HomeMy WebLinkAboutC4.2.SWPPNREVISION RECORD
05/15/2024
INDEX OF THE LOCATION OF REQUIRED PLAN
ELEMENTS IN THE CONSTRUCTION PLAN:
A VICINITY MAP DEPICTING THE PROJECT SITE
LOCATION IN RELATIONSHIP TO MAJOR ROADS:
NARRATIVE OF THE NATURE &
PURPOSE OF THE PROJECT:
””
LATITUDE &
LONGITUDE:
LEGAL DESCRIPTION OF
THE PROJECT SITE:
11x17-INCH PLAT SHOWING THE BUILDING LOT
NUMBERS/BOUNDARIES & ROAD LAYOUT/NAMES:
BOUNDARIES OF THE 100-HUNDRED (100) YEAR
FLOODPLAINS, FLOODWAY FRINGES & FLOODWAYS:
LAND USE OF ADJACENT
PROPERTIES:
IDENTIFICATION OF A U.S. EPA
APPROVED OR ESTABLISHED TMDL:
NAMES OF RECEIVING
WATERS:
IDENTIFICATION OF DISCHARGES TO A WATER ON
THE CURRENT 303(d) LIST OF IMPAIRED WATERS:
SOILS MAP OF THE
PREDOMINANT SOIL TYPES:
LOCATION OF ALL KNOWN WETLANDS, LAKES & WATER
COURSES ON OR ADJACENT TO THE PROJECT SITE:
IDENTIFICATION OF ANY OTHER STATE OR FEDERAL WATER
QUALITY PERMITS REQUIRED FOR CONSTRUCTION:
IDENTIFICATION & DELINEATION OF EXISTING COVER,
INCLUDING NATURAL BUFFERS:
EXISTING SITE TOPOGRAPHY AT AN INTERVAL APPROPRIATE
TO INDICATE DRAINAGE PATTERNS:
LOCATION(S) WHERE RUNOFF
ENTERS THE PROJECT SITE:
LOCATION(S) WHERE RUNOFF DISCHARGES FROM
THE PROJECT SITE PRIOR TO LAND DISTURBANCE:
LOCATION OF ALL EXISTING
STRUCTURES ON THE PROJECT SITE:
EXISTING PERMANENT RETENTION OR
DETENTION FACILITIES:
LOCATIONS WHERE STORMWATER MAY BE
DIRECTLY DISCHARGED INTO GROUNDWATER:
SIZE OF THE PROJECT
EXPRESSED IN ACRES:
TOTAL EXPECTED LAND
DISTURBANCE:
PROPOSED FINAL
TOPOGRAPHY:
LOCATIONS & APPROXIMATE BOUNDARIES
OF ALL DISTURBED AREAS:
MATERIAL HANDLING & STORAGE PROCEDURES
ASSOCIATED WITH CONSTRUCTION ACTIVITY:
DESCRIPTION OF POLLUTANTS & THEIR SOURCES
ASSOCIATED WITH THE PROPOSED LAND USE;
DESCRIPTION OF PROPOSED POST-CONSTRUCTION
STORMWATER MEASURES:
PLAN DETAILS FOR EACH
STORMWATER MEASURE:
SEQUENCE DESCRIBING STORMWATER
MEASURE IMPLEMENTATION:
s
MAINTENANCE GUIDELINES FOR PROPOSED
POST-CONSTRUCTION STORMWATER MEASURES:
ENTITY THAT WILL BE RESPONSIBLE FOR THE OPERATION
& MAINTENANCE OF THE STORMWATER MEASURES:
PLANNED CONSTRUCTION
SEQUENCE:
PROVISIONS FOR EROSION CONTROL ON
INDIVIDUAL RESIDENTIAL BUILDING LOTS:
MATERIAL HANDLING, SPILL
PREVENTION & SPILL RESPONSE:
LOCATIONS, SIZE & DIMENSIONS OF THE
STORMWATER DRAINAGE SYSTEM:
LOCATIONS OF SPECIFIC POINTS WHERE
STORMWATER DISCHARGES WILL LEAVE THE SITE:
LOCATION OF ALL PROPOSED
SITE IMPROVEMENTS:
LOCATION OF ALL SOIL STOCKPILES
& BORROW AREAS:
CONSTRUCTION SUPPORT ACTIVITIES THAT
ARE EXPECTED TO PART OF THE PROJECT:
LOCATION OF ANY IN-STREAM ACTIVITIES
THAT ARE PLANNED FOR THE PROJECT:
DESCRIPTION OF THE POTENTIAL POLLUTANT
GENERATING SOURCES & POOLUTANTS:
STABLE CONSTRUCTION ENTRANCE
LOCATIONS & SPECIFICATIONS:
SPECIFICATIONS FOR TEMPORARY &
PERMANENT STABILIZATION:
SEDIMENT CONTROL MEASURES FOR
CONCENTRATED FLOW AREAS:
SEDIMENT CONTROL MEASURES
FOR SHEET FLOW AREAS:
RUN-OFF CONTROL
MEASURES:
STORMWATER OUTLET PROTECTION
LOCATION & SPECIFICATIONS:
GRADE STABILIZATION STRUCTURE
LOCATIONS & SPECIFCIATIONS:
DEWATERING APPLICATIONS &
MANAGEMENT METHODS:
MEASURES UTILIZED FOR WORK
WITHIN WATERBODIES:
MAINTENANCE GUIDELINES FOR EACH
PROPOSED STORMWATER QUALITY MEASURE:
PROJECT NUMBER
DRAWING NUMBER
SHEET OF
SCALE:
DATE:
DWN BY:
CHKD. BY:CIVIL SITE GROUP, INC.GROUP, INC.PROF
E
SS
ION A L E NG INEERIND
IA NA
PE10910647
STATE OF
-oNREGIS TER
E
DBR IA N S CR
O
SSACG.065
C4.2INDIANAPOLIS, INDIANA 46225425 W SOUTH STREET, STE 100ALDERSON COMMERCIAL GROUP, INC.STORMWATER POLLUTION PREVENTION NOTESROBEY SURGERY CENTER & CLINICSE CORNER OF HARLESTON ST & PETIGRU DRCARMEL, IN 46033CHRIS HOFFEE
ALDERSON COMMERCIAL GROUP, INC.
425 W. SOUTH STREET, STE. 100
INDIANAPOLIS, INDIANA 46225
(317) 889-3800 PRELI
MI
NA
RY
NOT F
O
R
C
O
NST
R
U
CTI
O
N