HomeMy WebLinkAboutC001 TITLE SHEET116th ST.DITCH RD.NO SCALE
HAMILTON COUNTY
PROJECT LOCATION PROJECT LOCATION
LOCATION MAPAREA MAP
CITY OF CARMEL STANDARD NOTES
DESIGN DATA
EXISTING ZONING
S1 DISTRICT
ZONING OVERLAY
W 116TH ST OVERLAY
TOTAL ACREAGE
38.68 ACRES
BUILDING AREA (TOTAL PROPERTY)
4.95 ACRES
BUILDING COVER RATIO (TOTAL PROPERTY)
13%
PROJECT AREA (DISTURBED AREA)
4.29 ACERS
PROJECT AREA IMPERVIOUS COVER
560.00 SQUARE FEET
IMPERVIOUS COVER RATIO
0.30%
W
S
N
E
CITY OF CARMEL PLANNING
ONE CIVIC SQUARE
CARMEL, IN 46032
ANGIE CONN / ALEXIA LOPEZ
TEL: 317/571-2417
CITY OF CARMEL ENGINEERING
ONE CIVIC SQUARE
CARMEL, IN 46032
JOHN THOMAS / ALEX JORDAN
TEL: 317/571-2441
CITY OF CARMEL BLDG SERVICES
ONE CIVIC SQUARE
CARMEL, IN 46032
BILL HOHLT
TEL: 317/571-2444
CITY OF CARMEL FIRE DEPARTMENT
TWO CIVIC SQUARE
CARMEL, INDIANA 46032
CHRIS ELLISON
TEL: 317/571-2600
CARMEL CITY UTILITIES
30 W MAIN ST, SUITE 220
CARMEL, INDIANA 46032
JOHN DUFFY
TEL: 317/571-2648
HAMILTON COUNTY SURVEYOR
ONE HAMILTON COUNTY SQUARE
SUITE 188
NOBLESVILLE, INDIANA 46060
SAM CLARK
TEL: 317/776-8495
HAMILTON COUNTY HEALTH DEPARTMENT
18030 FOUNDATION DR. SUITE A
NOBLESVILLE, INDIANA 46060
JASON LEMASTER
TEL: 317/776-8500
TRICO REGIONAL SEWER UTILITY
7236 MAYFLOWER PARK DR.
ZIONSVILLE, IN 46077
RYAN HARTMAN
TEL: 317/844-9200
DUKE ENERGY
100 SOUTH MILL CREEK RD.
NOBLESVILLE, INDIANA 46060
TEL: 317/776-5352
COMCAST
9750 E. 150th STREET
SUITE 1600
NOBLESVILLE, INDIANA 46060
TEL: 317/776-4495
VECTREN GAS
P.O. BOX 1700
NOBLESVILLE, INDIANA, 46060
TEL: 317/776-5573
AT&T
5858 NORTH COLLEGE
INDIANAPOLIS, INDIANA 46220
TEL: 317/252-5168
OPERATING AUTHORITIESGENERAL NOTES
CONSTRUCTION PLANS FOR
PRIVATE BALLFIELD
11303 DITCH ROAD
CARMEL, IN 46032
LAND DESCRIPTION
BENCH TIE SET +1' ABOVE GRADE IN THE EAST SIDE OF A
UTILITY POLE ON THE WEST SIDE OF DITCH ROAD.
SAIDS UTILITY POLES FALLS +34' WEST OF THE CENTERLINE
OF DITCH ROAD AND +110' SOUTH OF THE CENTERLINE OF
PICKWICK LANE
ELEV. 864.56' (NAVD 88)
BENCHMARK INFORMATION
PLANS PREPARED FOR
PRIVATE BALLFIELD
11303 DITCH ROAD
CARMEL, IN 46032
TELEPHONE: (317) 514-7383
CONTACT PERSON: PETE CLEMENS
EMAIL: PCLEMENS@LUCASOIL.COM W230487-C001 titleC001TITLE SHEETW23.0487ABW23.048704/26/2024WSWSPRIVATE BALLFIELD11303 DITCH ROAD, CARMEL, IN 46032PLANS PREPARED BY
WEIHE ENGINEERS, INC.
10505 N. COLLEGE AVE.
INDIANAPOLIS, INDIANA 46280
TELEPHONE: (317) 846-6611
FAX: (317) 843-0546
CONTACT PERSON: BILL SCHMIDT
EMAIL: SCHMIDTB@WEIHE.NET
1.NO EARTH DISTURBING ACTIVITY MAY TAKE PLACE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT
2.THESE PLANS COMPLY WITH ALL ADA REQUIREMENTS.
3.UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE OWNER. UTILITY LINE
RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL
BE THE DEVELOPER TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN
ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE.
4.ALL EXISTING PERIMETER ROAD DRAINAGE STRUCTURES AND BRIDGES ACROSS THE FRONTAGE OF THIS
DEVELOPMENT ARE INDICATED ON THE PLANS. PROVISIONS HAVE BEEN MADE TO IMPROVE OR REPLACE ANY
DRAINAGE STRUCTURES AND BRIDGES AS NECESSARY OR AS REQUEST BY THE CITY TO ACCOMMODATE THE
PAVEMENT WIDENING, AUXILIARY LANES, MULTI-USE PATH, AND ANY OTHER REQUIRED IMPROVEMENTS TO THE
PROPERTY OR THE ROADWAY. THE COST TO IMPROVE OR REPLACE ANY DRAINAGE STRUCTURES AND BRIDGES WILL
BE BORNE BY THE DEVELOPER.
5.DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL BE RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE
COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY
PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY.
