Loading...
HomeMy WebLinkAbout07030125 Application BUILDER of RECORD: PHONE: 5' 'S- 3/7 FAX: 5.3 BUILDER'S EMAIL ADDRESS: , STATE: ZIP; j"... AJ Cf (Of 0:f PROPERTY OWNER INFO: :t BEST METHOO OF CONTACT: EfYl/llL. " 3/7 Jlf -31 'fj--- PHONE: FAX: PROJECT LOCATION -- INFO: STATE: tV ..r. rJ L ({GO 3'z.- ESTIMATED COST OF CONSTRUCTION: LOT # and ~UBDIVISION NAME: (If appllcabl~ i .s . r . 'v1 SUMP PUMP: IIf YES-INDICATE DRAINAGE ON SITE PLAN) DYES RE TYPE, IF APPUCABLE: ~ SQUARE FOOTAGE "''':3 '" IncludJnQ deck area: ~ AUTO FILTER: YES 0 NO o YES IS ANY PART OF PROPERTY WITHIN SPECIAL FLOOD HAZARD AREA: DYES NO POOL HEATED:)<'YES 0 NO ----..... 0 NO DIVING BOARD: YES 0 NO STATE COMMERCIAL DESIGN RELEASE # IF APPUCABLE: < CLASS OF POOL IF COMMERC~ IF HEATED: GAS o ELECTRIC SUDE: o YES SWIMMING POOL / SPA PERMIT REQUIREMENTS . SAFETY FEATURES (INCLUDING POOL COVERS) SHALL COMPLY WITH THE INDIANA SWIMMING POOL CODES 675 lAC 20-2-26, 20-4-27 "SAFETY REQUIREMENTS." . IF POOL CONSTRUCTION REQUIRES ACCESS TO PROPERTY THROUGH A RIGHT-OF-WAY, NOT CONTAINING AN ESTABLISHED DRIVEWAY, THE APPLICANT MUST GAIN APPROVALS THROUGH THE CITY OF CARMEL ENGINEERING DEPT. (317) 571-2441 OR THE HAMILTON COUNTY HIGHWAY DEPT. (317) 773-7770. (Whichever is applicable) I INSPECTIONS: All pool construction requires AT LEAST TWO (2) inspections. Large pools, specially constructed pools, and pools with steel rebar reinforcement will require additional inspectiDns. CDmmercial/lnstitutional pDols may also require additional inspections. BONDING & GROUNDING: Pool builders must contact the "Footing, Under-siab, and Bonding & Grounding SCheduling Line" at (317) 571.2449, between 8:00 AM and 9:00 AM each weekday, tD schedule this inspection for a SAME DAY INSPECTION. FOR THIS INSPECT/ON: . The pool shell must be installed. . All piping for plumbing, all electrical conduits and wiring must be installed in the conduits, and all receptacles and junction. boxes must be installed and open for inspection. . Equipotential bonding under the deck must be bonded and ready at inspection. . A maior aspect of the bonding inspection js the common bonding grid, as called for in the Indiana Electrical Code; Section 680-26. ..CONCRETE POOLS NOTE: All pools with concrete reinforcement (rebar) may require TWO bonding and grounding inspections prior to the final inspection. ...ALL ELECTRICAL EQUIPMENT COVERS MUST BE REMOVED. DO NOT ENERGIZE ANY EQUIPMENT UNTIL INSPECTED AND APPROVED.