02 IAnalysis Year Yr 2012 + PfJ Q !Analysis Time Period AM Peak Project Description Clarian Health EasVWest Street: Penn. Parkway INorth/South Street: College Avenue f1 Intersection Orientation: North-South IStudy Period (hrs): 0.25 lVehicle Volumes and Adjustments - Major Street Northbound Southbound i1 Movement 1 2 3 4 5 6 L T R L T R - Volume 155 346 0 0 519 25 n Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 172 384 0 0 576 27 - Percent Heavy Vehicles 5 -- -- 0 -- -- ~ Median Type Undivided I [ RT Channelized 0 0 .. anes 1 1 0 0 1 1 Configuration L T T R I [ Upstream Signal 0 0 .. Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 U L T R L T R ~olume 0 0 0 8 0 151 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 -u- Hourly Flow Rate, HFR 0 0 0 8 0 167 Percent Heavy Vehicles 0 0 0 5 0 5 Percent Grade (%) 0 0 -0- Flared Approach N N IStorage 0 0 RT Channelized 0 0 I [I Lanes 0 0 0 1 0 1 - Configuration L R,' Delay, Queue lenqth, and level of Service I rl IApproach NB 5B Westbound Eastbound - Movement 1 4 7 8 9 10 11 ~lJ-1 Lane Configuration L L IV (v ph) 172 8 167 C (m) (vph) 960 143 51rJl vie 0.18 0.06 0.3 95% queue length 0.65 0.18 1.41 Control Delay 96 31.7 1~D1 LOS A 0 IApproach Delay -- n 16.2 IApproach LOS -- -- C I [ iIIIII > 1"37 VeJSiOOI CopYlighl <E' 7000 UniverSIty of Florida. All RIghts Reserved file://C:\WINDOWS\TEMP\u2k3] ] O.TMP ]) /7/0 o Two-Way Stop Control Page] of: o o o o o o o o o o D D o o o D o > D tJ!}t1Stf/l' TWO-WAY STOP CONTROL SUMMARY General Information Site Information ftxnalyst TSV Intersection College Ave. & Penn. Parkway ftxgency/Co. A&F Engineering Uurisdiction Carmel Date Performed 11/6/02 Analysis Year Yr 2012 + PfJ ftxnalysis Time Period PM Peak Project Description Clarian Health East/West Street: Penn. Parkway North/South Street: Colleae Avenue Intersection Orientation: North-South IStudy Period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R Volume 79 743 0 0 500 8 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 87 825 0 0 555 8 Percent Heavy Vehicles 5 -- -- a -- -- Median Type Undivided RT Channelized 0 0 Lanes 1 1 0 0 1 1 k::onfiguration L T T R Upstream Signal 0 0 Minor Street Westbound Eastbound . Movement 7 8 9 10 11 12 L T R L T R Volume 0 0 0 33 0 230 I Peak-Hour Factor, PHF 0.90 090 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 0 0 0 36 0 255 Percent Heavy Vehicles 0 0 0 5 0 5 I Percent Grade (%) 0 0 Flared Approach N N Istorage 0 0 RT Channelized 0 0 Lanes 0 0 0 1 0 1 lConfiguration L R .. Delay, Queue Lenqth, and Level of Service ftxpproach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration L L R tv (vph) 87 36 255 C (m) (vph) 994 112 526 'rv/c 0.09 0.32 0.48 ~5% queue length 029 126 2.62 k::ontrol Delay 90 51.7 18.1 LOS A F C Approach Delay -- n 22.3 Approach LOS -- - C C0pynghl Ii) 2000 Umvel,I1Y of Floflda, All RighlS Resened Vers.;on 4.)( 138 fi]e://C:\WINDOWS\TEMP\u2k43] 4.TMP ] ]/7/02 D o D D D D o D o o o D D o o o o o o CLARIAN llEALrn - NORTII HOSPITAL TRAFFIc IMPACT ANAL YS1S COLLEGE AVENUE & IOlsT STREET INTERSECTION DATA TRAFFIC VOLUME COUNTS AND CAPACITY ANALYSES 139 o D D o o D D o o D o D D o D D o D o A & F ENGINEERING CO., INC. TRAFFIC VOLUME SUMMARY CLIENT LOCATION DATE CLARIAN HEALTH 101ST STREET & COLLEGE AVENUE (01) OCTOBER 15, 2002 NORTHBOUND SOUTHBOUND WESTBOUND PEAK HOUR DATA AM PEAK OFF PEAK PM PEAK HR BEGIN 7:30 AM HR BEGIN 4:45 PM L T R TOT L T R TOT L T R TOT 537 7 544 858 47 905 3 736 739 12 814 826 45 2 47 15 9 24 HOUR SUMMARY HOUR NB SB NB+SB WB TOTAL - AM - 6- 7 125 161 286 29 315 7- 8 435 592 1027 52 1079 8- 9 456 572 1028 25 1053 - PM - 3- 4 428 354 782 12 794 4- 5 647 594 1241 21 1262 5- 6 850 795 1645 26 1671 TOTAL 2941 3068 6009 165 6174 47.6% 49.7% 97.3% 2.7% 100.0% - AM PEAK VOLUMES - 15-MIN 184 215 18 HOUR 544 739 52 PHF 0.74 0.86 0.72 - PM PEAK VOLUMES - 15-MIN 245 276 9 HOUR 905 854 26 PHF 0.92 0.77 0.72 140 0 A & F ENGINEERING CO., INC. 0 TRAFFIC VOLUME SUMMARY 0 CLIENT CLARIAN HEALTH LOCATION 101ST STREET & COLLEGE AVENUE (01) 0 DATE OCTOBER 15, 2002 DIRECTION OF TRAVEL NORTHBOUND HOUR LEFT THRU RIGHT TOTAL PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH AM 6- 7 121 2 123 2 0 2 123 2 125 7- 8 425 7 432 3 0 3 428 7 430 8- 9 441 7 448 7 1 8 448 8 45 PM 3- 4 393 11 404 24 0 24 417 11 4~ 4- 5 612 4 616 29 2 31 641 6 64 5- 6 805 0 805 45 0 45 850 0 8 PASSENGER 2797 110 2907 D 98.9% 97.3% 98.8% TRUCK 31 3 34 D 1.1% 2.7% 1.2% BOTH 2828 113 2941 96.2% 3.8% 100.0% 0 DIRECTION OF TRAVEL : SOUTHBOUND HOUR LEFT THRU RIGHT TOTAL PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH AM 6- 7 1 0 1 160 0 160 7- 8 1 0 1 589 2 591 8- 9 6 0 6 561 5 566 PM 3- 4 5 0 5 345 4 349 4- 5 6 0 6 584 4 588 5- 6 12 0 12 783 0 783 PASSENGER 31 3022 100.0% 99.5% TRUCK 0 15 0.0% 0.5% BOTH 31 3037 1. 