6.ALL PAVING WITHIN THE EXISTING AND PROPOSED CITY RIGHT -OF-WAY SHALL CONFORM TO THE REQUIREMENTS OF
THE DEPARTMENT OF ENGINEERING. THE CONTRACTOR SHALL CONTACT THE DEPARTMENT OF ENGINEERING TO
SCHEDULE A PRE-CONSTRUCTION MEETING TO REVIEW THE DEPARTMENT'S CONSTRUCTION REQUIREMENTS, STAFF
NOTIFICATION REQUIREMENTS, REQUIRED INSPECTIONS FOR CERTAIN STAGES OF THE WORK AND TO REVIEW THE
AUTHORITY OF THE DEPARTMENT AS IT RELATES TO WORK WITHIN THE EXISTING AND PROPOSED RIGHT-OF-WAY.
1.THESE PLANS ARE BASED ON A SURVEY PREPARED BY WEIHE ENGINEERS DATED 04/04/2024. PRIOR TO
THE START OF CONSTRUCTION, THE CONTRACTOR SHALL VERIFY THAT THE IMPROVEMENTS EXIST AS
SHOWN ON THE SURVEY. THE CONTRACTOR IS RESPONSIBLE FOR NOTIFYING THE OWNER
CONSTRUCTION MANAGER AND THE ENGINEER OF ANY DEVIATIONS OR OMISSIONS THAT MAY EFFECT
THE CONSTRUCTION OF THE PROPOSED IMPROVEMENTS.
2.THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING, OR VERIFYING THAT ALL PERMITS AND
APPROVALS ARE OBTAINED FROM THE RESPECTIVE CITY, COUNTY, AND STATE AGENCIES PRIOR TO
STARTING CONSTRUCTION.
3.IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO DETERMINE THE EXACT LOCATION OF ALL
EXISTING UTILITIES IN THE VICINITY OF THE CONSTRUCTION AREA PRIOR TO STARTING
CONSTRUCTION
4.IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO NOTIFY AND COORDINATE CONSTRUCTION WITH
ALL RESPECTIVE UTILITIES.
5.ALL QUANTITIES GIVEN ON THESE PRINTS, VERBALLY OR IN THE SCOPE OF WORK SECTION ARE
ESTIMATES AND SHALL BE CONFIRMED BY THE BIDDING CONTRACTORS.
6.OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS FOR EXCAVATIONS; FINAL
RULE 29 CFR PART 1926, SUBPART "P" APPLIES TO ALL EXCAVATIONS EXCEEDING FIVE (5) FEET IN
DEPTH.
7.EXCAVATIONS EXCEEDING TWENTY (20) FEET IN DEPTH REQUIRE THE DESIGN OF A TRENCH SAFETY
SYSTEM BY A REGISTERED PROFESSIONAL ENGINEER.
8.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN QUALITY CONTROL
THROUGHOUT THIS PROJECT.
9.THE ENGINEER AND/OR OWNER DISCLAIM ANY ROLE IN THE CONSTRUCTION MEANS AND METHODS
ASSOCIATED WITH THE PROJECT AS SET FORTH IN THESE PLANS.
10.ANY FIELD TILES ENCOUNTERED DURING EXCAVATION SHALL BE REPAIRED AND CONNECTED TO NEW
STORM SEWERS AND POSITIVE DRAINAGE PRESERVED.
11.THE SITE DOES NOT LIE IN A SPECIAL FLOOD HAZARD AREA AS ESTABLISHED BY THE FEDERAL
EMERGENCY MANAGEMENT AGENCY - NATIONAL FLOOD INSURANCE PROGRAM, WHEN PLOTTED BY
SCALE ON FLOOD INSURANCE RATE MAP #18057C0208G, DATED 11/19/2014.
12.BEARINGS, DIMENSIONS AND EASEMENTS ARE SHOWN FOR REFERENCE ONLY. SEE RECORD
SURVEYS & PLAT FOR EXACT INFORMATION.
13.THIS SITE DOES NOT CONTAIN ANY WETLANDS AT SHOWN ON THE U.S. DEPARTMENT OF THE INTERIOR
FISH AND WILDLIFE SERVICE;INDIANA, NATIONAL WETLANDS INVENTORY MAP.
10 9abcd 8 7 6efgh109876
5 4 3 2 1 PREPARED FOR:PROJECT NO.
SHEET NO.abcd5 4 3 2
e1
fhAPPROVAL PENDINGNOT FOR CONSTRUCTIONISSUED FOR CITY REVIEW04.26.2024WGS1gALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.SMENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546 faxWEIHELand Surveying | Civil EngineeringLandscape Architecture05/09/2024PROJECT NO.:REVISIONS AND ISSUESDATEBYDWG NAME:DESIGNED BY:DRAWN BY:CHECKED BY:DATE:Know what's below.
before you dig.Call
R
DARRELL A. EDWARDS P.E. #890047SPRING MILL RD.106th ST.
116th ST.
106th ST.
131st ST.
146th ST.
141st ST.
96th ST.TOWNE RD.SPRING MILL RD.DITCH RD.I-465 I-465US-421US 31Sheet List Table
Sheet Number Sheet Title
C001 TITLE SHEET
C002 GENERAL NOTES
C101 STORMWATER POLLUTION PREVENTION PLAN PHASE I
C102 STORMWATER POLLUTION PREVENTION PLAN PHASE II
C103 STORMWATER POLLUTION PREVENTION PLAN SPECS.
C104 STORMWATER POLLUTION PREVENTION PLAN DETAILS
C105 STORMWATER POLLUTION PREVENTION PLAN DETAILS
C200 SITE PLAN
C201 SITE PLAN DETAILS
C300 GRADING PLAN
C600 DRAINAGE PLAN
C602 DRAINAGE PLAN DETAILS
L100 LANDSCAPE PLAN
L101 LANDSCAPE PLAN DETAILS