Loading...
HomeMy WebLinkAboutC4.1.SWPPD05/15/2024 PERMANENT SEEDING DATES TEMPORARY SEEDING DATES LAWNS AND HIGH MAINTENANCE AREAS STEEP BANKS AND CUTS SEED TOLERANCE CHART LEVEL AND SLOPING, OPEN AREAS SEED TOLERANCE TEMPORARY SEEDINGS SEEDING DETAIL TEMPORARY CONSTRUCTION ENTRANCE FERTILIZER NOTE SILT FENCE CONSTRUCTION JOINT DETAIL EROSION CONTROL MEASURES MAINTENANCE REQUIREMENTS SILT FENCE MAINTENANCE REQUIREMENTS: EROSION CONTROL BLANKET (SURFACE APPLIED) MAINTENANCE REQUIREMENTS: TEMPORARY GRAVEL CONSTRUCTION ENTRANCE MAINTENANCE REQUIREMENTS: EROSION CONTROL SCHEDULE MAINTENANCEEROSION CONTROL MEASURE INSTALLATION SEQUENCE ROCK CHECK DAM MAINTENANCE REQUIREMENTS: PROTECTION SILT FENCE INLET EROSION BLANKET INSATLLATION REVISION RECORD1 1 2 2 3 3 4 4 A A B B C C D D SHEET 1 OF 1 DWG NOSIZE SCALE REV TYPICAL RECTANGULAR INLET FILTER COMBINATION INLET FILTER FOR CURB HOODS TYPICAL ROUND INLET FILTER STAINLESS STEEL ROUND INLET FILTERS for NYLOPLAST CASTINGS CATCH-ITS SPECIFIED W/ FX or FX-S BAGS IPP Flexstorm SpecificationsC A CONCRETE WASHOUT BMP PLAN SECTION B-B PROJECT NUMBER DRAWING NUMBER SHEET OF SCALE: DATE: DWN BY: CHKD. BY:CIVIL SITE GROUP, INC.GROUP, INC.PROF E SS ION A L E NG INEERIND IA NA PE10910647 STATE OF -oNREGIS TER E DBR IA N S CR O SSACG.065 C4.1INDIANAPOLIS, INDIANA 46225425 W SOUTH STREET, STE 100ALDERSON COMMERCIAL GROUP, INC.STORMWATER POLLUTION PREVENTION DETAILSROBEY SURGERY CENTER & CLINICSE CORNER OF HARLESTON ST & PETIGRU DRCARMEL, IN 46033PRELI MI NARY NOT F O R C ONST R U CTI O N