Loading...
HomeMy WebLinkAboutS_201-FirstFloorStructuralPlan1 2 3 4 5 6 8 9 10 11 12 A B C D E F G 1 S400 ______GL 6-3/4x9GL 6-3/4x9GL 6-3/4x9GL 6-3/4x9GL 6-3/4x9GL 6-3/4x9GL 6-3/4x9GL 6-3/4x9GL 6-3/4x9GL 6-3/4x9GL 6-3/4x9GL 6-3/4x9GL 6-3/4x9GL 6-3/4x9GL 6-3/4x9GL 6-3/4x9GL 6-3/4x9GL 6-3/4x9GL 6-3/4x9GL 6-3/4x9GL 6-3/4x9GL 6-3/4x7-1/2GL 6-3/4x9GL 6-3/4x9GL 6-3/4x9GL 6-3/4x7-1/2GL 6-3/4x7-1/2GL 6-3/4x7-1/2GL 6-3/4x7-1/2GL 6-3/4x7-1/2GL 6-3/4x7-1/2GL 6-3/4x7-1/2GL 6-3/4x9GL 6-3/4x9GL 6-3/4x9GL 6-3/4x9GL 6-3/4x9GL 6-3/4x9GL 6-3/4x9GL 6-3/4x9GL 6-3/4x9GL 6-3/4x9GL 6-3/4x92 S400 ______ 3 S400 ______ 2'-0"10'-0"10'-0"2'-0"10'-0"10'-0"10'-0"2'-0"10'-0"10'-0"2'-0" H 2'-0"12'-0"8'-0"2'-0"8'-0"6'-0"26'-3 3/8"2'-11"1'-1"4'-0"4'-0"4'-0" 2 S510 ______GL 6-3/4x9GL 6-3/4x9GL 6-3/4x9GL 6-3/4x9GL 6-3/4x9GL 6-3/4x9GL 6-3/4x9GL 6-3/4x9GL 6-3/4x9GL 6-3/4x9GL 6-3/4x91 S510 ______ 7 5 S100 ______GL 6-3/4x7-1/2HD2HD1HD1HD1HD1HD2SW123'-10"GL 6-3/4x7-1/214 S510 ______ 3 S510 ______ 4 S510 ______ 5 S510 ______ 6 S510 ______ 7 S510 ______ 8 S510 ______ 9 S510 ______ 10 S510 ______ 11 S510 ______ 12 S510 ______13 S510 ______ W2 W2 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 8'-0" W1 W1 COORD w/ CIVIL FOR PLANTER REQMTS ROOF FRAMING NOTES 1. INDICATED SHEAR WALL LENGTHS ARE REQUIRED MINIMUMS, CONTRACTOR MAY ELECT TO INCREASE LENGTH AS DESIRED FOR CONSTRUCTABILITY. 2. FOR ADDL FRAMING REQUIREMENTS SEE S301. DESIGNATIONS ARE AS FOLLOWS: A. BEAMS/HEADERS ARE TAGGED INDIVIDUALLY B. SQUARES DESIGNATE JOIST C. DIAMONDS DESIGNATE WALLS 3. ALL DIMENSIONS ARE FROM FACE OF EXTERIOR WOOD STUD, UNO. ARCHITECTURAL DIMENSION TAKE PRECEDENT OF DIMENSIONS SHOWN ON THE STRUCTURAL DRAWINGS. 4. PROVIDE TRUSS BRACING AS REQUIRED BY TRUSS MANUFACTURER. 5. FASTEN 2x10 ROOF JOIST w/ SDWS2712100G TIMBER SCREW THROUGH JOIST INTO GLULAM BEAM. THIS IS TO OCCUR EVERYTIME A JOIST CROSS OF A GLULAM BEAM. 6. COORDINATE TRUSS BEARING ELEVATIONS w/ ARCH DRAWINGS 7. FOR ROOF DECK THICKNESS, FASTENING AND BLOCKING REQUIREMENTS, SEE S601. 8. PROVIDE 2X4 DFL T&G CEILING BOARDS. SEE ARCH FOR ADDL REQMTS 9. ALL EXTERIOR WOOD IS TO BE COATED PER ARCHITECTURAL DRAWINGS. EXTERIOR WOOD IS TO BE PROTECTED AND MAINTAINED. 10. SEE S200 FOR ADDL FOUNDATION REQUIREMENTS 11. PROVIDE STRAPS WHERE INDICATED BY BLUE DASHED LINE. BELOW IS A BREAKDOWN OF STRAP REQUIREMENTS AS A FUNCTION OF THE LENGTH ("L") OF THE DIAPHRAGM ON EITHER SIDE OF SHEAR WALL. EXAMPLE BELOW. STRAPS REQUIRED AT EACH JOINT. A. STRAP 01 a. 0%-25% x "L" -ST6215 w/ (2)BLOCKING STUDS PER 5/S610 b. 25%-50% x "L" -LSTA15 c. >50% x "L" -LSTA9 d. @SHEARWALL -ST6215 w/ (2)BLOCKING STUDS PER 5/S610 B. STRAP 02 a. 0%-25% x "L" -ST22 b. 25%-50% x "L" -LSTA15 c. >50% x "L" -LSTA9 d. @SHEARWALL -ST22 SW"L""L" >50%50%25% GENERAL: 1. SEE S0 SERIES SHEETS FOR GENERAL NOTES, STRUCTURAL SYMBOLS AND NOTATIONS, STATEMENT OF SPECIAL INSPECTIONS AND LOADING DIAGRAMS. 2. SEE S1 SERIES SHEETS FOR PLAN VIEWS. 3. SEE S3 SERIES SHEETS FOR SCHEDULES AND ASSOCIATED DETAILS. 4. SEE S5 SERIES SHEETS FOR FOUNDATION DETAILS. 5. SEE S6 SERIES SHEETS FOR FRAMING SECTIONS. 6. SEE ARCHITECTURAL DOCUMENTS FOR DIMENSIONS NOT SHOWN, OPENINGS, AND COORDINATE ROUGH OPENING SIZED WITH INDIVIDUAL TRADES. COORDINATE BEARING ELEVATIONS WITH ARCHITECTURAL. 7. COORDINATE WITH ARCHITECTURAL & CIVIL FOR SITE INFORMATION. 8. SEE ARCHITECTURAL SITE PLAN FOR BUILDING ORIENTATION. 9. SHEAR WALL ANCHORS AND HOLDOWN EMBEDMENT PLATE TO BE CAST IN PLACE. COORDINATE WITH SHEET S201.1 PLAN NOTES STRUCTURAL WALL SCHEDULE WALL MARK DESCRIPTION W1 W2 2x6 @16" OC 2x6 @12" OC REMARKS SPF #2 SPF #2 WALL NOTES: 1. ALL TOP PLATES & SILL PLATES TO BE SP#1 (SPF PLATES NOT ALLOWED) W3 2x4 @16" OC SPF #2 PERMIT SETDrawn By: Designed By: Project No: Date: 151 W. 4th Street, Suite 700A Cincinnati, OH 45202 O: (513) 409.2337 www.kpff.com TAVERN AT PROSCENIUM 122 Proscenium ParkwayCarmel, IN 46032S201 LR 2400017 03/19/2024 FIRST FLOOR STRUCTURAL PLAN RWNOVO Development GroupSCALE: 1/4" = 1'-0" FIRST FLOOR STRUCTURAL PLAN1 Doc. Rel.#Date Description