0% 99.0% 141 161 O_~ 161 590 2 ~tJ 567 5 350 4 354 590 4 ;U 795 0 3053 0 99.5% 15 D 0.5% 3068 100.0% D ---- - D o o o o D D D D D o o D o D D o o o o A & F ENGINEERING CO., INC. TRAFFIC VOLUME SUMMARY CLIENT LOCATION DATE CLARIAN HEALTH 101ST STREET & COLLEGE AVENUE (01) OCTOBER 15, 2002 DIRECTION OF TRAVEL WESTBOUND HOUR LEFT THRU RIGHT TOTAL PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH AM 6- 7 25 0 25 4 0 4 29 0 29 7- 8 48 0 48 3 1 4 51 1 52 8- 9 23 0 23 1 1 2 24 1 25 PM 3- 4 9 0 9 2 1 3 11 1 12 4- 5 14 1 15 6 0 6 20 1 21 5- 6 15 0 15 11 0 11 26 0 26 PASSENGER 134 27 161 99.3% 90.0% 97.6% TRUCK 1 3 4 0.7% 10.0% 2.4% BOTH 135 30 165 81.8% 18.2% 100.0% 142 Two-Way Stop Control Page] D 7 fit 5 / ~O-WAYSTOPCONTROlSUMMARY General Information Site Information I\nalyst RMB Intersection College Ave. & 101st Street I\gency/Co. A&F Engineering Jurisdiction Carmel Date Performed 11/1/02 Analysis Year Existing D Analysis Time Period AM Peak Project Description C/arian Health East/West Street: 101st Street North/South Street: Colleae A venue Intersection Orientation: North-South IStudy Period hrs): 0.25 0 Vehicle Volumes and Adjustments Maior Street Northbound Southbound Movement 1 2 3 4 5 6 U L T R L T R Volume 0 537 7 3 736 0 Peak-Hour Factor. PHF 0.90 0.90 0.90 0.90 0.90 0.90 D Hourly Flow Rate. HFR 0 596 7 3 817 0 Percent Heavy Vehicles 0 - -- 5 - - Median Type Undivided D RT Channelized 0 0 Lanes 0 1 0 1 1 0 Configuration TR L T n Upstream Signal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 D L T R L T R lVolume 45 0 2 0 0 0 Peak-Hour Factor. PHF 0.90 0.90 0.90 0.90 0.90 0,90 i1 Hourly Flow Rate, HFR 50 0 2 0 0 0 Percent Heavy Vehicles 5 0 5 0 0 0 - Percent Grade (%) 0 0 i1 Flared Approach N N Storage 0 0 RT Channelized 0 0 -Q lanes 0 0 0 0 0 0 Configuration LR Delay. Queue lenqth. and level of Service = Approach NB 5B Westbound Eastbound - Movement 1 4 7 8 9 10 11 12 lane Configuration L LR U v (vph) 3 52 C (m) (vph) 960 151 - v/c 0.00 0.34 95% queue length 0.01 1.41 - Control Delay 8.8 40.9 D lOS A E Approach Delay - -- 40.9 Approach LOS -- -- E > ~ COPYlighl ."t;. 2000 l'ni'TlSirv of F101id.. All RighlS Reserwd V {,Ision 4 143 o 1117/( fiJe://C:\ WJNDOWS\TEMP\u2k9] D4. TMP o Two-Way Stop Contro] o o o o D D D D o o o o o o D D o > o TWO-WAY STOP CONTROL SUMMARY General Information lSite Information iAnalyst RMB Intersection College Ave. & 101st Street Agency/Co. A&F Engineering Wurisdiction Carmel Date Performed 11/1/02 f'\nalysis Year Existing Analysis Time Period PM Peak Project Description Clarian Health EastlWest Street: 101st Street North/South Street: College A venue Intersection Orientation: North-South IStudy Period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R ~olume 0 858 47 12 814 0 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 0 953 52 13 904 0 Percent Heavy Vehicles 0 -- -- 5 -- -- Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 1 1 0 Configuration TR L T Upstream Signal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R Volume 15 0 9 0 0 0 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 16 0 10 0 0 0 j Percent Heavy Vehicles 5 0 5 0 0 0 Percent Grade (%) 0 0 Flared Approach N N ~torage 0 0 RT Channelized 0 0 . Lanes 0 0 0 0 0 0 Configuration LR ." Delav, Queue LenQth, and level of Service Approach NB SB Westbound Eastbound , Movement 1 4 7 8 9 10 11 12 Lane Configuration L LR , v (vph) 13 26 C (m) (vph) 678 103 , Iv/c 0.02 0.25 i 195% queue length 0.06 0.92 : I Control Delay 10.4 51.4 I I LOS B F J lApproach Delay h -- 51.4 , i lApproach LOS -- -- F ! ; Page I of= / P/I-1S! Copyr;ght <{) 7000 Unn""ilv of f1orida. All RJghls Reserved Version 4_), 1.44 fj le://C:\ WINDOWS\ TEMP\u2kB065. TMP ]J 17/0:: Two-Way Stop Control Page] JJ 71//1151- TWO-WAY STOP CONTROL SUMMARY General Information Site Information . Analyst RMB Intersection College Ave. & 101st Street ~gency/Co. A&F Engineering Jurisdiction ' Carmel Date Performed 11/1/02 ~nalysis Year Existing+Proposed IAnalysis Time Period AM Peak Project Description Clarian Health EastlWest Street: 101 st Street lNorth/South Street: Co/leoe A venue Intersection Orientation: North-South Istudv Period (hrs): 0.25 dJ ~ehicle Volumes and Adiustments Major Street Northbound Southbound Movement 1 2 3 4 5 6 U L T R L T R Volume 1 560 7 3 743 1 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 U Hourly Flow Rate, HFR 1 622 7 3 825 1 Percent Heavy Vehicles 5 -- -- 5 -- - Median Type Undivided D RT Channelized 0 0 Lanes 1 1 0 1 1 0 Configuration L TR L TR D Upstream Signal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 D L T R L T R Volume 45 0 2 1 1 1 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 D Hourly Flow Rate, HFR 50 0 2 1 1 1 Percent Heavy Vehicles 5 5 5 5 5 5 Percent Grade (%) 0 0 D Flared Approach N N Storage 0 0 RT Channelized 0 0 -0- Lanes 0 1 0 0 1 0 Configuration LTR LTR . Delay, Queue len~th, and level of Service U l\pproach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration L L LTR LTR I [I " (vph) 1 3 . 52 3 III C (m) (vph) 792 939 107 148 11 vlc 0.00 0.00 0.49 0.02 95% queue length 000 0.01 2.16 0.06 Control Delay 9.6 8.8 67.0 29.8 D LOS A A F 0 Approach Delay - -- 67.0 29.8 Approach LOS -- -- F 0 D > Cppyrighl ~ 7000 UOIwr"ry pf Flonda. All Righl$ Resened Version 4 145 o 1117/( fiJe:l/C: \ WTNDOWS\ TEMP\u2k9372. TMP o Two-Way Stop Control o f/, 'I/!./ ~ TWO-WAY STOP CONTROL SUMMARY General Information Site Information Analyst RMB Intersection College Ave. & 101st Street Agency/Co. A &F Engineering Jurisdiction Carmel Date Performed 11/1/02 Analysis Year Existing+ Proposed Analysis Time Period PM Peak Project Description Clarian Health East/West Street: 101 st Street /North/South Street: Co/lege Avenue Intersection Orientation: North-South IStudy Period hrs): 0.25 Vehicle Volumes and Adjustments Major Street Northbound Southbound Movement 1 2 3 4 5 6 l T R L T R Volume 1 868 47 12 842 1 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 1 964 52 13 935 1 Percent Heavy Vehicles 5 -- -- 5 - - Median Type Undivided RT Channelized 0 0 lanes 1 1 0 1 1 0 Configuration L TR L TR Upstream Signal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 . 