Loading...
HomeMy WebLinkAboutC040.0 - GRADING & DRAINAGE PLANSTMSTMSTMSTM STM STM STM STMSTMSTMWES T O N P O I N T E D R .REDD ROAD9 12 15 16 GGGGGGGGGGGGGGGGGWWWWWWWWWWWWWWWWWCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMEEEEEEEEEEEEEER STM STM 8" PVC @ 1.0% 8" PVC @ 1.0% 8" PVC @ 1.0% E E E E E EEEEE E E EEEEEW W WWWWPROPOSED BUILDING 3,500± SF SAN SAN SAN SAN SAN SANWWW W W W W W W W W W D D D D D D D D D D D D D D D D D D D D D DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD DFFE = 902.25E CONVERT TO GRATED TOP 900.40 GRADE TO DRAIN, UNIFORM SLOPE OF 10% INV.=897.68 INV. OUT=896.95 INV. OUT=897.20 EXISTING POND INFO. N.P. = 892.00 10 YR. = 894.20 100 YR. = 895.24 OVERFLOW = 896.80 MFPG = 898.80 MLAG = 901.20 BORROW NOTE EARTHWORK CONTRACTORS SHALL IDENTIFY OFFSITE BORROW AREAS AND HAUL ROUTES PRIOR TO OBTAINING PERMIT. BENCHMARK DATA CARMEL REQUIREMENTS 1.NO EARTH DISTURBING ACTIVITY MAY TAKE PLACE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 2.DECORATIVE SIGNS, SPRINKLER SYSTEMS, TREES, LANDSCAPING MOUNDS, FENCES, LIGHT POLES OR OTHER SUCH AMENITIES ARE NOT PERMITTED WITHIN THE RIGHT-0F-WAY. 3.M.F.P.G. = MINIMUM FLOOD PROTECTION GRADE M.F.P.G. OF ALL STRUCTURES FRONTING A POND OR OPEN DITCH SHALL BE NO LESS THAN 2 FEET ABOVE ANY ADJACENT 100-YEAR LOCAL OR REGIONAL FLOOD ELEVATIONS, WHICHEVER IS GREATER, FOR ALL WINDOWS, DOORS, PIPE ENTRANCES, WINDOW WELLS, AND ANY OTHER STRUCTURE MEMBER WHERE FLOOD WATERS CAN ENTER A BUILDING. 4.M.L.A.G. = LOWEST ADJACENT GRADE IS THE ELEVATION OF THE LOWEST GRADE ADJACENT TO A STRUCTURE WHEN THE SOIL MEETS THE FOUNDATION AROUND THE OUTSIDE OF THE STRUCTURE. (INCLUDING STRUCTURAL MEMBERS SUCH AS BASEMENT WALKOUT, PATIOS, DECKS, PORCHES, SUPPORT POST, OR PIERS, AND RIM OF THE WINDOW WELL.C300 Grading PlanC040.0GRADING & DRAINAGE PLANW24.0018JK 05/29/2024DDDDEVERWISE CARMEL10920 N. MICHIGAN ROAD, ZIONSVILLE, IN 46077W24.001810 9abcd 8 7 6efgh109876 5 4 3 2 Part of Section 6, Township 17 North, Range 3 East, Clay Township, Hamilton County, Indiana1 PREPARED FOR:PROJECT NO. SHEET NO.abcd5 4 3 2 e1 fhAPPROVAL PENDINGNOT FOR CONSTRUCTIONgALLAN H. WEIHE, P.E., L.S. - FOUNDER14528 S. Outer 40 Road, Suite 444Chesterfield, Missouri 63017weihe.netBuild with confidence.SMENGINEERS314 | 343 - 2211800 | 452 - 6408WEIHELand Surveying | Civil EngineeringLandscape Architecture05/29/2024PROJECT NO.:REVISIONS AND ISSUESDATEBYDWG NAME:DESIGNED BY:DRAWN BY:CHECKED BY:DATE:W S N E Know what's below. before you dig.Call R STEVEN SCOTT RUCKER P.E. 11300279 GRADING & DRAINAGE NOTES 1.THE CONTRACTOR SHALL REFER TO THE STORMWATER POLLUTION PREVENTION PLANS (SWPPPs) AND DETAILS FOR SUPPORTING THE CONSTRUCTION SCHEDULE WITH SEDIMENTATION CONTROL MEASURES PRIOR TO COMMENCING EARTHMOVING ACTIVITIES. 2.ALL CONSTRUCTION SHALL BE PERFORMED IN COMPLIANCE WITH O.S.H.A. STANDARDS FOR WORKER SAFETY. 3.THE PLANS SHOW THE LOCATION OF ALL UTILITIES SHOWN IN AVAILABLE RECORDS AND FOUND BY OBSERVATION OF SURFACE CONDITIONS DURING COMPLETION OF TOPOGRAPHIC SURVEYING. THE ACCURACY OF THIS INFORMATION IS GUARANTEED AND THERE MAY BE OTHER UTILITIES NOT SHOWN IN RECORDS OR OBSERVED ON THE GROUND SURFACE. 