HomeMy WebLinkAboutC010.1 - GENERAL NOTESDEMOLITION PLAN GENERAL NOTES
1.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY WITH THE
OWNER DURING BIDDING AND DURING CONSTRUCTION ACTIVITIES ALL ITEMS TO
BE REMOVED. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REMOVE ANY
MATERIALS AND/OR STRUCTURES NOT LOCATED ON THIS SURVEY FOR THE
INSTALLATION OF THE NEW WORK.
2.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY ALL
EXISTING UTILITIES PERTAINING TO THEIR PHASE OF WORK, AND TO VERIFY
WHICH UTILITIES WILL BE REMOVED BY UTILITY COMPANY. ANY AND ALL
UTILITIES NOT REMOVED BY THE UTILITY COMPANY SHALL BE REMOVED BY THE
CONTRACTOR.
3.UTILITIES ARE SHOWN TO BE APPROXIMATE AND SHALL BE RELOCATED AND/OR
CAPPED AND ABANDONED BEFORE CONSTRUCTION AT NO ADDITIONAL COST TO
THE OWNER.
4.ALL DEMOLITION MATERIAL AND SALVAGEABLE MATERIAL IS THE PROPERTY OF
THE DEMOLITION CONTRACTOR AND SHALL BE PROPERLY DISPOSED OF OFF
THE SITE.
5.SLABS ON GRADE MUST BE REMOVED COMPLETELY AND TAKEN OFF THE SITE.
6.ALL UTILITIES MUST REMAIN ACTIVE FOR AREA TENANTS THAT ARE REMAINING.
NO UTILITY SERVICE SHALL BE INTERRUPTED DURING THE CONSTRUCTION
PROCESS.
7.BEARINGS, DIMENSIONS, AND EASEMENTS ARE SHOWN FOR REFERENCE ONLY.
SEE RECORD SURVEYS AND PLATS FOR EXACT INFORMATION.
8.ANY EXISTING TREE(S) THAT MAY REQUIRE REMOVAL BUT ARE NOT SHOWN ON
THE PLAN AS BEING REMOVED MAY BE DONE SO, AS LONG AS THE TREE(S) ARE
RELOCATED TO AN APPROVED ALTERNATIVE LOCATION ON SITE.
9.IF THERE ARE ANY QUESTIONS CONCERNING THIS DEMOLITION PLAN, PLEASE
CONTACT THE ENGINEER BEFORE CONTINUING WORK.
EROSION CONTROL GENERAL NOTES
1.ALL DISTURBED AREAS SHALL BE SODDED OR SEEDED, EXCEPT BUILDING PAD
AND LANDSCAPE BEDS. SEE LANDSCAPE PLANS FOR LOCATION OF LANDSCAPE
BEDS.
2.INSTALL SILT FENCE ALONG ALL DOWNSTREAM SLOPES. SILT FENCE TO FOLLOW
CONTOUR.
3.THERE SHALL BE NO DIRT, DEBRIS OR STORAGE OF MATERIAL IN THE STREET.
SITE PLAN GENERAL NOTES
1.THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING, OR VERIFYING
THAT ALL PERMITS AND APPROVALS ARE OBTAINED FROM THE RESPECTIVE
CITY, COUNTY, AND STATE AGENCIES PRIOR TO STARTING CONSTRUCTION.
2.ALL QUANTITIES GIVEN ON THESE PRINTS, VERBALLY OR IN THE SCOPE OF
WORK SECTION ARE ESTIMATES AND SHALL BE CONFIRMED BY THE BIDDING
CONTRACTORS.
3.OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS
FOR EXCAVATIONS; FINAL RULE 29 CFR PART 1926, SUBPART "P" APPLIES TO
ALL EXCAVATIONS EXCEEDING FIVE (5) FEET IN DEPTH. IN ADDITION,
EXCAVATION EXCEEDING TWENTY (20) FEET IN DEPTH REQUIRE THE DESIGN
OF A TRENCH SAFETY SYSTEM BY A REGISTERED PROFESSIONAL
ENGINEER.
4.IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER AND CONTRACTOR
TO MAINTAIN QUALITY CONTROL THROUGHOUT THIS PROJECT.