11 12 L T R l T R Volume 15 0 9 1 1 1 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 16 0 10 1 1 1 Percent Heavy Vehicles 5 5 5 5 5 5 Percent Grade (%) 0 0 Flared Approach N N Istorage 0 0 RT Channelized 0 0 lanes 0 1 0 0 1 0 Configuration LTR LTR Delay, Queue len<Jth, and level of Service Approach NB S8 Westbound Eastbound Movement 1 4 7 8 9 10 11 12 lane Configuration L L LTR LTR " (vph) 1 13 26 3 C (m) (vph) 720 671 68 71 'r-;/c 0.00 0.02 038 0.04 195% queue length 0.00 0.06 1.45 0.13 Control Delay 10.0+ 10.5 87.6 57.9 lOS B B F F Approach Delay -- -- 87.6 57.9 Approach LOS -- -- F F Page 1 of2 7'YJ,<: o o o D o o o o o o o o D o o 0> o Copyright <i) 2000 Univnsll}' of Florida. All Right, Re>e"ed Version 4_ I ( 146 file:l/C:\WJNDO\VS\TEMP\u2kB J 75.TMP JJ /7/02 Two-Way Stop Control Page I 00. '74V/s3 n - TWO-WAY STOP CONTROL SUMMARY General Information Site Information College Ave. & 101st Street U !Analyst RMB Intersection IAgency/Co. A&F Engineering Jurisdiction Carmel Date Performed 11/1/02 Analysis Year Year 2012 n Analysis Time Period AM Peak Proiect Description Clarian Health EastJWest Street 101 st Street North/South Street: Colleqe Avenue fl Intersection Orientation: North-South IStudy Period (hrs): 0.25 Vehicle Volumes and Adjustments - Major Street Northbound Southbound il Movement 1 2 3 4 5 6 l T R l T R Volume 0 671 7 3 920 0 J1 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 0 745 7 3 1022 0 iIIIII Percent Heavy Vehicles 0 -- -- 5 -- - D Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 1 1 0 Configuration TR L T U Upstream Signal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 U l T R l T R Volume 46 0 2 0 0 0 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 U Hourly Flow Rate, HFR 51 0 2 0 0 0 Percent Heavy Vehicles 5 0 5 0 0 0 Percent Grade (%) 0 0 D Flared Approach N N Storage 0 0 RT Channelized 0 0 I Lanes 0 0 0 0 0 A. iIIIII Configuration LR " Delav, Queue lenQth, and level of Service I Ii IApproach NB SB Westbound Eastbound -, I Movement 1 4 7 8 9 10 11 12{] Lane Configuration L LR tv (vph) 3 53 C (m) (vph) 844 92 {] tv/e 0.00 058 195% queue length 0.01 2.64 Control Delay 9.3 87.5 U LOS A F IApproach Delay - - 87.5 Il IApproach LOS -- - F iIIIII > 147 VerSiono' Cop]'Tighll0 :zooo Unin-,Slty of Florida. .1\11 Rights Reserved file://C:\ WINDOWS\ TEMP\u2kA 093. TMP 11/7 /O~ o Two-Way Stop Control Page] of2 o D D D D D D D D o o D o o o D D> D fi le:1 IC: \ WJNDOWS\TEMP\u2kB2 83. TMP 7PM53 TWO-WAY STOP CONTROL SUMMARY General Information Site Information Analyst RMB Intersection College Ave. & 101s1 Street Agency/Co. A&F Engineering Jurisdiction Carmel Date Performed 11/1/02 f\nalysis Year Year 2012 Analysis Time Period PM Peak Project Description Clarian Health EasVWest Street: 101st Street North/South Street: College A venue Intersection Orientation: North-South IStudy Period hrs): 0.25 Vehicle Volumes and Adjustments Major Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R Volume 0 1073 48 12 1018 0 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 0 1192 53 13 1131 0 Percent Heavy Vehicles 0 - -- 5 -- -- Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 1 1 0 Configuration TR L T Upstream Signal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R ~olume 15 0 9 0 0 0 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 16 0 10 0 0 0 Percent Heavy Vehicles 5 0 5 0 0 0 Percent Grade (%) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR . .' . . Delay, Queue lenqth, and level of Service Approach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration L LR v (vph) 13 26 C (m) (vph) 549 53 v/c 0.02 0.49 95% queue length 0.07 1.86 Control Delay 11.7 126.0 LOS B F Approach Delay -- -- 126.0 Approach LOS -- -- F C"p\~ight 'f:' :000 l'ni\ClSity of Fk'rida. All Rights Reserved Version 4.lc 148 11/7/02 o D D D D D D D D D D D D D o D D D o CLARIAN HEALTIJ - NORTIJ HOSPITAL TRAFFlc IMPACT ANALYSIS PENNSYLVANIA P ARKW A Y & ACCESS DRIVE 1 INTERSECTION DATA CAPACITY ANALYSES 149 D Two-Way Stop Control o o Page] of I D o o fJ ~!vi <:. Z TWO-WAY STOP CONTROL SUMMARY General Information Site Information V\nalyst RMB Intersection Penn. . Pkwy. & Access 1 IAQency/Co. A&F Enaineerina Jurisdiction Carmel Date Performed 11/6/02 Analysis Year Existing+Proposed IAnalysis Time Period AM Peak Project Description Clarian Health EastlWest Street: Pennsylvania Parkway North/South Street: Access 1 ; Intersection Orientation: East-West Istudy Period hrs): 0.25 i Vehicle Volumes and Adiustments I Maior Street Eastbound Westbound i Movement 1 2 3 4 5 6 ! L T R L T R ! Volume 0 594 92 1 281 0 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 0 660 102 1 312 0 Percent Heavy Vehicles 0 -- -- 5 h -- Median Type Raised curb RT Channelized 0 0 Lanes 0 2 0 1 2 0 Configuration T TR L T Upstream Sional 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R lVolume 28 0 1 0 0 0 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 31 0 1 0 0 0 Percent Heavy Vehicles 5 0 5 5 0 5 Percent Grade (%) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 O~~:C,. Configuration LR Delav, Queue lenqth, and level of Service IApproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration L LR Iv (vph) 1 32 Ie (m) (vph) 827 376 Iv/c 0.00 0.09 95% queue length 0.00 0.28 Control Delay 9.4 15.5 LOS A C Approach Delay -- - 15.5 Approach LOS - -- C o o D o D