Lillard, Sarah N
From: Akers, William P
Sent: Friday, March 02, 2007 11:44 AM
To: Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Hoyt, Gary A; Blanchard, Jim E; Brewer, Scott I;
Dolan, Veronica A; 'grh@co.hamilton.in.us'; 'rct@co.hamilton.in.us'; 'Ryan.hartman@ctrwd.org';
'jbt@co.hamilton.in.us'; Foley, Amanda J; Griffin, Matt L; Duncan, Gary R; Redden, Nick; Duffy,
John M
Cc: 'handleyc@estridge.net'
Subject: RE: Pre-Submittal for the Lincolnshire Subdivision Pool House Bldg.
The address mentioned is correct.
From: Lillard, Sarah N
Sent: Friday, March 02, 2007 11: 11 AM
To: Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Hoyt, Gary A; Blanchard, Jim E; Brewer, Scott I; Dolan,
Veronica A; Akers, William P; 'grh@co,hamilton.in.us'; 'rct@co.hamilton.in.us'; 'Ryan.hartman@ctrwd.org';
'jbt@co.hamilton.in.us'; Foley, Amanda J; Griffin, Matt L; Duncan, Gary R; Redden, Nick; Duffy, John M
Cc: 'handleyc@estridge.net'
Subject: Pre-Submittal for the Lincolnshire Subdivision Pool House Bldg.
The Dept. of Community Service, Building & Code Services division, has received a
request to meet for the purpose of submitting to obtain a building permit for the
below-mentioned project. PLEASE "~J;PL.Y.IQ_ ALL" AS SOON AS POSSIBLE. IF
YOU HAVE OUTSTANDING ISSUES. After some time, we may proceed with the
meeting and submittal, even if all offices have not responded.
Project:
LINCOLNSHIRE SUBDIVISION POOL HOUSE
14150 Carlow Run
Meeting Date:
PENDING
Time:
PENDING
Related Planning & Zoning docket numbers:
05060018 SU
Representative(s):
Chad Handley
The Estridge Companies
handleyc@estridge.net
Ph. (317) 669-8559
3/2/2007
I
Page 1 of2
Lillard, Sarah N
From: Lillard, Sarah N
Friday, March 02, 2007 11 :14 AM
Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Hoyt, Gary A; Blanchard, Jim E; Brewer, Scott I;
Dolan, Veronica A; Akers, William P; 'grh@co.hamilton.in.us'; 'rct@co.hamilton.in.us';
'Ryan.hartman@ctrwd.org'; 'jbt@co.hamilton.in.us'; Foley, Amanda J; Griffin, Matt L; Duncan, Gary
R; Redden, Nick; Duffy, John M
Cc: 'handleyc@estridge.net'
Subject: RE: Pre-Submittal for the Lincolnshire Subdivision Pool House Bldg.
Sent:
To:
Chad,
The following requests for copies of certain parts of the approved plan come from members of
our Planning and Zoning office. One copy of each stamped plan mentioned below is required at
submittal for the building permit.
1. Please submit four (4) copies of the approved site plan to Scott Brewer, DOCS, One Civic Square, Carmel, IN,
46032. You will be notified when your stamped copies are ready for pickup. Contact: Scott Brewer, City
Forester/Environmental Planner. One Civic Square; Carmel. IN 46032. Phone: (317) 571-2478. FAX (317) 571-2426
2. Please submit three (3) copies of the architectural elevation drawings for the structure to Matt Griffin,
DOCS, One Civic Square, Carmel, IN, 46032. You will be notified when your stamped copies are ready for
pickup. Contact: Matt Griffin, Planning Administrator. One Civic Square; Carmel. IN 46032. Phone: (317) 571-2417.
FAX (317) 571-2426.
Also, john Duffy of Carmel Utilities and/or Dick Hill of the City Engineer's needs to provide
information regarding whether or not a water and/or sewer connection and/or availability
permit will be needed for this project. If it is, they will also need to provide the amount due for
this permit. They may require information from you to provide this figure. There may be
approval requirements for this, as well.
