HomeMy WebLinkAboutCorrespondence
u
,
u
CITY OF CARMEL
Department of Community SelVices
One Civic Square
Carmel, IN 4E032
(317) 571-2417
Fax: (317) 571-2426
Fax
~,~
Fax: 510 - ? 025/
Re: Acker~. /3? - 00{ .::s;>a
~~A~
o For Review 0 Please Comment .
Phone:
o Urgent
F",...I 9r'--
pag~: c?
Date: l/tl-.,2-tJP(
I
cc: I
o Please Reply
o Please Recycle
.- '--1
u
o
City of Carmel
VIA FAX: 849-5942
Original by Mail
October I, 2002
Edward Fleming
Stoeppelwerth & Associates, Inc.
9940 Al1isonville Road
Fishers, IN 46038
COpy
RE:
Shelburne Par~ Section 1, Replat of Secondary Plat Application
I
Dear Mr. Fleming:
This letter is in response to your Replat of the Secondary Plat filing for Shelbome Park, Section 1. The
following issues must be resolved prior to signature of the plat by the director:
1. Change title to read, "She1bourne Park Repljt of Section One."
2. Hatch the site area on the key map. I
3. Add Primary Plat Amendment Docket # (105-02 PP Amend) and the Secondary Plat Docket
# that we will assign once an application is r~ceived.
4. Verify the source of title. Is there not a mor9 recent deed?
5. On page I, redraw the lake to show the expansion onto new area.
6. Please explain the modification in lot numtJring (i.e. 4A and 23A as opposed to the
numbering identified in the primary plat.) I
7. The monuments and markers should be as required under Section 8.2 of the sea.
I
a. Add concrete monuments at all corners that form the boundary of the plat, as
required under sea 8.2.1.
Please submit a revised Secondary Plat with the above-mentioned changes. Once these changes have
been made and comments addressed, please produce a ritylar copy for signature by this Department. Two
paper copies of the plat must be filed with the mylar pribr to recording. I will return the signed mylar to
you for signature by the County Commissioners. Once tecorded, our Department needs three paper
copies and a mylar of the recorded plat. Our approval dfthe secondary plat (signature) will be
forthcoming upon revision of the plans according to the items listed above.
Sincerely,
~/L 't
7
Jon C. Dobosiewicz
Planning Administrator
ShelboumePark-SP-Replat
ONE CIVIC SQUARE
Page /1
CARMEL, INDIANA 46032
!
317/571-2417
Fax
o
u
CITY OF CARMEL
Department of Community Services
One Civic Square
Carmel, IN 4&X32
(317) 571-2417
Fax: (317) 571-2426
From: ~
I
Pages~ -2
Date: I /0 - /-0;;1,
CC: I
To: ~~.A~~c-1n
Fax: %'-Y9 - 6 9'~
Phone:
Re:
o Please Recycle
o Urgent
o For Review
o Please Comment 0 Please Reply
r'\
l....-J
PROJECT NAME:
ERO ON AND SEDIMENT CONTR L PLAN
TECHNICAL REVIEW AND COMMENT
Hamilton County Soil and WJter Conservation District
1108 South 9th Street, NJblesville IN 46060
I
Ph- 317-773-1432 or Email a~ john-south@iaswcd.org
I
Shelborne Park Sec. 1 (Revised lans)
REVIEWED BY:
Mr. Roger Kessler
Logan Limited
10200 Lantern Road
Fishers, IN 46038
Ph- 317 -570-7250
John B. South P.E.
Certified Professional in Erosion and Sediment Control
Mr. Steven Staton
Stoeppelwerth & Associates
9940 Allsionville Road
Fishers, IN 46038
sf ~~
Q _0 'P R;P
l~
SUBMITTED BY:
PLAN REVIEW PROCEDURE: Site Visit Date:
Plan Review Date: 9-24-02
LOCATION: north side of 131 street V4 mile east of Shelborne Road
LEGAL DESCRIPTION: Sec. 29
TOWNSHIP: 18N
RANGE: 3E
CIVIL TOWNSHIP: Clay
SOIL SURVEY MAP SHEET:
On the Plans
The technical review and comments are intended to evaluate the co~pleteness of the erosion and sediment control plan for the
project. The erosion and sediment control plan submitted was not teviewed for the adequacy of the engineering design. All
practices included in the plan, as well as those recommended in the comments should be evaluated as to their feasibility by a
qualified individual with structural practices designed by a qualifik engineer. The plan has not been reviewedfor local, state,
I
or federal permits that may be required to proceed with this project. Additional information, including design calculations may
be requested to further evaluate the erosion and sediment control )ran.
I
The erosion and sediment control plan has been reviewed and it has been determined that the plan:
I
X Satisfies the minimum requirements and intent of 327 AC 15-5 (Rule 5). Notification will be forwarded to the
Indiana Department of Environmental Management.
Proper implementation of the erosion and sediment control plan aAd inspections of the construction site by the developer or a
I
representative are necessary to minimize off-site sedimentation. Tre developer should be aware that unforeseen construction
activities and weather conditions may effect the performance of a ~ractice or the erosion and sediment control plan. The plan
must be aflexible document, with provisions to modifY or substituff! practices as necessary.
Revised 4 / 97
CC: Carmel DOCD
Surveyor
Highway
IDEM
File