D D D D o D o HCSZOOOD1 o ["PYTight rc 2000 UmvelSi,y of florida. .A/I Rlghts Reserved VeTsion 4. I< 150 file:llC: \ WINDOW S\ TEMP\u2k F3 72. TMP ] 117/02 Two- Way Stop Control Page 1 ~ gPF"<1. TWO-WAY STOP CONTROL SUMMARY General Information Site Information {J Analyst RMB Intersection Penn. Pkwy. & Access 1 Agency/Co. A&F Engineering Jurisdiction Carmel Date Performed 11/6/02 Analysis Year Existing+ Proposed D Analysis Time Period IPM Peak Proiect Description Clarian Health EasllWest Street: Pennsylvania Parkway INorth/South Street: Access 1 r IStudy Period (hrs): . Intersection Orientation: East-West 0.25 U Vehicle Volumes and Adjustments Major Street Eastbound Westbound U Movement 1 2 3 4 5 6 L T R L T R Volume 0 404 38 1 551 0 D Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 0 448 42 1 612 0 Percent Heavy Vehicles 0 -- -- 5 -- -- D Median Type Raised curb RT Channelized 0 0 Lanes 0 2 0 1 2 0 -0- Configuration T TR L T Upstream Signal 0 0 Minor Street Northbound Southbound -0- Movement 7 8 9 10 11 12 L T R l T R ~olume 111 0 1 0 0 0 -n- Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 123 0 1 0 0 0 Percent Heavy Vehicles 5 0 5 5 0 5 l1 Percent Grade (%) 0 0 Flared Approach N N Storage 0 0 D RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR 0 Delay, Queue length, and level of Service Approach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12lJ- Lane Configuration L LR v (vph) 1 124 C (m) (vph) 1049 441 I v/c 0.00 0.28 - 95% queue length 0.00 1.14 D Control Delay 8.4 16.3 LOS A C Approach Delay -- -- 16.3 {} Approach LOS -- h C HC5.'/lU01 ~l ("Pc.right <E' 7000 Uniwrsiry (>f Florida, All RighlS Reser. ed VeJsion 4.1 151 D 11/7/0: file://C:\\VINDOWS\TEMP\u2k] 90.TMP o Two-Way Stop Control o o o o o o o o D o o D a a o o 0> D fiJe://C:\WINDOWS\TEMP\u2kA 190.TMP "1/11 c;'l/- TWO-WA Y STOP CONTROL SUMMARY General Information Site Information IAnalyst TSV Intersection College Ave. & 101st Street IAgency/Co. A&F Engineering lJurisdiction Carmel Date Performed 11/6/02 IAnalysis Year Yr 2012 + fD IAnalysis Time Period AM Peak Proiect Description Clarian Health EastlWest Street: 101 st Street NorthlSouth Street: Colleqe A venue Intersection Orientation: North-South IStudy Period hrs): 0.25 Vehicle Volumes and Adjustments Maior Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R Volume 1 694 7 3 927 1 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 1 771 7 3 1030 1 Percent Heavy Vehicles 5 -- -- 5 -- -- Median Type Undivided RT Channelized 0 0 Lanes 1 1 0 1 1 0 Configuration L TR L TR Upstream Siqnal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R Volume 46 1 2 1 1 1 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 51 1 2 1 1 1 Percent Heavy Vehicles 5 5 5 5 5 5 Percent Grade (%) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LTR LTR .' Delav, Queue lenQth, and level of Service !Approach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration L L LTR LTR Iv (vph) 1 3 54 3 C (m) (vph) 662 825 60 89 Iv/e 0.00 0.00 0.90 0.03 95% queue length 000 0.01 4.14 0.10 Control Delay 10.4 9.4 200.0 46.9 LOS B A F E Approach Delay - -- 200.0 46.9 Approach LOS -- -- F E Page] of: -'74 Y! CopYlIghT <Ei 2000 Un;Y""SJry of Flonda. All RighI, R...,...rvrd 'hISJOn 4.1 ( 152 ] ]/7/02 Two-Way Stop Control Page 1 JJ 7:fJ145l/A JJ TWO-WAY STOP CONTROL SUMMARY General Information Site Information Analyst TSV Intersection College Ave. & 101 st Street Agency/Co. A&F Engineering Jurisdiction Carmel Date Performed 11/6/0.2 Analysis Year Yr 20.12 + PD fA,nalysis Time Period PM Peak Project Description Clarian Health EasVWest Street: 10.1 st Street INorth/South Street: College A venue Intersection Orientation: North-South IStudy Period hrs): 0..25 I b Vehicle Volumes and Adjustments lIIII Major Street Northbound Southbound D Movement 1 2 3 4 5 6 L T R L T R Volume 1 1083 48 12 1046 1 Peak-Hour Factor, PHF 0..90. 0..90. 0..90. 0..90. 0..90. 0..90. U Hourly Flow Rate, HFR 1 120.3 53 13 1162 1 Percent Heavy Vehicles 5 -- -- 5 -- - Median Type Undivided l} RT Channelized 0. a Lanes 1 1 0. 1 1 a Configuration L TR L TR {} Upstream Signal 0. 0. Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 -D- L T R L T R Volume 15 1 9 1 1 1 Peak-Hour Factor, PHF 0.90. 0..90. 0..90. 0..90. 0..90. 0..90. {} Hourly Flow Rate, HFR 16 1 10. 1 1 1 Percent Heavy Vehicles 5 5 5 5 5 5 Percent Grade (%) 0. 0. -0- Flared Approach N N Storage 0. 0. RT Channelized 0. a -0- Lanes 0. 1 0. 0. 1 a Configuration LTR LTR . . Delay, Queue Lenqth, and Level of Service U Approach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration L L LTR LTR I[ v (vph) 1 13 27 3 - C (m) (vph) 590. 544 32 34 l} v/c 0..0.0. 0..0.2 0..84 0..0.9 95% queue length 0..0.1 0..0.7 2.88 0..27 Control Delay 11.1 11.8 292.0. 120..9 {] LOS 8 8 F F Approach Delay h -- 292.0. 