Loading...
HomeMy WebLinkAboutC4.2.SWPPNREVISION RECORD 05/15/2024 INDEX OF THE LOCATION OF REQUIRED PLAN ELEMENTS IN THE CONSTRUCTION PLAN: A VICINITY MAP DEPICTING THE PROJECT SITE LOCATION IN RELATIONSHIP TO MAJOR ROADS: NARRATIVE OF THE NATURE & PURPOSE OF THE PROJECT: ”” LATITUDE & LONGITUDE: LEGAL DESCRIPTION OF THE PROJECT SITE: 11x17-INCH PLAT SHOWING THE BUILDING LOT NUMBERS/BOUNDARIES & ROAD LAYOUT/NAMES: BOUNDARIES OF THE 100-HUNDRED (100) YEAR FLOODPLAINS, FLOODWAY FRINGES & FLOODWAYS: LAND USE OF ADJACENT PROPERTIES: IDENTIFICATION OF A U.S. EPA APPROVED OR ESTABLISHED TMDL: NAMES OF RECEIVING WATERS: IDENTIFICATION OF DISCHARGES TO A WATER ON THE CURRENT 303(d) LIST OF IMPAIRED WATERS: SOILS MAP OF THE PREDOMINANT SOIL TYPES: LOCATION OF ALL KNOWN WETLANDS, LAKES & WATER COURSES ON OR ADJACENT TO THE PROJECT SITE: IDENTIFICATION OF ANY OTHER STATE OR FEDERAL WATER QUALITY PERMITS REQUIRED FOR CONSTRUCTION: IDENTIFICATION & DELINEATION OF EXISTING COVER, INCLUDING NATURAL BUFFERS: EXISTING SITE TOPOGRAPHY AT AN INTERVAL APPROPRIATE TO INDICATE DRAINAGE PATTERNS: LOCATION(S) WHERE RUNOFF ENTERS THE PROJECT SITE: LOCATION(S) WHERE RUNOFF DISCHARGES FROM THE PROJECT SITE PRIOR TO LAND DISTURBANCE: LOCATION OF ALL EXISTING STRUCTURES ON THE PROJECT SITE: EXISTING PERMANENT RETENTION OR DETENTION FACILITIES: LOCATIONS WHERE STORMWATER MAY BE DIRECTLY DISCHARGED INTO GROUNDWATER: SIZE OF THE PROJECT EXPRESSED IN ACRES: TOTAL EXPECTED LAND DISTURBANCE: PROPOSED FINAL TOPOGRAPHY: LOCATIONS & APPROXIMATE BOUNDARIES OF ALL DISTURBED AREAS: MATERIAL HANDLING & STORAGE PROCEDURES ASSOCIATED WITH CONSTRUCTION ACTIVITY: DESCRIPTION OF POLLUTANTS & THEIR SOURCES ASSOCIATED WITH THE PROPOSED LAND USE; DESCRIPTION OF PROPOSED POST-CONSTRUCTION STORMWATER MEASURES: PLAN DETAILS FOR EACH STORMWATER MEASURE: SEQUENCE DESCRIBING STORMWATER MEASURE IMPLEMENTATION: s MAINTENANCE GUIDELINES FOR PROPOSED POST-CONSTRUCTION STORMWATER MEASURES: ENTITY THAT WILL BE RESPONSIBLE FOR THE OPERATION & MAINTENANCE OF THE STORMWATER MEASURES: PLANNED CONSTRUCTION SEQUENCE: PROVISIONS FOR EROSION CONTROL ON INDIVIDUAL RESIDENTIAL BUILDING LOTS: MATERIAL HANDLING, SPILL PREVENTION & SPILL RESPONSE: LOCATIONS, SIZE & DIMENSIONS OF THE STORMWATER DRAINAGE SYSTEM: LOCATIONS OF SPECIFIC POINTS WHERE STORMWATER DISCHARGES WILL LEAVE THE SITE: LOCATION OF ALL PROPOSED SITE IMPROVEMENTS: LOCATION OF ALL SOIL STOCKPILES & BORROW AREAS: CONSTRUCTION SUPPORT ACTIVITIES THAT ARE EXPECTED TO PART OF THE PROJECT: LOCATION OF ANY IN-STREAM ACTIVITIES THAT ARE PLANNED FOR THE PROJECT: DESCRIPTION OF THE POTENTIAL POLLUTANT GENERATING SOURCES & POOLUTANTS: STABLE CONSTRUCTION ENTRANCE LOCATIONS & SPECIFICATIONS: SPECIFICATIONS FOR TEMPORARY & PERMANENT STABILIZATION: SEDIMENT CONTROL MEASURES FOR CONCENTRATED FLOW AREAS: SEDIMENT CONTROL MEASURES FOR SHEET FLOW AREAS: RUN-OFF CONTROL MEASURES: STORMWATER OUTLET PROTECTION LOCATION & SPECIFICATIONS: GRADE STABILIZATION STRUCTURE LOCATIONS & SPECIFCIATIONS: DEWATERING APPLICATIONS & MANAGEMENT METHODS: MEASURES UTILIZED FOR WORK WITHIN WATERBODIES: MAINTENANCE GUIDELINES FOR EACH PROPOSED STORMWATER QUALITY MEASURE: PROJECT NUMBER DRAWING NUMBER SHEET OF SCALE: DATE: DWN BY: CHKD. BY:CIVIL SITE GROUP, INC.GROUP, INC.PROF E SS ION A L E NG INEERIND IA NA PE10910647 STATE OF -oNREGIS TER E DBR IA N S CR O SSACG.065 C4.2INDIANAPOLIS, INDIANA 46225425 W SOUTH STREET, STE 100ALDERSON COMMERCIAL GROUP, INC.STORMWATER POLLUTION PREVENTION NOTESROBEY SURGERY CENTER & CLINICSE CORNER OF HARLESTON ST & PETIGRU DRCARMEL, IN 46033CHRIS HOFFEE ALDERSON COMMERCIAL GROUP, INC. 425 W. SOUTH STREET, STE. 100 INDIANAPOLIS, INDIANA 46225 (317) 889-3800 PRELI MI NA RY NOT F O R C O NST R U CTI O N