Docket No. PZ-2023-00076 PP/SP: Cherry Creek Farms Minor Subdivision.
The applicant seeks minor subdivision plat approval to split one 2.7-acre parcel into 2 residential
lots. The site is located at 13777 Hazel Dell Parkway and is zoned S- 1/Residential. Filed by Mike
Kinney, owner.
Project Overview: The Petitioner seeks to subdivide one 2.7-acre parcel into 2 lots on Hazel Dell Parkway just
south of Cherry Tree Elementary School. The property is zoned S-1/Residential. Surrounding properties to the
ease, south, and west are single family residential homes zoned S-1/Residential. To the north is Cherry Tree
Elementary School. Please see the Petitioner’s Information Package for more details.
UDO Standards this project MEETS:
• Minimum Lot Area – 15,000 sq. ft.
• Minimum lot Width – 120 ft.
• Minimum Side Yard Setback – 10 ft., 30 ft. aggregate
• Minimum Rear Yard Setback – 20 ft.
• Maximum Density – 1 lot per acre
• Dedication of right-of-way
UDO Ordinance Standards NOT MET:
• 10 ft. multi-use path required along Hazel Dell Pkwy – No path shown.
Comprehensive (Comp) Plan Analysis:
• The Comp. Plan classifies this area as East Neighborhoods.
• Suburban single-family homes are the dominant land use, and the typical lot size is between 1/8 to 3
acres.
• Maximum height is 2.5 stories, and the typical lot coverage is between 20% and 55%.
• The proposed plat meets these goals of the Comp. Plan and is therefore considered a best fit next to the
surrounding properties which are also classified as East Neighborhoods on the Comp. Plan.
Additional Analysis:
Site Plan and Engineering:
• This plat is considered a Minor Subdivision because there are less than 6 lots, and no new streets are
being created.
• The petitioner proposes to split the existing 2.7-acre parcel into 2 lots.
• The current home will remain on the southern parcel, and a new home will be built to the north on Lot 1.
• Whenever land is divided into new lots, the project must meet the Comp. Plan requirements for right-of-
way dedication and path construction per the Transportation Plan.
• Most of the required right-of-way for Hazel Dell Pkwy is already dedicated, but there is a small portion
on the south end of the project that will be dedicated with this subdivision.
• A 10 ft. multi-use path is also required along Hazel Dell Pkwy, but only a sidewalk exists today.
• Tree preservation is shown on the lots, which will also help with drainage by reducing disturbance and
helping with absorption.
Active Transportation:
• The Transportation Plan in the Carmel Comprehensive Plan requires a 10 ft. multi-use path along this
section of Hazel Dell Pkwy.
2
• The petitioner has not shown the path on the plans and will need to either build the path with
their project, contribute the cost to design and construct the path, or request a variance.
• The Dept. would not support a variance from this requirement.
• The best option would be to build the path now because this is an important connection as it is along a
main thoroughfare, and it leads to a school.
• The school to the north is also planning some renovations and a building addition which is triggering
them to upgrade their sidewalk to a path as well.
Landscaping:
• A 30 ft. tree preservation easement is shown around the north, west, and south perimeters of the
subdivision.
• Since this is a Minor Subdivision, no additional buffering is required.
Sustainability Measures: The petitioner has stated they will implement the following sustainable site and
building design aspects.
• Exterior Envelope Materials: Utilizing siding made from recycled or sustainable materials, contributing
to reduced environmental impact.
• LED Lighting: Incorporating Energy Star LED surface mounted lights throughout the home, ensuring
energy efficiency and longevity with an expected lifespan of 40,000 hours.
• Local Sources: Sourcing materials locally to minimize emissions, transportation costs, and to maintain a
higher level of quality in construction.
• Indoor Air Quality: Using "GREENGUARD" certified insulation products to promote healthier indoor
air quality. Additionally, installing heating and cooling units with high efficiency ratings and whole
home humidifiers for optimal comfort.
• Windows: Installing windows with low E coatings to block UV rays and improve insulation, keeping the
home comfortable while reducing energy consumption.
• Water Efficiency: Incorporating WaterSense faucets to achieve 30% greater efficiency compared to
standard faucets, conserving water resources.
• Flooring: Choosing flooring with Cradle-to-Cradle recyclable carpet, promoting sustainability by
enabling the materials to be recycled into new products.
• Paper Reduction: Embracing digital solutions for scheduling, plans, specifications, and homeowner
materials to reduce reliance on paper and minimize landfill waste.
• HERS Index: Achieving a lower HERS score of 68 compared to the average new home standard of 100,
indicating significantly reduced energy usage and superior energy efficiency.
DOCS Remaining Comments/Concerns:
1. 10 ft. multi-use path should be constructed with the subdivision improvements.
2. Please show sewer easements on the secondary plat, per the Carmel Utilities comment.
Recommendation:
The Department of Community Services recommends the Plan Commission votes to send this item to the Plan
Commission Committee with final voting authority, so the petitioner can finalize their plans for the path.