5.TEMPORARY TRAFFIC CONTROL DURING CONSTRUCTION TO CONFORM TO
APPLICABLE LOCAL STANDARDS.
6.BEARINGS, DIMENSIONS, AND EASEMENTS ARE SHOWN FOR REFERENCE
ONLY. SEE RECORD SURVEYS AND PLATS FOR EXACT INFORMATION.
7.THE ENGINEER AND/OR OWNER DISCLAIM ANY ROLE IN THE CONSTRUCTION
MEANS AND METHODS ASSOCIATED WITH THE PROJECT.
8.ALL DIMENSIONS ARE BASED ON FACE OF CURB OR BACK OF ROLL CURB OR
FACE OF BUILDING.
9.SEE ARCHITECTURAL PLANS FOR DETAILS OF BUILDING, BUILDING
DIMENSIONS AND SIGNAGE SPECIFICATIONS. DO NOT STAKE BUILDING
FROM THESE PLANS.
10.COORDINATE CONSTRUCTION ACTIVITIES WITH ADJOINING WORK IF
APPLICABLE. VERIFY EXTENT OF ADJOINING WORK AND COORDINATE AS
REQUIRED.
11.FIELD VERIFY EXISTING CURBS AND TAPER PROPOSED VERTICAL CURBS TO
MATCH WITHIN A MIN. OF THREE (3) FEET.
12.± DIMENSIONS INDICATE FIELD DIMENSION ADJUSTMENT AREA BASED ON
ACTUAL FIELD LAYOUT COORDINATES.
13.THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO
START OF CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE
FOR ALL FIELD DIMENSIONS. IF ANY DISCREPANCIES ARE FOUND IN THESE
PLANS FROM ACTUAL FIELD CONDITIONS, THE CONTRACTOR SHALL NOTIFY
THE ENGINEER IMMEDIATELY.
14.PROVIDE SMOOTH TRANSITION FROM NEWLY PAVED AREAS TO EXISTING
AREAS AS NECESSARY. ALL AREAS WHERE PROPOSED PAVEMENT MEETS
EXISTING PAVEMENT, THE EXISTING EDGE OF PAVEMENT SHALL BE FREE OF
ALL LOOSE DEBRIS. THE EDGE OF EXISTING ASPHALT PAVEMENT SHALL BE
PROPERLY SEALED WITH A TACK COAT MATERIAL IN ALL AREAS WHERE
NEW ASPHALT PAVEMENT IS INDICATED TO JOIN EXISTING.
15.RESURFACE OR RECONSTRUCT AT LEAST TO ORIGINAL CONDITIONS ALL
AREAS WHERE THE EXISTING PAVEMENT OR LAWNS ARE DAMAGED DURING
CONSTRUCTION FROM TRAFFIC BY CONTRACTORS, SUBCONTRACTORS, OR
SUPPLIERS AFTER CONSTRUCTION WORK IS COMPLETE.
16.THE CONTRACTOR SHALL PROTECT AND NOT DESTROY THE PROPERTY
CORNER MONUMENTS DURING CONSTRUCTION.
17.REFER TO ARCHITECTURAL PLANS FOR BUILDING ACCESSORY DETAILS.
18.REFER TO SHEET C201 FOR SITE PLAN DETAILS UNLESS OTHERWISE NOTED.
GRADING GENERAL NOTES
1.CONTRACTOR SHALL REFER TO THE STORMWATER POLLUTION PREVENTION
PLAN AND DETAILS FOR CONSTRUCTION SCHEDULING AND EROSION CONTROL
MEASURES TO BE INSTALLED PRIOR TO EARTHMOVING ACTIVITIES.
2.REFER TO THE INDIANA DEPARTMENT OF TRANSPORTATION (INDOT) STANDARD
SPECIFICATIONS, LATEST EDITION, FOR BASIC MATERIALS AND CONSTRUCTION
METHODS. THE SECTIONS BELOW FOR VARIOUS ITEMS ARE TO CLARIFY THE
INTENT OF THE REQUIREMENTS FOR THIS PROJECT. PLEASE NOTE THAT OTHER
SECTIONS OF THE INDOT STANDARD SPECIFICATIONS MAY ALSO BE
APPLICABLE.
