Loading...
HomeMy WebLinkAbout06110089 Correspondence Page 1 of 1 Blanchard, Jim E From: Steve Hardy [srh@REIReaIEstate.com] Sent: Monday, March 26, 2007 10:50 AM To: Blanchard, Jim E Cc: KOsborne@axisarch.com; Jeremy Stephenson; Dave Ford Subject: Email Notice of Correction on Strategic Marketing (permit # 06110089) Jim: Thanks for the rapid response this morning on the subject issue. Per our discussion this morning this is a follow- up to what was stated. See the attached copy of the Inspection report from the Structural Engineer & the Architect on the subject building. All items on attached memo has been addressed and approved. REI was not aware that Carmei required a structural inspection prior to Rough-in. This inspection is not called for on the back of your ' permit, thus the error. The remaining items will be corrected this afternoon, and Gary will call for the reinspection. Thanks Again..............Steve Steven R. Hardy P.E. Sr. Project Manager REI Construction Services Office: 317-573-6848 Cell: 317-402-2259 Fax: 317-573-6857 3/26/2007 " Structural Design, Inc. FIELD REPORT DATE: March 9, 2007 TO: Kerry Osbourne FROM: RE: Chuck Schaefer Strategic Marketing We were on site at tt1e above referenced project 3-9-2007 to observe construction progress to date. At the time of our visit Foundation, Steel and wood construction was complete. All construction was in conformance with the co rJtract documents except for the items listed below: 1) The W18x35 beam near line 4 between Band A.1 has inadequate bearing at line A.1. We recommend installing a new post TS 4x4x114 set inside the 2x6 wall to carry the load. 2) The W18x35 beam south of line 3 between Band A.1 has inadequate bearing at line A.1. We recommend welding (2) bearing angles L4x4x3/8 x 2'-0" long (1 each side of flange) to carry the load. These angles shall also be through bolted to the wall top plates. 3) The center window jamb for the 3 large windows (1 on the first floor and 2 on the second floor) requires modification. The intent was to have a 4 stud jamb condition extending past the header to Ihe floor above (see detail on sheet S2.3). This can be repaired either by adding (4) 2x6 studs in fronl of Ihe wall (creating a box oul condition) or install kickers above the window in a boxed oul header. 4) Treated lumber has been used at the base of all walls and on the sleel ledger angles around the flat roof. Contractor must verify that treated material used will not cause corrosive damage to structural steel, anchor bolts and otherfasteners. THIS IS A CRITICAL ISSUE THAT MUST BE ADDRESED AS SOON AS POSSIBLE. (317) 822-0204 . Fax (317) 822-0206 337 Main Street. Beech Grove, IN 46107 www.SfrllctDesign.com GO'd gOGO GG8 L1:E 'OUl 'u5~saa le~n+on~+s ~LE:90 LO-GI-~ew ~ S.L. ',-F..:.-.'.1::., ':, . r~ .I"i~!;~ '.~"\';'~ ~t ( . "'1.. .... '" ". ,.\ Structural Design, Inc. FACSIMILE TRANSMITTAL To: J?mt (Js6orAe FROM: ~d-- l' q~ FAX NUMBER: DATE: "3 hip? ' I tJ ' . JOB NUMBER: NUMBER OF PAGES: SENDER COMMENTS: '2: (317) 822-0204 . Fax (317) 822-0206 337 Main Street. Suite A . Beech Grove, IN 46107 ~O'd 90ZO 228 L~E 'OUI 'u6~saa L~~n~on~~s VLE:90 LO-ZI-~~W Page 1 of 1 Blanchard, Jim E From: Pam McBride [PMcBride@REICS.COM] Sent: Friday, March 23, 2007 4:14 PM To: Blanchard, Jim E Subject: Inspection of Strategic Marketing - 03/23/2007 Mr. Blanchard, Attached please fmd attached letter (dated 03/23/2007) from Kerry Osbome (our architect)regarding your inspection of Strategic Marketing. Should you have any questions or concems please feel free to call. Pamela McBride Administrative Assistant REI Construction, LLC 11711 North Pennsylvania Street, Suite 200 Carmel, IN 46032 Phone: 317.573.6040 Fax: 317.573.6857 E-mail: pmcbride@reics.com Web: www.reics.com