Once this information is obtained, you will need to either pay for this permit ahead of time, or
bring a check to the submittal meeting. We will need the name of the contractor who will be
doing the excavation of the extetior, lateral connection to the utility line. That contractor must
hold a current bond with the City. If you need a list of companies with current bonds, please
contact Dick Hill, at dhill@carmeLin.gov or at (317) 571- 2441.
Thank you,
Sarah
SM"'/i. LiItM~
Building & Code Services
City of Carmel
Ph. (317) 571-2475
Fax (317) 571-2499
~lill~n;!@l:armel.in.gov
3/2/2007
Page 2 0[2
-----Original Messagem--
From: Lillard, Sarah N
Sent: Friday, March 02, 2007 11: 11 AM
To: Liilard, Sarah N; Conn, Angelina V; Hill, Dick B; Hoyt, Gary A; Blanchard, Jim E; Brewer, Scott I;
Dolan, Veronica A; Akers, William P; 'grh@co.hamilton.in.us'; 'rct@co.hamilton.in.us';
'Ryan.hartman@ctrwd.org'; 'jbt@co.hamilton.in.us'; Foley, Amanda J; Griffin, Matt L; Duncan, Gary R;
Redden, Nick; Duffy, John M
Cc: 'handleyc@estridge.net'
Subject: Pre-Submittal for the Lincolnshire Subdivision Pool House Bldg.
The Dept. of Community Service, Building & Code Services division, has
received a request to meet for the purpose of submitting to obtain a building
permit for the below-mentioned project. PLEASE "REPLY TO ALL" AS
SOON AS POSSIBLE, IF YOU HAVE OUTSTANDING ISSUES. After some
time, we may proceed with the meeting and submittal, even if all offices have not
responded.
Project:
LINCOLNSHIRE SUBDIVISION POOL HOUSE
14150 Carlow Run
Meeting Date:
PENDING
Time:
PENDING
Related Planning & Zoning docket numbers:
05060018 SU
Representative(s):
Chad Handley
The Estridge Companies
handlevc@estridge.net
Ph. (317) 669-8559
Again, if there are concerns that might affect the issuance of this
permit, please RI;PL YJO~!-1.. on this e-mail.
3/2/2007
Page 1 of 1
Lillard, Sarah N
From: Lillard, Sarah N
Sent: Friday, March 02, 2007 11 :11 AM
To: Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Hoyt, Gary A; Blanchard, Jim E; Brewer, Scott I;
Dolan, Veronica A; Akers, William P; 'grh@co.hamilton.in.us'; 'rct@co.hamilton.in.us';
'Ryan.hartman@ctrwd.org'; 'jbt@co.hamilton.in.us'; Foley, Amanda J; Griffin, Matt L; Duncan, Gary
R; Redden, Nick; Duffy, John M
Cc: 'handleyc@estridge.net'
Subject: Pre-Submittal for the Lincolnshire Subdivision Pool House Bldg.
The Dept. of Community Service, Building & Code Services division, has received a
request to meet for the purpose of submitting to obtain a building permit for the
below-mentioned project. PLEASE "REPLY TO ALL" AS SOON AS POSSIBLE, IF
YOU HAVE OUTSTANDING ISSUES. After some time, we may proceed with the
meeting and submittal, even if all offices have not responded.
Project:
LINCOLNSHIRE SUBDIVISION POOL HOUSE
14150 Carlow Run
Meeting Date:
PENDING
Time:
PENDING
Related Planning & Zoning docket numbers:
05060018 SU
Representative(s):
Chad Handley
The Estridge Companies
handleyc@estridge.net
Ph. (317) 669-8559
Again, if there are concerns that might affect the issuance of this permit,
please REPLY TO ALL on this e-mail.
3/2/2007
i
Page 1 of2
,
Lillard, Sarah N
From: Duncan, Gary R
Sent: Monday, March 19, 2007 11: 18 AM
To: Lillard, Sarah N
Subject: RE: Pre-Submittal for the Lincolnshire Subdivision Pool House Bldg.
Yes. We still need to review engineered site plans. I am trying to schedule a meeting with them this week.
Gary
-----Original Message-----
From: Lillard, Sarah N
Sent: Monday, March 19, 2007 09:0S
To: Duncan, Gary R
Subject: RE: Pre-Submittal for the Lincolnshire Subdivision Pool House Bldg.
