Loading...
HomeMy WebLinkAboutLandscape Plan rev 4N Maintenance Needs Properly mulch trees and remove/fix any 'volcano' mulch around the existing trees. Please allow the shrubbery around the building foundation to at least grow to a 3' height - stop hedging shrubbery down. These are both requirements of the UFO sec 5.19.H.2. Sod = 5,350 sq/ft (Existing) Seed and Blanket Damaged Area's= 16,192 sq/ft ---------------- ---,` L 4 depth Shredded Hardwood Mulch - 4,966 sq/ft L Existing Bed Decomposed Granite = 1 020 s /ft��'� p q Existing Tree Existing Tree r� Proposed Sidewalk } Existin Tree Norway Spruce Dwarf Fountain Grass Playground Mulch = 2,336 sq/ft Picea abies • PROPOSED 25' FLOOD ZONE SETBACK Honeysuckle Kodiak Orange Viburnum - Korean Spice Viburnum carlesii Tree Preservation Fencing EXISTING �' TREE LINE \CANC:RETE WALK Sugar Maple Green Sugar Maple Green Mountain -------------------------- Proposed Sidewalk Plant Legend Symbol Qty Size Common Botanical 10 4' American Arborvitae Thuja Occidentalis - 6 1 gal- Dwarf Fountain Grass Pennisetum alopecu ro ides 'Hameln' } 7 Existing Tree 26 Existing Tree * 6 1 gal- Happy Returns Daylily Hemerocallis ssp- "Happy Returns" �. 6 5 gal- Honeysuckle 'Kodiak Orange' Diervilla x "Kodiak Orange" 4 6' Norway Spruce Picea Abies 2 2-5" Sugar Maple 'Green Mountain' Acer saccharum "Green Mountain" 5 5 gal- Viburnum - Korean Spice Viburnum cadesii Replace any dead,dying or missing plant material in existing landscape plan. LANDSCAPING NOTES: 1. LOCATING AND PROTECTING ALL UNDERGROUND UTILITIES, PRIOR TO DIGGING, IS THE RESPONSIBILITY OF THE LANDSCAPE CONTRACTOR. 2. PRIOR TO INSTALLATION, THE LANDSCAPE CONTRACTOR SHALL INSPECT THE SUB GRADE, GENERAL SITE CONDITIONS, VERIFY ELEVATIONS, UTILITY LOCATIONS, IRRIGATION, APPROVE TOPSOIL PROVIDED BY GENERAL CONTRACTOR AND OBSERVE THE SITE CONDITIONS UNDER WHICH THE WORK IS TO BE DONE. NOTIFY GENERAL CONTRACTOR OF ANY UNSATISFACTORY CONDITIONS. WORK SHALL NOT PROCEED UNTIL SUCH CONDITIONS HAVE BEEN CORRECTED AND ARE ACCEPTABLE TO THE LANDSCAPE CONTRACTOR AND/OR CONSTRUCTION MANAGER. 3. GENERAL AND LANDSCAPE CONTRACTOR ARE RESPONSIBLE FOR PROTECTING EXISTING TREES FROM DAMAGE DURING CONSTRUCTION. GENERAL CONTRACTOR TO INSTALL TREE PROTECTION FENCING PRIOR TO ANY SITE WORK. 4. ALL SHRUB AND GROUNDCOVER BEDS TO BE MULCHED WITH A MINIMUM OF 3 INCHES OF CLEAN SHREDDED HARDWOOD MULCH. 5. PLANTING HOLES TO BE DUG A MINIMUM OF TWICE THE WIDTH THE SIZE OF THE ROOT BALL OF BOTH SHRUB AND TREE. AMEND BACKFILL WITH TOPSOIL MIX. BACKFILL AND TAMP BOTTOM OF THE HOLE PRIOR TO PLANTING SO TOP OF ROOT BALL DOES NOT SETTLE BELOW SURROUNDING GRADE. 6. TOPSOIL MIX TO BE 4 PARTS SCREENED TOPSOIL AND 1 PART ORGANIC MATERIAL. 7. EXISTING GRASS IN THE PROPOSED PLANTING AREAS TO BE REMOVED AND AREA TO BE HAND RAKED TO REMOVE ALL ROCKS AND DEBRIS LARGER THAN 1 INCH IN DIAMETER PRIOR TO PLANTING SHRUBS. 8. SOIL TO BE TESTED TO DETERMINE FERTILIZER AND LIME REQUIREMENTS. LIME AND FERTILIZER TO BE DISTRIBUTED PRIOR TO LAYING SOD. ALL DISTURBED AREAS (INCLUDING RIGHT-OF-WAYS) NOT RECEIVING PLANTINGS TO RECEIVE 4 INCHES OF TOPSOIL AND SODDED. 9. SOD TO BE DELIVERED FRESH (CUT LESS THAN 24 HOURS PRIOR TO ARRIVING ON SITE), LAID IMMEDIATELY, ROLLED AND WATERED THOROUGHLY WITHIN ONE HOUR OF INSTALLATION. 10. ALL CHANGES TO DESIGN AND/OR PLANT SUBSTITUTIONS TO BE AUTHORIZED BY THE LANDSCAPE ARCHITECT. 11. ALL PARKING ISLANDS TO BE BERMED UP 5%10" WITH CLEAN FRIABLE TOPSOIL PRIOR TO PLANTING. 12. ALL LANDSCAPING SHALL BE INSTALLED IN CONFORMANCE WITH ANSI Z60.1 THE AMERICAN STANDARD FOR NURSERY STOCK, AND THE ACCEPTED STANDARDS OF AMERICANHORT. 13. THE LANDSCAPE CONTRACTOR SHALL GUARANTEE ALL PLANTS INSTALLED FOR ONE FULL YEAR FROM THE DATE OF ACCEPTANCE BY THE OWNER. ALL PLANTS SHALL BE ALIVE AND AT VICOROUS RATE OF GROWTH AT THE END OF THE GUARANTEE PERIOD. THE LANDSCAPE CONTRACTOR SHALL NOT BE RESPONSIBLE FOR ACTS OF GOD OR VANAL ISM. 14. ANY PLANT THAT IS DETERMINED DEAD, IN AN UNHEALTHY OR UNSIGHTLY CONDITION. LOST ITS SHAPE DUE TO DEAD BRANCHES OR OTHER SYMPTOMS OF POOR, NON -VIGOROUS GROWTH SHALL BE REPLACED BY THE LANDSCAPE CONTRACTOR WITH THE COST OF THE REPLACEMENT INCLUDED IN THE BID PROPOSAL PRICE. 15. WATER THOUGHLY TWICE IN THE FIRST 24 HOURS AND APPLY MULCH IMMEDIATELY. Graphic Scale 0 zo 40 (IN FEET) 1 inch = 20 ft.