3.TOPSOIL SHALL BE STRIPPED FROM ALL AREAS TO RECEIVE PAVING AND FROM
WITHIN THE LIMITS OF PROPOSED BUILDINGS AND STRUCTURES. TOPSOIL
SHALL BE STRIPPED TO THE DEPTH AS NOTED IN THE GEOTECHNICAL REPORT.
4.AFTER STRIPPING TOPSOIL, PROOFROLL AREAS TO BE FILLED WITH A MEDIUM
WEIGHT ROLLER TO DETERMINE LOCATIONS OF ANY POCKETS OF UNSUITABLE
MATERIAL. RECOMMENDATIONS FOR DRYING, AMENDING AND/OR REMOVAL OF
ANY UNSUITABLE MATERIAL WITHIN THE PROPOSED PAVED AND/OR BUILDING
AREAS WILL BE DETERMINED AT THE TIME OF CONSTRUCTION BY THE OWNER'S
GEOTECHNICAL TESTING REPRESENTATIVE.
5.TOPSOIL SHALL BE PLACED IN MOUNDING AREAS, NONSTRUCTURAL FILL
AND/OR PLANTING AREAS TO A MINIMUM DEPTH OF 6". EXCESS TOPSOIL SHALL
BE REMOVED FROM THE SITE.
6.WHEN PERFORMING GRADING OPERATIONS DURING PERIODS OF WET
WEATHER, PROVIDE ADEQUATE DEWATERING, DRAINAGE AND GROUND WATER
MANAGEMENT TO CONTROL MOISTURE OF SOILS. REFER TO GEOTECHNICAL
REPORT AND/OR CONSULT WITH OWNER'S GEOTECHNICAL TESTING
REPRESENTATIVE FOR RECOMMENDATIONS.
7.FILL MATERIAL SHALL CONSIST OF EARTH OBTAINED FROM CUT AREAS,
BORROW PITS OR OTHER APPROVED SOURCES. EARTH SHALL BE FREE FROM
ORGANIC MATTER AND OTHER DELETERIOUS SUBSTANCES AND LARGE ROCKS.
THE FILL MATERIAL SHALL BE PLACED IN LAYERS NOT TO EXCEED SIX INCHES
FOLLOWING COMPACTION, PROPER MOISTURE CONTENT OF FILL MATERIAL WILL
BE SUCH TO ACHIEVE SPECIFIED COMPACTION DENSITY. ALL FILL BENEATH
PAVED AREAS, FLOOR SLABS AND FUTURE BUILDINGS SHALL BE COMPACTED TO
AT LEAST 95% OF THE MAXIMUM DRY DENSITY PER ASTM D-1557. FIELD
COMPACTING TEST SHALL BE RUN ON EACH LIFT, IN FILL SECTIONS, AND THE
REQUIRED COMPACTION ON EACH LIFT SHALL BE IN ACCORDANCE WITH INDOT
SECTION 211.
8.MAXIMUM LAWN SLOPE IS 3:1.
9.THE PLANS SHOW THE LOCATION OF ALL KNOWN UTILITIES LOCATED WITHIN
THE LIMITS OF CONSTRUCTION ACCORDING TO INFORMATION PROVIDED BY THE
VARIOUS UTILITY COMPANIES, PREVIOUS CONSTRUCTION PLANS AND AS
EVIDENCED BY OBSERVATION OF ABOVE GROUND CONDITIONS BY THE
SURVEYOR. THE ACCURACY OF THIS INFORMATION IS NOT GUARANTEED.
10.THE CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES TO LOCATE MAINS,
CONDUITS, SERVICE LINES, ETC. WITHIN THE CONSTRUCTION LIMITS. THE
LOCATION AND PROTECTION OF UTILITY STRUCTURES, THEIR SUPPORT AND
MAINTENANCE DURING CONSTRUCTION (IN COOPERATION WITH APPLICABLE
UTILITY COMPANY) IS THE EXPRESSED RESPONSIBILITY OF THE CONTRACTOR.
11.ALL SPOT ELEVATIONS ARE TO FINISHED GRADE.
12.COMPACTED "B" BORROW BACK FILL REQ'D. OVER ALL UTILITIES IN PAVED
AREAS.
