Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
C621 - Site Utility Details - SU2.1
PLAN VIEWSEE SITEUTILITY PLAN4"X4" DOWNSPOUT, CONFIRM SIZE WITHARCHITECT/PLUMBING ENGINEERPOWDER COATED J.R. HOE CAST IRON DOWNSPOUTBOOT X 24" VERTICAL W/ 8" DIA. OUTLET90° DIP ELBOWDIP FITTING2% MIN.6" DIP,SEE SITE UTILITY PLANSFOR LOCATIONS45° HDPE ELBOW45° HDPE WYEFITTINGFACE OF BUILDINGNO SCALENEW DOWNSPOUT BOOT DETAIL HFERNCO TRANSITION COUPLINGFOR DISSIMILAR MATERIALSHDPE STORM SEWER PIPE.SEE SITE UTILITY PLANS.FINISH GRADESTORM SEWER PIPE. SEESITE UTILITY PLANS.6" DIPFERNCO TRANSITION COUPLINGFROM BOOT TO AN 8" DIP PIPECLEANOUTFFECBDETAIL ADETAIL EDFGPLAN VIEWSEE SITEUTILITY PLAN4"X4" DOWNSPOUT, CONFIRM SIZE WITHARCHITECT/PLUMBING ENGINEERPOWDER COATED J.R. HOE CAST IRON DOWNSPOUTBOOT X 24" VERTICAL W/ 8" DIA. OUTLET90° DIP ELBOWDIP FITTING2% MIN.6" DIP,SEE SITE UTILITY PLANSFOR LOCATIONS45° HDPE ELBOW45° HDPE WYEFITTINGFACE OF BUILDINGNO SCALEDOWNSPOUT BOOT REPLACEMENT DETAIL IFERNCO TRANSITION COUPLINGFOR DISSIMILAR MATERIALSHDPE STORM SEWER PIPE.SEE SITE UTILITY PLANS.FINISH GRADESTORM SEWER PIPE. SEESITE UTILITY PLANS.6" DIPFERNCO TRANSITION COUPLINGFROM BOOT TO AN 8" DIP PIPECLEANOUTFFECOPYRIGHT 2023 BY FANNING/HOWEY ASSOCIATES, INC.WWW.FHAI.COMARCHITECTPROJECT NUMBER: 222011.00CHERRY TREEELEMENTARYSCHOOLADDITION ANDRENOVATIONCARMEL CLAY SCHOOLS13989 HAZEL DELL PARKWAYCARMEL, IN 46033PROJECT ISSUE DATE: 12.15.2023DRAWN BY: ARS317-848-0966350 E NEW YORK ST# 300, INDIANAPOLIS, IN 46204REV.NO.DESCRIPTIONDATECONSULTANTBIDSTLF-ENGINEERS.COM317-334-15003901 WEST 86TH STREET, ST# 200, INDIANAPOLIS, IN 4626819700317No.SU2.1SITE UTILITY DETAILSNEENAH R-1976 OR EJIW1578 WITH SEWER ONCASTINGTAC REVIEW12-15-20231