120..9 I Approach LOS -- n F F UJ '> Copyright <D 7000 UniycJSilY of Florid,. All R rghlS Reserwd Version 4.11 153 o 11 /7/02 file:l/C:\WlNDOWS\TEMP\u2kB35] .TMP D Two-Way Stop Control o u u u u U D U o U o D D o o o o HCS2000B1 o fiJe://C:\ WINDOWS\ TEMP\u2k3 J O.TMP TWO-WA Y STOP CONTROL SUMMARY General Information Site Information ~nalvst TSV Intersection IPenn. Pkwy. & Access 1 lAQency/Co. A&F Engineerinq Jurisdiction Carmel Date Performed 11/6/02 Analysis Year Yr 2012 + PO V\nalvsis Time Period AM Peak Project Description Clarian Health EasUWest Street: Pennsylvania Parkway North/South Street: Access 1 Intersection Orientation: East-West IStudy Period (hrs): 0.25 !vehicle Volumes and Adjustments Maior Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R Volume 0 598 92 1 284 0 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 0 664 102 1 315 0 Percent Heavy Vehicles 0 -- -- 5 -- -- Median Type Raised curb RT Channelized 0 0 Lanes 0 2 0 1 2-c- 0 Configuration T TR L T Upstream Siqnal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R Volume 28 0 1 0 0 0 Peak-Hour Factor, PHF 0.90 0.90 090 0.90 0.90 0.90 Hourly Flow Rate, HFR 31 0 1 0 0 0 Percent Heavy Vehicles 5 0 5 5 0 5 Percent Grade (%) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0:... : Configuration LR 0- Delav. Queue len~th, and level of Service Approach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration L LR : Iv (vph) 1 32 C (m) (vph) 824 374 !v/c 0.00 0.09 195% queue length 000 0.28 Control Delay 9.4 15.5 ; LOS A C ! Approach Delay -- -- 155 i Approach LOS h -- C Page I of] 84M.5<11l C"pyright 'C. ;'000 UniwT5iry "r fl0rida. All Rlgh" R..,,.,, "d Version 4. It 154 I J 17/02 Two-Way Stop Control Page ] LJ f5 PfV15l/11 TWO-WAY STOP CONTROL SUMMARY General Information Site Information n I\nalvst TSV Intersection Penn. Pkwy. & Access 1 ~ I\gency/Co. iA&F Engineering lJurisdiction Carmel Date Performed 11/6/02 ~nalysis Year Yr 2012 +fD n I\nalysis Time Period IPM Peak L Proiect Description Clarian Health EasVWest Street: Pennsylvania Parkway North/South Street: Access 1 D Intersection Orientation: East-West IStudy Period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street Eastbound Westbound U Movement 1 2 3 4 5 6 L T R L T R Volume 0 409 38 1 613 0 {} Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 0 454 42 1 681 0 Percent Heavy Vehicles 0 -- u 5 -- - -0- Median Type Raised curb RT Channelized 0 0 Lanes 0 2 0 1 2 0 i} Configuration T TR L T Upstream Signal 0 0 Minor Street Northbound Southbound l1 Movement 7 8 9 10 11 12 L T R L T R lVolume 111 0 1 0 0 0 n- Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 123 0 1 0 0 0 - Percent Heavy Vehicles 5 0 5 5 0 5 i1 Percent Grade (%) 0 0 Flared Approach N N - Storage 0 0 -0- RT Channelized 0 0 Lanes 0 0 0 0 0 a".. Configuration LR {} Delay, Queue Length, and level of Service iApproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12.0- Lane Configuration L LR Iv (vph) 1 124 C (m) (v ph) 1043 427 IL Iv/e 0.00 0.29 iii 195% queue length 0.00 1.19 iI Control Delay 8.5 16.8 LOS A C iApproach Delay -- -- 16.8 fr !Approach LOS -- - C J!CS,'UOU1M C0pyr;ghl 'V 20W Umversily of f1onda. .AlI Righls Resnwd Ve"ioo 4.1. 155 o 11/7 /O~ file://C:\WINDOWS\TEMP\u2k] ] 50.TMP D o D o D D o o o o o o o D D o o o D CLARlAN HEALTH - NORTH HOSPITAL TRAFFIClMPACT ANALYSlS PENNSYLVANIA P ARKW A Y & ACCESS DRIVE 2 INTERSECTION DATA CAPACITY ANALYSES 156 o Two- Way Stop Control o Page] of] (//1 /t15 z. TWO-WAY STOP CONTROL SUMMARY General Information Site Information I.A:nalvst RMB Intersection Penn. Pkwy. & Access 2 lAoencv/Co. A&F Enqineerinq Uurisdiction Carmel Date Performed 11/6/02 iAnalysis Year Existing + Proposed I.A:nalvsis Time Period AM Peak Proiect Description Clarian Health EasVWest Street: Pennsylvania Parkway INorth/South Street: Access 2 Intersection Orientation: East-West IStudv Period hrs): 0.25 Vehicle Volumes and Adiustments Maior Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R Volume 0 369 225 11 212 0 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 0 410 250 12 235 0 Percent Heavy Vehicles 0 -- -- 5 -- -- Median Type Raised curb RT Channelized 0 0 Lanes 0 2 0 1 2 0 Configuration T TR L T Upstream Siqnal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R !volume 69 0 4 0 0 0 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 76 0 4 0 0 0 Percent Heavy Vehicles 5 0 5 5 0 5 Percent Grade (%) 0 a Flared Approach N N Storage 0 a RT Channelized a a Lanes 1 a 1 0 a a Configuration L R Delav, Queue lenqth, and level of Service Approach EB WB Northbound Southbound Movement 1 4 7 8 9. 10 11 12 Lane Configuration L L R Iv (vph) 12 76 4 C (m) (vph) 904 456 657 Iv/c 0.01 0.17 0..01 S5% queue length 0.04 0.59 0..02 Control Delay 90 14.5 10.5 LOS A B B ~pproach Delay n n 14.3 Approach LOS -- n B D o He 5,'000 1',' o fiJe:IIC:\ WINDOWS\TEMP\u2k9024.TMP ~ ~ o o o o o o o o o o D o Cop"ight i{) ~ooo Un;'e";lv e>f F10JJ(Ia, All Righ15 ResenTd Version -t_]e 157 ] ]/7/02 Two-Way Stop Control Page 1 J] tjPM5Z- TWO-WAY STOP CONTROL SUMMARY General Information :>ite Information n Analyst RMB Intersection Penn. Pkwy. & Access 2 ~ AQency/Co. A&F Engineering Jurisdiction Carmel Date Performed 11/6/02 Analysis Year Existing+ Proposed I' Analysis Time Period PM Peak L Project Description Clarian Health EasVWest Street: Pennsylvania Parkway . North/South Street: Access 2 11 Intersection Orientation: East-West Study Period hrs): 0.25 Vehicle Volumes and Adjustments Major Street Eastbound Westbound D Movement 1 2 3 4 5 6 L T R L T R Volume 0 310 94 6 280 0 il Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 0 344 104 6 311 0 Percent Heavy Vehicles 0 -- -- 5 -- -- il Median Type Raised curb RT Channelized 0 0 Lanes 0 2 0 1 2 0 il Configuration T TR L T Upstream Signal 0 0 - -- Minor Street Northbound Southbound n Movement 7 8 9 10 11 12 L T R L T R - ~olume 271 0 14 0 0 0 f1 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 301 0 15 0 0 0 - Percent Heavy Vehicles 5 0 5 5 0 5 n Percent Grade (%) 0 0 Flared Approach N N - Storage 0 0 D RT Channelized 0 0 Lanes 1 0 1 0 0 CJ'.. Configuration L R ,. D Delay, Queue length, and level of Service ~pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12D Lane Configuration L L R 'v (vph) 6 301 15 C (m) (vph) 1088 525 770 U vie 0.01 0.57 0.02 95% queue length 0.02 3.57 0.06 11 Control Delay 8.3 20.7 9.8 LOS A C A - Approach Delay -- n 20.1 D Approach LOS -- -- C J/CS.70001M C"p:TigJlI <1) 7000 University of F1e>rida. All Rights Reserved VeJ~jQn 4. J 158 o ] ]/7/0: fiJe://C: \ WJNDOWS\ TEMP\u2k21 83. TM P , o Two-Way Stop Control Page] of o /!