13.ALL GRADES AT BOUNDARY SHALL MEET EXISTING. CONTRACTOR SHALL
ADJUST AND/OR CUT EXISTING PAVEMENT AS NECESSARY TO ASSURE A
SMOOTH FIT AND CONTINUOUS GRADE. BUTT JOINTS SHALL BE PROVIDED AT
TRANSITIONAL AREAS BETWEEN PROPOSED AND EXISTING PAVEMENT.
14.ANY PART OF SANITARY OR STORM SEWER TRENCHES RUNNING UNDER OR
WITHIN 5' OF PAVEMENT TO BE BACKFILLED WITH GRANULAR MATERIAL.
15.ALL CONSTRUCTION ON THIS SITE TO BE PERFORMED IN COMPLIANCE WITH
O.S.H.A. STANDARDS FOR WORKER SAFETY.
16.THE CONTRACTOR SHALL CONFIRM ALL EARTHWORK QUANTITIES PRIOR TO THE
START OF CONSTRUCTION. IF AN EXCESS OR SHORTAGE OF EARTH IS
ENCOUNTERED, THE CONTRACTOR SHALL CONFIRM WITH THE OWNER AND
ENGINEER THE REQUIREMENTS FOR STOCKPILING, REMOVAL OR IMPORTING OF
EARTH.
17.PROVIDE POSITIVE DRAINAGE WITHOUT PONDING IN ALL AREAS AFTER
INSTALLATION. CONTRACTOR TO TEST FOR AND CORRECT ANY PONDING
CONDITIONS. ANY AREAS THAT HOLD WATER MORE THAN 1/8" DEEP SHALL BE
CUT OUT AND CORRECTED TO POSITIVE DRAINAGE AT NO COST TO THE OWNER/
DEVELOPER OR ENGINEER.
18.ADA ACCESSIBLE PARKING SPACES, RAMPS, AND ROUTES SHALL BE IN
ACCORDANCE WITH THE LATEST ADA STANDARDS FOR ACCESSIBLE DESIGN.
19.VERTICAL CURVES, WITH A MINIMUM LENGTH OF 50', SHALL BE USED WHERE
POSSIBLE BETWEEN VERTICAL CHANGES IN DIRECTION (SLOPE) TO ALLOW FOR
POSITIVE DRAINAGE AND SMOOTH TRANSITIONS.
20.CONTRACTOR TO INSTALL CONCRETE CRADLES WHEN THE VERTICAL
SEPARATION (AS MEASURED FROM THE EXTERIOR OF THE PIPES) BETWEEN
SANITARY SEWER FACILITIES, WATER MAIN, AND STORM SEWERS IS 18" OR
LESS.
21.ALL DISTURBED AREA SHALL BE STABILIZED IN ACCORDANCE TO THE STORM
WATER POLLUTION PREVENTION PLAN AND LANDSCAPE PLAN.
DRAINAGE & UTILITY GENERAL NOTES
1.THE CONTRACTOR SHALL ADHERE TO ALL TERMS AND CONDITIONS AS
OUTLINED IN THE EPA OR APPLICABLE STATE GENERAL N.P.D.E.S. PERMIT FOR
STORMWATER DISCHARGE ASSOCIATED WITH CONSTRUCTION ACTIVITIES AND
STORMWATER POLLUTION PREVENTION PLAN.
2.REFER TO THE INDIANA DEPARTMENT OF TRANSPORTATION (INDOT) STANDARD
SPECIFICATIONS, LATEST EDITION, FOR BASIC MATERIALS AND CONSTRUCTION
METHODS. ALSO USE THE IDEM STORM WATER QUALITY MANUAL FOR
ADDITIONAL GUIDANCE FOR ONSITE BMP'S AND GENERAL SWPPP PRACTICES.
THE SECTIONS BELOW FOR VARIOUS ITEMS ARE TO CLARIFY THE INTENT OF THE
REQUIREMENTS FOR THIS PROJECT. PLEASE NOTE THAT OTHER SECTIONS OF
THE INDOT STANDARD SPECIFICATIONS MAY ALSO BE APPLICABLE.
3.THE CONTRACTOR SHALL CONTACT APPLICABLE STATE UNDERGROUND
LOCATION SERVICE AT LEAST 72 HOURS PRIOR TO ANY WORK AND SHALL
CONTACT THE OWNER AND/OR ENGINEER SHOULD UTILITIES APPEAR TO BE IN
CONFLICT WITH THE PROPOSED IMPROVEMENTS. IT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES
WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS.