Gary,
Besides Dick Hill's issues, do you folks have any further issues with this project?
Sarah
-----Original Message-----
From: Lillard, Sarah N
Sent: Friday, March 02, 2007 11:11 AM
To: Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Hoyt, Gary A; Blanchard, Jim E; Brewer, Scott I;
Dolan, Veronica A; Akers, William P; 'grh@co.hamilton.in.us'; 'rct@co.hamilton.in.us';
'Ryan.hartman@ctrwd.org'; 'jbt@co.hamilton.in.us'; Foley, Amanda J; Griffin, Matt L; Duncan, Gary R;
Redden, Nick; Duffy, John M
Cc: 'handleyc@estridge.net'
Subject: Pre-Submittal for the Lincolnshire Subdivision Pool House Bldg.
The Dept. of Community Service, Building & Code Services division, has
received a request to meet for the purpose of submitting to obtain a building:
permit for the below-mentioned project. PLEASE "REPI..YIc:L~~L" AS
SOON AS POSSIBLE. IF YOU HAVE OUTSTANDING ISSUES. After some
time, we may proceed with the meeting and submittal, even if all offices have not
responded.
Project:
LINCOLNSHIRE SUBDIVISION POOL HOUSE
14150 Carlow Run
Meeting Date:
PENDING
Time:
PENDING
Related Planning & Zoning docket numbers:
3/19/2007
Page 1 of:3
Lillard, Sarah N
From: Chad Handley [handleyc@estridge.net]
Sent: Monday, March 05, 2007 12:43 PM
To: Lillard, Sarah N
Subject: RE: Pre-Submittal for the Lincolnshire Subdivision Pool House Bldg.
Sarah,
From the looks of things there are a couple of items that need to be wrapped up. I am working with Ryan
Hartman of Clay Regional Waste and Dick Hill from engineering. I am getting them everything they have
requested. It there any thing else that will be needed. I will be dropping the sets off for Scott Brewer and Matt
Griffin today.
Let me know what else you need.
Thanks
Chad Handley
From: Lillard, Sarah N [mailto:SLillard@carmel.in.gov]
Sent: Friday, March 02, 2007 11:14 AM
To: Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Hoyt, Gary A; Blanchard, Jim E; Brewer, Scott I; Dolan,
Veronica A; Akers, William P; grh@co.hamilton.in,us; rct@co.hamilton.in.us; Ryan.hartman@ctrwd.org;
jbt@co.hamilton.in.us; Foley, Amanda J; Griffin, Matt L; Duncan, Gary R; Redden, Nick; Duffy, John M
Cc: Chad Handley
Subject: RE: Pre-Submittal for the Lincolnshire Subdivision Pool House Bldg.
Chad,
The following requests for copies of certain parts of the approved plan come from members of
our Planning and Zoning office. One copy of each stamped plan mentioned below is required at
submittal for the building permit.
1. Please submit four (4) copies of the approved site plan to Scott Brewer, DOCS. One Civic Square, Carmel, IN,
46032. You will be notified when your stamped copies are ready for pickup. Contact: Scott Brewer, City
Forester/Environmental Planner. One Civic Square; Carmel. IN 46032. Phone: (317) 571-2478. FAX (317) 571-2426
2. Please submit three (3) copies of the architectural elevation drawings for the structure to Matt Griffin,
DOCS, One Civic Square, Carmel, IN, 46032. You will be notified when your stamped copies are ready for
pickup. Contact: Matt Griffin, Planning Administrator. One Civic Square; Carmel. IN 46032. Phone: (317) 571-2417.
FAX (317) 571-2426.
Also, John Duffy of Carmel Utilities and/or Dick Hill of the City Engineer's needs to provide
information regarding whether or not a water and/or sewer connection and/or availability
permit will be needed for this project. If it is, they will also need to provide the amount due for
this permit. They may require information from you to provide this figure. There may be
approval requirements for this, as well.