/115t!1/ TWO-WAY STOP CONTROL SUMMARY General Information Site Information Analyst TSV Intersection Penn. Pkwy. & Access 2 I\Qency/Co. A&F Engineering ~urisdiction Carmel Date Performed 11/6/02 ~nalysis Year Yr 2012+ f!Q I\nalysis Time Period AM Peak Project Description Clarian Health EasVWest Street: Pennsylvania Parkway NorthlSouth Street: Access 2 Intersection Orientation: East-West IStudy Period hrs): 0.25 ~ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R Volume 0 373 225 11 215 0 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 0 414 250 12 238 0 Percent Heavy Vehicles 0 -- - 5 -- -- Median Type Raised curb RT Channelized 0 0 lanes 0 2 0 1 2 0 Configuration T TR L T Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 l T R L T R [Volume 69 0 5 0 0 0 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 76 0 5 0 0 0 Percent Heavy Vehicles 5 0 5 5 0 5 Percent Grade (%) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 1 0 1 0 0 d Configuration L R Delay, Queue length, and Level of Service V\pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 lane Configuration L L R v (vph) 12 76 5 C (m) (vph) 901 453 655 "/c 0.01 0.17 0.01 195% queue length 0.04 0.60 0.02 Control Delay 9.0 14.5 10.5 LOS A B B lApproach Delay - n 14.3 !Approach LOS - - B q D o D o D o o o o o o D o D o o o HCS}0001M C"pyright'f:' 2000 University "r F10rida, All Rights Reserved VeJSlon 4_1, file:! IC:\ W1NDOWS\ TEMP\u2k92 83. TMP 159 ] ]17102 Two-Way Stop Control Page 1 LJ qplY/ 5'h TWO-WAY STOP CONTROL SUMMARY General Information Site Information dJ Analyst TSV Intersection Penn. Pkwy. & Access 2 AfJency/Co. A&F Engineering Jurisdiction Carmel Date Performed 11/6/02 Analysis Year Yr 2012 + VO D Analysis Time Period PM Peak Project Description Clarian Health EasVWest Street: Pennsylvania Parkway North/South Street: Access 2 D Intersection Orientation: East-West IStudy Period hrs): 0.25 Vehicle Volumes and Adjustments Maior Street Eastbound Westbound U Movement 1 2 3 4 5 6 L T R L T R Volume 0 315 94 6 342 0 -0- Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 0 350 104 6 380 0 Percent Heavy Vehicles 0 -- u 5 -- -- D Median Type Raised curb RT Channelized 0 0 Lanes 0 2 0 1 2 0 D Configuration T TR L T Upstream SifJnal 0 0 Minor Street Northbound Southbound D Movement 7 8 9 10 11 12 L T R L T R - Volume 271 0 14 0 0 0 i1 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 301 0 15 0 0 0 - Percent Heavy Vehicles 5 0 5 5 0 5 i1 Percent Grade (%) 0 0 Flared Approach N N - Storage 0 0 -0- RT Channelized 0 0 Lanes 1 0 1 0 0 (} Configuration L R , 0 Delay, Queue length, and level of Service Approach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12-D- Lane ConfIguration L L R v (vph) 6 301 15 C (m) (vph) 1082 509 767 -U- IV/c 0.01 0.59 0.02 95% queue length 0.02 3.79 006 n Control Delay 8.3 21.8 9.8 LOS A C A - IApproach Delay -- -- 21.2 -0- !Approach LOS -- -- C HCSlOOOTM CCp}f1gnl 1:;. 2000 Uni\ersiry of f}ofld3. All Rights Resened Ve,s'e>n 4. J 160 o 11/7/0: file://C:\ WJNDOWS\TEMP\u2kB 125.TMP o o D D D D D o o o o o o o o D D o o CLARIAN HEALTII - NORTIl HOSPITAL TRAFFlClMPACf ANALYS1S PENNSYLVANIA PARKWAY & ACCESS DRIVE 3 INTERSECTION DATA CAPACITY ANALYSES 161 o Two-Way Stop Control D o ffCS?OOOlM o TWO-WAY STOP CONTROL SUMMARY Generallntormation Site Information [Analyst RMB Intersection Penn. Pkwy. & Access 3 [Aoency/Co. A&F Engineerina Uurisdiction Carmel Date Performed 11/6/02 [Analysis Year Existing+Proposed !l\nalysis Time Period AM Peak Proiect Description Clarian Health East/West Street Pennsvlvania Parkway North/South Street: Access 3 Intersection Orientation: East- West IStudy Period (hrs): 0.25 i Ivehicle Volumes and Adjustments Maior Street Eastbound Westbound I Movement 1 2 3 4 5 6 L T R L T R Volume 0 148 225 17 154 0 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 0 164 250 18 171 0 Percent Heavy Vehicles 0 -- -- 5 -- -- Median Type Raised curb RT Channelized 0 0 Lanes 0 2 0 1 2 0 Configuration T TR L T Upstream Siqnal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R Volume 69 0 5 0 0 0 Peak-Hour Factor, PHF 0.90 0.90 0.90 090 090 0.90 Hourly Flow Rate, HFR 76 0 5 0 0 0 Percent Heavy Vehicles 5 0 5 5 0 5 Percent Grade (%) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 1 0 1 0 0 0'., Configuration L R .'