4.THE PLANS SHOW THE LOCATION OF ALL KNOWN UTILITIES LOCATED WITHIN
THE LIMITS OF CONSTRUCTION ACCORDING TO INFORMATION PROVIDED BY THE
VARIOUS UTILITY COMPANIES, PREVIOUS CONSTRUCTION PLANS AND AS
EVIDENCED BY OBSERVATION OF ABOVE GROUND CONDITIONS BY THE
SURVEYOR. THE ACCURACY OF THIS INFORMATION IS NOT GUARANTEED.
5.THE CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES TO LOCATE MAINS,
CONDUITS, SERVICE LINES, ETC. WITHIN THE CONSTRUCTION LIMITS. THE
LOCATION AND PROTECTION OF UTILITY STRUCTURES, THEIR SUPPORT AND
MAINTENANCE DURING CONSTRUCTION (IN COOPERATION WITH APPLICABLE
UTILITY COMPANY) IS THE EXPRESSED RESPONSIBILITY OF THE CONTRACTOR.
6.THE CONTRACTOR SHALL CONTACT ALL APPLICABLE UTILITIES AND VERIFY ANY
AND ALL FEES ASSOCIATED WITH THE INSTALLATION OF ALL UTILITIES.
7.ALL CONSTRUCTION ON THIS SITE TO BE PERFORMED IN COMPLIANCE WITH
O.S.H.A. STANDARDS FOR WORKER SAFETY.
8.ANY PART OF STORM SEWER TRENCHES RUNNING UNDER OR WITHIN 5' OF
PAVEMENT TO BE BACKFILLED WITH GRANULAR MATERIAL.
9.IT IS THE CONTRACTORS RESPONSIBILITY TO VERIFY LOCATION, SIZE, AND
ELEVATION OF EXISTING UTILITIES, STRUCTURES, PIPES, PAVEMENTS, ETC. AS
RELATED TO THEIR WORK. NOTIFY ENGINEER OF ANY CONFLICT AND/OR
DISCREPANCIES IN THE CONSTRUCTION DOCUMENTS.
10.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL CLEARANCE BETWEEN STORM /
SANITARY SEWER SYSTEMS AND DOMESTIC/FIRE LINE SERVICE. SANITARY
SEWER LINE IN PROXIMITY OF WATER LINE SHALL BE C900 WATER MAIN GRADE
PVC.
11.CONTRACTOR TO INSTALL CONCRETE CRADLES WHEN THE VERTICAL
SEPARATION (AS MEASURED FROM THE EXTERIOR OF THE PIPES) BETWEEN
SANITARY SEWERS, WATER MAINS AND STORM SEWERS IS 18" OR LESS.
12.IF ANY EXISTING STRUCTURES TO REMAIN ARE DAMAGED DURING
CONSTRUCTION, IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO REPAIR
AND/OR REPLACE THE EXISTING STRUCTURE AS NECESSARY TO RETURN IT TO
EXISTING CONDITIONS OR BETTER.
13.WHEN PERFORMING EXCAVATIONS DURING PERIODS OF WET WEATHER,
PROVIDE ADEQUATE DEWATERING, DRAINAGE AND GROUND WATER
MANAGEMENT TO CONTROL MOISTURE OF SOILS.
14.COMPACTED "B" BORROW BACK FILL REQUIRED OVER ALL UTILITIES IN PAVED
AREAS.
15.ALL UTILITY STRUCTURES IN PAVED AREAS SHALL BE FLUSH WITH PAVEMENT
AND SHALL HAVE TRAFFIC BEARING RING AND COVERS.
16.COORDINATE LOCATIONS AND CONNECTIONS OF BUILDING STORM LINES WITH
PLUMBING DRAWINGS.
17.FOLLOW ALL LOCAL AND STATE CODES IN REFERENCE TO DOMESTIC/FIRE LINE
INSTALLATION AND STORM SEWER / SANITARY SEWER INSTALLATION.
18.ALL EXISTING MANHOLE AND CATCH BASIN GRATES SHALL BE ADJUSTED TO
NEW FINISH GRADE ELEVATIONS.