4.THE CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES AND SEWER AUTHORITIES TO LOCATE THEIR UTILITY AND SEWER ASSETS WITHIN CONSTRUCITION LIMITS. THE LOCATION OF UTILITIES AND SEWERS AND THEIR PROTECTION DURING CONSTRUCTION IS THE EXPRESSED RESPONSIBILITY OF THE CONTRACTOR. 5.THE CONTRACTOR SHALL CONFIRM ALL EARTHWORK QUANTITIES PRIOR TO BIDDING THE PROJECT. IF AN EXCESS OR SHORTAGE OF EARTH IS FOUND OR SUSPECTED, IT SHALL BE IMMEDIATELY REPORTED TO THE PROJECT MANAGER PRIOR TO BIDDING. A COST CHANGE ORDER WILL NOT BE ISSUED TO COMPENSATE FOR EXCESSES OR SHORTAGES FOUND DURING THE CONSTRUCTION PROCESS. 6.TOPSOIL SHALL BE STRIPPED AND STOCKPILED IN ACCORDANCE WITH SPECIFICATIONS. SURPLUS TOPSOIL SHALL BE HAULED OFFSITE BY THE CONTRACTOR AT THE CONTRACTOR'S EXPENSE. 7.SUITABLE FILL MATERIAL SHALL BE IN ACCORDANCE WITH SPECIFICATIONS AND THE GEOTECHNICAL REPORT. 8.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MOISTURE CONDITIONING OF FILL MATERIAL AND SHALL INCLUDE COSTS RELATED TO MOISTURE CONDITIONING IN UNIT BID PRICES. 9.ALL AREAS TO RECEIVE COMPACTED BACKFILL SHALL BE PROOFROLLED AND APPROVED BY THE PROJECT MANAGER, ENGINEER, OR GEOTECHNICAL REPRESENTATIVE PRIOR TO COMMENCIING BACKFILL AND COMPACTION. 10.SEWER AND UTILITY TRENCHES BENEATH OR WITHIN FIVE FEET OF PROPOSED PAVEMENT SURFACES SHALL BE BACKFILLED WITH COMPACTED GRANULAR FILL IN ACCORDANCE WITH DETAILS AND SPECIFICATIONS. 11.THE CONTRACTOR SHALL MAINTAIN THE MINIMUM HORIZONTAL AND VERTICAL SEPARATION BETWEEN SEWER AND WATER LINES DIRECTED BY SPECIFICATIONS. 1.ALL BIDDING CONTRACTORS, SUBCONTRACTORS, AND SUBTIERS ARE ENTIRELY RESPONSIBLE FOR ALL QUANTITY TAKEOFFS PRIOR TO SUBMITTING BIDS AND PROVIDING BALANCED UNIT PRICES FOR ALL WORK ITEMS. UNBALANCED BIDS WILL BE CONSIDERED TO BE DISQUALIFIED. 2.THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING OR VERIFYING THAT ALL PERMITS AND APPROVALS ARE OBTAINED FROM THE RESPECTIVE CITY, COUNTY, AND STATE AGENCIES PRIOR TO STARTING CONSTRUCTION. 3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THE EXACT LOCATION OF ALL EXISTING UTILITIES IN THE VICINITY OF THE CONSTRUCTION AREA PRIOR TO STARTING CONSTRUCTION. 4.THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING AND COORDANATING CONSTRUCTION WITH ALL RESPECTIVE UTILITIES. 5.THE CONTRACTOR SHALL PROVIDE OFF-STREET PARKING FOR ALL EMPLOYEES AND SUBCONTRACTORS. 6.NO MUD OR CONSTRUCTION DEBRIS OF ANY KIND MAY BE TAKEN OR TRACKED OFFSITE ONTO PUBLIC ACCESS ROUTES. THE CONTRACTOR, AT THE CONTRACTOR'S EXPENSE, SHALL IMMEDIATELY REMOVE ALL SUCH MUD OR DEBRIS FROM PUBLIC ACCESS ROUTES. 