- Delay, Queue lenqth, and level of Service lA.pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration L L R :v (vph) 18 76 5 C (m) (vph) 1120 607 790 vlc 0.02 0.13 0.01 95% queue length 0.05 0.43 0.02 Control Delay 83 11.8 9.6 LOS A B A Approach Delay - - 11.6 Approach LOS - - B Page] of ] /Vh/l15L o D o D D o o o o o D D o o o Copyrighl rf') 2000 Uniyc"if}' of Honda. ,'\11 Rights R"cncd Verslon ~_ Ie 162 fi le://C:\ WINDOWS\ TEMP\u2k72F 4 .TMP 1]/7/02 Two-Way Stop Control Page 1 00 /(JPM5l- TWO-WAY STOP CONTROL SUMMARY General Information Site Information I ~nalyst RMB Intersection Penn. Pkwy. & Access 3 I- Agency/Co. A&F Engineering Jurisdiction Carmel pate Performed 11/6/02 Analysis Year Existing+ Proposed I ~nalysis Time Period PM Peak L Project Description Clarian Health EasVWest Street: Pennsylvania Parkway INorth/South Street: Access 3 {J Intersection Orientation: East-West IStudy Period hrs): 0.25 ~ehicle Volumes and Adjustments Maior Street Eastbound Westbound -0 Movement 1 2 3 4 5 6 L T R l T R lVolume 0 230 94 7 76 0 {) Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 0 255 104 7 84 0 Percent Heavy Vehicles 0 -- -- 5 -- -- il Median Type Raised curb RT Channelized 0 0 lanes 0 2 0 1 2 0 il Configuration T TR L T Upstream SiQnal 0 0 - Minor Street Northbound Southbound il Movement 7 8 9 10 11 12 l T R l T R - Volume 210 0 21 0 0 0 f1 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 233 0 23 0 0 0 - Percent Heavy Vehicles 5 0 5 5 0 5 ~ Percent Grade (%) 0 0 I Flared Approach N N - Storage 0 0 -0 RT Channelized 0 0 lanes 1 0 1 0 0 0 Configuration L R D Delay, Queue lenQth, and level of Service Approach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12-0- lane Configuration L L R (vph) 7 233 23 C (m) (vph) 1175 624 822 U !V/c 0.01 0.37 0.03 95% queue length 0.02 1.73 0.09 11 Control Delay 8.1 14.2 9.5 lOS A B A - IApproach Delay -- -- 13.7 D IApproach lOS -- -- B HCS7000' \1 C0PYJight '&! 2000 Uni"e,silY of florid3. All R.gh15 Reser- ed Version 4 J 163 o 11 /7/0: file:! IC:\ WlNDOWS\ TEMP\u2k82A3 .TMP o Two-Way Stop Control Page] of /0;4/!~5i/4 o , TWO-WAY STOP CONTROL SUMMARY General Information Site Information Analyst TSV Intersection Penn. Pkwy. & Access 3 Aqency/Co. ~ &F Enqineerinq Jurisdiction Carmel Date Performed 11/6/02 Analysis Year Yr 2012+ P.D Analysis Time Period ~M Peak Project Description Clarian Health EastlWest Street: Pennsylvania Parkway /North/South Street: Access 3 Intersection Orientation: East-West IStudy Period hrs): 0.25 !vehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R Volume 0 152 225 17 157 0 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 0 168 250 18 174 0 Percent Heavy Vehicles 0 -- -- 5 -- -- Median Type Raised curb RT Channelized 0 0 Lanes 0 2 0 1 2 0 Configuration T TR L T Upstream Siqnal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R Volume 69 0 5 0 0 0 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 76 0 5 0 0 0 Percent Heavy Vehicles 5 0 5 5 0 5 Percent Grade ('Yo) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 1 0 1 0 0 0 Configuration L R , i I Delay, Queue lenQth, and level of Service Approach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration L L R Iv (vph) 18 76 5 C (m) (vph) 1116 603 788 'vlc 0.02 0.13 0.01 95% queue length 0.05 0.43 0.02 Control Delay 8.3 11.8 9.6 LOS A B A !Approach Delay -- -- 11.7 !Approach LOS -- -- B Hcs,'ono1\1 C0pyrighl <92000 Uni\ersity of Florida. All Righls Reser-cd VeJ~ion 4_ Je o o o D D D o o o o o o o o o o o fik://C:\WJNDOWS\TEMP\u2k804] .TMP 164 ) )/7/02 Two-Way Stop Control Page I cO /0 PfV1S!I A TWO-WAY STOP CONTROL SUMMARY General Information !site Information =0 Analyst TSV Intersection 1Penn. Pkwy. & Access 3 Agency/Co. A&F Engineerino Uurisdiction Carmel Date Penormed 11/6/02 IAnalysis Year Yr 2012 + I'D II Analysis Time Period PM Peak Project Description Clarian Health EasVWest Street: Pennsylvania Parkway North/South Street: Access 3 n Intersection Orientation: East-West IstudY Period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street Eastbound Westbound D Movement 1 2 3 4 5 6 L T R L T R Volume 0 235 94 7 78 0 il Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 0 261 104 7 86 0 - Percent Heavy Vehicles 0 -- -- 5 -- -- il Median Type Raised curb RT Channelized 0 0 - Lanes 0 2 0 1 2 0 il !configuration T TR L T Upstream Signal 0 0 - Minor Street Northbound Southbound f1 Movement 7 8 9 10 11 12 L T R L T R - Volume 270 0 21 o. 0 0 rt Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 300 0 23 0 0 0 - Percent Heavy Vehicles 5 0 5 5 0 5 Percent Grade (%) 0 0 I [ Flared Approach N N - Storage 0 0 III RT Channelized 0 0 Lanes 1 0 1 0 0 o. Configuration L R :' 01 Delay, Queue length, and level of Service Approach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 -0-1 Lane Configuration L L R v (vph) 7 300 23 C (m) (vph) 1169 619 820 UI vlc 0.01 0.48 0.03 95% queue length 0.02 2.65 0.09 Control Delay 8.1 16.2 9.5 In LOS A C A - Approach Delay -- -- 15.7 D Approach LOS -- -- C HCS;OOODl C opynl'ht <to 7000 UnivrtSltv 01 fJmida. All RIghts Rr>erwd Vrrsion 4 J 165 o 1 ]/7/0: file:/ IC:\ WlNDOWS\ TEMP\u2k83 76. TMP D o o o o D D o o o o o o o D o o o o CLARlANHEALrn -NORrnHosPITAL TRAFACIMPACT ANALYSIS PENNSYLVANIA PARKWAY & ACCESS DRIVE 4 INTERSECTION DATA CAPACITY ANALYSES 166 o Two-Way Stop Control Page 1 of] D o D D D D o o o o o o D D o o o o //AM5z. TWO-WA Y STOP CONTROL SUMMARY General Information Site Information IAnalyst RMB Intersection Penn. Pkwy. & Access 4 iAgency/Co. A&F Engineering !Jurisdiction Carmel Date Performed 11/6/02 IAnalysis Year Existing + Proposed : I !Analysis Time Period AM Peak , Project Description Clarian Health ; EasVWest Street: Pennsylvania Parkway North/South Street: Access 4 Intersection Orientation: East-West ~tudy Period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R ~olume 0 153 1 6 171 0 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 0 170 1 6 190 0 Percent Heavy Vehicles 0 -- -- 5 -- -- Median Type Raised curb RT Channelized 0 0 Lanes 0 