19.EXISTING PIPES WITHIN CONSTRUCTION LIMITS ARE TO BE CLEANED OUT TO
REMOVE ALL SILT AND DEBRIS.
20.ALL STORM PIPE CONNECTIONS AT STRUCTURES SHALL BE GROUTED TO
ASSURE CONNECTION AT STRUCTURE IS WATERTIGHT.
21.ALL STORM SEWER STRUCTURES IN PAVED AREAS SHALL BE FLUSH WITH
PAVEMENT AND SHALL HAVE TRAFFIC BEARING RING AND COVERS.
22.ALL STORM SEWER STRUCTURES SHALL HAVE A SMOOTH UNIFORM POURED
MORTAR CHANNEL FROM INVERT IN TO INVERT OUT.
23.NEW PIPES AND STRUCTURES WITHIN CONSTRUCTION LIMITS ARE TO BE
CLEANED OUT TO REMOVE ALL SILT AND DEBRIS PRIOR TO FINAL TURNOVER TO
THE OWNER.
24.ALL HDPE PIPE SHALL BE DUAL WALLED, HANCOR HQ, ADS N-12 PIPE OR
APPROVED EQUAL.
25.ALL FITTINGS AND ACCESSORIES INCLUDING BUT NOT LIMITED TO END CAPS,
CLEANOUTS, REDUCERS, ETC., SHALL BE OF HDPE MATERIAL COMPARABLE
WITH STORAGE PIPES.
26.PROVIDE BACKFILL WITH A MINIMUM OF 4" BEDDING MATERIAL OF #8
AGGREGATE COMPACTED IN 8" LIFTS TO 95% MAXIMUM DRY DENSITY.
27.VERIFY EXISTING STORM INVERT ELEVATIONS PRIOR TO STARTING NEW STORM
SEWER CONNECTION.
28.PROVIDE THRUST BLOCKS FOR ALL WATER LINE BENDS AND TEES, INCLUDING
TAP CONNECTION.
29.CONTRACTOR SHALL COORDINATE WITH WATER COMPANY FOR DOMESTIC AND
FIRE SERVICE. CONNECT TO BUILDING DOMESTIC AND FIRE LINE. COORDINATE
WITH PLUMBING DRAWINGS.
30.COORDINATE LOCATION OF ELECTRICAL AND COMMUNICATION LINES WITH
LOCAL UTILITIES.
31.COORDINATE LOCATION OF REQUIRED CONDUITS FOR ELECTRIC SERVICE,
LIGHT POLES, COMMUNICATION SERVICE AND IRRIGATION SYSTEM.
32.COORDINATE LOCATION AND SIZE OF GAS SERVICE CONNECTION AND
INSTALLATION OF SERVICE LINE AND METER WITH GAS COMPANY.
33.COORDINATE LOCATIONS AND CONNECTIONS OF BUILDING STORM LINES WITH
PLUMBING DRAWINGS.
34.SANITARY SEWER LATERAL, WATER SERVICE, & ELECTRICAL/COMMUNICATION
CONDUITS SHALL BE GRANULAR BACKFILL FOR ENTIRE RUN.C002 General NotesC010.1GENERAL NOTESW24.0018JKW24.001805/29/2024DDDDEVERWISE CARMEL10920 N. MICHIGAN ROAD, ZIONSVILLE, IN 46077EROSION CONTROL SPECIFICATIONS
1.THIS PLAN IS DESIGNED AS AN ATTEMPT TO PREVENT ANY AND ALL SEDIMENT
FROM LEAVING THE CONSTRUCTION SITE BY WAY OF EROSION. IF EROSION OF
SEDIMENT FROM THE SITE IS TAKING PLACE, THE CONTRACTOR AND/OR OWNER
SHALL TAKE PREVENTATIVE ACTION IMMEDIATELY. THE ENGINEER SHALL BE
CONSULTED IN THE EVENT THIS HAPPENS.
2.TEMPORARY SEEDING IS TO BE APPLIED TO ANY DISTURBED AREA THAT WILL
REMAIN UNALTERED IN EXCESS OF 7 DAYS.
3.PERMANENT SEEDING IS TO BE APPLIED IMMEDIATELY TO AREAS THAT HAVE
ACHIEVED FINAL AND FINISHED GRADE.