7.EXISTING CONTOURS REPRESENT THE GROUND AND PAVEMENT SURFACES EXISTING ON THE DATE OF THE SURVEY. THE CONTRACTOR SHALL PERFORM A PRELIMINARY TOPOGRAPHIC SURVEY AND NOTIFY THE PROJECT MANAGER OF ANY DISCREPANCIES (BETWEEN PLAN AND ACTUAL CONDITIONS) AT LEAST TWO (2) WORKING DAYS PRIOR TO COMMENCEMENT OF LAYOUT OF PROPOSED WORK. ANY QUESTIONS REGARDING THE LAYOUT OF WORK DURING OR AFTER THE LAYOUT SHALL BE DIRECTED TO THE PROJECT MANAGER AT LEAST TWO (2) WORKING DAYS PRIOR TO COMMENCEMENT OF ACTUAL CONSTRUCTION WORK. 8.ALL CONTROL POINTS SHOWN ON THE DRAWINGS SHALL BE PRESERVED. IF DAMAGED, THE CONTRACTOR AT THE CONTRACTOR'S EXPENSE SHALL REPLACE THEM. 9.DIMENSIONS SHALL NOT BE SCALED FROM PLAN SHEETS EXCEPT WHEN PERFORMING LAYOUT OF PROPOSED GRADING CONTOURS. ELECTRONIC DESIGN FILES WILL BE AVAILABLE FOR USE BY THE CONTRACTOR AS INSTRUMENTS OF SERVICE. 10.SITE GRADING AND PAVING SHALL BE LAID OUT AND PERFORMED CONSIDERING LINEAR INTERPOLATION BETWEEN GRADING CONTOURS AND SPOT ELEVATIONS SHOWN ON THE GRADING PLAN. 11.GRADING PLANS, PROFILES, AND DETAILS HAVE BEEN DESIGNED TO PROVIDE ADEQUATE POSITIVE SURFACE DRAINAGE AT ALL LOCATIONS WITHIN THE FOOTPRINT OF IMPROVEMENTS. NO DEVIATIONS FROM PLANS, PROFILES, AND DETAILS SHALL BE MADE WITHOUT WRITTEN PERMISSION FROM THE PROJECT MANAGER PRIOR TO COMMENCEMENT OF WORK. 12.ALL REQUESTS FOR CLARIFICATION REGARDING PROPOSED GRADING CONTOURS AND INTERPRETATION BETWEEN PROFILES, SECTIONS, DETAILS AND CONTOURS SHALL BE DIRECTED TO THE PROJECT MANAGER AT LEAST TWO (2) WORKING DAYS PRIOR TO COMMENCEMENT OF LAYOUT OF PROPOSED WORK. 13.ANY QUESTIONS REGARDING COORDINATION BETWEEN PLAN, PROFILE AND DETAIL SHEETS OR LAYOUT SHALL BE DIRECTED TO THE PROJECT MANAGER AT LEAST TWO (2) WORKING DAYS PRIOR TO COMMENCEMENT OF ACTUAL CONSTRUCTION WORK. 14.THE CONTRACTOR SHALL PROTECT EXISTING IMPROVEMENTS AND NEW WORK. THE CONTRACTOR, AT THE CONTRACTOR'S EXPENSE, PRIOR TO FINAL SURFACE TREATMENT OR PAVING, SHALL REWORK ALL DAMAGED OR PONDED AREAS. 15.OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS FOR EXCAVATIONS; FINAL RULE 29 CFR PART 1926, SUBPART "P" APPLIES TO ALL EXCAVATIONS EXCEEDING FIVE (5) FEET IN DEPTH. 16.EXCAVATION EXCEEDING TWENTY (20) FEET IN DEPTH REQUIRE THE DESIGN OF A TRENCH SAFETY SYSTEM BY A REGISTERED PROFESSIONAL ENGINEER. 17.THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING QUALITY CONTROL THROUGHOUT THIS PROJECT. 18.TEMPORARY TRAFFIC CONTROL DURING CONSTRUCTION TO CONFORM TO APPLICABLE LOCAL STANDARDS. 19.THE ENGINEER AND OWNER DISCLAIM ANY ROLE IN THE CONSTRUCTION MEANS AND METHODS ASSOCIATED WITH THE PROJECT AS DETAILED IN THESE PLANS. 20.ANY EXISTING STORM DRAINAGE OR SANITARY SEWER PIPES ENCOUNTERED DURING EXCAVATION SHALL BE REPAIRED AND CONNECTED TO NEW STORM SEWERS. SITE TBMs TBM 1: CUT "X" ON THE THE NORTH BOLT OF A FIRE HYDRANT LOCATED IN NORTHEAST QUADRANT OF WESTON POINTE DRIVE AND REED ROAD ELEV. 901.80 (NAVD 88) TBM 2: CUT SQUARE ON THE WEST SIDE OF LIGHT POLE BASE AT THE SOUTHEAST CORNER OF THE SITE. ELEV. 901.82 (NAVD 88) THE BASIS OF BEARINGS FOR THIS PLAT OF SURVEY IS THE USE OF A STATE PLANE GRID SYSTEM DERIVED FROM THE EAST ZONE OF THE INDIANA STATE PLANE COORDINATE SYSTEM (1301 IN EAST), 2011 ADJUSTMENT AS DETERMINED BY RTK GPS MEASUREMENTS UTILIZING INDOT'S INCORS RTK NETWORK AND/OR TRIMBLE'S VRS NOW RTK NETWORK.