Maintenance Needs
Properly mulch trees and remove/fix any 'volcano' mulch around the existing trees. Please
allow the shrubbery around the building foundation to at least grow to a 3' height - stop hedging
shrubbery down. These are both requirements of the UFO sec 5.19.H.2.
Sod = 5,350 sq/ft
(Existing) Seed and Blanket Damaged Area's= 16,192 sq/ft
----------------
---,` L
4 depth Shredded Hardwood Mulch - 4,966 sq/ft L
Existing Bed
Decomposed Granite = 1 020 s /ft��'�
p q Existing Tree
Existing Tree
r� Proposed Sidewalk }
Existin Tree
Norway Spruce Dwarf Fountain Grass
Playground Mulch = 2,336 sq/ft Picea abies •
PROPOSED 25' FLOOD
ZONE SETBACK
Honeysuckle Kodiak Orange
Viburnum - Korean Spice
Viburnum carlesii
Tree Preservation Fencing
EXISTING
�' TREE LINE
\CANC:RETE
WALK
Sugar Maple Green
Sugar Maple Green Mountain
--------------------------
Proposed Sidewalk
Plant Legend
Symbol
Qty
Size
Common
Botanical
10
4'
American Arborvitae
Thuja Occidentalis
-
6
1 gal-
Dwarf Fountain Grass
Pennisetum alopecu ro ides 'Hameln'
}
7
Existing Tree
26
Existing Tree
*
6
1 gal-
Happy Returns Daylily
Hemerocallis ssp- "Happy Returns"
�.
6
5 gal-
Honeysuckle 'Kodiak Orange'
Diervilla x "Kodiak Orange"
4
6'
Norway Spruce
Picea Abies
2
2-5"
Sugar Maple 'Green Mountain'
Acer saccharum "Green Mountain"
5
5 gal-
Viburnum - Korean Spice
Viburnum cadesii
Replace any dead,dying or missing plant material
in existing landscape plan.
LANDSCAPING NOTES:
1. LOCATING AND PROTECTING ALL UNDERGROUND UTILITIES, PRIOR TO DIGGING,
IS THE RESPONSIBILITY OF THE LANDSCAPE CONTRACTOR.
2. PRIOR TO INSTALLATION, THE LANDSCAPE CONTRACTOR SHALL INSPECT THE
SUB GRADE, GENERAL SITE CONDITIONS, VERIFY ELEVATIONS, UTILITY
LOCATIONS, IRRIGATION, APPROVE TOPSOIL PROVIDED BY GENERAL
CONTRACTOR AND OBSERVE THE SITE CONDITIONS UNDER WHICH THE WORK IS
TO BE DONE. NOTIFY GENERAL CONTRACTOR OF ANY UNSATISFACTORY
CONDITIONS. WORK SHALL NOT PROCEED UNTIL SUCH CONDITIONS HAVE BEEN
CORRECTED AND ARE ACCEPTABLE TO THE LANDSCAPE CONTRACTOR AND/OR
CONSTRUCTION MANAGER.
3. GENERAL AND LANDSCAPE CONTRACTOR ARE RESPONSIBLE FOR PROTECTING
EXISTING TREES FROM DAMAGE DURING CONSTRUCTION. GENERAL
CONTRACTOR TO INSTALL TREE PROTECTION FENCING PRIOR TO ANY SITE WORK.
4. ALL SHRUB AND GROUNDCOVER BEDS TO BE MULCHED WITH A MINIMUM OF 3
INCHES OF CLEAN SHREDDED HARDWOOD MULCH.
5. PLANTING HOLES TO BE DUG A MINIMUM OF TWICE THE WIDTH THE SIZE OF THE
ROOT BALL OF BOTH SHRUB AND TREE. AMEND BACKFILL WITH TOPSOIL MIX.
BACKFILL AND TAMP BOTTOM OF THE HOLE PRIOR TO PLANTING SO TOP OF ROOT
BALL DOES NOT SETTLE BELOW SURROUNDING GRADE.
6. TOPSOIL MIX TO BE 4 PARTS SCREENED TOPSOIL AND 1 PART ORGANIC MATERIAL.
7. EXISTING GRASS IN THE PROPOSED PLANTING AREAS TO BE REMOVED AND AREA
TO BE HAND RAKED TO REMOVE ALL ROCKS AND DEBRIS LARGER THAN 1 INCH IN
DIAMETER PRIOR TO PLANTING SHRUBS.
8. SOIL TO BE TESTED TO DETERMINE FERTILIZER AND LIME REQUIREMENTS. LIME
AND FERTILIZER TO BE DISTRIBUTED PRIOR TO LAYING SOD. ALL DISTURBED
AREAS (INCLUDING RIGHT-OF-WAYS) NOT RECEIVING PLANTINGS TO RECEIVE 4
INCHES OF TOPSOIL AND SODDED.
9. SOD TO BE DELIVERED FRESH (CUT LESS THAN 24 HOURS PRIOR TO ARRIVING ON
SITE), LAID IMMEDIATELY, ROLLED AND WATERED THOROUGHLY WITHIN ONE
HOUR OF INSTALLATION.
10. ALL CHANGES TO DESIGN AND/OR PLANT SUBSTITUTIONS TO BE AUTHORIZED BY
THE LANDSCAPE ARCHITECT.
11. ALL PARKING ISLANDS TO BE BERMED UP 5%10" WITH CLEAN FRIABLE TOPSOIL
PRIOR TO PLANTING.
12. ALL LANDSCAPING SHALL BE INSTALLED IN CONFORMANCE WITH ANSI Z60.1 THE
AMERICAN STANDARD FOR NURSERY STOCK, AND THE ACCEPTED STANDARDS OF
AMERICANHORT.
13. THE LANDSCAPE CONTRACTOR SHALL GUARANTEE ALL PLANTS INSTALLED FOR
ONE FULL YEAR FROM THE DATE OF ACCEPTANCE BY THE OWNER. ALL PLANTS
SHALL BE ALIVE AND AT VICOROUS RATE OF GROWTH AT THE END OF THE
GUARANTEE PERIOD. THE LANDSCAPE CONTRACTOR SHALL NOT BE
RESPONSIBLE FOR ACTS OF GOD OR VANAL ISM.
14. ANY PLANT THAT IS DETERMINED DEAD, IN AN UNHEALTHY OR UNSIGHTLY
CONDITION. LOST ITS SHAPE DUE TO DEAD BRANCHES OR OTHER SYMPTOMS OF
POOR, NON -VIGOROUS GROWTH SHALL BE REPLACED BY THE LANDSCAPE
CONTRACTOR WITH THE COST OF THE REPLACEMENT INCLUDED IN THE BID
PROPOSAL PRICE.
15. WATER THOUGHLY TWICE IN THE FIRST 24 HOURS AND APPLY MULCH IMMEDIATELY.