4.PRESERVE EXISTING VEGETATION ON THE SITE WHENEVER AND WHEREVER
POSSIBLE TO PREVENT TOPSOIL EROSION.
5.ALL SEDIMENT CAPTURING MEASURES SHALL BE IMPLEMENTED PRIOR TO THE
DISTURBANCE OF THE CONSTRUCTION AREA THEY ARE INTENDED TO SERVICE.
ALL EROSION CONTROL MEASURES PROPOSED ARE TO BE PROPERLY
MAINTAINED TO CONTINUE THEIR EFFECTIVENESS.
6.IF GRADING OCCURS DURING THE MONTHS OF DECEMBER, JANUARY OR
FEBRUARY DORMANT SEEDING PROCEDURES SHALL BE USED.
7.DURING DRY WEATHER, KEEP LAWNS WATERED WITH SPRINKLERS OR OTHER
APPROVED METHODS. RESEED ANY AREAS NOT GERMINATING OR DAMAGED AT
INTERVALS AS MAY BE REQUIRED ACCORDING TO SEASONAL CONDITION
AND/OR CONSTRUCTION ACTIVITY. WATER GRASS AND EXECUTE NECESSARY
WEEDING UNTIL FULL STAND OF GRASS HAS BEEN OBTAINED.
8.THE IMPLEMENTATION AND MAINTENANCE OF THE EROSION CONTROL IS THE
SOLE RESPONSIBILITY OF THE CONTRACTOR AND/OR OWNER.
9.IT SHALL BE THE CONTRACTOR'S AND/OR OWNER'S RESPONSIBILITY TO
MINIMIZE SEDIMENTATION (FROM ON-SITE CONSTRUCTION ACTIVITIES) FROM
BEING DEPOSITED ONTO ADJACENT PROPERTIES AND RECEIVING
STREAMS/DITCHES IN STRICT COMPLIANCE WITH "CONSTRUCTION
STORMWATER GENERAL PERMIT" (327 IAC, CONSTRUCTION ACTIVITY STORM
WATER RUNOFF CONTROL). IT SHALL ALSO BE THE CONTRACTOR'S AND/OR
OWNER'S RESPONSIBILITY TO OBTAIN ANY APPROVALS REQUIRED FROM THE
LOCAL AUTHORITY AND TO SUBMIT A COMPLETE NOTICE OF INTENT LETTER TO
THE OFFICE OF WATER MANAGEMENT, INDIANA DEPARTMENT OF
ENVIRONMENTAL MANAGEMENT PRIOR TO ANY CONSTRUCTION ACTIVITY.
10.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND/OR OWNER TO
MAINTAIN THE SWPPP INFORMATION SIGN UNTIL SUCH TIME THAT THE SITE IS
READY FOR THE IDEM NOTICE OF TERMINATION. INSTALL 4" PVC TUBE WITH END
CAPS ATTACHED TO THE SWPPP INFORMATION SIGN TO CONTAIN APPROVED
SWPPP DRAWINGS AND PERMITS FOR INPSECTORS.
11.FOR SEASONAL VARIATIONS - SEE SEASONAL SOIL PROTECTION CHART IN
THESE PLANS.
12.PORTABLE TOILETS MUST BE ANCHORED AND LOCATED A MINIMUM OF 50' FROM
ANY STORM DRAIN.
10 9abcd 8 7 6efgh109876
5 4 3 2 Part of Section 6, Township 17 North, Range 3 East, Clay Township, Hamilton County, Indiana1 PREPARED FOR:PROJECT NO.
SHEET NO.abcd5 4 3 2
e1
fhAPPROVAL PENDINGNOT FOR CONSTRUCTIONgALLAN H. WEIHE, P.E., L.S. - FOUNDER14528 S. Outer 40 Road, Suite 444Chesterfield, Missouri 63017weihe.netBuild with confidence.SMENGINEERS314 | 343 - 2211800 | 452 - 6408WEIHELand Surveying | Civil EngineeringLandscape Architecture05/29/2024PROJECT NO.:REVISIONS AND ISSUESDATEBYDWG NAME:DESIGNED BY:DRAWN BY:CHECKED BY:DATE:Know what's below.
before you dig.Call
R
STEVEN SCOTT RUCKER P.E. 11300279