Once this information is obtained, you will need to either pay for this permit ahead of time, or
bring a check to the submittal meeting. We will need the name of the contractor who will be
doing the excavation of the exterior, lateral connection to the utility line. That contractor must
3/19/2007
Page 1 of2
Lillard, Sarah N
From: Hill, Dick B
Sent: Friday, March 02, 2007 4:12 PM
To: lillard, Sarah N; Conn, Angelina V; Hoyt, Gary A; Blanchard, Jim E; Brewer, Scott I; Dolan,
Veronica A; Akers, William P; 'grh@co.hamilton.in.us'; 'rct@co.hamilton.in.us';
'Ryan.hartman@ctrwd.org'; 'jbt@co.hamilton.in.us'; Foley, Amanda J; Griffin, Matt L; Duncan, Gary
R; Redden, Nick; Duffy, John M
Cc: 'handleyc@estridge.net'
Subject: RE: Pre-Submittal for the lincolnshire Subdivision Pool House Bldg.
Believe this will require BPWS approval of Water Availability and Commercial Curb Cut and the project will owe
Water Connection Fees once the appropriate data is submitted to calculate the fees.
-----Original Message-----
From: Lillard, Sarah N
Sent: Friday, March 02, 2007 11: 11 AM
To: Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Hoyt, Gary A; Blanchard, Jim E; Brewer, Scott I; Dolan,
Veronica A; Akers, William P; 'grh@co.hamilton.in.us'; 'rct@co.hamilton.in.us'; 'Ryan.hartman@ctrwd.org';
'jbt@co.hamilton.in.us'; Foley, Amanda J; Griffin, Matt L; Duncan, Gary R; Redden, Nick; Duffy, John M
Cc: 'handleyc@estridge.net'
Subject: Pre-Submittal for the Lincolnshire Subdivision Pool House Bldg.
The Dept. of Community Service, Building & Code Services division, has
received a request to meet for the purpose of submitting to obtain a building
permit for the below-mentioned project. PLEASE "REPLY TO ALL" AS
SOON AS POSSIBLE, IF YOU HAVE OUTSTANDING ISSUES. After some
time, we may proceed with the meeting and submittal, even if all offices have not
responded.
Project:
LINCOLNSHIRE SUBDIVISION POOL HOUSE
14150 Carlow Run
Meeting Date:
PENDING
Time:
PENDING
Related Planning & Zoning docket numbers:
05060018 SU
Representative(s):
Chad Handley
The Estridge Companies
handleyc@estridge.net
Ph. (317) 669-8559
3/5/2007
Page 10f2
Lillard, Sarah N
From: Ryan Hartman [Ryan.Hartman@CTRWD.ORG]
Sent: Friday, March 02, 2007 2:29 PM
To: Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Hoyt, Gary A; Blanchard, Jim E; Brewer, Scott I;
Dolan, Veronica A; Akers, William P; grh@co.hamilton.in.us; rct@co.hamilton.in.us;
jbt@co.hamilton.in.us; Foley, Amanda J; Griffin, Matt L; Duncan, Gary R; Redden, Nick; Duffy, John
M
Cc: handleyc@estridge.net
Subject: RE: Pre-Submittal for the Lincolnshire Subdivision Pool House Bldg.
Clay Township Regional Waste District has not seen any plans or plot plans for this pool house. Prior to issuing
permit plans must be reviewed. Thanks.
Ryan C. Hartman, E.I.T
District Engineer
Clay Township Regional Waste District
10701 N. College Ave., Suite A
Indianapolis, IN 46280-1098
Direct: 317-844-9200
Fax: 317-844-9203
Cell: 317-714-7219
Kyan.hartman@ctrwd.org
From: Lillard, Sarah N [mailto:SLillard@carmel.in.gov]
Sent: Friday, March 02, 2007 11: 11 AM
To: Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Hoyt, Gary A; Blanchard, Jim E; Brewer, Scott I; Dolan,
Veronica A; Akers, William P; grh@co.hamilton.in.us; rct@co.hamilton.in.us; Ryan Hartman;
jbt@co.hamilton.in.us; Foley, Amanda J; Griffin, Matt L; Duncan, Gary R; Redden, Nick; Duffy, John M
Cc: handleyc@estridge.net
Subject: Pre-Submittal for the Lincolnshire Subdivision Pool House Bldg.
