Loading...
HomeMy WebLinkAboutL100 - Landscape Plan - L1.140' BOX TRUCK NO PARKING FIRE LANE NO PARKING FIRE LANE NOPARKINGNO PARKING FIRE LANE KINGPARNO 11124666245333111111334222333645222TPTPTPTPTP TPTPTPTPTP TPTPTPTPTP TPTPTPTPTP TPTPTPTPTPTPTPTPTPTP TPTPTPTPTPTPTPTPTPTP TPTPTPTPTP TPTPTPTPTPTPTPTPTP TPTPTPTPTPTP TPTPTPTPTP TPTPTPTPTP TPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTP TPTPTPTPTP TPTPTPTPTP TPTPTPTPTP TPTPTPTPTP TPTPTPTPTPTPTPTPTPTP TPTPTPTPTPTPTPTPTPTP TPTPTPTPTP TPTPTPTPTPTPTPTPTP TPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPINLETS, VALVES, AND MARKS MADE UPON THE GROUND BYALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOREXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIESSHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAYALL CONSTRUCTION.THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIESEVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES,SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUNDCAUTION !!Know what'sbelow.before you dig.CallRCall 811 or 1-800-382-5544 Before You Begin Any Digging Project.Call 48 hours or 2 working days before you dig.It's Fast, It's Easy and It's the Law in the state of Indiana! 206002040COPYRIGHT 2023 BY FANNING/HOWEY ASSOCIATES, INC.WWW.FHAI.COMARCHITECTPROJECT NUMBER: 222011.00CHERRY TREEELEMENTARYSCHOOLADDITION ANDRENOVATIONCARMEL CLAY SCHOOLS13989 HAZEL DELL PARKWAYCARMEL, IN 46033PROJECT ISSUE DATE: 2.23.2024DRAWN BY: ARS317-848-0966350 E NEW YORK ST# 300, INDIANAPOLIS, IN 46204REV.NO.DESCRIPTIONDATECONSULTANTTLF-ENGINEERS.COM317-334-15003901 WEST 86TH STREET, ST# 200, INDIANAPOLIS, IN 4626819700317No.L1.1LANDSCAPE PLANKEYNOTESSEEDED LAWN PER SPECIFICATIONSMULCH TREE RING - PER DETAIL A/L1.2PROTECT TREES TO REMAIN - PER DETAIL F/L1.2SHREDDED HARDWOOD MULCH LANDSCAPE BED PERSPECIFICATIONSTRENCH BED EDGE - PER DETAIL C/L1.2WASHED RIVER ROCK BED - PER DETAIL D/L1.2GENERAL NOTESPROPOSED LANDSCAPE LEGENDPROPOSED 2 1/2" CAL. DECIDUOUS TREEPROPOSED 1 1/2" CAL. DECIDUOUS TREEPROPOSED 3 GAL. SHRUBSEEDED LAWNEXISTING TREESZONING SUMMARY8EAC3IVL5HPI5HPI8TME5SBD3TMD4CAK20SAF3MAJ3MAJ12RAG12RAGTPTPTP 1POTPTPTPTPSOUTH PLAYGROUNDMECHANICALCOURTYARDCONSTRUCTION LIMITSCONSTRUCTION LIMITSCONSTRUCTION LIMITSCONSTRUCTION LIMITSCONSTRUCTION LIMITS (SEE DWG G1.2 FOR REQUIREMENTSWHILE MODULAR TRAILERS ARE INSTALLED)4MAJTAC REVIEW12-15-20231TAC COMMENT RESPONSE21QR1GTS1GTS1MAL1PO3PO1MAL1MAL1MALPROPERTY LINE (RIGHT-OF-WAY)11PLANT QUANTITYPLANT TYPEABBREVIATION, REFERTO PLANT SCHEDULEFOR FULL PLANT NAMEAND ADDITIONALREQUIREMENTS FOREACH PLANTTREE PROTECTION333-5-2024PR-024-18-202435LT3QR3QR13322211.SEE DRAWING G0.1 FOR GENERAL NOTES ANDADDITIONAL LEGEND.2.TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIESSHOWN WERE PROVIDED BY SCHNEIDER GEOMATICSDATED 09/05/2023. THE ENGINEER MAKES NOGUARANTEES THAT THE UNDERGROUND UTILITIESSHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA,EITHER IN SERVICE OR ABANDONED.3.CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS INTHE PROJECT AREA INCLUDING UNDERGROUND UTILITYCONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHERSITE CONSTRUCTION. REPORT ANY DISCREPANCIES TOTHE ENGINEER.4.LANDSCAPING MUST BE PLANTED ACCORDING TO THEDETAILS A, B & G ON SHEET L1.2. WIRE BASKET, BURLAPAND TWINE MUST BE REMOVED FROM ROOTBALL.5.TREES PLANTED IN LAWN AREAS TO HAVE A SHREDDEDHARDWOOD MULCH TREE RING PER DETAIL A SHEET L1.2.6.ALL EXISTING PERIMETER ROAD DRAINAGE STRUCTURESAND BRIDGES ACROSS THE FRONTAGE OF THISDEVELOPMENT ARE INDICATED ON THE PLANS.PROVISIONS HAVE BEEN MADE TO IMPROVE OR REPLACEANY DRAINAGE STRUCTURES AND BRIDGES ASNECESSARY OR AS REQUEST BY THE CITY OTACCOMMODATE THE PAVEMENT WIDENING, AUXILIARYLANES, MULTI-USE PATH, AND ANY OTHER REQUIREDIMPROVEMENTS TO THE PROPERTY OR THE ROADWAY.THE COST TO IMPROVE OR REPLACE ANY DRAIANGESTRUCTURES AND BRIDGES WILL BE BORNE BY THEDEVELOPER.7.ALL PAVING WITHIN THE EXISTING AND PROPOSED CITYRIGHT -OF-WAY SHALL CONFORM TO THE REQUIREMENTSOF THE DEPARTMENT OF ENGINEERING. THECONTRACTOR SHALL CONTACT THE DEPARTMENT OFENGINEERING TO SCHEDULE A PRE-CONSTRUCTIONMEETING TO REVIEW THE DEPARTMENT'S CONSTRUCTIONREQUIREMENTS, STAFF NOTIFICATION REQUIREMENTS,REQUIRED INSPECTIONS FOR CERTAIN STAGES OF THEWORK AND TO REVIEW THE AUTHORITY OF THEDEPARTMENT AS IT RELATES TO WORK WITHIN THEEXISTING AND PROPOSED RIGHT-OF-WAY.TYPTYP1TYPTAC COMMENT RESPONSE435-14-20241GTSTAC COMMENT RESPONSE56-5-20243IVLSITE RESTORATION (UPON TRAILER REMOVAL) PLANSCALE: 1" = 30'-0"CONSTRUCTION LIMITS (SEE DWG G1.2 FOR REQUIREMENTSWHILE MODULAR TRAILERS ARE INSTALLED)311113313TAC COMMENT RESPONSE66-21-20246/21/2024