2 0 1 2 0 Configuration T TR L T Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R ~olume 1 0 2 0 0 0 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 1 0 2 0 0 0 Percent Heavy Vehicles 5 0 5 5 0 5 Percent Grade (%) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 1 0 1 0 0 0 Configuration L R '" Delay, Queue length, and level of Service IApproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration L L R v (vph) 6 1 2 C (m) (vph) 1382 701 946 vlc 0.00 0.00 000 95% queue length 001 0.00 0.01 Control Delay 76 10.1 88 LOS A B A Approach Delay h h 9.3 Approach LOS -- -- A HCSL'OOOTM C"PYTighl e 2000 l'ni\'.ISITV "f FlOlid3. All RighTS ReSt"r\ed Version 4_1{ 167 fiJe://C:\ WINDOWS\ TEMP\u2kF286. TMP ] 1/7/02 - Two-Way Stop Control Page 1 D II P!t15 TWO-WAY STOP CONTROL SUMMARY General Information Site Information {J !Analyst RMB Intersection Penn. Pkwy. & Access 4 !Aqency/Co. A&F Enqineerinq Jurisdiction Carmel Date Performed 11/6/02 Analysis Year Existing+ Proposed -D !Analysis Time Period IPM Peak Project Description Clarian Health East/West Street: Pennsylvania Parkway 1N0rth/South Street: Access 4 {] Intersection Orientation: East-West IStudy Period (hrs): 0.25 Vehicle Volumes and Adjustments Maior Street . Eastbound Westbound U Movement 1 2 3 4 5 6 L T R L T R Volume 0 251 1 2 83 0 D Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 0 278 1 2 92 0 Percent Heavy Vehicles 0 -- -- 5 -- - -0 Median Type Raised curb RT Channelized 0 0 Lanes 0 2 0 1 2 0 -0 Configuration T TR L T Upstream Siqnal 0 0 Minor Street Northbound Southbound fl Movement 7 8 9 10 11 12 L T R L T R Volume 1 0 7 0 0 0 il Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 1 0 7 0 0 0 - Percent Heavy Vehicles 5 0 5 5 0 5 fl Percent Grade (%) 0 0 Flared Approach N N Storage 0 0 -0 RT Channelized 0 0 Lanes 1 0 1 0 0 0 Configuration L R {} Delay, Queue Lenath, and level of Service Approach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12U Lane Configuration L L R ~ (vph) 2 1 7 C (m) (vph) 1259 648 873 11 ~/c 0.00 0.00 0.01 -- ~5% queue length 0.00 0.00 0.02 -0 Control Delay 7.9 10.6 9.2 LOS A B A Approach Delay -- n 9.3 a Approach LOS -- -- A HCS,'(l(lOl ~I C"opyrighl Ii;; 2000 UniversiTy of Florida, All RighlS Resernd VCJ$Jon 4.) 168 D fiJe://C:\\VJN DOWS\TEM P\u2k I B3.TMP ] ]/7/0: "I o Two-Way Stop Control o D D D D o D TWO-WAY STOP CONTROL SUMMARY General Information Site Information Analyst TSV Intersection Penn. Pkwy. & Access 4 lAqency/Co. IA&F Engineerina !Jurisdiction Carmel Date Performed 11/6/02 !A.nalysis Year Yr 2012 + .PO Analysis Time Period lAM Peak i Project Description Clarian Health EastfWest Street: Pennsylvania Parkway North/South Street: Access 4 Intersection Orientation: East-West Istudy Period (hrs): 0.25 Vehicle Volumes and Adiustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 l T R l T R Volume 0 157 1 6 174 0 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 0 174 1 6 193 0 Percent Heavy Vehicles 0 -- -- 5 -- -- Median Type Raised curb RT Channelized 0 0 lanes 0 2 0 1 2 0 Configuration T TR L T Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 l T R l T R Volume 1 a 2 0 a 0 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90. 0.90 Hourly Flow Rate, HFR 1 0 2 0 a a Percent Heavy Vehicles 5 0 5 5 a 5 Percent Grade (%) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 lanes 1 0 1 0 0 O. Configuration L R Delay, Queue lenath, and level of Service Approach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 lane Configuration L L R v (vph) 6 1 2 C (m) (vph) 1377 698 943 vie 0.00 0.00 0.00. 195% queue length 0.01 0.00 0.01 Control Delay 7.6 10..2 8.8 LOS A B A Approach Delay - u 9.3 Approach LOS - -- A Page J of 1 11///'1' 5~1l D D D D D D D D D o HC51(}(I{)H1 Cop\rJght <[;, 7000 Uni\erslty of flmid3. All Rlghts Resened D 169 fiJe://C:\ WINDOWS\TEMP\u2k J O.TMP VerSIon 4 Ie )J /7/02 Two-Way Stop Control Page I Q II PM j1 ~O-WAYSTOPCONTROLSUMMARY .. General Information Site Information Q Analyst TSV Intersection [Penn. Pkwy. & Access 4 Agency/Co. ~&F Engineering lJurisdiction Carmel Date Performed 11/6/02 !Analysis Year Yr 2012 +Pv D Analysis Time Period IPM Peak Project Description Clarian Health . East/West Street: Pennsylvania Parkway North/South Street: Access 4 -'--- Intersection Orientation: East-West !study Period (hrs): 0.25 ... Vehicle Volumes and Adjustments Maior Street Eastbound Westbound U Movement 1 2 3 4 5 6 L T R L T R ~olume 0 256 1 2 85 0 U Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 0 284 1 2 94 0 Percent Heavy Vehicles 0 - -- 5 -- -- {} Median Type Raised curb RT Channelized 0 0 Lanes 0 2 0 1 2 0 -U Configuration T TR L T Upstream Siqnal 0 0 Minor Street Northbound Southbound -0.. Movement 7 8 9 10 11 12 L T R L T R Volume 1 0 7 0 0 0 D Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 1 0 7 0 0 0 Percent Heavy Vehicles 5 0 5 5 0 5 D Percent Grade (%) 0 0 Flared Approach N N Storage 0 0 -0- RT Channelized 0 , 0 Lanes 1 0 1 0 0 (J. , . Configuration L R 01 Delay, Queue lenQth, and level of Service IApproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12UI Lane Configuration L L R tv (vph) 2 1 7 111 C (m) (vph) 1253 643 870 vlc 0.00 0.00 0.01 - 95% queue length 0.00 0.00 0.02 111 Control Delay 7.9 10.6 92 LOS A B A Approach Delay -- -- 9.4 -01 Approach LOS - -- A HCS;OOOBI COp'llghl If) 2000 Uni\"crsiry of florida. All Righls Reserycd Version 4. 170 D 1117/0 file:!/C:\W1NDOWS\TEMP\u2k271.TMP