The Dept. of Community Service, Building & Code Services division, has received a
request to meet for the purpose of submitting to obtain a building permit for the
,
below-mentioned project. PLEASE "REPLY TO ALL" AS SOON AS POSSIBLE. IF
YOU HAVE OUTSTANDING ISSUES. After some time, we may proceed with the
meeting and submittal, even if all offices have not responded.
Project:
LINCOLNSHIRE SUBDIVISION POOL HOUSE
14150 Carlow Run
Meeting Date:
PENDING
Time:
PENDING
Related Planning & Zoning docket numbers:
3/2/2007
Lillard. Sarah N
From:
Sent:
To:
Subject:
Greg Hoyes [grh@co.hamilton.in.us]
Friday, March 02, 2007 2:25 PM
Lillard, Sarah N
Re: Pre-Submittal for the Lincolnshire Subdivision Pool HouseBldg.
Sarah
The HCSO has no outstanding issues with this project. If you have any questions, please
let me know.
Greg Hoyes
ReBa Plan Reviewer
>>> "Lillard, Sarah Nil <8Lillard@carmel.in.gov> 11:10 AM Friday, March
02, 2007 >>>
The Dept. of Community Service, Building & Code Services division, has received a request
to meet for the purpose of submitting to obtain a building permit for the below-mentioned
project. PLEASE "REPLY TO ALL" AS SOON AS POSSIBLE, IF YOU HAVE OUTSTANDING ISSUES.
After some time, we may proceed with the meeting and submittal, even if all offices have
not responded.
Project:
LINCOLNSHIRE SUBDIVISION POOL HOUSE
14150 Carlow Run
Meeting Date:
PENDING
Time:
PENDING
Related Planning & Zoning docket numbers:
05060018 SU
Representative(s) :
Chad Handley
The Estridge Companies
handleyc@estridge.net
Ph. (317) 669-8559
Again, if there are concerns that might affect the issuance of this permit, please REPLY
TO ALL on this e-mail.
1
Page 1 of2
Lillard, Sarah N
From: Hoyt, Gary A
Sent: Friday, March 02, 2007 12:21 PM
To: Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Blanchard, Jim E; Brewer, Scott I; Dolan, Veronica
A; Akers, William P; 'grh@co.hamilton.in.us'; 'rct@co.hamilton.in.us'; 'Ryan.hartman@ctrwd.org';
'jbt@co.hamilton.in.us'; Foley, Amanda J; Griffin, Matt L; Duncan, Gary R; Redden, Nick; Duffy,
John M
Cc: 'handleyc@estridge.net'
Subject: RE: Pre-Submittal for the Lincolnshire Subdivision Pool House Bldg.
The fire department will be requesting a Knox box for emergency access. Knox
products may be purchased at www.knoxbox.com
Thank you,
Gary Hoyt, Fire Marshal
Carmel Fire Prevention Bureau
From: Lillard, Sarah N
Sent: Friday, March 02, 2007 11: 11 AM
To: Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Hoyt, Gary A; Blanchard, Jim E; Brewer, Scott I; Dolan,
Veronica A; Akers, William P; 'grh@co.hamilton.in.us'; 'rct@co.hamilton.in.us'; 'Ryan.hartman@ctrwd.org';
'jbt@co.hamilton.in.us'; Foley, Amanda J; Griffin, Matt L; Duncan, Gary R; Redden, Nick; Duffy, John M
Cc: 'handleyc@estridge.net'
Subject: Pre-Submittal for the Lincolnshire Subdivision Pool House Bldg.
The Dept. of Community Service, Building & Code Services division, has received a
request to meet for the purpose of submitting to obtain a building permit for the
below-mentioned project. PLEASE "REPLY TO ALL" AS SOON AS POSSIBLE, IF
YOU HAVE OUTSTANDING ISSUES. After some time, we may proceed with the
meeting and submittal, even if all offices have not responded.
Project:
LINCOLNSHIRE SUBDIVISION POOL HOUSE
14150 Carlow Run
Meeting Date:
PENDING
Time:
PENDING
Related Planning & Zoning docket numbers:
05060018 SU
Representative(s):
Chad Handley
3/2/2007